PALM DESERT HOUSING AUTHORITY
STAFF REPORT
RATIFICATION OF AN AGREEMENT FOR PROFESSIONAL
SERVICES CONTRACT NO. HA-25760D FOR RE -DESIGN OF
STRUCTURAL ENGINEERING BY A THIRD PARTY ENGINEER
RELATED TO THE LAGUNA PALMS RENOVATION PROJECT
JAMES CONWAY, PROJECT COORDINATOR
KNAPP AND ASSOCIATES, INC.
408 S. STODDARD AVE.
SAN BERNARDINO, CA 92401
SEPTEMBER 13, 2007
CONTRACT NO. HA-25760D
By Minute Motion, that the Housing Authority Board ratify an agreement in
an amount not -to -exceed $15,000 with Knapp and Associates, Inc.
(Contract No. HA-25760D ) for the structural re -design of all single -story
structures on the project known as Laguna Palms.
Funds for this work are available in Account No. 870-4481-464-4001.
Executive Summary:
By approval of staff's recommendation, the Housing Authority Board will ratify an
agreement approved by the Executive Director for engineering services on the project
known as Laguna Palms.
Discussion:
The original engineer, B G Structural Engineering, Inc., submitted several revisions
each receiving approval, however, the engineering detailed for the single -story
buildings, while not required, meant substantial cost and time increases to the project.
Discussions to recognize alternate approved methods by industry professionals were
not acceptable to B G Structural Engineering. As such, staff consulted with larger
structural engineering firms that were experienced in renovations of this magnitude. In
order to facilitate the change in engineers without a time delay, the Executive Director
authorized the use of Knapp and Associates for the re -engineering of the single -story
Staff Report
Ratification of Agreement for Re -Design of Structural Engineering by Third Party Engr. -
Laguna Palms Renovation Project
Page 2 of 2
September 13, 2007
buildings. Knapp and Associates submitted a proposal in the amount of $15,000, which
included all submittals, construction management, and all the coordination efforts
involving the Building Department, and architects for re -engineered drawings for the
single -story buildings at Laguna Palms. The re -engineered plans still complied with all
Building Code requirements, but resulted in a substantial construction cost savings.
As part of their proposal, Knapp has taken the responsibility for all the engineering for
the single -story buildings, including the original Engineer of Record's plans, stamped
and approved by the Building Department. The original engineer will continue to be the
Engineer of Record for the two-story building and laundry maintenance building.
Therefore, staff is requesting ratification of the agreement with Knapp and Associates,
Inc.
Submitted by:
James
Projec
Jan M. Moore, Director of Housing
Approval:
ti i McCarthy, AC
Carlos L. Ortega, Executive Director
Martin Alvarez
Redevelopment Manager
Department Head:
wave Yrigoy , Dir. of Red./Housing
elopment Paul S. Gibson, Director of Finance