Loading...
HomeMy WebLinkAboutC33620 - BPFA - Presidents Plaza Prkng Lot Imprvmnts Prjct CITY OF PALM DESERT/SUCCESSOR AGENCY OF THE PALM DESERT REDEVELOPMENT AGENCY CITY MANAGERS OFFICE STAFF REPORT REQUEST: REQUEST FOR APPROVAL TO EXECUTE A PRESIDENTS PLAZA PARKING LOT IMPROVEMENTS PROJECT BOND PROCEEDS FUNDING AGREEMENT BETWEEN THE SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY AND THE CITY OF PALM DESERT AND TAKING CERTAIN RELATED ACTIONS SUBMITTED BY: Ryan Stendell, Senior Management Analyst DATE: May 22, 2014 CONTENTS: Resolution No. 2014-51 & Resolution No. SA-RDAo33 Draft Reimbursement Agreement (C 33620 � Recommendation 1. Waive further reading and adopt Resolution No. 2014-51 and Resolution No. SA-RDA- 033 approving the execution of a Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement between the Successor Agency to the Palm Desert Redevelopment Agency and the City of Palm Desert and taking certain related action. 2. By Minute Motion, approve and authorize the Mayor/Chair to execute the Bond Proceeds Funding Agreement. Backqround Presidents Ptaza I � II is located between Portola and Larkspur Lane and bound by Highway 111 and EI Paseo. The City has had a long-standing involvement with this parking area, which is privately owned but has a public parking easement. The parking area was maintained by the City through a Business Improvement District (BID) for many years. The BID allowed the City to collect a levy against each property to maintain their parking area. Unfortunately, the BID was never funded adequately for major capital improvements. In June of 2013, property owners denied the continuation of the BID and since then staff has been working towards a solution with the property owners. At this point, staff is minimally maintaining the parking area with reserve funding from the BID. Project Area's 1 & 3 were programmed with funding for a rehabilitation project within the Presidents Plaza Parking Areas I & II. Two project areas were utilized for funding due to the regional nature of our commercial core areas. Project Area 1 includes $5,000,000 and Project Area 3 includes $3,000,000 for a total of $8,000,000 for this project. Public Works staff has done some preliminary testing and has developed a plan for the project. The project will bring the parking area up to City standards and is estimated to cost between six and eight million dollars. Staff Report Contract No. c33620 Presidents Plaza Parking Lot Improvements Page 2 of 3 May 22, 2014 Staff has met with the property owners to discuss how to proceed with this parking area. Because these are private properties, the City could let the maintenance of these areas go completely back to each individual property owner. However, the owners expressed an interest in keeping the City involved due to the importance of this shared public parking area. Staff does agree that it would be hard for each owner to maintain their own portion of the public parking area. Staff indicated that if the City was to pay for the improvement project, then staff would look to the property owners to form a new BID to adequately fund its ongoing maintenance. Property owners agreed in concept with this proposal and the City agreed to meet again after determining if the funds were available. If approved by the City Council, Successor Agency and Oversight Board, staff will again meet with the property owners to discuss the project. Staff would like to proceed with this project in phases during the summer months so as not to disturb the retail businesses. Our preliminary schedule is as follows: Pro'ect Phase: Timeline: Outreach Mt w/Pro ert Owners June 2014 Utilit Desi n Fall-Winter 2014 Assessment District Formation Winter-S rin 2015 Utilit Relocation Construction Summer 2015 Final Desi n Fall 2015 Bid/Construction S rin /Summer 2016 Fiscal Analvsis The Department of Finance has approved our Recognized Obligation Payment Schedule (ROPS) which lists this project with a total allocation of $8,000,000 (ROPS line items 48 & 183). Staff has drafted the Bond Proceeds Funding Agreement to encumber all $8,000,000 and granted the City's Director of Finance to manage these funds for thi purpose. Prepared By: Revi e nd Conc r: Ryan Stendell Mark G e nwood P.E. Senior Management Analyst C�C��f� �Works ' APPROVED DENiLrD Rev' d and Concur: R CEIVED �THER .�f � , — MEET G DA ' � ' Paul S. Gibson, Director of Finance A�s= NOES: A p ABSEN'P: ABSTAIN: VERIFIED BY: n M. Wohlmuth Original on File with City CI 's O�ce ' y Manager/Executive Director of the /� �,� S ccessor Agency of the Palm Desert , / BY SA.-RI)A ON Q� ,%,i:� `� �`f VERIFIED BY� mC _ Original on file with City Cler 's Of�'ice Staff Report Contract No. c33620 Presidents Plaza Parking Lot Improvements Page 2 of 3 May 22, 2014 Redevelopment Agency RESOLUTION NO. 2 1 -51 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM DESERT APPROVING THE EXECUTION OF A PRESIDENTS PLAZA PARKING LOT IMPROVEMENTS PROJECT BOND PROCEEDS FUNDING AGREEMENT BETWEEN THE SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY AND THE CITY AND TAKING CERTAIN RELATED ACTIONS RECITALS: A. The Palm Desert Financing Authority (the "Financing Authority") previously issued its Tax Allocation Revenue Bonds (Project Area No. 1, As Amended), 2006 Series A, in the principal amount of $37,780,000 (the "PA1 2006A Bonds"), and Tax Allocation Revenue Bonds (Project Area No. 3), 2006, in the principal amount of $15,059,526 (the "PA3 2006 Bonds") pursuant to four separate Indentures of Trust, dated as of July 1, 2006, by and between the Financing Authority and Wells Fargo Bank, National Association, as trustee (the "Trustee"). B. Pursuant to the four Loan Agreements, dated as of July 1, 2006 (the "Loan Agreements"), by and among the Financing Authority, the former Palm Desert Redevelopment Agency (the "Former RDA"), and the Trustee, proceeds of the PA1 2006A Bonds and PA3 2006 Bonds were lent to the Former RDA as a loan (the "Loans"). C. The Former RDA caused a portion of the proceeds of the PA1 2006A Bonds and PA3 2006 Bonds received as part of the Loans to be deposited into Project Funds (the "PA1 2006A Project Fund" and the "PA3 2006 Project Fund"), which were established, and are held by, the Trustee pursuant to the Loan Agreements. D. Pursuant to the Loan Agreements, moneys in the PA1 2006A Project Fund and PA3 2006 Project Fund shall be disbursed from time to time to finance the cost of redevelopment projects in or of benefit to the Former Agency's Project Area No. 1, As Amended and Project Area No. 3 (the "Project Areas"). E. As documented by the Official Statements, dated June 22, 2006 and June 27, 2006 respectively, and the Certificates Regarding Compliance with Certain Tax Matters, dated as of July 6, 2006 and July 25, 2006 respectively, (the "Tax Certificates"), it was intended, at the issuance of the PA1 2006A Bonds and PA3 2006 Bonds, that the projects to be financed from moneys deposited in the PA1 2006A Project Fund and PA3 2006 Project Fund include, among others, the Presidents Plaza Parking Lot Project (described as the "Renovation and improvement of parking facilities at Presidents Plaza" in the Tax Certificates) (the "ProjecY'). F. Pursuant to AB X1 26 (which became effective at the end of June 2011) and the California Supreme Court's decision in California Redevelopment Association, \\srv-5t2k3\groups\CityM�r\Ryan Stendell\Staff Reports\2014\May 22\Re'vnbwsement Agreements\Presidents Plaza Pazking[mp\Palm Desert-City reso-PA 1&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOC RESOLUTION NO. 2014_51 et al. v. Ana Matosantos, et al., 53 Cal.4th 231(2011), the Former RDA was dissolved as of February 1, 2012, and the Successor Agency was constituted. G. AB 1484, which became effective at the end of June 2012, amended and supplemented the provisions of AB X1 26. Together, AB X1 26 and AB 1484 are referred to in this Agreement as the "Dissolution Act." H. Pursuant to Section 34175(b) of the California Health and Safety Code ("HSC"), all assets, properties, contracts, leases, books and records, buildings, and equipment of the Former RDA, including all unspent proceeds of the PA1 2006A Bonds and PA3 2006 Bonds remaining in the PA1 2006A Project Fund and PA3 2006 Project Fund (the "PA1 2006A and PA3 2006 Bond Proceeds"), transferred to the control of the Successor Agency by operation of law. I. According to HSC Section 34191.4, after the receipt by the Successor Agency of a finding of completion (the "Finding of Completion") issued by the California State Department of Finance (the "DOF") pursuant to HSC Section 34179.7, the PA1 2006A and PA3 2006 Bond Proceeds shall be used for the purposes for which the PA1 2006A and PA3 2006 Bonds were sold, in a manner consistent with the original bond covenants. J. By DOF's letter, dated May 15, 2013, the DOF informed the Successor Agency that the DOF has issued a Finding of Completion to the Successor Agency. K. There remains a balance of PA1 2006A Bond Proceeds in the PA1 2006A Project Fund (in the amount of $15,591,166 as of April 30, 2014) and a balance of PA3 Bond Proceeds in the PA3 Project Fund (in the amount of $14,026,020 as of April 30, 2014). L. The Successor Agency desires to use a portion of the PA1 2006A and PA3 2006 Bond Proceeds for completion of work with respect to the Project. M. Because of the limited staffing of the Successor Agency and the traditional role and the established procedures of the City of Palm Desert (the "City") with respect to the awarding of public works contracts, the Successor Agency and the City desire to enter into the Presidents Plaza Parking Lot Improvement Project Bond Proceeds Funding Agreement, pursuant to which the City will agree to perForm or cause to be performed all work required to complete the Project, with payment therefor to be made from the PA1 2006A Bond Proceeds. � NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PALM DESERT DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. Recitals. The above recitals, and each of them, are true and correct. Section 2. Presidents Plaza Parking Lot Improvements Bond Proceeds Fundina Aqreement. The Presidents Plaza Parking Lot Improvements Project Bond \�Srv-fi12k3\groups\CityM�r\Ryan Stendell\Staff Reports�2014\May 22\Reimbursement Agreements�Presidents Plaza Parking Imp\Palm Desert-City reso-PA 1&3 Bond Proceeds Funding AgmbPresidents Plaza 5-2-14.DOC RESOLUTION NO. Proceeds Funding Agreement, in the form attached hereto as Exhibit A, is hereby approved. Each of the Mayor (or in the Mayor's absence, the Mayor Pro Tem) and the City Manager (each, an Authorized Officer"), individually, is hereby authorized to execute and deliver, for and in the name of the City, the Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement, in substantially such form, with changes therein as the Authorized Officer executing the same may approve (such approval to be conclusively evidenced by the execution and delivery thereof). Section 3. Other Acts. The Authorized Officers and all other officers of the City are hereby authorized, jointly and severally, to execute and deliver any and all necessary documents and instruments and to do all things which they may deem necessary or proper to effectuate the purposes of this Resolution and the Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement. Any actions previously taken by officers of the City consistent with the purposes of this Resolution, the Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement are hereby ratified and confirmed Section 4. Effective Date. This Resolution shall take effect immediately upon adoption. APPROVED and ADOPTED this day of , 2014. AYES: NOES: ABSENT: ABSTAIN: VAN G. TANNER, MAYOR ATTEST: RACHELLE D. KLASSEN, CITY CLERK \\srv-fi12k3\groups\CityMgr\Ryan StendeID,Staff Reports\2014`,May 22\Re'vnbursement Agreements\Presidents Plaza Parking Imp\Palm Desert-City reso-PA I&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOC Contract No. C33620 PRESIDENTS PLAZA PARKING LOT IMPROVEMENT PROJECT BOND PROCEEDS FUNDING AGREEMENT This PRESIDENTS PLAZA PARKING LOT IMPROVEMENT POJECT BOND PROCEEDS FUNDING AGREEMENT (this "Agreement"), dated as of , 2014, is entered into by and between the City of Palm Desert (the "City") and the Successor Agency to the Palm Desert Redevelopment Agency (the "Successor Agency," and together with the City, the "Parties"). RECITALS: A. The Palm Desert Financing Authority (the "Financing Authority") previously issued its 2006 Tax Allocation Revenue Bonds (Project Area No. 1, As Amended and Project Area No. 3), (the "the 2006 Bonds") for the purpose of financing redevelopment projects of benefit to Project Area No. 1, As Amended and Project Area No. 3 (the "Project Areas") of the former Palm Desert Redevelopment Agency (the "Former RDA"). B. Pursuant to four separate indentures, each dated as of July 1, 2006 (collectively, the "Indentures"), by and between the Palm Desert Financing Authority (the "Financing Authority") and Wells Fargo Bank, National Association, as trustee (the "Bond Trustee"), the Financing Authority has previously issued the following bonds: (i) The Palm Desert Financing Authority Tax Allocation Refunding Revenue Bonds (Project Area No. 1), 2006 Series A (the "PA1 2006A Bonds"); (ii) The Palm Desert Financing Authority Tax Allocation Refunding Revenue Bonds (Project Area No. 1), 2006 Series B (the "PA1 2006B Bonds"); (iii) The Palm Desert Financing Authority Tax Allocation Revenue Bonds (Project Area No. 3), 2006 Series A (the "PA3 2006A Bonds"); (iv) The Palm Desert Financing Authority Tax Allocation Revenue Capital Appreciation Bonds (Project Area No. 3), 2006 Series B (the "PA3 2006B Bonds"); and (v) The Palm Desert Financing Authority Subordinate Tax Allocation Revenue Capital Appreciation Bonds (Project Area No. 3), 2006 Series C (collectively with the PA3 2006A Bonds and the PA3 2006B Bonds, the "PA3 2006 Bonds"). C. Pursuant to four loan agreements, each dated as of July 1, 2006, (collectively, the "Loan Agreements"), by and among the Financing Authority, the former Palm Desert Redevelopment Agency (the "Former Redevelopment Agency") and the -1- \�srv-fi12k3\groups\CityMgr�Ryan Stendell\Staff Reports�2014�May 22\Reimbursement Agreements�Presidents Plaza Parking Imp�Palm Desert- PA I&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOCX Bond Trustee, proceeds of the PA1 2006 Bonds and the PA3 2006 Bonds were lent to the Former Redevelopment Agency as loans (the "Loans"). D. The Former Redevelopment Agency caused portions of the Loans to be deposited into certain Project Funds (the "Project Funds"), which were established pursuant to the Loan Agreements. E. Pursuant to the Loan Agreements, moneys in the Project Funds shall be disbursed and used from time to time to finance the costs of redevelopment projects of benefit to the Former Redevelopment Agency's Project Area No. 1 and Project Area No. 3, respectively. F. As documented by the Certificates Regarding Compliance with Certain Tax Matters, dated July 6, 2006 and July 25, 2006 respectively, (the "Tax Certificates"), it was intended, at the time of issuance of the PA1 2006 Bonds and the PA3 2006 Bonds, that the projects to be financed from moneys deposited in the Project Funds include, among others, the Presidents Plaza Parking Lot Project (described as the "Renovation and improvement of parking facilities at Presidents Plaza" in the Tax Certificates) (the "Project"). G. Pursuant to AB X1 26 (which became effective at the end of June 2011) and the California Supreme Court's decision in California Redeve/opment Association, ef al. v. Ana Matosantos, et al., 53 Cal.4th 239(2091), the Former RDA was dissolved as of February 1, 2012, and the Successor Agency was constituted. H. AB 1484, which became effective at the end of June 2012, amended and supplemented the provisions of AB X1 26. Together, AB X1 26 and AB 1484 are referred to in this Agreement as the "Dissolution Act." I. Pursuant to Section 34175(b) of the California Health and Safety Code ("HSC"), all assets, properties, contracts, leases, books and records, buildings, and equipment of the Former RDA, including all unspent proceeds of the PA1 2006 and PA3 2006 Bonds remaining in the PA1 and PA3 2006 Project Fund (the "PA1 and PA3 2006 Bond Proceeds"), transferred to the control of the Successor Agency by operation of law. J. According to HSC Section 34191.4, after the receipt by the Successor Agency of a finding of completion (the "Finding of Completion") issued by the California State Department of Finance (the "DOF") pursuant to HSC Section 34179.7, the PA1 and PA3 2006 Bond Proceeds shall be used for the purposes for which the PA1 and PA3 2006 Bonds were sold, in a manner consistent with the original bond covenants. K. By DOF's letter, dated May 15, 2013, the DOF informed the Successor Agency that the DOF has issued a Finding of Completion to the Successor Agency. L. There remains a balance of PA1 2006 Bond Proceeds in the PA1 2006 Project Fund (in the amount of $15,591,166} and a balance of PA3 Bond Proceeds in the PA3 Project Fund (in the amount of$ 14,026,020) as of April 30, 2014. -2- \�srv-fil2k3\groups\CityMgr�Ryan Stendell�Staff Reports�2014Vv1ay 22�Reimbursement Agreements�Presidents Plaza Parking Lnp�Palm Desert- PA 1&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOCX M. The Successor Agency desires to use a portion of the PA1 2006 Bond Proceeds and a portion of the PA3 2006 Bond Proceeds to provide funds to complete the Project. N. Pursuant to HSC Section 34177(I), the Successor Agency must prepare a Recognized Obligation Payment Schedule ("ROPS") for each six-month fiscal period ("ROPS Period"). The ROPS must be submitted to the Oversight Board of the Successor Agency (the "Oversight Board") and the DOF for approval. O. Pursuant to HSC Section 34191.4(c)(2), the use of PA1 2006 Bond Proceeds and PA3 2006 Bond Proceeds for obligations must be listed on a ROPS. P. Prior to the execution of this Agreement, the Successor Agency has prepared a ROPS listing line items which in�lude the use of the PA1 2006 Bond Proceeds (in the amount of $5,000,000) and the PA3 2006 Bond Proceeds (in the amount of $3,000,000) for the Project (together, the "Project 13-14B Estimate"), and the Oversight Board and the DOF have approved the relevant ROPS items. Q. Resolution No. adopted by the Oversight Board on , 2014 approving the Successor Agency's execution and delivery of this Agreement was approved [deemed approved] by the DOF pursuant to HSC Section 34179(h) on , 2014 (the "DOF Agreement Approval Date"). NOW, THEREFORE, THE PARTIES DO HEREBY AGREE AS FOLLOWS: Section 1. Subject to the provisions of this Agreement and with the funding provided pursuant to this Agreement, the Cify agrees to perform or cause to be perFormed all work required for the completion of the Project, including but not limited to the preparation of designs, plans and specifications and all acquisitions, demolitions, construction and installations. The City shall perform such work in accordance with all applicable federal, state and local laws, rules and regulations. Subject to the covenants set forth herein, the City shall have the sole discretion with respect to the design, planning, specification and the timing with respect to all components of the Presidents Plaza Parking Lot Improvements Project. Section 2. As soon as practical upon the Parties' execution of this Agreement, the Successor Agency shall transfer to the City an amount equal to the ROPS 13-14B Project Estimate from the PA1 and PA3 2006 Bond Proceeds on deposit in the PA1 and PA3 2006 Project Fund. Section 3. (a) The Parties acknowledge and agree that the PA1 2006 Bond Proceeds and the PA3 2006 Bond Proceeds shall be the sole sources of the Successor Agency's payment for the completion of the Project pursuant to this Agreement. The Parties also agree that the City's obligation with respect to the work for the Project under this Agreement shall be limited to the extent that funding therefor is available from the PA1 2006 Bond Proceeds and the PA3 2006 Bond Proceeds. -3- \�srv-fi12k3\groups\CityMgr\Ryan Stendell�Staff Reports�2014VVtay 22�Reimbursement Agreements�Presidents Plaza Parking Imp�Palm Desert- PA 1&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOCX (b) At any time, if the City determines that the amount previously transferred by the Successor Agency pursuant to this Agreement is insufficient for the completion of the Project, the City's Finance Director shall notify the Successor Agency, specifying the estimated dollar amount necessary for the completion of the Project (the "Additional Funding AmounY'). To the extent that sufficient unspent PA1 2006 Bond Proceeds or PA3 2006 Bond Proceeds (or a combination thereof) remain available, the Successor Agency shall list the Additional Funding Amount on the ROPS for the next available ROPS Period. Upon obtaining the Oversight Board's and the DOF's approval for such ROPS item(s), the Successor Agency shall transfer or caused to be transferred to the City the Additional Funding Amount from the PA1 2006 Bond Proceeds or the PA3 2006 Bond Proceeds, or a combination thereof as applicable, as soon as practicable upon the commencement of the applicable ROPS Period. (c) Before the transfer of any Additional Funding Amount pursuant to Section 3(b) above, the City may, but is not obligated to, advance funds from sources available to City for the work necessary for the Project (each such advance being a "City Advance"). Any Additional Funding Amount transferred by the Successor Agency pursuant to Section 4(b) shall first be used to reimburse the City for outstanding City Advances, and then to pay for other expenditures of the Project. Section 4. To the extent the City still holds unspent PA1 2006 Bond Proceeds or PA3 2006 Bond Proceeds transferred pursuant to this Agreement after the completion of the Project (as determined by the legislative body of the City), the City shall return such unspent PA1 Bond Proceeds and PA3 2006 Bond Proceeds to the Successor Agency within a reasonable time after such determination. Section 5. The City covenants that it shall use the PA1 Bond Proceeds and the PA3 2006 Bond Proceeds in a manner consistent with the covenants in the Loan Agreement and the Tax Certificate, including, but not limited to, any covenants regarding the tax-exempt status of interest on the PA1 Bond Proceeds and the PA3 2006 Bonds under the Internal Revenue Code of 1986, as amended, and any regulations promulgated thereunder. Section 6. Each Party shall maintain books and records regarding its duties pursuant to this Agreement. Such books and records shall be available for inspection by the officers and agents of the other Party at all reasonable times. Section 7. The Parties agree to take all appropriate steps and execute any documents which may reasonably be necessary or convenient to implement the intent of this Agreement. Section 8. This Agreement may be amended from time to time by written instrument executed by both Parties. Section 9. No official, agent, or employee of the Successor Agency or the City, or members of the City Council, or members of the Successor Agency Board of Directors or Oversight Board shall be individually or personally liable for any payment -4- \�srv-fil2k3\groups\CityMgr�Ryan Stendell�Staff Reports�2014�May 22\Reimbursement Agreements\Presidents Plaza Parking Imp�Palm Desert- PA 1&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOCX hereunder in the event of any default or breach by the Successor Agency or the City, or for any amount which may otherwise become due to the City or Successor Agency, or successor thereto, or on any obligations under the terms of this Agreement. Section 10. This Agreement is made in the State of California under the Constitution and laws of the State of California, and is to be so construed. IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by their duly authorized officers. SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY � By JOHN WOHLMUTH, EXECUTIVE DIRECTOR ATTEST: RACHELLE D. KLASSEN, SECRETARY TO THE SUCCESSOR AGENCY OF THE PALM DESERT REDEVELOPMENT AGENCY CITY OF PALM DESERT By VAN G. TANNER, MAYOR ATTEST: RACHELLE D. KLASSEN, CITY CLERK APPROVED: OVERSIGHT BOARD OF THE SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY By BOB A. SPIEGEL, CHAIR Date: -5- \�Srv-fi12k3\groups\CityMgrUtyan Stendell�Staff Reports�2014Vv1ay 22�Reimbursement Agreements\Presidents Plaza Parking Imp�Palm Desert- PA I&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOCX -6- \\srv-fi12k3\groups\CityMgr�Ryan Stendell\Staff Reports�2014�May 22�Reimbursement Agreements�Presidents Plaza Parking Imp�Palm Desert- PA 1&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOCX RESOLUTION NO. sA-xDa o33 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY APPROVING THE EXECUTION OF A PRESIDENTS PLAZA PARKING LOT IMPROVEMENTS PROJECT BOND PROCEEDS FUNDING AGREEMENT BETWEEN THE SUCCESSOR AGENCY AND THE CITY OF PALM DESERT AND TAKING CERTAIN RELATED ACTIONS RECITALS: A. The Palm Desert Financing Authority (the "Financing Authority") previously issued its Tax Allocation Revenue Bonds (Project Area No. 1, As Amended), 2006 Series A, in the principal amount of $37,780,000 (the "PA 1 2006A Bonds") and Tax Allocation Revenue Bonds (Project Area No. 3), 2006, in the principal amount of $15,059,526 (the "PA3 2006 Bonds"), pursuant to four separate Indentures of Trust, dated as of July 1, 2006, by and between the Financing Authority and Wells Fargo Bank, National Association, as trustee (the "Trustee"). B. Pursuant to the four Loan Agreements, dated as of July 1, 2006 (the "Loan Agreements"), by and among the Financing Authority, the former Palm Desert Redevelopment Agency (the "Former RDA"), and the Trustee, proceeds of the PA1 2006A Bonds and PA3 2006 Bonds were lent to the Former RDA as a loan (the "Loans"). C. The Former RDA caused a portion of the proceeds of the PA1 2006A Bonds and PA3 2006 Bonds received as part of the Loans to be deposited into a Project Fund (the "PA1 2006A Project Fund" and the "PA3 2006 Project Fund"), which were established, and are held, by the Trustee pursuant to the Loan Agreements. D. Pursuant to the Loan Agreements, moneys in the PA1 2006A Project Fund and PA3 2006 Project Funds shall be disbursed from time to time to finance the cost of redevelopment projects in or of benefit to the Former Agency's Project Area No. 1, As Amended and Project Area No. 3 (the "Project Areas"). E. As documented by the Official Statement, dated June 22, 2006 and June 27, 2006 respectively, and the Certificates Regarding Compliance with Certain Tax Matters, dated as of July 6, 2006 and July 25, 2006 respectively, (the "Tax Certificates"), it was intended, at the issuance of the PA1 2006A Bonds and PA3 2006 Bonds, that the projects to be financed from moneys deposited in the PA1 2006A Project Fund and PA3 Project Fund include, among others, the Presidents Plaza Parking Lot Project (described as the "Renovation and improvement of parking facilities at Presidents Plaza" in the Tax Certificates) (the "Project"). F. Pursuant to AB X1 26 (which became effective at the end of June 2011) and the California Supreme Court's decision in California Redevelopment Association, \1srv-fi12k3\groups\CityMgr\Ryan Stendell\Staff Reports\2014\May 22`�Reunbursement Agreemen[s\Presidents Plaza Parking Imp�Palm Desert-SA reso-PA 1&3 Bond Proceeds Funding Agmt-1'residents Plaza 5-2-14.DOC RESOLUTION NO. et al. v. Ana Matosantos, et al., 53 Cal.4th 231(2011), the Former RDA was dissolved as of February 1, 2012, and the Successor Agency was constituted. G. AB 1484, which became effective at the end of June 2012, amended and supplemented the provisions of AB X1 26. Together, AB X1 26 and AB 1484 are referred to in this Agreement as the "Dissolution Act." H. Pursuant to Section 34175(b) of the California Health and Safety Code ("HSC"), all assets, properties, contracts, leases, books and records, buildings, and equipment of the Former RDA, including all unspent proceeds of the PA1 2006A Bonds and PA3 Bonds remaining in the PA1 2006A Project Fund and PA3 2006 Project Fund (the "PA1 2006A and PA3 2006 Bond Proceeds"), transferred to the control of the Successor Agency by operation of law. I. According to HSC Section 34191.4, after the receipt by the Successor Agency of a finding of completion (the "Finding of Completion") issued by the California State Department of Finance (the "DOF") pursuant to HSC Section 34179.7, the PA1 2006A and PA3 2006 Bond Proceeds shall be used for the purposes for which the PA1 2006A Bonds and PA3 2006 Bonds were sold, in a manner consistent with the original bond covenants. J. By DOF's letter, dated May 15, 2013, the DOF informed the Successor Agency that the DOF has issued a Finding of Completion to the Successor Agency. K. There remains a balance of PA1 2006A Bond Proceeds in the PA1 2006A Project Fund (in the amount of $15,591,166 as of April 30, 2014) and a balance of PA3 Bond Proceeds in the PA3 Project Fund (in the amount of $14,026,020 as of April 30, 2014). L. The Successor Agency desires to use a portion of the PA1 2006A and PA3 2006 Bond Proceeds for completion of work with respect to the Project. M. Because of the limited staffing of the Successor Agency and the traditional role and the established procedures of the City of Palm Desert (the "City') with respect to the awarding of public works contracts, the Successor Agency and the City desire to enter into the Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement, pursuant to which the City will agree to perform or cause to be performed all work required to complete the Project, with payment therefor to be made from the PA1 2006A Bond Proceeds. N. Pursuant to HSC Sections 34178(a) and 34180(h), with the approval of the Oversight Board of the Successor Agency (the "Oversight Board"), the Successor Agency may enter into agreements with the City. \�srv-fi12k3�goups\CityMgr\Ryan Stendell\Staff Reports�2014\May 22\Re'vnbursemen[Abneements�Presiden[s Plaza Pazking Imp\Palm Desert-SA reso-PA 1&3 Bond Roceeds Funding Agmt-Presidents Plaza 5-2-I4.DOC RESOLUTION NO. NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. Recitals. The above recitals, and each of them, are true and correct. Section 2. Presidents Plaza Parkinq Lot Improvements Bond Proceeds Fundinq Aqreement. The Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement, in the form attached hereto as Exhibit A, is hereby approved. Each of the Chair of this Board, the Vice Chair of this Board and the Executive Director of the Successor Agency (each, an Authorized Officer"), individually, is hereby authorized to execute and deliver, for and in the name of the Successor Agency, the Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement, in substantially such form, with changes therein as the Authorized Officer executing the same may approve (such approval to be conclusively evidenced by the execution and delivery thereof). Section 3. Reauest for Oversipht Board Approval. The Oversight Board is hereby requested to approve the Successor Agency's execution and delivery of the Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement. The Secretary of the Successor Agency is hereby directed to transmit this Resolution to the Oversight Board for consideration at the earliest possible date. Section 4. Other Acts. The Authorized Officers and all other officers of the Successor Agency are hereby authorized, jointly and severally, to execute and deliver any and all necessary documents and instruments and to do all things which they may deem necessary or proper to effectuate the purposes of this Resolution and the Presidents Plaza Parking Lot Improvements Project Bond Proceeds Funding Agreement. \\srv-fi12k3\groops\CityMgr�Ryan Steudell\Staf}'Repotts�2014\May 22\Reimbursement Agreements\Presidents Plaza Pazking Imp�Palm Desert-SA reso-PA 1&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-14.DOC RESOLUTION NO. Section 5. Effective Date. This Resolution shall take effect immediately upon adoption. APPROVED and ADOPTED this day of , 2014. AYES: NOES: ABSENT: ABSTAIN: VAN TANNER, CHAIR ATTEST: RACHELLE D. KLASSEN, SECRETARY SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY \�Srv-fi12k3\groups\CityMgr�Ryan Stendell\Staff Reports\2014\May 22\Reimbursement Agreements�Presidents Plaza Pazking Imp�Palm Deser[-SA reso-PA 1&3 Bond Proceeds Funding Agmt-Presidents Plaza 5-2-I4.DOC