Loading...
HomeMy WebLinkAboutHA23650C - ProposalSECTION 00410 BID SCHEDULE PROPOSAL FOR THE CONSTRUCTION OF CALIFORNIA VILLAS PHASE "B" JANUARY 30, 2008 Owner: Palm Desert Redevelopment Agency Honorable Mayor and Members of the Redevelopment Agency Board: In accordance with the public calling for bids to be opened MONDAY, the 4th DAY of FEBRUARY, 2008 at 2:00 p.m. in the City of Palm Desert City Clerk's office, 73-510 Fred Waring Drive, Palm Desert, California, for the construction of the CALIFORNIA VILLAS PHASE "B" project, in strict conformity with the drawings and specifications, and all addenda thereto issued by the City prior to the opening of bids, for the above described work at the Lump Sum per Bid Item Price set forth in this Bid Schedule. Pursuant to Section 00200, NOTICE INVITING SEALED BIDS, the undersigned hereby proposes and agrees that on award by the Palm Desert Redevelopment Agency under this Bid, and in accordance with the provisions therein stated, to execute a Contract, with necessary bonds, to furnish and install any and all labor, materials, transportation, and services for the construction of CALIFORNIA VILLAS PHASE "B", in accordance with the Drawings and Specifications therefore adopted and on file with City of Palm Desert Redevelopment Agency within the time hereinafter set forth and at the prices named in this Bid as follows: The City requests that the following items of Work be identified as a line item, they are to be inclusive of the TOTAL LUMP SUM BASE BID PRICE: Item Item Lump Sum Price Number Quantity Item Description In Figures and Words 1. Lump Sum Division 0 and 1 $ 411 (-10 General Requirements (In figures) o: Fear hiinctirs -sveouSak-Ncl orksz hunrift cl (In words) 2. Lump Sum Division 2 — Site Construction 9vOV \t\cis 11Y 'thr11-\ Out SZtr d A-N-eQ-.1nU.hAre8 d0<<7r`> C,o)171) (In words) City of Palm Desert Bid Schedule California Villas Phase "B" 1 Section 00410 3. 4. Lump Sum Division 3 — Concrete bor\c\I-`e.c`i `�,'x i '1i \(,l.1c/ r r1rL1( `/6( (In words) Lump Sum Division 4 — Masonry $ (In figures) $ gC3 g`_7 (In figures) Q Ar1n Lcs0.1\ 014 hued r d e �I- \ _rlr-,I (71 r s� q C'�' ��. c1 (In words) 5. Lump Sum Division 5 — Metals $ t1. JEe (In figures) r,i,( h irv-tf t rt ich3.,)i, Ah,0u3ar d Zfe hurAc rd 4h+r4i -Q t.q '- - Ai )117,v 4 (x./ot (In words) oc. 6. Lump Sum Division 6 — Wood and Plastic $al f)“) (In figures) 7 lir t,r -ect 4-,c)10, !' a\ cs C jir,r-, (In words) Lump Sum Division 7 — Thermal and Moisture Protection Tu:Joir\k3 ice, `iti`loucar Ncl IIars 0ckyn (In words) 8. Lump Sum Division S — Doors and Windows $ , mob" (In figures)flY $ (14-) �rf) (In'figures) ItOo ti 4hciu<Air\d r".t hunt rec-1 c l�� (E� �10() In words) 9. Lump Sum Division 9 — Finishes $ M. a3Cci (in figures) f, li,reo_ Y Wr N ltd "`milb 11 1 I 1 W \I \i r ,,,Ita ]k�l (In words) City of Palm Desert Bid Schedule Califomia Villas Phase "S" 2 Section 00410 10. Lump Sum Division 10 — Specialties In figures) (In words) 11. Lump Sum Division 11 — Equipment (In words) c ri $ I N C) (In figures) 12. Lump Sum Division 12 — Furnishings NOT USED 13. Lump Sum Division 13 — Special Construction NOT USED 14. Lump Sum Division 14 — Conveying Systems NOT USED CSC, 15. Lump Sum Division 15 — Mechanical $ tao, 1 f� (In figures) h„r,-Ory)Ias nd ih^ePQea1-i-,5 6(7, ►17i (S CO/moo (In words) 16. Lump Sum Division 16 — Electrical $ ?"/73S Ci M" (In figures) `T"4,rek. Vu yrOre_d 14- 4hT I1 cc->nel h‘ i 41c1 do liars c c lOT: (In words) City of Palm Desert Bid Schedule Califomia Villas Phase "B" 3 Section 00410 17. Lump Sum SpecialpServices - Allowance A-// / (// (t/,t .i 18. Lug Sum Maintenance Services - Allowance // /f 1 j .5/1 /Her-149/'l' 19. Lump Sum Provide (2) hour rated separation, per code at the New Maintenance Building Lump Sum S/i /C. -'' 7iy66//s/U 14 Additive Bid Alternate: $ 75,000 $ 36,000 r<v $ Furnish all labor and material shown in Exhibit "B". Lump Sum: $ /' zri-c.6) r Special Services shall be performed by the General Contractor as directed by the OWNERS REPRESENTATIVE. General Contractor shall include a lump sum allowance of $75,000 in the Bid for these special services and $36,000 for Maintenance Services. Special services shall be paid for by agreement between General Contractor and Agency with the cumulative total not to exceed the fixed contract allowance of $75,000 for Special Services and $36,000 for Maintenance Services shall be full compensation for furnishing all labor, materials, tools, equipment, appropriate mark-ups, and incidentals, and doing all the work involved in the operations directed by the OWNER'S REPRESENTATIVE. It is understood that this contract shall be awarded based on the lowest responsive and responsible TOTAL LUMP SUM BASE BID AMOUNT for items #1 through #19, inclusive of any additive or deductive adjustment. It is further understood that after opening of bids, no adjustments to the TOTAL LUMP SUM BASE BID PRICE or Additive Bid Alternate shall be allowed. However, the Owner, at its sole discretion can select whether to include the Additive Bid Alternate. (In words) Total Lump Sum Base Bid Price Items 1 through 19, inclusive and all work and materials incidental thereto and connected therewith. r (In figures) /9 L4 /t J 4� /,'v�' ,� 7 //e7 /�'t ,' % 7417;07 A '' Audit") (In words) Bid amount of each of the above bid items must be filled in and completed in figures and words. ALL BIDDERS SHALL ACKNOWLEDGE THE RECEIPT OF ALL ADDENDA AND ATTACHMENTS. Receipt of ADDENDUM NO. 1, ADDENDUM NO. 2 and attachments for both, is acknowledged. construction, Tnc/ .r/ 2-4-08 Doug wall Bidder Signature Date *** END THIS SECTION, *** City of Palm Desert Califomia Villas Phase "B" 4 Bid Schedule Section 00410