Loading...
HomeMy WebLinkAboutC33120 - Negotiate a Design-Build 4 Prjct 705-14Contract No. C33120 CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT REQUEST: AUTHORIZE STAFF TO NEGOTIATE A DESIGN -BUILD CONTRACT FOR THE MATERIAL BIN COVER STRUCTURE PROJECT (PROJECT NO. 705-14) SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works DATE: October 24, 2013 Recommendation X E By Minute Motion, Authorize Staff to Negotiate a Design -Build Contract for the Material Bin Cover Structure Project (Project 705-14) Background To be in compliance with the California Regional Water Quality Control Board rules, the City is required to cover any area where materials are stored. The rule is intended to prevent rain from washing pollutants into the water system. At the City's Corporation Yard, there are five material bins where clean sand, base material, cold -mix asphalt, and various other materials are stored. The material bins have no cover over them. A Request for Proposals was advertised in the newspaper on August 25, 2013, and contractors that have constructed steel structures for the City in the past were notified of the project. However, no proposals were received by the due date on September 18, 2013. The City Attorney has indicated that, because the City received no response to the public request for proposals, the City may negotiate a fair price with a design -build contractor to complete the design and construction of the Material Bin Cover Structure. Fiscal Analysis There is no fiscal impact associated with this action. Once a fee is negotiated, it will brought before Council for consideration. Pr red By:�/ Dep il G21i1��17/ Ry le/,/r ject Administratorgegi.-- aul S. Gibson, Director of Finance Ap•ro .I Wohlmuth, City Manager Mark Gre Director of ood, P.E. ublic Works CITY COUNCIL ACTION APPROVED ✓ DENIED RECEIVED OTHE:It MEETING DATE /C' /3 AYES: ailson,S(niege% `Pinner, ideherl NOES: Nan e ABSENT: >J ABSTAIN: 0 on e VERIFIED BY, ..... . _ R p K- (.1 Original on File with City Clerk's Office