Loading...
HomeMy WebLinkAboutR29410A AS3 Architectural Svcs - Carlos Ortega Villas Prjct Contract No. R29410A SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY/ PALM DESERT HOUSING AUTHORITY STAFF REPORT REQUEST: APPROVE ADDITIONAL SERVICES IN AN AMOUNT NOT TO EXCEED $13,500 (ADDITIONAL SERVICES NO. 3) TO CONTRACT NO. R29410A WITH INTERACTIVE DESIGN CORPORATION FOR PROFESSIONAL ARCHITECTURAL SERVICES FOR THE CARLOS ORTEGA VILLAS PROJECT SUBMITTED BY: Martin Alvarez, Redevelopment Manager ARCHITECT: Interactive Design Corporation 199 S. Civic Drive, Suite 10 Palm Springs, CA 92262 DATE: April 26, 2012 CONTENTS: Additional Services Proposal from Interactive Design Corporation Agreement Sections 3.8 and 3.10.2 Additional Services Request Recommendation By Minute Motion that the Successor Agency and Housing Authority Boards: 1. Authorize Additional Service No. 3 in an amount not to exceed $13,500 to Interactive Design Corporation (Contract No. R29410A) for Professional Architectural Services; 2. Authorize staff to forward to the Oversight Board for approval; and 3. Authorize the Director of Finance to transfer funding from contingency to base in the amount of $13,500 upon approval in accordance with the requirements of ABx1 26. Funds are available in the Capital Budget for the Carlos Ortega Villas, Account No. 703-8691-466-4001. Contract No. R29410A Staff Report Additional Services No. 3 with Interactive Design Corp. for Carlos Ortega Villas April 26, 2012 Page 2 of 3 Commission Recommendation The Housing Commission approved the recommendation at its regularly scheduled meeting of April 11, 2012. Staff will provide a verbal report upon request of the Successor Agency/Housing Authority Board. Background On April 8, 2010, the Palm Desert Redevelopment Agency Board ("Agency Board") authorized the Executive Director to negotiate and finalize a Professional Services Agreement with Interactive Design Corporation (IDC) for architectural services for the Carlos Ortega Villas in an amount not to exceed $734,450 along with reimbursable expenses in an amount not to exceed $36,722. With the action the Agency Board also authorized the establishment of a contingency in an amount not to exceed $75,000. Use of the contingency requires additional approval from the Agency Board. The project entitlement process was completed and the project design approved by the Successor Agency/Housing Authority on March 22, 2012. Interactive Design is moving forward with construction documents and is designing the project based on available data regarding the location of existing utilities. In order to confirm the exact location of the underground utilities and mitigate potential construction delays, IDC proposes to pothole 17 locations for water, sewer, gas, and telephone at the project site. Staff has reviewed the Request for Additional Services with Successor Agency legal counsel who has stated that the original contract agreement sections 3.8 and 3.10.2 (attached) allow for additional services to be approved without an amendment to the contract. Therefore, staff recommends approval of the Additional Services Request with Interactive Design Corporation in the amount not to exceed $13,500 (Contract No. R29410A) and that the Successor Agency/Housing Authority Boards authorize staff to forward Additional Service No. 3 to the Oversight Board for approval. G:\rda\Heather Buck\Carlos Ortega Villas\Stf Rpt\R29410A-COVAprvASNo3 042612.doc Contract No. R29410A Staff Report Additional Services No. 3 with Interactive Design Corp. for Carlos Ortega Villas April 26, 2012 Page 3 of 3 Fiscal Analysis The fiscal impact to the Successor Agency/Housing Authority involves transferring an amount not to exceed $13,500 from contingency to the base contract. The total contract amount (including contingency) is listed on the Recognized Obligation Payment Schedule (ROPS) under Project Area 4, line 18; this request will not require an adjustment to the total obligation. Submitted By: rtin Alvarez, Redevelopment Manager JOet.Moore, Director of Housing Department Head: • sti McCarthy, Assista ty Manager aul S. Gibson, Director of Finance roval: 1.1" J n M. Wohlmuth, Executive Director G:\rda\Heather Buck\Carlos Ortega Villas\Stf Rpt\R29410A-COVAprvASNo3 042612.doc ; CONTRACT N T R A C T AMENDMENT 008.3 IMO INTERACTIVE DESIGNCORPORATION ARCHITECTS + DATE April 3, 2012 199 S.Civic Drive,Suite 10 Palm Springs, California 92262 TO Heather Beck, PD RDA T: (760) 323-4990 F: (760) 322-5308 mari a@i nteractived esigncorp.co m VIA email FROM Maria Song PROJECT IDC No. 1008 Carlos Ortega Villas SUBJECT Additional Services for Potholing Page I of 2 We are h our ng of beiow DISTRIBUTION amendment by theproceeding third business day from the date ve of thisreferenced pro�ct record,project in accordance the following will be considered as confirmed onfrmed instruction and understanding Unless we receive written clarification or Fax: ADDITIONAL SERVICES 1008.3 to PALM DESERT REDEVELOPMENT AGENCY AGREEMENT FOR ARCHITECTURAL SERVICES CONTRACT NO. R29410A Dated May 19, 2010 In accordance with Article 3.10 COMPENSATION, the parties wish to ADD to the above-referenced Agreement to retain the services of Architect to design the project to include potholing to survey the physical locations of the existing utilities on site and apply this information to the design of the wet and dry utilities: A. Pursuant to Article 3.10 COMPENSATION, Section 3.10.2 PAYMENT FOR ADDITIONAL SERVICES, the parties agree to retain the services of Architect as follows: I. Existing utility information by Potholing approximately 17 locations of water, gas, sewer, and telephone in the vicinity of proposed utilities, buildings, and site amenities. The Architect will: a. Contract with the Civil Engineer to provide (See Exhibit A& B): I. Pothole exhibit 2. Coordinate with survey contractor 3. Apply information to the proposed site design b. Meet with Civil Engineer to review existing conditions and resolve any site design conflicts. c. Determine which utility lines will not be used for the proposed project and provide capping information in the construction plans of the project. d. Meet with RDA Staff to review outcome. B. Article 3.10 COMPENSATION, Section 3.10.2 PAYMENT FOR ADDTIIONAL SERVICES is amended to include the following compensation for said specific services as identified hereinabove: P:\1008 Carlos Ortega Villas\CONTRACTS11008.3 Contract Am Potholing 23JUN 11.doc■ MUM IMO INTERACTIVE DESIGN CORPORATION 1. Compensation shall be on hourly basis according to the rates in the original contract not to exceed Twelve Thousand Five Hundred Dollars ($13,500). The survey services of the civil design services are included in this fee. C. All other terms and conditions of said Agreement shall remain in effect. AGREED AND ACCEPTED /,% April 3, 2012 Reuel A. Young;'/ si en Date Interactive Dn Corp. ation California License #C I''74 T: (760) 323-4990 Palm Desert Redevelopment Agency Date 73510 Fred Waring Drive Palm Desert, California 92262 P:\1008 Carlos Ortega Villas\CONTRACTS\1008.3 Contract Am Potholing 23JU Page 2 of 2 (V th , MSA CONSULTIN<i, INC. PLANNING•CIVIL ENGINEERING•LAND SURVEYING CONTRACT SCOPE CHANGE NOTIFICATION / AUTHORIZATION Project: Carlos Ortega Villas MSA Job#: 1892 MSA RFP#: 4387 Initiated by: Maria Song Client Reference: IDC Date: June 23,2011 MSA PM: Bruce S. Kassler The following change is proposed for the above referenced project and is a request to amend the previous established and contracted relationship between MSA Consulting, Inc. and Client and is to act as an addendum to any existing contract or relationship established between the two parties. Authorized changes may also impact delivery dates and milestones. The undersi.ned 'art desires MSA Consultin. Inc.to rovide the followin_additional _oods and services: CHANCE TYPE: ®Extra Work I Field Change Design Change III Schedule Change U Other(Specify) CHANGE REQUEST: • Potholing Coordination: 1. Secure potholing estimate and coordinate with the Contractor. 2. Prepare a pothole exhibit. 3. Survey crew to provide pothole tie in points. 4. Field meetings with the pothole Contractor. 5. Review all pothole digsheets. 6. Update existing utility base plan. 7. Potholin! assumin l 17 excavations'5 as'halt and 12 in dirt. li<IP.1(`'1 : SCHEDULE: Start Work(for this Work): Upon NTP Est.Complete Work(for this Work):3 weeks from NTP Overall Schedule Impact:®No ❑Yes COSI' IN1P:kC`I: Cost Impact: ■ No 0 Yes Proposed Total Additional Cost:$10,535 Fixed Fee:$10,535 Time&Materials: CO%l\lEN`TS: Included is a hand drawn potholing exhibit. AUTHORIZED BY: Signature: Entity: ❑Accept 0 Reject Date: 34200 13tn1 lltat'i DKR' • I(.x\a lit) MIR v<,t ■ ('NI Il tl)tyt1 U 92270 760.320-9Sll ■ '60.323-7h93 1•ax 111 vtv .A'lSACirysrt tty..Ist .cum L /4, 'A ---.-- ---.„-.1 '---—t'—;' . '.--,--.,,, ----.--..- ___ i „,',;;7,7--ST--t9Z—Lf-TE-77-*1 '''- \' ' , ..„,,,____„,___„,„____:,_ ....,:,.. ,:,_ ..„- . ,,,,-..,....„,_ _._, ___,,_____________ --_ __, .-- a �,. `' �T _ `F` � AVENUE OF THE --- . _ _ _ STATESe�a� € x� J //'' / // , I '( tt 3 pq I A Ail // ��1 1 if I/ %. 1 f /;� it $ 1 'w.. ,v 1 r x. �f'-�/ GBS I',1 I _ _ ,` � d L/ �•// i I �� � r�� _ti Z °?'i.:0 2_P__%/7 t.',/:,,z'/;',.74' if ,I. ,- i --- I, *1, ', i --,,,./-p.......7---,-- ---/-•••--1,- ji'.---i , ?A wkii— t1 l rr ^s> - - , /'/ L._, r-\ e✓ " i• ' i� rl I. r � ID'r / rf = -° y _1 \ / ,; --; 0 "MP \I1 { 1 ��\\ L 2' .. - I r 17 /" oa L -(;3 f _ i jr� `� -{n i, jv \�4 IBA tjy i < /- '/� ' C ` � 1 e- L I ,�`1 ° / rl / r Bs' �e \I\; DUDLEY D�_\E` 1 ` �- _ -` 1 ,. 99 `i //�'// il� �I I I I a r/ 3 � . C co i l //ice%/ 4: 'U- . �!5 - ifill - ----� /// i / s� { 4r y • I n��� Il y _ y 71 /� � 11 r7 .' ,L11' /� j'l . ,) // , � I �i' 'f _d IeJ `J Ii 5 ,L,/i ,i,T \ ll, rI°�IJ / 7 1iWf. 1 J ULH . , i1 I l yd . `,/ /-.4 I +� / oes ._ yj 1 11 1 III %/ / P } I 5 r u 4 f,- 1 f,r r i f l y % 1 / l I I / _ ,/// 1/3) / • f j r ] 1 l L am_'- Il III II (i/�i / .1� // , I I,/ c I h i:/ II Ir ; � / JI I , (IP �.0 1# i f f ii / 1f / -- I E`— 14 in) r,; // //` { od j 1 j IF gn �, ' lt / i i �1 ! l 'f -1T -I ! y, .I I i ; :..._�g5O — �� 'I/ r 1 -� z I L / t / , I '1!•-..y . I . ' i I-4 � mi ` - . '. I (l � ir if '1 • •le i R a 8i 3.7 Schedule of Services. 3.7.1 Timely Performance Standard. Architect shall perform all Services hereunder as expeditiously as is consistent with professional skill and care, as well as the orderly progress of the Project work so as not to be the cause, in whole or in part, of dprovys ided In the completion of the Project or in the achievement of any Project milestones, as herein. Specifically, Architect shall perform its Services so as to allow for the full and adequate completion of the Project within the time required by the Agency and within any completion schedules adopted for the nsultants inr the performance ofct. Architect g the Services,to o coordinate and shall be availableAgency's ff, contractors and co Agency's staff, contractors and consultants at all reasonable times. 3.7.2 performance Schedule. Architect shall complete all work in accordance with the milestones specified in Exhibit"D' Schedule of Performance.The schedule shall not be exceeded by Architect without the prior written approval of Agency. If the Architect's Services es are not completed within the time provided in Exhibit °D" the agreed uponpe schedule, or any milestones established therein, it is understood, acknowledged and agreed that the Agency will suffer damage for which the Architect will be responsible pursuant to the Indemnification provision of this Agreement 3.7.3 Excusable Delays. Any delays in Architect's work caused by the following shall be added to the time for completion of any obligations of Architect: (1) the actions of Agency or its employees; (2)the actions of those In direct contractual relationship with Agency; (3)the actions of any governmental agency having jurisdiction over the Project; (4) the actions of any parties not within the reasonable control of the Architect; and (5)any act of God or other ligence on the part of unforeseen teArchitect occurrence shat ll be liable for da to any fault or mages, liquidated or otherwise, to theeither other the on Agency nor th account of such delays. 3.7,4 Request for Excusable Delay Credit. The Architect shall,within thirty(30) calendar days of the beginning of any excusable delay(unless Agency grants in writing a further period of time to file such notice prior to the date of final payment under the Agreement), notify the Agency in writing of the causes of delay. Agency will then ascertain the facts and the extent of the delay, and grant an extension of time for completing the Services when, in its sole judgment, the findings of fact justify such an extension. The Agency's findings of fact thereon shall be final and conclusive on the parties. Extensions of time shall apply only to that portion of the Services affected by the delay and shalt not apply to other portions of the Services not so affected. The sole remedy of Architect for extensions of time shall be an extension of the performance time at no cost to the Agency. If Additional Services are required as a result of an excusable delay, the parties shall mutually agree thereto pursuant to the Additional Services provision of this Agreement. Should Architect make an application for an extension of time, Architect shall submit evidence that the insurance policies required by this Agreement remain in effect during the requested additional period of time. 3.8 Additional Architect Services. 3.8.1 Request for Services. At Agency's request, Architect may be asked to perform services not otherwise included in this Agreement, not included within the basic 6 Beat Best&Krieger LLP—July 2009 SDPUBu383408.1 services listed in Exhibit "A" attached hereto, and/or not customarily furnished in accordance with generally accepted architectural pre usedctice. herein, "Additional Services" mean: (1) any work 3.8.2 L '2, As for is determined by Agency to be necessaryor the proper completion of the Project, but which the parties did not reasonably anticipate��disted as Add be itional oral Services for the Exhibit to �A" rm at the execution of this Agreement, or ( ) any Additionalin Services attached hereto. Architect shall not perform,�d withoutb anensated for,agreement between the Agency without prior written authorization from Agency and Architect as to the compensation to be paid for such services. Agency shall pay Architect for any approved Additional Services, pursuant oughcthepfauit compensation Architect pursuant toiong the as such services are not made necessary indemnification provision of this Agreement. 3.8.3 r' `rn"'ac n4 Additional Senricee. Such Additional Services shall not include any redesign or revisions to drawings, specifications or other documents when such revisions are necessary in order to bring such documents into compliance with applicable laws, rules, regulations or codes of which Architectthis was aware or �ulSuch Additional Servces may rsuant to the laws and regulations provision of Agreement abovs include, but shall not be limited to: 3.8.3.1 $epa"ately BId Portions of Proiect. Plan preparation and/or administration of work on portions of the Project separately bid. 3.8.3.2 °rna .T and Interigr Desian. Assistance to Agency, if requested,for the selection of moveable furniture, equipment or articles which are not included in the Construction Documents. 3.8.3.3 Fault of Contra Services caused by delinquency, default or insolvency of contractor, or by major defects in the work of the contractor, provided that any such services made necessary by the failure of Architect to detect and report such matters when it reasonably should have done so shall not be compensated. 3.8.3.4 'n n st�r* """rgvals or Ina vctons. Revisions in drawings, specifications or other documents y when such revi sions are causes beyanditconsi stteontof with�written approvals or instructions previously given and are 3.8.3.5 Leoa_____Pinar. Serving as an expert witness on Agency's behalf or attending legal proceedings to which the Architect is not a party. 3.8.3.8 Qamaae ReQair. Supervision of repair of damages to any structure. 3,8.3.7 c ,a environmental Serviq S. Additional work required for environmental conditions (e.g. asbestos or site conditions) not already contemplated within the Architect's services for the Project. 3.9 Agency Responsibilftles. Agency's responsibilities shall include the following: 3.9.1 f]at a d Informati i. Agency shall make available to Architect all necessary data and information concerning the purpose and requirements of the Project, 7 Best Best&Krieger LIP—July 2000 SDPua\3a3408.1 • including scheduling and budget limitations, objectives, constraints and criteria. As part of the budget limitation information, the Agency shall provide the Architect with a preliminary construction budget("Agency's Preliminary Construction Budget"). 3.9.2 ALTA Survey. Agency shall furnish Architect with, or direct Architect to procure at Agency's expense, a survey of the Project site prepared by a registered surveyor or civil engineer, any other record documents which shall indicate existing structures, land features, improvements, sewer, water, gas, electrical, utility lines, and boundary dimensions of the site, and any other such pertinent information. 3.9.3 Bid Phase. Distribute Construction Documents to bidders and conduct the opening and review of bids for the Project. 3.9.4 Required inspections and Tests. Retain consultant(s) during construction to conduct materials testing and inspection or environmental/hazardous materials testing and inspection pursuant to any applicable laws, rules or regulations. 3.9.5 Fees of Reviewing or Licensing Aaencles. Directly pay or reimburse the payment of all fees required by any reviewing or licensing agency, or other agency having approval jurisdiction over the Protect. 3.9.6 Agency's Representative. The Agency hereby designates the Agency Manager, or his or her designee, to act as its representative for the performance of this Agreement ("Agency's Representative"). Agency's Representative shall have the power to act on behalf of the Agency for all purposes under this Contract. The Agency Manager hereby designates Catherine Walker, Senior Management Analyst, or his or her designee, as the Agency's contact forte implementation otherhe than the sAgerecy'ser.RepresContractor enta6veshall his not accept direction or orders any person designee. 3.9.7 Review and Approved Documents. Review all documents submitted by Architect, including change orders and other matters requiring approval by the Agency's governing board or other officials. Agency shall advise Architect of decisions pertaining to such documents within a reasonable time after submission, so as not to cause unreasonable delay as provided in the excusable delay provisions of this Agreement above. 3.10 Compensation. 3.10.1 Architect's Compensation for Basic Services. Agency shall pay to Architect, for the performance of all Services rendered under this Agreement, the total not to exceed amount of Seven hundred and thirty four thousand, four hundred and fifty dollars. ($ 734,450) ("Total Compensation"). The Total Compensation shall constitute complete and adequate payment for Services under this Agreement. 3.10.2 jlyment for Additional Services. At any time during the term of this Agreement, Agency may request that Architect perform Additional Services. As used herein, Additional Services means any work which is determined by Agency to be necessary for the properecescompletion t en of xeccuuttiioP%th st bAgreement which the Parties If authorized, suchdditionaltcipate Servi vs will be uld be necessary at the execution Best Best&Krieger LLP—Juty 2000 SDPUB1383408.i • compensated at the rates and In the manner set forth in Exhibit "C" attached hereto and incorporated herein by reference, unless a fiat rate or some other form of compensation is mutually agreed upon by the parties_ If Agency requires Architect to hire consultants to perform any Additional Services, Architect shall be compensated therefore at the rates and in the manner set forth in Exhibit 'C" attached hereto and incorporated herein by reference, unless a fiat rate or some other form of compensation is mutually agreed upon by the parties. Agency shall have the authority to review and approve the rates of any such consultants. In addition, Architect shall be reimbursed for any expenses incurred by such consultants pursuant to the terms and conditions of Section 3.10.3. 3.10.3 Reimbursable Expenses. Reimbursable expenses are in addition to compensation for the Services and Additional Services. Architect shall not bee imbur denim for any expenses unless authorized In writing by Agency, which approvalY by inclusion in Exhibit "C" attached hereto. Such reimbursable expenses shall include only those expenses which are reasonably and necessarily incurred by Architect in the interest of the Project. Architect shall be required to acquire prior written consent in order to obtain reimbursement for the following: (1) extraordinary transportation expenses incurred in connection with the Project; (2) out-of-town travel expenses incurred in connection with the Project; (3)fees paid for securing approval of authorities having Jurisdiction over the Project; (4) bid document duplication costs in excess of$1,000; and (5) other costs, fees and expenses in excess of$1,000. 3.10.4 Pavment to Architeet. Architect's compensation and reimbursable expenses shall be paid by Agency to Architect no more often than monthly. Such periodic payments shall be made based upon the percentage of work completed,and in accordance with the phasing and funding schedule provided in Exhibit "B" and the compensation rates indicated in Exhibit "C" attached hereto and incorporated herein by reference. In order to receive payment, Architect shall present to Agency an itemized statement which indicates Services performed, percentage of Services completed, method for computing the amount payable, and the amount to be paid. The statement shall describe the amount of Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement as well as those expenses for which reimbursement is requested for that statement period. The amount paid to Architect shall never exceed the percentage amounts authorized by the phasing and funding schedule located In Exhibit 'B' attached hereto. Agency shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon pursuant to the provisions of Civil Code Section 3320. Disputed amounts shall be resolved by the parties in a mutually agreeable manner. Payments made for Additional Services shall be made in installments, not more often than monthly, proportionate to the degree of completion of such services or in such other manner as the parties shall specify when such services are agreed upon, and in accordance with any authorized fee or rate schedule. In order to receive payment Architect shall present to Agency an itemized statement which indicates the Additional Services performed, percentage of Additional Services completed, method for computing the amount payable, and the amount to be paid. The statement shall describe the amount of Additional Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. Agency shall, within thirty (30) days of receiving such statement, review the statement and pay ail approved charges thereon pursuant to the provisions of Civil Code Section 3320. Disputed amounts shall be resolved by the parties in a mutually agreeable manner. 9 Best Best&Krieger LLP—July 2009 SDPUB\383408.I SUCCESSOR AGENCY TO THE PALM DESERT REDEVELOPMENT AGENCY PALM DESERT HOUSINGAOTHORITY Contract#/P.O.# R29410A 17371 PROFESSIONAL �p ADMIRE�pD�(�r Additional 3 PROFESSIONAL SERVICE SERVICES Services No. Contingency: YES X NO Contract Purpose Architectural Services for Carlos Ortega Villas Account No. 703-8691-466-4001 Consultants Name Interactive Design Corporation Project No. Address: 199 South Civic Drive, Suite 10 Vendor No. 326 Palm Springs, CA 92262 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE DESCRIPTION OF CHANGES In Contract Price In Contract Price Provide additional services to confirm exact location of underground utilities (water, sewer, gas, telephone) by potholing approximately 17 locations. 13,500.00 TOTALS: - 13,500.00 NET ADDITIONALSERVICES PRICE: 13,500.00 JUSTIFICATION: Identify location of underground utilities to mitigate potential construction delays. TOTAL BUDGET FOR PROJECT: + 846,172.00 CONTINGENCY: Less: Expend. & Encumb. To Date: - 791,472.00 Amount Approved by Authority: + 75,000.00 Less: This Change Order Amount: - 13,500.00 Less: PriorAmendment(s): - 20,300.00 BALANCE OF BUDGET Less: This Amendment: - 13,500.00 REMAINING FOR PROJECT: 41,200.00 Balance Remaining of Contingency: 41,200.00 The amount of the Contract will be (Decreased) Increased by the Sum of: Thirteen thousand five hundred and NO/100 Dollars ($13,500.00). G:\rda\Heather Buck\Carlos Ortega Villas\Stf Rpt\Carlos Ortega Villas AddlSrvc#3-HA 4-12-12.doc See reverse ... Contract R29410A Additional Services (AS) 3 Continued from front This AS covers changes to the subject contract as described herein. The consultant shall perform all work as necessary or required to complete the AS items for a lump sum price agreed upon between the Consultant and the Palm Desert Housing Authority, otherwise referred to as Owner. Contract Time Extension -0- Days. Revised Contract Total $804,972.00 The undersigned Consultant approves the foregoing AS # 3 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the AS, and as to the extension of time allowed, if any, for completion of the entire work on account of said AS # 3 . The Consultant agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the AS items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the AS shall be effective when approved by the Owner. Execution of this AS by the Consultant constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the AS, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of productivity, as well as any and all consequential damages. This document will become a supplement to the Contract as permitted in Sections 3.8 and 3.10.2 and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 1. REQUESTED BY: 2. ACCEPTED BY: EXECUTIVE DIRECTOR CONSULTANT Date Accepted 3. CERTIFIED FUNDS AVAILABLE: 4. APPROVED BY: FINANCE DIRECTOR ROBERT A. SPIEGEL, CHAIRMAN 4/12/2012 NOTE: No payments will be made prior to Executive Director and Housing Authority approval SECRETARY 4/12/2012 G:\rda\Heather Buck\Carlos Ortega Villas\Stf Rpt\Carlos Ortega Villas AddlSrvc#3-HA 4-12-12.doc See reverse ... 0 m 0 Cl) C.71 .A CA) N.) —• O M. CD 0 COD > 0 0 0 0 CT) H 0 su Q-0 Q O G7 ;L7 w _ �_ 5_ Cp to -1 O Qp. > r c-, CD — cp < z D Z Z Z co Q /) O < o• (DQ D D D —` CI) S v m c (O r r r rn c n v CD D 0 0 0 CD -I.or ._+ —I Z Z , � n c rt O p • w D -I H o C n. a) D 1- O° ND Z -CN p N •0 CD ..G n• o -I N < te a) N z a) Ts D �mCDD 73 v su ZD= :- m C) n CO 0 C Q —I D 7:1I> D W D n m w w rNv 3 0CnD 0 Cu 0 0 C @ Z C 0 0 0 0 rn 73E00 0 0 0 0 N D D 0 N -i -< Z o0 o 0 O m o - - - 0 � n w ▪ 0 CD v o 71 = D � c*) Co C� \ 0 N D.ALZ r > ci) P O __I 0, N N N N 'a o o 0 o a CD CD //O soa v O v 10a D O v = o jm• N C) -1 o 2) o � m -iFn- u) "Ti %o %m o Z / /o _1 v 0 Z n cn m co 0 a) - .A v -ti CO 0) X NJ Cn o D CDCDo � < N.)O O 0 0 j