HomeMy WebLinkAboutC31450 CO1 2012 Citywide Striping Program 564-12Contract No. C31450 CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: APPROVE CHANGE ORDER NO. 1 IN THE AMOUNT OF $23,695.00, AND REQUEST FOR ACCEPTANCE OF WORK FOR CONTRACT NO. C31450 WITH STATEWIDE STRIPES, INC., FOR THE 2012 CITYWIDE STRIPING PROGRAM (PROJECT NO. 564-12) SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works CONTRACTOR: Statewide Stripes, Inc. PO Box 600710 San Diego, California 92160 DATE: September 27, 2012 CONTENTS: Change Order No. 1 Memo Dated August 7, 2012, to John M. Wohlmuth Notice of Completion Recommendation By Minute Motion: 1. Approve Change Order No. 1 to Contract No. C31450 with Statewide Stripes, Inc., for the 2012 Citywide Striping Program in the amount of $23,695.00 (Project No. 564-12); 2. Move $23,695.00 from contingency to base; 3. Authorize the Mayor to execute the subject Change Order; and 4. Accept the work as complete and authorize the City Clerk to file the Notice of Completion for Contract 31450. Funding is available for this project in General Fund Account No. 110-4315-433-3320, Striping. Staff Report NOC and C0#1 to Contract C31450 for Statewide Stripes, Inc. Project 564-12) September 27, 2012 Page 2of2 Background On May 10, 2012, City Council awarded the contract for the 2012 Citywide Striping Program to Statewide Stripes, Inc., in the amount of $262,773.83, and approved a 10 percent contingency in the amount of $26,277.38. In late July, staff identified several areas where striping improvements were needed, but were not included in the original contract. Staff requested an estimate from Statewide Stripes for the additional work. Staff reviewed the price estimate and found it to be well within industry standards. On August 7, 2012, staff requested that the City Manager authorize extra work for this project in the amount of $23,695.00, and a copy of that memo is attached. This amount was below the 10 percent contingency approved for this project. Staff has inspected the work performed by the contractor and has found said work to be complete and in accordance with the contract requirements. Fiscal Analysis This is an on -going maintenance activity with no fiscal impact beyond the contract and change order amount. Funding is available for this project in General Fund Account No. 110-4315-433-3320, Striping. Prepared By: r. MarkA. Diercks, P.E. Transportation Engineer ul S. Gibson, Director of Finance proval: hn M. Wohlmuth, City Manager E Departn-WnyHoad: Mark Gre�nood, P.E. Director of Rublic Works CITY COUNCIL ACTION APPROVED DENIED RECEIVED {Y IJE1t_ MEETING DATE, - '1- 1 D AYES:_ e_osnn, ink NOES: NoUP A13SENT: __N 06 E- ABSTAIN: N0AL VERIFIED BY:- Original on File with City Clerk's 0 iccee CITY OF PALM DESERT Contract # / P.O. # CONSTRUCTION CHANGE ORDER Change Order No. Contingency: Contract Purpose: Citywide Striping Project (564-12) Account No. Consultant's Name Statewide Stripes, Inc. Project No. Address: PO BOX 600710 vendor No. San Diego, California 92160 C31450 P017986 1 YES NO 1-4315-433-3320 564-12 r12906 You are herebv reauested to compiv with the following chanqes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE (Supplemental Plans, Specifications, and Directives dated Attached) In Contract Price In Contract Price Median Isalnd edge line; Remove existing Raised Pavement Markers Monterey Avenue- Remove conflicting striping Tamarisk Row -Remove conflicting striping Joni Drive and Velie Way-Restripe parking stalls 23,695.00 TOTALS: NET CHANGE IN CONTRACT PRICE: JUSTIFICATION: These improvements are needed and were not included in the original contract. TOTAL BUDGET FOR PROJECT: + 289,051.11 CONTINGENCY: Less: Expend. & Encumb. To Date: - 262,773.83 Amount Approved by Council: + 26,277.28 Less: This Change Order Amount: - 23,695.00 Less: Prior Change Order(s): - BALANCE OF BUDGET Less: This Change Order: - 23,695.00 REMAINING FOR PROJECT: 2,582.28.1 Balance Remaining of Contingency: 2,582.28 The amount of the Contract will be increased by the Sum of: Twenty -Three Thousand, Six Hundred Ninety - Five and no/100 Dollars ($ 23,695.00). GAPubWorks\PROJECTS\564-XX Citywide Striping1564-12 Citywide StrlpingWStaff Reports\09-27-12 NOC and CO#1 564-12\Contract Change Order No. 1.docx See reverie Contract C31450 Change Order No. 1 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension 0 Days. Revised Contract Total $286,468.83 . The undersigned Contractor approves the foregoing Change Order # 1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order # 1. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 1. REQUESTED BY: 2. ACCEPTED BY: DEPARTMENT HEAD 3. CERTIFIED FUNDS AVAILABLE: 4. APPROVED BY: FINANCE DIRECTOR NOTE: No payments will be made prior to City Manager and Council approval CONTRACTOR ROBERT A. SPIEGEL, MAYOR CITY MANAGER Date Accepted Date Approved Date Approved GAPubWorks%PROJECTS1564 XX Citywide Striping1564-12 Citywide StripinglStaff Reports109-27-12 NOC and CO#1 564-121Contract Change Order No. 1.docx See reverse ... CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT INTEROFFICE MEMORANDUM To: John M. Wohimuth, City Manager From: Mark Greenwood, P.E., Director of Public Works CC: Mark S. Dercks, P.E., Transportation Engineer Ed Gallardo, Public Works Inspector Date: August 7, 2012 Subject: Authorization for Extra Work — 2012 Citywide Striping Program (Project No. 564-12) The 2012 Citywide Striping Program was awarded to Statewide Stripes, Inc. on May 10, 2012 for the amount of $262,773.83. The striping work began July 9, 2012 and will be completed in September 2012. Since the start of the project, Public Works staff has identified several additional areas where striping improvements are needed that were not included in the original contract. These improvements include: installation/ modification of median edge line stripes and markers; modification of double -double yellow striped medians to two-way left turn lane stripes; additional removals of old conflicting striping; and restriping of parking stalls on Velie Way and Joni Drive. Exhibits which detail the extra work to be performed are attached for reference. Staff requested a quote from Statewide Stripes to perform the extra work. A quote was received on August 6, 2012 in the amount of $23,695.00 to complete the extra work. This amount is approximately 9.0% of the original project costs and does not exceed the $26,277.28 contingency amount set aside for the project. I am requesting your authorization to issue a Change Order to Statewide Stripes, Inc. in the amount of $23,695.00 to perform the additional roadway striping work. Funds are available in Account No. 110-4315-433-3320, Striping. If you concur, please indicate your approval below. Review and Concur:. Mr enwood, P.E. hn M. Wohlmuth Direc r f Public Works tark ty Manager Attachments tmd A GAPubWorkMMark QerckMword datasMemomN1emo to JW-PO for Statemde Stnpes Extra Work- 564-12.doc STATEWIDE STRIPES, INC. P.O. BOX 900287 SAN DIEGO, CA 92190 858.560.6887 858.560.0158 FAX TAX ID #33-0915254 SLBE# IOSS0008 DBE# 32232 MB/SB# 40421 CA tic. #788286 Since 1990 City of Palm Desert Cora Gaugush 73-510 Fred Waring Dr. Palm Desert, CA 92260 760-776-6450 X 760-341-7098 1 Chge Odr 2 8/12 DAB Median Islands edge line: 1 Remove existing Raised Pavement Markers 17,182 Apx. Ln. Ft. Detail-25 Left Edgeline with Reflectors @ 48' Total $17186.00 Modification of Roadways: Monterey Ave 1 Remove conflicting striping 1 Restripe per provided plans Total $3965.00 Waterblast Tamarisk Row 1 Remove conflicting striping Total $75o.00 Paint Parking stalls on Joni and Velie St. 1 Restripe existing parking stalls Total $1795.00 ESTIMATE 8/62012 11559 Includes: Striping and removals per provided plans and e-mail, Traffic control for our operations, One move per locations ' T E 1 1,14213,695.00 EXCLUDES: Waiver of Subrogation on Workers Comp per party/policy g $150.00 ea., Additional Insured Endorsements on Auto Liability @ $75.00 ea.. Railroad Insurance, bonds, mast arm signs, electrical or FLASHING BEACONS, notary, night work, prevailing wages (unless included above). Not responsible for A.D.A. compliance. Items not specifically included are excluded and require an additional bid. STATEWIDE STRIPES INC. REQUIRES TWO WEEKS WRITTEN NOTICE PRIOR TO SCHEDULING. Acceptance of Estimate and Agreement The undersigned hereby contracts for the services noted above and agrees to pay for the services upon completion and receipt of an invoice. The undersigned agrees to pay reasonable attorneys' fees and costs if incurred in the enforcement of this contract. Co. Name: By _ _ _ _ Signature: (Print Name and Title) Contract No. C31450 CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: AWARD CONTRACT NO. C31450 FOR THE 2012 CITYWIDE STRIPING PROGRAM TO STATEWIDE STRIPES, INC., IN THE AMOUNT OF $262,773.83 (PROJECT NO. 564-12) SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works CONTRACTOR: Statewide Stripes, Inc. PO Box 600710 San Diego, California 92160 DATE: May 10, 2012 CONTENTS: Contract Agreement Contractor's Proposal Payment Bond Performance Bond Recommendation By Minute Motion: 1. Award Contract No. C31450 for the 2012 Citywide Striping Program to Statewide Stripes, Inc., in the amount of $262,773.83 (Project No. 564-12); 2. Authorize the Director of Finance to set aside an additional 10 percent contingency in the total amount of $26,277.38 and 3. Authorize the Mayor to execute the subject agreement. Funding is available for this project in General Fund Account No. 110-4315-433-3320, Striping. Backaround The 2012 Citywide Striping Program will repaint al] streets within Palm Desert. The items to be restriped include all traffic stripes, pavements markings and pavement legends. The project includes all streets in Palm Desert except for Highway 111. Highway 111 was kept off the list because the street is scheduled to be repaved this Staff Report Award Contract C31450 to Statewide Stripes, Inc. Project 664-12) May 10, 2012 Page 2 of 2 summer. Additionally, bike/golf cart lanes will be striped on Portola Avenue between Hovley Lane West and Magnesia Falls Drive as part of this project. The project was advertised and contractors were encouraged to submit bids. At the April 24, 2012, bid opening, three contractors submitted bids. The bid summary is below: Contractor Location Bid Amount Statewide Stripes, Inc. San Diego, California $262,773.83 Chrisp Company Bloomington, California $303,088.00 B C Traffic Specialists Orange, California $315,460.00 Statewide Stripes Inc., submitted the lowest responsive bid in the amount of $262,773.83. Staff has reviewed Statewide Stripes, Inc., qualifications, checked references and found them to be within industry standards. Fiscal Analysis This is an on -going maintenance activity with no fiscal impact beyond the contract amount. Funding is available for this project in General Fund Account No. 110-4315- 433-3320, Striping. z4e�4- �! CITY COUNCILASZTION Paul S. Gibson, Director of Finance APPROVED ✓✓ DENTED RECEIVED OTHER Fv` ' MEET[ G DA AYES: f 'elez� NOES: J ABSENT: M. Wohlmuth, City Manager ABSTA[N: VERIFIED BY: D Original on File with City rk's Office Locations Of Median Islands Without Yellow Edge Line As of 7-10-12: • Dinah Shore: o Both sides of the island from Monterey to Spyder Circle east • Gerald Ford: o Both sides of the first island east of Cook and a small piece north side of second island east of Cook o East side of the first island north of Frank Sinatra As of 7-13-12: • Monterey: o East side from Gerald Ford to A street o East side from Dick Kelly/ 35th to 350' south of Market Place o East side from Market Place to 400' south of Dinah Shore • Cook: o West side From Gerald Ford to University Park Dr./ Berger Drive West o West side 750' south of University Park Dr./ Berger Drive West to Frank Sinatra As of 7-20-12: • Hovley Lane East o South side from Corporate to Eclectic • Hwy 74 o Both sides from Hwy 111 to El Paseo W d w W Y N � Q z O 0 W W � U To be recorded with the Riverside County Recorder within 10 days after completion and acceptance by the City Council. NO RECORDING FEE PER SECTION 6103 OF THE GOVERNMENT CODE. When recorded, return to: Office of the City Clerk City of Palm Desert 73-510 Fred Waring Drive Palm Desert, CA 92260 NOTICE OF COMPLETION (Cal. Civ. Code § 3093 - Public Works) NOTICE IS HEREBY GIVEN: 1. That the interest or estate stated in paragraph 3 herein in the real property herein described is SOLELY OWNED by the CITY OF PALM DESERT, A MUNICIPAL CORPORATION, a political subdivision of the State of California, and whose address is 73-510 FRED WARING DRIVE, PALM DESERT, CALIFORNIA, 92260. 2. That the full name and address of the owner of said interest or estate is set forth in the preceding paragraph. 3. That the nature of the title of the stated owner, as set forth in paragraph 1, is Fee. 4. That on the 271h day of September, 2012, a work of improvement described as 2012 Citywide Striping Project-564-12; Contract No. C31450 on the real property herein described was completed. 5. That the name of the original contractor, if any, for said work of improvement was: Statewide Stripes, Inc., PO Box 900287, San Diego, California 92190. 6. That the real property herein referred to is situated in the City of Palm Desert, County of Riverside, State of California, and is described as various streets as shown on Exhibit "A" attached, and made a part of this document. CITY OF PALM DESERT Dated By: Robert A. Spiegel, Mayor STATE OF CALIFORNIA } } ss COUNTY OF RIVERSIDE } I hereby certify that I am the City Clerk of the governing board of the CITY OF PALM DESERT, CALIFORNIA, the political subdivision which executed the foregoing Notice and on whose behalf I make this verification: That I have read said Notice, know its contents, and that the same is true. I certify under penalty of perjury that the foregoing is true and correct. Executed at Palm Desert, California, on this day of 20 RACHELLE D. KLASSEN, CITY CLERK Rev. Oct 02 EXHIBIT A-1 ROADWAY RESTRIPING SEGMENTS CITYWIDE RESTRIPING 2012 s PROJECT NO. 564-12 I DR HDVIIY LANE EAST F HDVLEY LANE FAST EEN WAY M ma wIw 3 w :FAII Iwlt W� s F mtu u[ u A 4 .sue 51w p F Y A� GRAPEVNE d HWY. 111 Inv IINORi IM NOTES: LUMP SUM BID ITEM NO. 1 CONSISTS OF: REPAINT EXISTING TRAFFIC LINES ON ALL STREET SEGMENTS LISTED IN EXHIBIT A-2, INCLUDING INTERSECTING SIDE STREETS UP TO 100' FROM LISTED ROADWAY SEGMENTS. RESTRIPING INCLUDES LANE LINES, CENTERUNES, LEFT AND RIGHT EDGELINES. PAINTED MEDIAN ISLANDS. TWO-WAY LEFT TURN LANES, LANE DROPS AT INTERSECTIONS, CHANNELIZING LINES, BIKE LANE LINES, AND LANE LINE EXTENSIONS AND DUAL LEFT TURNTR CAT-ACKS THROUGH INTERSECTIONS. LUMP SUM BID ITEM NO. 2 CONSISTS OF: REPAINT EXISTING MARKINGS, LEGENDS, CROSSWALKS, LIMIT LINES, STOP BARS, PAVEMENT ARROWS, AND CHEVRON STRIPES IN GORE AREAS ON ALL STREET SEGMENTS LISTED IN EXHIBIT A-2. INCLUDING SIDE STREETS AT INTERSECTION OF LISTED ROADWAY SEGMENTS. LUMP SUM BID ITEM NO. 3 CONSISTS OF: REPAINT EXISTING ON -STREET PARKING STALL STRIPES ON THE FOLLOWING STREET SEGMENTS: PALM DESERT DR. NORTH - BETWEEN SAN MARCOS AVE. AND DE ANZA WAY PALM DESERT DR. SOUTH - EAST OF HWY. 74 TO EL PASEO/CABRILLO SAN PABLO AVE. - BETWEEN SAN GORGONIO WAY AND HWY. III ECLECTIC STREET - BETWEEN HOVLEY LANE EAST AND 42ND AVENUE LENNON PLACE - BETWEEN CORPORATE WAY AND ECLECIIC STREET IS NOT A PART OF THIS PROJECT LEGEND: PROJECT ROADWAY RESTRIPING SEGMENTS INDICATED IN BOLD DASHED SEGMENTS INDICATED RESTRIPING SEGMENTS ON ONLY ONE SIDE OF THE STREET e m ® Iwo rm ORCWUL SCALE &# 4 p44wVmmt JANUARY 2012 EXHIBIT A-1 DEPARTMENT OF PUBLIC WORKS DATE: SCALE:1" = 4000' 73-510 FRED WARING DRIVE ROADWAY RESTRIPING SEGMENTS PALM DESERT, CA 92260 MSD SHEET 1 OF 1 (760) 346-0611 PREPARED BY CITYWIDE RESTRIPING 2012 PROJECT NO. 564-12 ®R w a c� r� 0 0 z Jul 11. 2012 — 219PN C:\OTempV—p1\Mmtw y NO Ave Del Se1.d�g Jul 11, 2012 STRIPING MODIFICATION NTS DATE: MONTEREY AVENUE N/0 AVENIDA DEL SOL/CLANCY LANE SCALE: MODIFY 240't OF DETAIL 29 TO DETAIL 32 SHEET NO. MSD DEPARTMENT OF PUBLIC WORKS CITY OF PALM DESERT 1 OF 1 BY N Jul 11, 2012 — 2:51PU C:\OTemp\Tempt\Monterey SO Are 0d Sddrq Jul 11, 2012 STRIPING MODIFICATION NTS DATE. MONMEY AVENUE 9001 S/0 AVENIDA DEL SOL/CLANCY LANE SCALE: MODIFY 240't OF DETAIL 29 TO DETAIL 32 SHEET NO. MSD BY DEPARTMENT OF PUBLIC WORKS CITY OF PALM DESERT 1 OF 1 BY Water blast to remove black line crossing #1lane of west bound Tamarisk Row and Frank Sinatra A