Loading...
HomeMy WebLinkAboutHA25090Contract No. 11A25090]11 REQUEST: SUBMITTED BY: DATE: CONTENTS: Recommendation: PALM DESERT HOUSING AUTHORITY STAFF REPORT AUTHORIZE THE SOLICITATION OF PROPOSALS FOR THE DESIGN/BUILD OF NEW CARPORT STRUCTURES AND PHOTOVOLTAIC SOLAR ARRAYS AT THE PALM VILLAGE APARTMENTS MISSY WIGHTMAN, PROJECT COORDINATOR APRIL 13, 2006 PALM VILLAGE APARTMENTS SOLAR SITE PLAN By Minute Motion, that the Authority Board authorize the solicitation of proposals for the design/build of new carport structures and photovoltaic solar arrays at the Palm Village Apartments. Executive Summary: Approval of this request will allow staff to solicit design/ build proposals for construction of the new carport structures and photovoltaic arrays at the Palm Village Apartments. These carport structures will provide protection to the residents' cars as well as provide placement for photovoltaic solar arrays. Discussion: The City of Palm Desert has undertaken ambitious goals to reduce energy use throughout the city, and has sponsored the "Estonia Protocol." In support of these goals, the proposed solar powered electrical system should reduce the amount of electricity required from an outside provider in excess of thirty (30) percent. Palm Village Apartments is a residential complex approximately forty -one -thousand (41,000) square feet in size and is currently under construction. There are three (3) separate two-story buildings with a total of thirty-six (36) residential units and common areas. This request for solicitation of proposals is for design and construction services for the Palm Village Apartments photovoltaic solar arrays (approximately 62 KWDC +/- 5%) and carport structures at 73-650 Santa Rosa Way. Carport structures will give shelter to a total of fifty-six (56) parking spaces or 1.56 spaces per residential unit. These structures have a specified site placement, but no design. Staff Report Authorize the Solicitation of Bids for the Design/ Build of New Carport Structures and Photovoltaic Solar Arrays at the Palm Village Apartments Page 2 of 2 April 13, 2006 There are a total of four (4) carport canopies, with the photovoltaic systems occupying portions of two (2) of these canopies. The design and installation of the photovoltaic systems will be integrated into the two (2) carports located closest to the east and west property lines. Photovoltaic systems will not occupy the remaining two (2) carports. The proposed photovoltaic systems will offset the electric needs for nine (9) housing units and the common areas located in three (3) separate buildings within the site. All systems qualify for the California Energy Commission's low-income housing rebates, which includes the systems for the common areas. Carport structures are to be divided into designated Solar Plots allocated to provide solar electricity for the individually metered units and common area meters. A current site plan with solar plot layouts is attached to this document illustrating locations of the proposed carport structures and photovoltaic solar arrays. The work will be scheduled to be complete within seventy-five (75) days of issuance of the Notice to Proceed. Submitted by: Missy WI tman Project Coordinator Approval: cCarthy, ACM Department Head: Direct of Redevelopment/Housing opment Paul S. Gibson, Director of Finance Carlos L. Ortega, xecutive Director 0 0 0 z ap 0 r COco xi CO CD ▪ ch 00 • -n C) a ▪ r m • 0 c r co - r- • r s a � rm Z 0 0 - to ai 0 3 co ws CD z 0 0 (1) ti ✓ rn z SOLAR 0 .0 r 0 0 to QJ r 0 0 C 4# t 1 a 1 t R R A Y 14 PARKING PLACES t 1 w * 0) 0 w 0 0) a a L • x o � Cr-) I* IQ IQ- 0 CO i 0) 0 0 0 0 1 4 PARKING PLACES a S O L A R IA R R A Y Fs} IAIOO8 :13J3l 1 O 001E1 Ol S1.dOd VNOJd 11110N00 ,t