PALM DESERT HOUSING AUTHORITY
STAFF REPORT
REQUEST: APPROVE CHANGE ORDER NO. 11 TO CONTRACT NO. HA29410B
WITH OPTIMUS CONSTRUCTION, INC., IN THE AMOUNT OF
$12,770.45 FOR CONSTRUCTION OF THE CARLOS ORTEGA VILLAS
(PROJECT NO. 825-11)
SUBMITTED BY: Heather Buck, Project Coordinator
CONTRACTOR: Optimus Construction, Inc.
440 Western Avenue, Suite 202
Glendale, CA 91201
DATE: July 9, 2015
CONTENTS: Change Order No. 11
Recommendation
By Minute Motion, that the Authority Board:
1. Approve Change Order No. 11 to Contract No. HA29410B in the total
amount of$12,770.45 for the Carlos Ortega Villas (Project No. 825-11);
2. Authorize the transfer of$12,770.45 from contingency to base; and
3. Authorize the Chairman to execute Change Order No. 11.
Funds are available in Account Nos. 8718691-4400100 and 7038691-4400100, Capital
Improvements, for this purpose.
Commission Recommendation
The Housing Commission reviewed the recommendation at the regularly scheduled meeting of
July 8, 2015. Staff will provide a verbal report upon request of the Authority Board.
Backqround
On July 10, 2014, the Authority Board authorized award of the contract for construction of the
Carlos Ortega Villas to Optimus Construction, Inc. The Notice to Proceed was issued on
September 4, 2014. Construction is on schedule and anticipated to be completed in
November 2015.
This Change Order incorporates the following items. Costs for the additional work and
materials are within industry standards.
• Added waterproofing at HVAC units
Staff Report
Approve CO No. 11 to Contract No. HA29410B (Optimus)for the COV project
Page 2 of 2
July 9, 2015
• Relocated pool equipment wiring due to added equipment in the utility room
• Refrigerator model change due to problems with the specified appliances at existing
Housing properties
• Added door for security in community room kitchen
• Lighting for public art mosaic
Fiscal Analvsis
Below is a summary of the approved and proposed change orders:
Descri tion Contin enc Contract
Ori inal Contract $1,542,335.13 $15,423,351.39
Previousl A roved Chan e Orders $274,417.26 $274,417.26
Chan e Order No. 11 $12,770.45 $12,770.45
Revised Contract Total $1,255,147.42 $15,710,539.10
If Change Order No. 11 is approved, total Change Orders to date represent 1.86 percent of the
contract.
The estimated costs for the project are listed on ROPS lines 171 and 186. Although the
Housing Authority will initially advance the funds for this work, the SARDA may reimburse the
Authority for the costs from bond proceeds. The 2007 Housing Set-Aside bond issuance
included the Carlos Ortega Villas as a project in the bond covenants.
As a requirement of the State Department of Finance, a Bond Proceeds Funding Agreement
was approved to facilitate this purpose by the Oversight Board on October 7, 2013, and by the
Authority Board on October 10, 2013.
Submitted By: ,
/��%�L.����.-� ,���c.�..°-�ti`--, �. �
�� �
Heather Buck, Project Coordinator J net . Moore, Director of Housing
�S�
Martin Alvarez udy A sta, Assistant City Manager
Director of Economic Development
Reviewed:
�r psG ��SY HousG AU-ti-t
Paul S. Gi s n, D' ctor of Finance o� 7`�'�5
� �2,l01� (�l w1
A 'pro al: VERIFIED 8Yo -
�
�� C?riginal on file with G�tv Cterk's�'rC�
J M. Wohlmuth, Executive Director
cn
n
d
� �
m
� � � CO (D OD �I � CJi A W N � O
o �
�
� � g � � Om � � vcn3 cn � 00 O
� O n� � � � � w n� � � � o � �7 :U �l
� D � `� =, � � n � � � o G) G� G�
� � � � w � cn < o o O m � Z Z Z
� � � a 2. o m = Q � ° � r r r
o � � o' m � -o� m � cn � cp -I C� C�
� cn cn � cn v o w o• cn � O O O
n � � � � � w cn � rn � Q D � �
� N 3 � D � cnv. n�i � r �
m � � m v � �' 'c � m n O
a � v N o v � n n � -Zi
� �
� � � N• � � � ' � �
� � � c� p � - D
� c p� o (7
� TI � f�ND l�D N = � Q
cn � � Q ,��, (n
o � Z C
�n r' � -1 O 3
� � � � 3
° °' ry ,. -• D c) n 3 �
C oo � � � � � � c,.� .� 3 � 3 c -< n
� y �I N W �! �I N -� W � U1 A O O Q � � N � D
D � � �1 -� CO �1 �I O -� W � O �I � � �
� 00 �l W � O �l N O �I N O --� CO � � (D � �
'n O �l O W N � CJ� CD � W N � W � � C7 �
� �J A W � N N �I O � A A 00 CJi � O �
� `� '"' U1 v v O� U1 CO O CJi � 00 N W � Z
° v * � �
� � � � � m
0 0
D Z � o .o .o � 00000000 � o � nD
� O 00 O O O N O O O O --• N O O � �` n
2 (n � OD Cfl � N CJi 00 �! N � W W �I � 2 G
D � � � � � � � � � � � � � D r
R1 0 0 0 0 0 0 0 0 0 0 0 0 0
Z z r
� �' O � cDi�
� � .� � � � � � � � � .� .� � Zm
p cn cn cn cn cn cn u, cn cn cn cn cn n � cn O � O
� � a� � � in cn cn � 1� A � � � o c� � cQ � �
m � co � � rv � ocoao � wwo � � r� D v
Z o � o � � rn � wcowww .-• � �,� w � nm
Cfi �l C� 00 � W W N 00 N N CJ� � � (D W - --� �
O W � O � � 00 CJ1 U1 00 � CJ� A ;?. fl- CJ� D
CO 00 N A W 00 OD �l W � Cfl U1 � "� Z
�1 ---' � O � W � W W � N �! CO W � O
O CT O CJi �! N W W 00 N A N C� �
� _
p� � 3 v� D
n � � � O � A
� v � D � � �
Z �p O d � � D O
� Q� � N � O W
= C)
D p � � W �p N
-I 2 � � 'T1 � O �
�n �' C w cu' o
Z � �
v � __
� �
� � z �
,
� � � � � � � � � _a � � O � � � �
N N N N .A A A A A A Ul CJ1 � l� CO Z
CJi � C7� CT A A � �I �I Cfl N W .+ (D � � —I
CI� �l A W -� CO � N CJ� N �l N � �,� CJ� �
� cD �1 0o c.Ti IV W A Oo A A � � � j � D
A � 00 N N C� N N O N N A n
�l �I A � W O� 00 C� N CJi � O 3� � �
� OD (Jl 00 � A � � 00 W �I � V! Ul
N �I N �I CJ� O CO CO A O 00 O N
CTI'Y OF PALM DESERT Contract#/P.o.# HA29410B P019255
Change Order No. �1
CONSTRUCTION CHANGE ORDER Contingency: YES No
Contract Purpose Carlos Ortega Villas Account►vo. 871'8691-466-4001
703-8691-466-4001
ConsultanYs Name Optimus Construction Inc. Pro�ect rvo. g25-�1
Add�ess: 440 Western Avenue, Suite 202 vendor rvo. 13425
Glendale, California 91201
You are hereby requested to comply with the following changes from the contract plans and specifications:
DESCRIPTION OF CHANGES DECREASE INCREASE
Optimus COR Nos. 40-R4, 42, 43-R1, 44, and 47 In Contract Price In Contract Price
Waterproofing detail at HVAC units 2,384.59
Relocate pool equipment wiring 1,049.47
Refrigerator model change due to problems at existing Housing properties 6,636.47
Pocket door/window at Community Room Kitchen 770.05
Lighting for public art 1,929.87
TOTALS: - 12,770.45
NET CHANGE IN CONTRACT PRICE: 12,770.45
JUSTIFICATION: Additions to the scope of the contract.
OTAL BUDGET FOR PROJECT: + 15,710,539.10 CONTINGENCY:
Less: Expend. & Encumb. To Date: - 15,697,768.65 Amount Approved by Council: + 1,542,335.13
Less: This Change Order Amount: - 12,770.45 Less: Prior Change Order(s): - 274,417.26
BALANCE OF BUDGET Less: This Change Order: - 12,770.45
REMAINING FOR PROJECT: 0.00 Balance Remainin of Contin enc : 1,255,147.42
The amount of the Contract will be Increased by the Sum of: Twelve Thousand Seven Hundred Seventy and
45/100 Dollars ($12,770.45).
G\PubWorks\PROJECTS\825-11 Carlos Ortega Villas\Statt Reports�2015-07-09 SR-Optimus OCO 11\Contract Change Orde�No.11.docx See reverse ...
Contract HA29410B Change Order No. 11 Continued from front
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order items for a
lump sum price agreed upon between the Contractor and the Ciry of Palm Desert, otherwise referred to as Owner.
Contract Time Extension -0- Days.
Revised Contract Total $15,710,539.10.
The undersigned Contractor approves the foregoing Change Order No. 11 as to the changes, if any, in the contract
price specified for each item including any and all supervision costs and other miscellaneous costs relating to the
change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said
Change Order No. 11. The Contractor agrees to furnish all labor and materials and perform all other necessary work,
inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order
items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood
that the Change Order shall be effective when approved by the Owner.
Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies,
waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of
or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and
indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as
any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
1. REQUESTED BY: 2. ACCEPTED BY:
DEPARTMENT HEAD CONTRACTOR Date Accepted
3. CERTIFIED
FUNDS AVAILABLE: 4. APPROVED BY:
FINANCE DIRECTOR SUSAN MARIE WEBER, CHAIRMAN Date Approved
NOTE: No payments will be made prior
to Executive Director and Housing
Authority approval EXECUTIVE DIRECTOR Date Approved
G:\PubWorks\PROJECTS�825-11 Carlos Ortega Villas\StaH Reports�2015-07-09 SR-Optimus OCO 11\Contract Change Order No.11.docx See reverse ...