HomeMy WebLinkAboutC33100 - CO1 San Pascual Chnl Acces Rmp 518-13 Contract No. C33100
CITY OF PALM DESERT X� f
PUBLIC WORKS DEPARTMENT
STAFF REPORT
REQUEST: REQUEST APPROVAL OF CHANGE ORDER NO. 1 AND
ACCEPTANCE OF WORK FOR CONTRACT NO. C33100 WITH
CORA CONSTRUCTORS, INC., FOR THE SAN PASCUAL
CHANNEL ACCESS RAMP PROJECT (PROJECT NO. 518-13)
SUBMITTED BY: Mark Greenwood, P.E., Director of Public Works
CONTRACTOR: Cora Constructors, Inc.
75140 St. Charles Place, Suite A
Palm Dese�t, CA 92211
DATE: January 23, 2014
CONTENTS: Change Order No. 1
Notice of Completion
Vicinity Map
Recommendation
By Minute Motion:
1. Approve Change Order No. 1 to Contract No. C33100 in the
amount of$564 for the San Pascual Channel Access Project;
2. Authorize the transfer of$564 from contingency to base;
3. Authorize the Mayor to execute said Change Order No. 1; and
4. Accept the work as complete and authorize the City Clerk to file a
Notice of Completion for Contract No. C33100, the San Pascual
Channel Access Ramp Project (Project No. 518-13).
Backqround
On November 14, 2013, City Council awarded Contract No. C33100 in the amount of
$76,000 to Cora Constructors, Inc., of Palm Desert, California, for the San Pascual
Channel Access Ramp Project. The project constructed an access ramp to the bottom
of the channel to provide access for maintenance. The concrete driveway required an
Staff Report
Approve Change Order No.1 and NOC for the San Pascual Channel Access Ramp Project
(Contract No. C33100)
Page 2 of 2
January 23, 2014
additional 94 square feet of concrete beyond the contract amount. The additional
concrete was placed at the contract unit price, which added $564 to the cost.
Staff has inspected the work performed by the contractor and has found said work to be
complete and in accordance with the contract requirements. The work was completed
on time.
Fiscal Analvsis
The initial contract amount was $76,000. This change order will increase the contract
amount to $76,564. There is no fiscal impact beyond the change order amount.
Prepared By: Depa en Head:
1�{'
el ontalvo, P.E., Senior Engineer Mark G e nwood, P.
Directo o Public Work
CITY CpUNCILACTION
aul S. Gibson, Director of Finance API'RQVED DENiF,D
RECEIVED OTHER
Approval:
M r ETtNC DATE - a _a�
AYF,S: 1
�'oFs: o� e
Ar�srNT: b �e
At3STAIN:
J M. Wohlmuth, City Manager vrrttFtru t�v; � �-
Origin.�1 on Filc with City Clcrk's fficc
G:IPub WorkslSta/f Reports12014Uanuary 23102 CO 1 and NOC/or San Pascual Channell Access RampISR NOC for San Pascual Channel.docx
CI'I'Y QF PALM DESERT Contract#/P.O.# C33100 018864
Change Order No. �
CONTRACT CHA►NGE URDER Contingency: YES No
Contract Purpose San Pascual Channel Access Ramp Account No. 232-4383-433-4001
Consultant's Name Cora Constructors, Inc. P�oiecc No. 518-13
Address: 75140 St. Charles Place, Suite A vendor No. 95Qg
Palm Desert, California 92211
You are hereby requested to comply with the following changes from the contract plans and specifications:
DESCRIPTION OF CHANGES DECREASE INCREASE
Su lemental Plans, S ecifications, and Directives dated Attached In Contract Price In Contract Price
Additional 94 Square Feet of Concrete Required for Driveway 564.00
TOTALS: - 564.00
NET CHANGE fN CONTRACT PRICE: 564.00
JUSTIFICATION:
Additional cost due to overage on quantities related to asphalt paving.
OTAL BUDGET FOR PROJECT: + 76,564.00 CONTINGENCY:
Less: Expend.& Encumb. To Date: 76,000.00 Amount Approved by Council: + 7,600.00
I�ess:This Chartge Order Amourd: 564.00 Less: Prior Change Order(s): - -
BALANCE OF BUDGET Less: ThisChange Order. 564.00
REMAINING FOR PRQJECT: - Balance Remaining of Contingency: 7,036.00
The amount of the Contract will be Increased by the Sum of: Five Hundred Sixtv Four NO/100 Dollars
($564.00).
See reverse ...
Contract C33100 Change Order No. 1 Continued from front
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order items for a
lump sum price agreed upon between the Contractor and the City of Palm Desert, otherwise referred to as Owner.
Contract Time Extension 0 Days.
Revised Contract Total $76.564.00
The undersigned Contractor approves the foregoing Change Order # 1 as to the changes, if any, in the contract
price specified for each item including any and all supervision costs and other miscellaneous costs relating to the
change in work, and as to ihe extension of time allowed, if any, for completion of the entire work on account of said
Change Order # 1 . The Contractor agrees to furnish all labor and materials and perform all other necessary work,
inclusive of that directly or indirect(y related to the approved time extension, required to compiete the Change Order
items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood
that the Change Order shalf be effective when approved by the Owner.
Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies,
waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of
or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and
indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as
any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
1. REQUESTED BY: 2. ACCEPTED BY:
DEPARTMENT HEAD CONTRACTOR Date Accepted
3. CERTIFIED
FUNDS AVAILABLE: 4. APPROVED 8Y:
FINANCE DIRECTOR VAN G. TANNER, MAYOR Date Approved
NOTE: No payments will be made prior
to City Manager and Council approval CITY MANAGER Date Approved
See reverse ...
To be recorded with the Riverside County Recorder
within 10 days after completion and acceptance by
the City Council. NO RECORD/NG FEE PER
SECTION 6103 OF THE GOVERNMENT CODE.
When recorded, return to:
Office of the City Clerk
City of Palm Desert
73-510 Fred Waring Drive
Palm Desert, CA 92260
NOTICE OF COMPLETION
(Cal. Civ. Code§ 3093—Pubtic Worksj
NOTICE IS HEREBY GIVEN:
1. That the interest or estate stated in paragraph 3 herein in the real property herein described is SOLELY
OWNED by the CITY OF PALM DESERT, A MUNICIPAL CORPORATION, a political subdivision of the State
of California, and whose address is 73-510 FRED WARING DRIVE, PALM DESERT, CALIFORNIA, 92260.
2. That the full name and address of the owner of said interest or estate is set forth in the preceding
paragraph.
3. That the nature of the title of the stated owner, as set forth in paragraph 1, is IN FEE
4. That on the 23rd day of January , 2014, a work of improvement described as the San Pascual
Channel Access Ramp Project, Project No. 518-13, Contract No. C33100 on the real property herein described
was completed.
5. That the name of the original contractor, if any, for said work of improvement was: Cora Constructors,
Inc., 75140 St. Charles Place, Suite A, Palm Desert, California, 92211.
6. That the real property herein referred to is situated in the City of Palm Desert, County of Riverside,
State of California, and is described as 43-100 to 44-000 San Pascual Avenue.
CITY OF PALM DESERT
Dated: By:
Van G Tanner, Ma or
STATE OF CALIFORNIA }
}ss
COUNTY OF RIVERSIDE }
I hereby certify that I am the City Clerk of the governing board of the CITY OF PALM DESERT, CALIFORNIA,the political subdivision
which executed the foregoing Notice and on whose behalf I make this verification: That I have read said Notice, know its contents, and
that the same is true. I certify under penalty of perjury that the foregoing is true and correct.
Executed at Palm Desert, California, on this day of , 20
RACHELLE D. KLASSEN,CITY CLERK
Rev.Oct 02
e.
/RI VATFI ROAD
3_
d
—Z—PRIVATF ROAD
i
J
' ...-/
-Jr ,, 1fr j'f,Y.M�.Il'�ly i� gRO
a71
4,• •, L
ce' it.-/C1.7 ./.:4'-c-)1,t6F1.-v,:7..,:ii.4.1if.i4-
ram, > ;' � . 1 , . ,�`_`7
DU CKSILVER DRIVE:::.: U
1.4-- -.1)1 ri
Z]H�yi --Q1
UQSuQ;u-
> - t .
• d. 1
%(:.. � 1 I( � --� � i�-�-.•' per.'
'mAAs r.5 I—LDESERT. STAR BOt1L
f I . ',; ate.- 1 L J_I l- I_
KRIJGAV,.NUt f'. 1 -*�' .-'sj • I
IIf'
11
..-''.%/,S ;iRII1 IL TREIL
)� jff/' f�._ .I
_ ..// i rQ � �if�DJ ,L( IV
DI � — z 1.11 I
{' 1 II ryt, 1JKI�r
•
r t_
�x,kLwA-1 INb v1 IV'
IULLIIAI ]lt�lU� I 1
I I I.1 I ;41 .
_
fl
U •
-CATALINA,WA - I . . Z—
[7- _L. I
Ps. y 4L , w:y
A
i_ i�1 — - -1"- -_J i I' -
I_1
1: 9,430
San Pascual Access Ramp Vicinity Map