HomeMy WebLinkAboutC31040A - CA1 - CO1 - Sec 29 Rtntn Basin 627-11 Contract No. C31040A CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: APPROVE AMENDMENT NO. 1 AND CHANGE ORDER NO. 1 TO CONTRACT NO. C31040A WITH KIP, INCORPORATED FOR THE SECTION 29 RETENTION BASIN REPAIR PROJECT (PROJECT NO. 627-11) SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works CONTRACTOR: KIP, Incorporated 25740 Washington Avenue Murrieta, CA 92562 DATE: March 14, 2013 CONTENTS: Amendment No. 1 Change Order No. 1 Recommendation By Minute Motion: 1. Approve Amendment No. 1 to Contract No. C31040A; 2. Approve Change Order No. 1 to Contract No. C31040A in the total amount of $127,427.58 for the Section 29 Retention Basin Repair Project; 3. Authorize the transfer $80,231.15 from contingency to base; 4. Appropriate $47,196.43 from Unobligated Fund 469, Assessment District 2004-02, to Account No. 469-4350-433-4001; and; and 5. Authorize the Mayor to execute said Amendment No. 1 Change Order No. 1. Backqround On December 13, 2012, City Council awarded Contract No. C31040A in the amount of $802,311.50 to KIP, Incorporated of Murrieta, California, for the Section 29 Retention Basin Repair Project to improve the capacity to convey storm water into the basin, relocate a sewer line, and construct a stronger spillway slope protection. Prior to the commencement of some of the major construction activities, staff discovered two items that require change. During a review of the contract documents, an error was discovered. The contract was bid as a non-prevailing wage project when in fact, due to the project funding coming through an assessment district, the project should have been bid as subject to the prevailing wage requirements. Staff Staff Report Approve Amendment No. 1 and Change Order No. 1 (Contract C31040A) March 14, 2013 Page 2 of 2 examined several options to bring the contract into compliance, and has concluded that the best option is to issue Amendment No. 1 to properly identify the project as being subject to prevailing wage requirements. The City Attorney has reviewed this plan and has determined that the City has the authority to execute an amendment to subject the project to the prevailing wage rate requirements. The additional cost to the contractor for additional labor costs is $97,027.58. The second item is related to a concrete box used to convey storm water to the bottom of the basin. The concrete box runs over the top of a twelve-inch Coachella Valley Water District (CVWD) sewer line. Subsequent to CVWD's approval of the plan, they determined that their sewer line must be protected by a steel casing. The cost of installing the casing is $30,400.00 and also includes the removal and replacement of a live sewer line. This change and the additional labor costs associated with the Amendment No. 1 is covered by Change Order No. 1 Funding for these changes exceeds the approved contract contingency. Staff is requesting that Council authorize moving the full contingency amount of $80,231.15 to base and appropriate $47,196.43 from Unobligated Fund 469, Assessment District 2004-02, to Account No. 469-4350- 433-4001. Fiscal Analysis The initial contract amount was $802,311.50. The costs associated with the amendment and change order total $127,427.58 and will increase the contract amount to $929,739.08. The funding of these changes will come from funds set aside for the construction of the retention basin. No General Funds will be used on the project. This project will repair an existing facility, so there is no fiscal impact beyond the change order amount. Pr ed B Departme t He d: Rya Gayler, r ject Administrator Mark Green oo , P.E. Director of Public Works Paul S. Gibson, Director of Finance David J. Erwin, City Attorney Ap,p�oval: CITY COUNCILA�ION / APPROVED.�..�...�.,,,...,_,DEN�ED � RECEYVED OTHER J n M. Wohlmuth, City Manager �ET G DA �� AYES: ���1 r �rJ NOES: ABSENTs ABSTAIN: YERIFIED BYs Original on File with City erk's Oftice G:1Pub WorkslStaH Reports120131March 14105 CO 1 /or KIP to C31040A Section 29 Retention Basin Repairs P627-111SR Approve COl lor KIP Inc C31040A.docx Contract No. C31040A AMENDMENT NO. 1 THIS AMENDMENT (the "Amendment") is made and entered into this 14th day of March , 2013, by and between City of Palm Desert, California, hereafter called "CITY" and KIP, Incorporated hereinafter called "CONTRACTOR". RECITALS WHEREAS, the CITY and CONTRACTOR entered into an agreement for the SECTION 29 RETENTION BASIN REPAIR, PROJECT NO. 627-11, CONTRACT NO. C31040A, on December 13, 2012 (the "Agreement"). NOW THEREFORE, the CITY and CONTRACTOR agree to amend the Agreement as follows: 1. Paragraph 5 of the Notice Inviting Bid is hereby deleted in its entirety and replaced with the following: In accordance with California Labor Code Sections 1770, 1773, 1773.1, 1773.6 and 1773.7 as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Section 1773 for the locality in which the Work is to be performed. In accordance with City Ordinance No. 859, this project shall require prevailing wage payments. Any contract entered into pursuant to this notice will incorporate the provisions of the State labor Code. A copy of said wage rates can be obtained by accessing the Department of Industrial Relations website at: www.dir.ca.gov/DLSR/statistics research.html, or by contacting the District Office at 464 West Fourth Street, Room 348, San Bernardino, CA 92401, telephone (909) 383-4334. 2. Paragraph 1 of the Wage Rates and Labor Code Requirements in the Generat Specifications is hereby deleted in its entirety and replaced with the following: The Contractor and all Subcontractors shall be required to adhere to the general prevailing rate of per diem wages as determined and published by the State Director of the Department of Industrial Relations, pursuant to Section 1770, 1773 and 1773.2 of the California Labor Code. Copies of these rates and the latest revisions thereto are on file in the Office of the Secretary of the Board of Directors and are available for review upon request. 3 Delete Question 4 and answer from Addendum No. 1 in its entirety. 1 Contract No. C31040A Except as set forth in this Amendment, the Agreement shall continue in full force and effect in accordance with its terms. If there is conflict between this Amendment and the Agreement or any earlier amendment, the terms of this amendment will prevail. IN WITNESS WHEREOF the parties hereto have executed or caused to be executed by their duly authorized officials, this Amendment which shall be deemed an original on the date first above written. CONTRACTOR: BY: ATTEST BY: Signature to be notarized TITLE: TITLE: CITY: BY: ATTEST BY: Signature to be notarized TITLE: Mavor of Palm Desert, CA TITLE: City Clerk of Palm Desert, CA APPROVED AS TO CONTENT: APPROVED AS TO FORM: MARK GREENWOOD, P.E. DAVID J. ERWIN DIRECTOR OF PUBLIC WORKS CITY ATTORNEY 2 Contract No. C31040A CONTRACTOR ACKNOWLEDGMENT State of California ) ) SS. County of ) On , 20_, before me, , a Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seaL Signature (seal) CITY ACKNOWLEDGMENT State of California ) ) SS. County of Riverside ) On , 20_, before me, , a Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (seal) � 3 " ' Contrect#�P.o.# C31040A � � . . � �� �.:' .' . , Change Order No. � , . � ; ��� �'�� . , �� ' . � � . , � Contingency: ES NO Contract Purpose Section 29 Retention Basin Repair Account No. 69-4350-433-4001 Contractor's Name KIP, Incorporated Project No. 627-11 aaaress: 25740 Washington Avenue vendor No. 13094 Murrieta, California 92562 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE Su lemental Plans, S ecifications, and Directives dated Attached In Contract Price In Contract Price Cost to convert project to prevailing wage requirements pursuant to 97,027.58 Amendment No. 1 dated March 14, 2013 Protect�sewer line with steel casing 30,400.00 TOTALS: - 127,427.58 NET CHANGE IN CONTRACT PRICE: 127,427.58 JUSTIFICATION: The project funding requires prevailing wage and CVWD requires a steel encasement for the sewer line. TOTAL BUDGET FOR PROJECT: + $$$2,542.65 CONTINGENCY: Less: Expend. & Encumb. To Date: - $802,311.50 Amount Approved by Council: + $80,231.15 Less: This Change Order Amount: - $127,427.58 Less: Prior Change Order(s): - $0.00 BALANCE OF BUDGET $0.00 Less: This Change Order: - $80,231.15 REMAINING FOR PROJECT: $47,196.43 Balance Remaining of Contingenc : $0.00 The amount of the Contract will be Increased by the Sum of: One Hundred Twenty-seven Thousand Four Hundred Twenty-seven and 58/100 Dollars ($127,427.58) Contract C31040A Change Order No. 1 Continued from front This Change Order covers changes to the subject contract as described �herein. The Contractor shall construct, - furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner. Contract Time Extension 0 Days. Revised Contract Total $ 929,739.08. The undersigned Contractor approves the foregoing Change Order # 1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order# 1. The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 1. REQUESTED BY: 2. ACCEPTED BY: DEPARTMENT HEAD CONTRACTOR Date Accepted 3. CERTIFIED FUNDS AVAILABLE: 4. APPROVED BY: FINANCE DIRECTOR JAN C. HARNIK, MAYOR Date Approved NOTE: No payments will be made prior to City Manager and Councit approval CITY MANAGER Date Approved G:\PubWorks\Slaff Reports\2013\March 14\OS CO 1 for KIP lo C31040A SecUon 29 Retention Basin Repairs p627-11\C01 tor KIP C31040A.docx See reverse ...