Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
HA23650 - Portrait Homes
AGREEMENT THIS AGREEMENT is made and entered into this 9'h day of March, 2006, by and between the Palm Desert Housing Authority, Palm Desert, California, a California housing authority , hereinafter referred to as "OWNER", and Portrait Homes, Inc., a California corporation, hereinafter referred to as "CONTRACTOR". RECITALS. (i) OWNER heretofore publicly bid that certain project known as the "California Villas Apartment Rehabilitation Project: Phase A - Exterior Building Renovations, Contract No. HA23650", as described hereinafter; however, no responsive bids were received. Based thereon, OWNER entered into negotiations with CONTRACTOR to do the required work. (ii) CONTRACTOR has submitted its proposal dated January 25, 2006, to do all of the required work ("Proposal"). CONTRACTOR represents that CONTRACTOR and any and all of its subcontractors are properly skilled, qualified and licensed to do the work, and that each has inspected all of the project site and existing conditions prior to CONTRACTOR'S submittal of the Proposal. (iii) Based upon CONTRACTOR'S representations and prices to do the work, OWNER has accepted CONTRACTOR'S offer as set forth in the Proposal, subject to the terms herein. (iv) It is the intent of the OWNER and CONTRACTOR in entering this Agreement to set forth terms and conditions applicable to CONTRACTOR'S performance of the work. (v) Funds that will used to complete this project are derived entirely from monies from a Low and Moderate Income Housing Fund established pursuant to Section 33334.2 of the Health and Safety Code AGREEMENT. NOW THEREFORE, in consideration of the mutual covenants herein contained, it is agreed: 1. GENERAL SCOPE OF WORK: CONTRACTOR shall furnish all necessary labor, tools, materials, appliances, and equipment for and do the work for the California Villas Apartment Rehabilitation Project: Phase A - Exterior Building Renovations, Contract No. HA23650. Said work shall be performed in accordance with the "Plans, Specifications and Contract Documents for California Villas Apartment Rehabilitation Project: Phase A - Exterior Building Renovations, Contract No. HA23650", dated October 2005, and amended to delete bidding references. A copy of said Plans, Specifications and Contract Documents were provided to and inspected by CONTRACTOR prior to CONTRACTOR'S execution of this Agreement. 2. INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The aforesaid Plans, Specifications and Contract Documents, and the Proposal, attached hereto as Exhibit "A", are incorporated herein by reference and made a part hereof with like force and effect as if all of said documents were set forth in full herein. Said Plans, Specifications and Contract Documents, this written agreement 1 and the Proposal, including all attachments to the foregoing, constitute the entire Agreement between the parties. This Agreement is intended to require a complete and finished piece of work, and anything necessary to complete the work properly and in accordance with all local, state and federal laws and all applicable governmental regulations shall be performed by the CONTRACTOR, whether set out specifically in the Agreement or not. Should it be ascertained that any inconsistency exists between CONTRACTOR'S Proposal, the Plans, Specifications and Contract Documents, and/or and this written agreement, the provisions of this written agreement, then the Plans, Specifications and Contract Documents shall control. CONTRACTOR warrants and represents that all information set forth in the Proposal is true and correct. 3. TERMS OF AGREEMENT: CONTRACTOR agrees to start the work within ten (10) calendar days of the date OWNER provides CONTRACTOR with a Notice to Proceed, and to complete the work within 240 calendar days thereafter, except as otherwise provided by this Agreement or permitted in writing by OWNER. CONTRACTOR agrees to utilize its best efforts to complete all work in a shorter period of time. 4. LIQUIDATED DAMAGES: CONTRACTOR agrees further to the assessment of liquidated damages in the amount of Two Hundred Fifty and no/100 Dollars ($250.00) for each calendar day the work remains incomplete beyond the period specified in Section 3, above, and any extensions permitted pursuant to express term hereof including extensions resulting from approved change orders (see General Specifications). OWNER may deduct the amount thereof from any monies due or that may become due the CONTRACTOR under this Agreement. Progress payments made after the scheduled date of completion shall not constitute a waiver of liquidated damages. 5. INSURANCE: CONTRACTOR shall not commence work under this Agreement until he has obtained all insurance required hereunder in a company or companies acceptable to OWNER nor shall the CONTRACTOR allow any subcontractor to commence work on his subcontract until all insurance required of the subcontractor has been obtained. The CONTRACTOR shall take out and maintain, and require all subcontractors to take out and maintain, at all times during the life of this Agreement, those policies of insurance specified in the Plans, Specifications and Contract Documents. Before beginning work, the CONTRACTOR shall furnish to the OWNER a certificate of insurance as proof that he has taken out full compensation insurance for all persons whom he may employ directly or through subcontractors in carrying out the work specified herein, in accordance with the laws of the State of California. Such insurance shall be maintained in full force and effect during the period covered by this Agreement. In accordance with the provisions of Section 3700 of the California Labor Code, every contractor shall secure the payment of compensation to his employees. CONTRACTOR, prior to commencing work, shall sign and file with the OWNER a certification as follows: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract." 6. APPRENTICESHIP EMPLOYMENT: In accordance with the provisions of Section 1777.5 of the Labor Code as amended by Chapter 971, Statutes of 1939, and in 2 accordance with the regulations of the California Apprenticeship Council, properly indentured apprentices may be employed in the prosecution of the work. Attention is directed to the provisions in Section 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the CONTRACTOR or any subcontractor under him. Section 1777.5, as amended, requires the CONTRACTOR or subcontractor employing tradesmen in any apprenticable occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases shall not be Tess than one to five except: a. When unemployment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days prior to the request for certificate, or b. When the number of apprentices in training in the area exceeds a ratio of one to five, or c. When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis statewide or locally, or d. When the CONTRACTOR provides evidence that he employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. The CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if he employs registered apprentices or journeymen in any apprenticable trade on such contracts and if other contractors on the public works site are making such contributions. The CONTRACTOR and subcontractor under him shall comply with the requirements of Sections 1777.5 and 1777.6 in the employment of apprentices. 7. LEGAL HOURS OF WORK: Eight (8) hours of labor shall constitute a legal day's work for all workmen employed in the execution of this contract, and the CONTRACTOR and any subcontractor under him shall comply with and be governed by the laws of the State of California having to do with working hours set forth in Division 2, Part 7, Chapter 1, Article 3, of the Labor Code of the State of California as amended. The CONTRACTOR shall forfeit, as a penalty to OWNER, Twenty -Five Dollars ($25.00) for each laborer, workman, or mechanic employed in the execution of the contract, by him or any subcontractor under him, upon any of the work hereinbefore mentioned, for each calendar day during which said laborer, workman, or mechanic is required or permitted to labor more than eight (8) hours in violation of said Labor Code. 8. PAYROLL RECORDS: CONTRACTOR shall comply with all provisions of Labor Code Section 1776 pertaining to the maintenance of payroll records, including, but not limited to, provision to OWNER of the location where payroll records may be inspected. 3 9. CONTRACTOR'S LIABILITY: Neither the Palm Desert Housing Authority, the Palm Desert Redevelopment Agency, the City of Palm Desert, nor any of Authority's, City's, or Agency's officials, officers, agents and employees shall be answerable or accountable in any manner for any loss or damage that may happen to the work or any part thereof, or for any of the materials or other things used or employed in performing the work; or for injury or damage to any person or persons, either workmen, employees of the CONTRACTOR or his subcontractors or the public, or for damage to adjoining or other property from any cause whatsoever arising out of or in connection with the performance of the work. The CONTRACTOR shall be responsible for any damage or injury to any person or property resulting from defects or obstructions or from any cause whatsoever, except the sole negligence or willful misconduct of the OWNER, its employees, servants, or independent contractors who are directly responsible to OWNER during the progress of the work or at any time before its completion and final acceptance. In furtherance of the foregoing, the CONTRACTOR shall comply with and be bound by all indemnity and hold harmless provisions set forth in the Plans, Specifications and Contract Documents (see General Specifications.) 10. BONDS: CONTRACTOR shall procure and maintain in effect throughout the term of this Agreement, a labor and material (payment) bond, and a faithful performance bond, each from a California admitted surety insurer, and in such form and amounts as required by OWNER. 11. SUBCONTRACTORS: CONTRACTOR warrants and represents that he has truthfully provided in the Proposal provided to OWNER, the name and location of the place of business of each subcontractor who will perform work or labor or render service to CONTRACTOR in or about the construction of the work or improvement in an amount in excess of one-half of one percent (1/2%) of the total contract amount. 12. LICENSES: In addition to all other licenses required by law in order for CONTRACTOR to do the required work, CONTRACTOR shall possess, at all times throughout the term of this Agreement, the following class of current contractor's license: California "B", and CONTRACTOR'S subcontractors shall have the following class(es) of contractors licenses: C39, C35, C33, C29, C21, C10, and C8. 13. CONTRACT PRICE AND PAYMENT: OWNER shall pay to the CONTRACTOR for furnishing the material and doing the prescribed work for the lump sum prices set forth in CONTRACTOR'S Proposal for the base bid items, plus Alternate Items Nos. 1 and 6, and Allowance Items 2, 3, 4, and 5, in accordance with payment provisions set forth in the Plans, Specifications and Contract Documents. Payment to the CONTRACTOR shall be derived entirely from monies from a Low and Moderate Income Housing Fund established pursuant to Section 33334.2 of the Health and Safety Code. 14. MEASUREMENT AND PAYMENT OF ALLOWANCE ITEMS: The cost of all labor, material and equipment necessary to complete the work as described in the allowance items shall be included in the prices for each allowance item, either as a lump sum or by final quantities, whatever is indicated. The final payment quantities will be based on the actual amount of materials installed or measured on the job. Supporting documentation will be required for all allowance work performed. No payment will be made for any materials not adequately supported by such documentation. The contract unit price shall include all labor, material and equipment costs necessary to complete the work, even though not shown or specified. An allowance item will be considered complete when all necessary work has been completed and accepted by the OWNER, including site clean up. 4 15. NON-DISCRIMINATION: No discrimination shall be made in the employment of persons to perform the work required herein because of age, disability, race, color, religion, sex, sexual orientation or national origin of such persons. 16. ATTORNEYS' FEES: In the event that any action or proceeding is brought by either party to enforce any term or provision of this Agreement, the prevailing party shall recover its reasonable attorneys' fees, costs of experts and all other litigation costs incurred with respect thereto. 17. INTEGRATED CONTRACT: This Agreement, together with all attachments, exhibits and all other documents incorporated by reference herein, constitutes the entire agreement between the parties. No representation, promise or agreement, whether implied, express, written or verbal, that is not set forth herein or made a part hereof, shall be binding on the parties or have any force or effect. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed with all the formalities required by law on the respective dates set forth opposite their signatures. "OWNER" "CONTRACTOR" (both signatures to be notarized) PALM DESERT HOUSING AUTHORITY PORTRAIT HOMES, INC. By: By: Jim Ferguson, Chairman Signature ATTEST: Rachelle D. Klassen, City Clerk Approved as to form Dave Erwin City Attorney By: Title Signature Title 5 02/24/2006 16:52 9515208878 rum i r<Hi HUMt5 INL CONTRACTOR'S PROPOSAL TO: PALM DESERT HOUSING AUTHORITY, "OWNER" DATE: January 28�2006 BIDDER: Portrait Homes. Inc. "Contractor" The UNDERSIGNED, "Contractor", having carefully examined the site and the Contract Documents for the construction of CALIFORNIA VILLAS APARTMENT REHABILITATION PROJECT: PHASE A - EXTERIOR BUILDING RENOVATIONS, CONTRACT NO. HA23650 hereby proposes to construct the work in accordance with the Contract Documents for the amount stated In this Proposal. By submitting this Proposal, "Contractor" agrees with OWNER: 1. That unless withdrawn in person by "Contractor or some person authorized in writing by "Contractor" - not by telephone or telegram - before March 8th 2006, this Proposal constitutes an irrevocable offer for 60 calendar days after that date. 2. The OWNER has the right to waive any irregularities or informalities contained in a Proposal. 3. That the contract shall be awarded only by the goveming body of OWNER; and said contract shall only be deemed awarded after the contractor's complete submission of all contract documents, bonds, Insurance documentation, and the OWNER shall obtain all necessary signatures of the goveming body. At which time, the contract shall be deemed awarded. 4. To submit to OWNER such information as OWNER may require to determine the Bidder's financial standing experience and to perform the work. 1 02/24/2006 16:52 9515208878 ruK(KA1I HUMtb iIL CONTRACTOR'S PROPOSAL FOR CALIFORNIA VILLAS APARTMENT REHABILITATION PROJECT PHASE A - EXTERIOR BUILDING RENOVATIONS CONTRACT NO. HA23650 Construction Sequence — Construction Period (240 calendar days) Construction shall be conducted in a systematic sequence that minimizes the inconvenience on residents living in the California Villas Apartments complex. The Contractor shall proceed with construction in a continuous manner to facilitate the coordination of each phase of construction. Parking lot access for residents must be maintained et all times. Contractor personnel shall park in designated areas only. The Contractor shall consider the following construction sequence for bid purposes. 1. investigative roof renovation on Building H, units 5-8. 2. Building roof and wall renovations in the order of: Building H, I, G, F, D, C, A, B, E, and Administration / Recreation Building. The scope of work described below is a general list of items to help aid the contractor to understand the project scope for Phase A. Contractor must thoroughly read the drawings, specifications and visit the site to obtain full scope of work required to complete Phase A and provide a sound proposal. The drawings have been clarified and corrected to delineate scope of work for Phase A. There are several locations on the drawing that refer to Phase B scope of work; this work is not to be included in Phase A. During the Negotiations and Construction Administration the contractor shall direct all questions in writing to the Owner's Project Manager, available hours are from 8:00 am — 5:00pm Monday thru Friday. V2C Group, Inc.: Anthony Mendoza Office 760.200.4960 Fax 760.200.4965 Email: visons@v2cgroup.com PHASE A -- SCOPE OF WORK 1. GARDEN WALLS a. Demolition as shown on plans. Contractor's base bid to include all saw cutting of existing CMU and concrete and the adding of new CMU block, concrete and reinforcing as required to complete all the scope of work in Phase A. Refer to sheet(s): A3.1, A4.1, A5.1, A6.1, A7.1 b. Fabricate (140) rebar decorative wall lattices and Install to garden walls at noted locations, refer to sheet(s): A7.1 & CL2. 2 02/24/2006 16:52 9515208878 PORIRAII HUINIL im, c. Sand blast and prep all existing remaining CMU garden walls to receive scratch and color coat cement plaster. d. Provide Alternate for thickened garden wall at 18 locations per 4/A6.1 & 1/A7.1, see; Altemates below. 2. APARTMENT BUILDINGS a. Contractor's base bid to include all saw cutting of existing CMU and concrete and the adding of new CMU block, concrete and reinforcing as required to complete all the scope of work in Phase A. b. Demolition of existing hot water heater rooms as noted on drawings; refer to sheet(s): A3.1, A4.1, A5.1 c. Add new false chimney pop outs, new storage rooms pop outs, mechanical room pop outs and hot water heaters popouts, refer to sheet(s): A4.1, A6.1, A7.1, 2/S2.1 d. Install new aluminum windows, refer to sheet(s): 2/A5.1, 3/CL1, 7/CL1 & specifications e. Install new metal insulated doors, existing steel entry door frames to remain refer to sheet(s): A7.1 & specifications f. Install new roll -up doors at electrical meter rooms, refer to sheet(s): 5/A7.1, 1/CL1 & 2/CL1 & specifications g. New AC Units will be owner fumished contractor installed. Contractor to remove and reinstall all new AC Units (approximately 70 units) at existing 10' window locations. Modify existing CMU wall to receive AC units and new window. Refer to sheet(s): 2/A5.1, 8/CL1 & 16/CL1. h. Saw cut (3) new AC unit openings (approximately 18"x24" in existing CMU walls at Building's H & I, coordinate locations with owner. i. Remove all existing roofing, existing plywood roof sheathing, partial wood framed overhang as indicated and all existing fascia, refer to sheet(s): A3.1, A5.1, 6/CL1 & 9ICL1 j. Install approximately 100 attic access; refer to A3.1 See Allowances below. k. Remove all existing attic insulation at all buildings prior to installing new attic insulation. See A3.1 and specifications. I. Provide new 3I8" CDX plywood with shear wall nailing at edges of attic pony walls to create draft -stops at all apartment unit demising walls. Refer to A1.1 note "A" for locations and A3.1 for further information. Provide new 3/8" CDX plywood at locations "B" refer to A1.1 and A3.1 for further information. See Allowances below. m. Repair existing trusses as required, refer to sheet(s): A3.1 See Allowance below. n. Re -sheath roof with 5/8" COX plywood sheathing, refer to sheet(s): A3.1, A4.1, A5.1, A6.1, A7.1 o. Install new "built-up" gravel roof, eve vents, roof vents, vent stack jacks, roof fleshings and crickets at all building structures, refer to sheet(s): A3.1, A4.1, A5.1, A6.1, A7.1 & specifications. p. New Eaves, refer to sheet(s): A3.1, A4.1, A5.1, A6.1, A7.1, 6/CL1 & 9/CL 1 q. Sand blast and prep all existing CMU buildings and garden walls to receive new scratch and color coat cement plaster. See specifications. 3 02/24/2006 16:52 9515208878 h'UK r rlA l 1 HUMtb i N, r. Re -plaster all existing structures, refer to sheet(s): A4.1, A6.1, A7.1 & specifications. s. Paint Exterior, refer to sheet(s): A4.1, A6.1, A7.1, see specifications. t. Provide all electrical, break out costs for TV and Telephone conduits to each unit as a separate line item. See Alternates below. Refer to sheet (s): El-E10 3. ADMINISTRATION BUILDING a. Contractor's base bid to include all saw cutting of existing CMU and concrete and the adding of new CMU block, concrete and reinforcing as required to complete all the scope of work in Phase A. b. Provide and install all new aluminum windows at all existing window locations; refer to specifications. c. Provide new metal insulated doors at existing locations except at existing French door locations. Existing steel entry doorframes to remain if wood replace with new steel entry doorframes. Refer to specifications d. Remove all existing roofing, existing plywood roof sheathing, partial wood framed overhang and all existing fascia. Remaining over hang to match apartment units over hang. Refer to sheet(s): A3.1, A5.1, 6/CL1 & 9/CL1 e. Repair existing trusses as required, refer to sheet(s): A3.1 See Allowance below. f. Re -sheath roof with 5/8" CDX plywood sheathing, refer to sheet(s) for similar scope of work: A3.1, A4.1, A5.1, A6.1, A7.1 g. Install new "built-up" gravel roof, eve vents, roof vents, vent stack jacks, roof fleshings and crickets at all building structures, refer to sheet(s) for similar scope of work: A3.1, A4.1, A5.1, A6.1, A7.1 & specifications. h. New Eaves, refer to sheet(s) for similar scope of work: A3.1, A4.1, A5.1, A6.1, A7.1, 6/CL1 & 9/CL1 I. Sand blast and prep all existing CMU buildings and garden walls to receive new scratch and color coat cement plaster. See specifications. j. Re -plaster all exterior wails, refer to sheet(s)for similar scope of work: A4.1, A6.1, A7.1, see specifications. k. Paint Exterior, refer to sheet(s) for similar scope of work : A4.1, A6.1, A7.1, see specifications I. Provide all electrical; refer to sheet (s): El-E10 4. ALLOWANCE, ALTERNATES & UNIT COSTS a. Provide an Alternate for 5/8" Type 'X' Gyp. Bd. at each side of all apartment unit's draft -stops in above attic. b. Due to the age and the appearance of the existing roof, provide a 20% cost Allowance for the replacement of existing roof trusses © 24" o.c. at each building complex — including the administration building. Allowance to include engineering, calculations, city permits and complete installation c. During the construction document phase Consulting Architect was unable to verify all attic pony wall locations as shown on A1.1 note "A". Provide an Allowance to provide (61) new pony wall with 2x4 framing at 24" o.c, new 2x4bottom plate attached to existing 3x2 wood plate 4 02/24/2006 16:52 9515208878 PORTRAII HUvt.b INU anchored with %' dia anchor bolts at 6' o.c. to existing CMU wall and new 2x4 top plate to underside of sheathing. Sheathing will be nailed shear nailed to new top plate. For pony wall locations see A1.1 note "A". d. Provide an Alternate for TV cable and telephone conduits as describe in electrical drawings. e. Provide an Allowance to install 100 attic access panels. f. Provide Alternate for thickened garden wall at 36 locations per 4/A6.1 & 1 /A7.1. INDEX TO DRAWINGS T1.1 TITLE SHEET T1.2 INDEX TO DRAWINGS, SCOPE OF WORK, CONSULTANTS, CODE COMPLIANCE, ETC. CA.1 ACCESSIBILITY REQUIREMENTS A1.1 ALTA SURVEY BY J.H. HACKER ENGINEERING, DRAFT STOP LOCATIONS A3.1 EXISTING PLANS AND SECTIONS, NEW DRAFT STOP LOCATIONS, DEMOLITION A4.1 EXISTING ELEVATIONS, NEW ELEVATIONS A5.1 EXISTING ENLARGED ELEVATIONS AND BUILDING WALL SECTIONS, NEW WINDOWS A6.1 TYPICAL NEW BUILDING AND PATIO WALL SECTIONS AND EXTERIOR DETAILS A7.1 NEW ENLARGED BUILDING AND GARDEN WALL ELEVATIONS A8.1 NEW MECHANICAL ROOM PLAN A15.1 DETAILS S2.1 NEW FOUNDATION PLANS S3.2 NEW MECHANICAL ROOM SECTION El ELECTRICAL SYMBOLS LIST, LIGHTING FIXTURE SCHEDULE E2 ELECTRICAL SITE LIGHTING PLAN E3 ELECTRICAL BUILDING A & B SINGLE LINE DIAGRAM E4 ELECTRICAL BUILDING B & C SINGLE LINE DIAGRAM E5 ELECTRICAL BUILDING D & E SINGLE LINE DIAGRAM E6 ELECTRICAL BUILDING E & F SINGLE LINE DIAGRAM E7 ELECTRICAL BUILDING F & G SINGLE LINE DIAGRAM E8 ELECTRICAL BUILDING H & I SINGLE LINE DIAGRAM E9 ELECTRICAL HOUSE PANEL SCHEDULE E 10 ELECTRICAL GENERAL NOTES CL1 CLARIFICATION DETAILS CL2 CLARIFICATION DETAILS 5 02/24/2006 16:52 9515208878 }'URTRA11 HUMtb INL, ITEM DRAWING ITEM DESCRIPTION UNITS QTY NO. NUMBER General Provision (Standard Specifications for Public Works Construction) GARDEN WALLS 1 Demolition as shown on plans. Contractor's 1 LS base bid to include all saw cutting of existing CMU and concrete and the adding of new CMU block, concrete and reinforcing as required to complete all the scope of work in Phase A. Refer to sheet(s): A3.1, A4.1, A5.1, A6.1, A7.1 2 Fabricate (140) rebar decorative wall lattices 1 LS and install to garden walls at noted locations, refer to sheet(s): A7.1 & CL2. Removal and replacement of attic insulation 3 Sand blast and prep all existing remaining CMU 1 LS garden walls to receive scratch and color coat cement plaster. APARTMENT BUILDINGS 4 Contractor's base bid to include all saw cutting 1 LS of existing CMU and concrete and the adding of new CMU block, concrete and reinforcing as required to complete all the scope of work in Phase A. 5 Demolition of existing hot water heater rooms 1 LS as noted on drawings; refer to sheet(s): A3.1, A4.1, A5.1 6 Add new false chimney pop outs, new storage 1 LS rooms pop outs, mechanical room pop outs and hot water heaters popouts, refer to sheet(s): A4.1, A6.1, A7.1, 2/S2.1 7 Instal( new aluminum windows, refer to 1 LS sheet(s): 2/A5.1, 31CL1, 7/CL1 & specifications 8 Install new metal insulated doors, existing steel 1 LS entry door frames to remain refer to sheet(s): A7.1 & specifications 9 Install new roll -up doors at electrical meter 1 LS rooms, refer to sheet(s): 5/A7.1, 1/CL1 & 2/CL1 & specifications 10 New AC Units will be owner furnished 1 LS contractor installed. Contractor to remove and reinstall all new AC Units (approximately 70 units) at existing 10' window locations. Modify existing CMU wall to receive AC units and new window. Refer to sheet(s): 2/A5.1, 8/CL1 & 16/CL1. 6 UNIT COST TOTAL 273,757 478,282 114,933 Included in Item # 1 above 47,511 475,047 207,128 63,349 23,783 65,611 02/24/2006 16:52 9515208878 PUKIHAII HUMLb INL r/-1VG VU, 1`1 ITEM DRAWING ITEM DESCRIPTION UNITS QTY UNIT TOTAL NO. NUMBER COST 11 Saw cut (3) new AC unit openings 1 LS 2,262 (approximately 16"x24" in existing CMU walls at Building's H & I, coordinate locations with owner. 12 Remove all existing roofing, existing plywood 1 LS 273,757 roof sheathing, partial wood framed overhang as indicated and all existing fascia, refer to sheet(s): A3.1, A5.1, 6/CL1 & 9/CL1 13 Remove all existing attic insulation at all 1 LS 151,991 buildings prior to installing new attic insulation. See A3.1 and specifications 14 Re -sheath roof with 5/8" CDX plywood 1 LS 368,472 sheathing, refer to sheet(s): A3.1, A4.1, A5.1, A6.1, A7.1 15 Install new "built-up" gravel roof, eve vents, roof 1 LS 665,651 vents, vent stack jacks, roof fleshings and crickets at all building structures, refer to sheet(s): A3.1, A4.1, A5.1, A6.1, A7.1 & specifications. 16 New Eaves, refer to sheet(s): A3.1, A4.1, A5.1, I 1 LS 215,989 A6.1, A7.1, 6/CL1 & 9/CL1 17 Sand blast and prep all existing CMU buildings 1 LS 82,504 and garden walls to receive new scratch and color coat cement plaster. See specifications. 18 Re -plaster all existing structures, refer to 1 I LS 790,679 sheet(s): A4.1, A6.1, A7.1 & specifications 19 Paint Exterior, refer to sheet(s): A4.1, A6.1, 1 LS 94,269 A7.1, see specifications ADMINISTRATION BUILDING 20 Contractor's base bid to include all saw cutting 1 LS 23,379 of existing CMU and concrete and the adding of new CMU block, concrete and reinforcing as required to complete ail the scope of work in Phase A. 21 Provide and install all new aluminum windows 1 LS 14,593 at all existing window locations; refer to specifications 22 Provide new metal insulated doors at existing 1 LS 4,736 locations except at existing French door locations. Existing steel entry doorframes to remain if wood replace with new steel entry doorframes. Refer to specifications 7 02/24/2006 16:52 9515208878 PORTRAII HUMS INL ITEM DRAWING ITEM DESCRIPTION UNITS QTY UNIT TOTAL NO. NUMBER COST 23 Remove all existing roofing, existing plywood 1 LS 23,379 roof sheathing, partial wood framed overhang and all existing fascia. Remaining over hang to match apartment units over hang. Refer to sheet(s): A3.1, A5.1, 6/CL 1 & 9/CL 1 24 Re -sheath roof with 5/8" CDX plywood 1 LS 6,410 sheathing, refer to sheet(s) for similar scope of work: A3.1, A4.1, A5.1, A6.1, A7.1 25 Install new "built-up" gravel roof, eve vents, roof 1 LS 37,670 vents, vent stack jacks, roof flashings and crickets at all building structures, refer to sheet(s) for similar scope of work: A3.1, A4.1, A5.1, A6.1, A7.1 & specifications 26 New Eaves, refer to sheet(s) for similar scope 1 LS 14,804 of work: A3.1, A4.1, A5.1, A6.1, A7.1, 6/CL I & 9/CL1 27 Sand blast and prep all existing CMU buildings 1 LS 8,145 and garden walls to receive new scratch and color coat cement plaster. See specifications 28 Re -plaster all exterior walls, refer to sheet(s)for 1 LS 27,634 similar scope of work: A4.1, A6.1, A7.1, see specifications 29 Paint Exterior, refer to sheet(s) for similar 1 LS 9,502 scope of work : A4.1, A6.1, A7.1, see specifications _ 30 Provide all electrical; refer to sheet (s): El-E10 1 LS 53545 31 Special Services as directed by Owner's 1 Allowance 75,000 Representative TOTAL BID PRICE $ 4.693.772 The costs of any work shown or required in the Plans and Specifications, but not specifically identified as a Pay Item are included in the Pay Item, and no additional compensation shall be due Contractor by virtue of Contractor's compliance with the Plans and Specifications. TOTAL AMOUNT BASE BID IN FIGURES $ 4,693.772 TOTAL AMOUNT BASE BID IN WORDS FOUR MILLION SIX HUNDRED NINETY- THREE THOUSAND SEVEN HUNDRED SEVENTY-TWO DOLLARS IN WITNESS WHEREOF CONTRACTOR executed this proposal as of date set forth on Page C-1: By: v>P (Must Be Notarized) Title: VP. Portrait Homes. Inc. Contractor 8 02/24/2006 16:52 9515208878 rur< I KA1 I HUMLS 1NL. rNVL CALIFORNIA ALL•PIJRPOSE ACKNOWLEDGMENT 1.1; Y Ib ti Is State of Californian County of `e On :9.a741.-0(0 ore personally appeared 7kr7 r-45 f.. Cowart 1L I ! MOMS Nolan/ Pubic - Cedgarrio Ewald, Oou tf MyCoiii r. bpi=M v 2. ss before me. "Ler-br r , % a, �Uofri r� lr L wrly •M Thle of ATIcrer f•.0 •J.re Doo. Wiry Phalli • 6 W./IS) of 0lprw(•? (personally known to me Cl proved to me on the basis of satisfactory evidence to be the persan(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the Instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. nd and official seal. Noun, NOIYy'Oubll6 OPTIONAL Though the flUorma&on below is not required by I'rw, it may prove valuable to patrons relying on the document and cold prevent fraudulent rernotel and reattachment of this form to another doeurnent. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Nerved Above: Capacity(Ies) Claimed by Signer Signer's Name: ❑ Individual ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited 0 General ❑ Attorney -in -Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Number of Pages: 1.11 C V r i>r.T ibO of thumb here e:.let4...4e. r�•n:` e.x`' tAfe:!-I.,auw`02:00Ci`t`x=421e4C.Onk K5t`iKVAX40r R^.+34e. 24404 tur:Vw.�•teek. `(` ; p 1000 NNMeM Naar" amede ton • 9350 De Sao Aw., P.O. Boo NOR • CMltffweflh• CA013I3 t 4CO • tronNINNonoliNory.oig I. No 4 Q7 IleOrdlr. Cel lbll.Prnn f a00•R7I-0E27 02/24/2006 16:52 9515208878 ruKIKH1i MUMS INC, r Ml7C 1111.1 ADDITIVE BID ITEMS - ALLOWANCE, ALTERNATES & UNIT COSTS ITEM DRAWING ITEM DESCRIPTION UNITS QTY UNIT TOTAL NO. NUMBER COST 1 Provide an Alternate for 5/8" Type 'X' Gyp. Bd. 1 LS 0 at each side of all apartment unit's draft -stops in above attic. 2 Due to the age and the appearance of the 1 LS ' 108,675 existing roof, provide a 20% cost Allowance for the replacement of existing roof trusses t 24" o.c. at each building complex — including the administration building. Allowance to Include engineering, calculations, city permits and complete installation 3 During the construction document phase 61 EA Allowance 10,000 Consulting Architect was unable to verify all attic pony wall locations as shown on A1.1 note ,IA,. Provide an Allowance to provide (61) new pony wall with 2x4 framing at 24" o.c, new 2x4bottom plate attached to existing 3x2 wood plate anchored with '/' die anchor bolts at 6' o.c. to existing CMU wall and new 2x4 top plate to underside of sheathing. Sheathing will be nailed shear nailed to new top plate. For pony wall locations see A1.1 note "A". 4 Provide an Allowance for TV cable and 1 LS 67,500 telephone conduits as describe in electrical drawings. 5 Provide an Allowance to install 100 attic 100 LS 18,750 access panels. 6 Provide Alternate for thickened garden wall at 18 LS 49,552 18 locations per 4/A6.1 & 1/A7.1. TOTAL AMOUNT ADDITIVE BID IN FIGURES $ 254.477 TOTAL AMOUNT ADDITIVE BID IN WORDS TWO HUNDRED FIFTY FOUR THOUSAND FOUR HUNDRED SEVENTY-SEVEN DOLLARS 9 02/ 24/ 2006 16:52 95151b88 M:I ruK i KH1 I HUMtb INL r.VC 1.4114 INFORMATION REQUIRED OF CONTRACTOR The Contractor is required to supply the following information. Additional sheets may be attached if necessary. (1) Address 265 N. Jov Street, Ste 200. Corona CA 92879 (2) Telephone No. (951) 520-8898 (3) Type of Firm (Individual, Partnership or Corporation) Corporation (4) Corporation organized under the laws of the State of California (5) Contractor's License No. 615297 Exp. Date 3/31/07 Contractor hereby swears under penalty of perjury that this information provided is true and correct. By: t Sig Title: Thomas Day. Jr.. Portait Homes VP Contractor (6) List the names andresses of all owners of the firm or names and titles of all officers of the corporation: Bruce Abbey. President Tom Oay. Sr„ Chairman_of the_Board Tom Day. Jr., )Lice President Avinash Shah, CFO (7) Number of years' experience as a contractor in construction work 1 (8) List at least three similar projects completed recently: Contract Class of Date Amount Work Completed Name, Address & Telephone of Owner Related Companies — Hillview Glen 1. $6.9 m Rehab Dec. 2005 Irvine, CA (949) 660-7272 Related Companies — Jeffrey Lynne 2 2. $10.1 m Rehab Dec. 2005 Irvine, CA (949) 660-7272 Related Companies — Oak Village 3. $4.3 m Rehab Jan. 2005 Irvine, CA (949) 660-7272 10 02/24/2006 16:52 9515208878 F'UKIKmII HUML5 1NU List the names and addresses of each subcontractor who will perform work in or about the work improvement, and indicate what portion of the work will be done by each subcontractor: Note: Copy this page and attach addition! pages If necessary. Subcontractor's Name: American Demolition License Number. 390754 Address: 620 Poinsettia Street Santa Ana. CA 92701 Telephone: (7141 547-7181 Work to be performed: pemolition Subcontractor's Name: Superior Construcign License Number: 325931 Address: 265 N. Jov Street. Suite 100 Corona. CA 92879 Telephone: (9511808-8780 Work to be performed: Framina Subcontractor's Name: Knudsen Roofing License Number: 61n07 Address: PO Box 2801 Escondido. CA 92033 Telephone: (7601747-1864 Work to be performed: Roofina List the name of the person who inspected the site of the proposed work for your firm Tom Dav, Jr. A financial statement and references sufficiently comprehensive to permit an appraisal of your current financial condition may be required by the OWNER. 11 02/24/2006 16:52 9515208878 rOK 1 KAl I hU11 iINL ,1..L_ J. 1 List the names and addresses of each subcontractor who will perform work in or about the work improvement, and indicate what portion of the work will be done by each subcontractor: Note: Copy this page and attach additional pages if necessary. Subcontractor's Name: Your Enercv Source License Number: 581981 Address: 11500 Sunrise Gold Circle. #D Rancho Cordova. CA 95747 Telephone: (866) 861-7800 Work to be performed: Windows Subcontractor's Name: Jem Unlimited Iron License Number: 8317p Address: 316Z E. La Palma Ave. #F Anaheim, CA 92806 Telephone: (714) 630-0499 Work to be performed: Fencing Subcontractor's Name: Empire Insulation License Number: 86072 Address: 3901 Carter Riverside. CA 92501 Telephone: (951) 787-4844 Work to be performed: Insulation List the name of the person who inspected the site of the proposed work for your firm Tom Day. Jr. A financial statement and references sufficiently comprehensive to permit an appraisal of your current financial condition may be required by the OWNER. 12