Loading...
HomeMy WebLinkAboutC22310 H & I-RFP & NIB/Engneering & Construction/Mntrey Ave @I-10 Ramp Mod.Contract No. C22310H &C22310I REQUEST: SUBMITTED BY: DATE: Recommendation CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT STAFF REPORT )(-F AUTHORIZE THE CITY CLERK TO ADVERTISE A REQUEST FOR PROPOSAL FOR CONSTRUCTION ENGINEERING AND A CALL FOR SEALED BIDS FOR THE CONSTRUCTION OF MONTEREY AT I-10 RAMP MODIFICATIONS (Project 669-02) Mark Greenwood, P.E., Director of Public Works September 26, 2013 By Minute Motion, 1. Authorize the City Clerk to Advertise a Request for Proposal for Construction Engineering for the Monterey Avenue at 1-10 Ramp Modifications (Project 669-02); 2. Authorize the City Clerk to Advertise a Notice Inviting Sealed Bid for the construction of the Monterey Avenue at 1-10 Ramp Modifications (Project 669-02). Beyond the cost of publication there is no fiscal impact associated with this action. However, the ultimate project cost is estimated to be $8.36 Million. Background On September 11, 2013, staff received Authorization for Construction and Construction Engineering from the State of California -Department of Transportation (Caltrans). Staff is requesting authorization to advertise a Request for Proposal for Construction Engineering and a Notice Inviting Sealed Bid for construction. Construction Engineering includes construction management, surveying, project inspection, and material testing. It is anticipated that the process for the selection of a construction engineering firm will take two to three months due to Caltrans requirements and involvement. Staff intends to advertise for a construction engineering firm first, and mid -way through the selection process staff will advertise for construction. Construction is expected to begin in early 2014. Staff Report Advertise Monterey Ave. at 1-10 Ramp Modification Contract No. C22130H &C223101 September 26, 2013 Page 2 of 3 Fiscal Analysis Beyond the cost of publication there is no fiscal impact associated with this action. This project has federal, state, and local funding sources. The City will front the entire project cost and be reimbursed later from the appropriate agencies. Funds are available for this project in Account Number 213-4389-433-4001. Prepared By: Bo Cli n, P City Engineer Paul S. Gibson, Director of Finance A. •royal: n M. Wohlmuth, City Manager Ig Dep.- Head: Mar reenwood, P. Direc or of Public Works (1TY col Ng- [1. A(" 11( M'['RON RECEIVED MEETING DAT 7: cA0`0-0, . . arntic Noes: 1`3j�YS�I�......... ABSENT: ABSTAIN: N - VERIFIED BY. Original on File with City Cleric'stlice ' .DK I