HomeMy WebLinkAboutEl Paseo Options of Trash-Recycling Rcptacles - BenchesCurrent El Paseo Benches
Current El Paseo Trash Receptacles
Proposed Bench and Dual Trash/Recycling Receptacle Designs
OPTION A
70
OPTION B
roa
Proposed Bench and Receptacle Material Color
tit '.i ." • + . #, ► y • VI, �,, ± .: a ,, .` r..
•. . v
T
. .0. , • t• )• • 1 ` . '.jr .... • .. r,� y tl .1. •
, A -+ .. , �
4.
,.! •z •*,,, •, y•
r� 411 • r-.t.!1 wy .•, , ! , . , . +,�"**•.+ `t ems• 'J:�*r
•
•
111, ' �►' ! �• ti
6, •44* v _► .. + , , t: .y'4.•- rir ,
ilip,
.01
•
t
,.
Via' / . 1 , , . /. . tr, ",1 ' 1i ie•
CITY OF PALM DESERT
ART IN PUBLIC PLACES COMMISSION
STAFF REPORT
REQUEST: APPROVAL OF PROPOSED DUAL TRASH/RECYCLING
RECEPTACLE AND OPTION A BENCH DESIGNS;
APPROPRIATION OF $58,300 FROM ACCOUNT 400-4679-454-
4001 TO PURCHASE TWENTY-EIGHT (28) OPTION A BENCHES
AND TWENTY-EIGHT (28) DUAL TRASH/RECYCLING
RECEPTACLES FOR PLACEMENT ON EL PASEO BETWEEN
HIGHWAY 74 AND PORTOLA AVENUE; AND APPROVAL OF AN
EXEMPTION FROM THE BIDDING REQUIREMENT AS
PROVIDED IN MUNICIPAL CODE SECTION 3.32.090 TO ALLOW
SOLE SOURCE PROCUREMENT FROM GREENDAY, LLC,
INDIO, CALIFORNIA.
SUBMITTED BY: Deborah L. Schwartz, Management Analyst
DATE: July 10, 2014
CONTENTS: Proposed bench and receptacle material color
Proposed bench and dual trash/recycling receptacle designs
Current EI Paseo benches and trash receptacles
Recommendation
By Minute Motion: 1) Approve Option A benches and dual trash/recycling
receptacles as the designs to be placed on EI Paseo between Highway 74
and Portola Avenue; 2) Appropriate funds in the amount of $58,300 from
. Account 400-4679-454-4001 for the purchase of twenty-eight (28) Option
A benches and twenty-eight (28) Option A trash/recycling receptacles; and
3) Approve an exemption from the bidding requirement as provided in
Municipal Code section 3.32.090 to allow sole source procurement from
Greenday, LLC., Indio, California.
Sub-Committee Recommendation
The EI Paseo Streetscapes Sub-Committee recommends purchasing and installing
twenty-eight (28) Option A benches and finrenty-eight (28) Option A trash/recycling
receptacles from Greenday, LLC, Indio, California.
Backqround
At its meeting of September 12, 2013, the City Council, in joint consideration with the
Successor Agency to the Palm Desert Redevelopment Agency, approved an agreement
Staff Report
EI Paseo Benches and Trash/Recycling Receptacles
July 10, 2014
Page 2 of 4
between the Successor Agency and the City to advance General Fund money in the
amount of $120,000 (the "ROPS 13-14B Project Estimate") for EI Paseo Projects,
including permanent/affixed seating, receptacles, and planters, as well as electrical
work and other items. Part of the advanced funds will be used for the benches and
receptacles for EI Paseo and be repaid by the Successor Agency to the General Fund
from bond proceeds.
At its meeting of December 12, 2013, the City Council approved the formation of the EI
Paseo Streetscapes Sub-Committee to select new benches and trash/recycling
receptacles to be placed in various locations on EI Paseo between Highway 74 and
Portola Avenue. At the same meeting, the City Council appointed Councilmembers
Benson and Harnik to serve on the sub-committee. Additional members of the sub-
committee include Lauri Aylaian, Director of Community Development; Mark
Greenwood, Director of Public Works; Lisa Ream, Recycling Technician; Deborah
Schwartz, Management Analyst; and Ryan Stendell, Management Analyst.
Since its formation, the sub-committee has met several times to review potential
designs and materials for the benches and dual trash/recycling receptacles. After
reviewing numerous styles and material types, the sub-committee opted to create
custom designs for both the benches and trash/recycling receptacles. The sub-
committee narrowed the design choices to finro styles of benches and one style of
receptacle. Option A is a rectangular bench with a decorative cut along the upper
portion of the face of the bench, and Option B is a bench with a wave patterned seating
area with a decorative cut along the upper portion of the face of the bench. The
selected bench style will be fabricated with groves notched into it to discourage
skateboarders from skating on it. The trashlrecycling receptacles will house an
individual liner for each use and have a color inset on the front and back that includes
the Palm Desert logo.
OPTION A OPTION B
�7 O� �7 ON��
�..
� �
Proposed Bench Designs
Staff Report
EI Paseo Benches and Trash/Recycling Receptacles
July 10, 2014
Page3of4
�,6"�
� 7�t
3� -- .
� , ,.�
Proposed Receptacle Design with Bench Option A
The benches and the receptacles will be fabricated from recycled glass and concrete
and sealed to assist with cleaning and to protect them from the environment. The
options were shown to the EI Paseo Business Improvement District Board, and it
unanimously preferred Option B benches. The Streetscapes Sub-committee prefers
and recommends Option A for the benches.
The sub-committee selected to work with Greenday, LLC of Indio, California to fabricate
the benches and receptacles. The sub-committee recommends to sole source
procurement of this project because Greenday, LLC is a unique Coachella Valley
company that works with locally collected recycled glass to fabricate custom designed
products made from recycled materials. Staff researched pre-fabricated benches and
receptacles and found that the local, custom fabricated products are less expensive
than the pre-fabricated products.
Staff conducted extensive tests on the proposed materials and clear sealer to ensure
that, once located on EI Paseo, the benches and receptacles will be durable in their
environment. Staff soiled material samples with coffee, chocolate, soda, and other food
and beverage items and let them sit in the sun for a period of approximately 2 weeks at
a time, before pressure washing them to see if the material held up. The pressure
washing was done by the Public Works staff members who will ultimately be
responsible for the cleaning of the furnishings. Upon review of the cleaned material
samples, the Director of Public Works was satisfied that the proposed material will be
durable, and that staff will be able to maintain it.
Staff Report
EI Paseo Benches and Trash/Recycling Receptacles
July 10, 2014
Page 4 of 4
Fiscal Analvsis
The fabrication and delivery cost for each bench is $600 plus tax, and the fabrication
and delivery cost for each dual receptacle is $1,150 plus tax, for an estimated total of
$53,000 inclusive of tax and delivery. Staff is seeking an additional 10% in contingency
funds for a total request of $58,300. Funds are available from RDA bonds that have
been posted to Account 400-4679-454-4001.
Submitted By: Department Head:
;�
-- - - ._ .�'"� �
_____'_'_-'- 1
Deborah L. Schwartz, Lauri Aylaian,
Management Analyst Director of Community Development
Reviewed: ��
CITY COUNCILA 'CION
r. C�' APPROVED nFNTFn
�� ��`' R�CEIVED OTHER
Paul S. Gib , Director of Finance MF.�T DA �� 'M
AYE5: - �� � 6 �
NOF.S: �
Approval: ABSENT:
AT3STAIN:
VCRIFIED BY: ' �`S
���� � Original on File with City k's Office
✓. l.�aH�—,Gl�/
John M. Wohlmuth, City Manager