HomeMy WebLinkAboutSR - HA23010A CA3 - Arch Dsgn Svcs for Laguna PalmsPALM DESERT HOUSING AUTHORITY STAFF REPORT REQUEST: CONTRACT AMENDMENT NO. 3 TO PREST VUKSIC, INC. CONTRACT NO. HA 23010-A FOR ADDITIONAL ARCHITECTURAL DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES FOR LAGUNA PALMS APARTMENTS SUBMITTED BY: MARTIN ALVAREZ, REDEVELOPMENT MANAGER DATE: JANUARY 10, 2008 CONTRACTOR: PREST VUKSIC, INC. 44530 SAN PABLO AVENUE, SUITE 200 PALM DESERT, CA 92260 CONTENTS: CONTRACT AMENDMENT NO. 3 TO CONTRACT NO. HA 23010-A PROPOSAL Recommendation: By Minute Motion that the Redevelopment Agency: 1) Approve Contract Amendment No. 3 to Prest Vuksic Contract No. HA-23010- A for additional architectural design and construction administration services for Laguna Palms Apartments in an amount not -to -exceed $35,575. Funds are available in the Fiscal Year 2007-2008 Capital Improvement Budget Account No. 871-8610-466-4001; 2) Authorize additional reimbursables in the amount of $2,500.00; and 3) Authorize the Executive Director to execute all documents necessary to implement the assignment and change order request. Executive Summary: Approval of the contract amendment will compensate Prest Vuksic for work outside the original contract scope. The additional scope includes the following components: 1. Additional design services to incorporate modifications to apartment unit interiors, design work for electrical re -wire, and fire sprinkler system. 2. Additional costs required to coordinate field modifications resulting from unforeseen conditions such as substandard roofing, underground utilities, and structural design modifications, and additional construction administration services required through the project's completion date of January 2008. Staff Report Amendment No. 3 to Contract HA23010-A — Prest/Vuksic Laguna Palms Rehab Page 2 of 3 January 10, 2008 The failure to approve this request will result in a significant delay in this project. Discussion: The Housing Authority entered into a contract with Prest Vuksic, Inc., Contract No. HA 23010-A, in order to provide architectural design and construction administration services to renovate the property known as Laguna Palms, 73-875 Santa Rosa Way. Prest Vuksic has provided a proposal for additional services outside their original contract in the amount of $35,575. The proposal is attached and consists of two categories. The first category consists of additional design services required to implement modifications to the unit interiors, added electrical re -wire design, and installation of a complete fire sprinkler system. The cost for these services totals $10,850. The second category consists of additional construction coordination services due to unforeseen conditions and additional construction administration services necessary to complete the project. During construction, the Laguna Palms project has encountered several unforeseen conditions that required resolution. The architect has assisted in coordinating meetings, revision and field correction to resolve these issues. Unforeseen conditions that have been coordinated and addressed include: • Modifications to the site's structural design to meet the Uniform Building Code • Modifications to resolve unforeseen conditions found within the building's roof elements, underground utilities, and the additional coordination required to implement the new electrical wiring and fire sprinkler system. In addition, the architect requests approval of additional construction administration services based on the revised completion date of January 2008. As part of this scope, the architect will continue to address contractor questions, review and approve product submittals, issue field clarifications, and complete the final unit and site walk-throughs to ensure consistency with the plans and a quality project. The cost to provide these services is $22,850. The overall contract with Prest Vuksic, including the proposed Amendment No. 3, totals $352,140. This amount translates to less than 6% of the overall project budget, which is within industry standards. G:\rda\Martin Alvarez\2007 SR\Prest-Vuksicamndmt3 011008.doc Staff Report Amendment No. 3 to Contract HA23010-A — PrestNuksic Laguna Palms Rehab Page 3 of 3 January 10, 2008 Therefore, staff recommends approval of Contract Amendment No. 3 in an amount not -to - exceed $35,575.00, plus $2,500 for additional reimbursables to facilitate the completion of the Laguna Palms renovation project. Submitted by: rviartin Alvarez, Redevelopment Manager Department Head: 7., G4, Dave Yrigoy , Dir. Reid./Housing 15/ Carlos L. • Ore , Executive Director Jartet41. Moore, Director of Housing Approval: 1.24±14 McCart CMRedevel ment Paul S. G BY HOUSG AUTH 5—CJ ON 1-10-�B II VERIFIED BY: CDK /1-1P Original on file with City Clerk's Office f Finance G:\rda\Martin Alvarez\2007 SR\Prest-Vuksicamndmt3 011008.doc o O 0) L U I j o C 0 ,• O N U w- F- N cco U C Z / c c 0 CD o CO /U U To Z U cn m -- ~ U % � Z v o %// j u- 2 I F- a) a �.U o1- co% o o Q o fj a1,1- Q Q o f / Q aco0 0 0 0 Q o U = a o0 o O 0 0 0 Q o� 0 0 v v v • O o a)alo i - v) to Z co - c N N N LLI c > c 0 , In �7 C10 N CD o i- N M Cr) M C'7 O g O W F- cfl,% CO nl _ �. o c Q • 0 i r-- CC Q .6 cp CD CD CD �% 0 U7 ci tri Q Z 0 aix i CS Z0Y J O N CL Q 0. as 2 II MO 0 Q Lt 1- Z 0 0 871-8610-466-4001 ORIGINAL CONTRACT ORIGINAL CONTINGENCY ORIGINAL TOTAL CONTRACT O 0 0 0 0 0 o Sri Lri • 0 CO 0 Cti M co M Add'I Archt Svcs & Reimb Allow Add'I Archt Svcs & Reimb Allow N M • IX) g/rda/Beth Longman/Staff Reports/Prest Vuksic LP CO Log