STAFF REPORT
PALM DESERT HOUSING AUTHORITY
PUBLIC WORKS DEPARTMENT
November 15, 2018
Cora L. Gaugush, Management Specialist II
Award Contract HA37350 to S & T Contractors Service Inc. dba
Service Master Restoration by S&S, of Santa Clarita, California, in the
amount of $164,616.00, for the Stair Top Handrail Replacement at One
Quail Place Apartments (Project 821-19)
By Minute Motion:
1. Pursuant Municipal Code Section 3.30.160(i) (Best Interest of City), award
Contract HA37350 to S & T Contractors Service Inc., dba Service Master
Restoration by S&S of Santa Clarita, California, in the amount of $164,616.00,
for the Stair Top Handrail Replacement at One Quail Place Apartments (Project
821-19);
2. Authorize the Director of Finance to set aside a 10% contingency, in the amount
of $16,461.60;
3. Authorize the Executive Director or designee to review and approve written
requests for the use of any portion of the contingency toward unforeseen
conditions; and
4. Authorize the Executive Director and/or the Chairman to execute the negotiated
contract and any documents necessary to facilitate the contract award.
Funds are available in the Authority's capital replacement budget for this project.
Committee/Commission Recommendation
The Housing Commission reviewed this recommendation at its regular meeting of
November 14, 2018. An oral report of their action will be presented.
November 15, 2018 - Staff Report
Stair Top Rail Replacement at One Quail Place Apartments
Page 2 of 3
Strategic Plan
The Stair Top Handrail Replacement at One Quail Place Apartments is an on -going
maintenance activity and, as such, does not contribute directly to the objectives of the
Strategic Plan.
Background Analysis
This project will replace all the stair top handrails at One Quail Place Apartments, with a
wooden rail treated with a polyurea coating. The property is owned and maintained by
the Palm Desert Housing Authority, and the top handrail has not been replaced since the
apartments were constructed in 1983. The top handrail has reached its life expectancy
and needs to be replaced. The protective coating will provide UV protection for the wood
as well as a textured finish to the handrail.
A Notice Inviting Bids was advertised in August of this year and bids were due on October
12, 2018, at which time no responsive bid was received. When no responsive bids were
received, staff contacted the contractor that provided samples of the product for the pre -
bid meeting, S & T Contractors Services, Inc. dba Service Master Restoration by S&S.
The company specializes in this type of coating for a variety of products. They are very
familiar with the product and One Quail Place. Additionally, the Housing Authority has
previously used this contractor for other repairs/replacement items at this location and
has been satisfied with their work. They provided a cost of $38.00 for the top handrail
replacement, complete, per linear foot. The complex will need 4,332 linear feet of handrail
replaced, for a total of $164,616.00.
Pursuant to Municipal Code 3.30.160(i), staff is requesting that the City Council award
this contract to S & T Contractors Services, Inc. dba Service Master Restoration by S&S,
in the best interest of the City.
Fiscal Analysis
The fiscal impact of this contract is the cost of the contract itself in the amount of
$164,616, plus 10% contingency in the amount of $16,461.60, (if used for unforeseen
conditions) which will be paid from the Authority's capital replacement budget.
LEGAL REVIEW DEPT. REVIEW
W.
City Attorney
r('
es Tom Garcia, P.E.
Director of Public Works
FINANCIAL
REVIEW
Director of Finance
CITY MANAGER
Lauri Aylaian
City Manager
November 15, 2018 - Staff Report
Stair Top Rail Replacement at One Quail Place Apartments
Page 3 of 3
APPLICANT: S & T Contractors Services, Inc.
dba Service Master Restoration by S&S
21163 Centre Pointe Parkway
Santa Clarita, California 91350
ATTACHMENTS: Contract HA37350
Proposal
Payment Bond
Performance Bond
1/ L3Y hOUSO AUTN
ON 6
VERIFIED BY:
Original on rite with City erk's Offic
MEs: 1- Irnik., [ ( , N h *i
WeigP_r: ard Ti an
40ES : ALOI e,�
Contract No. HA37350
CONTRACT
THIS CONTRACT is made this 15th day of November, 2018, in the County of
Riverside, State of California, by and between the Palm Desert Housing Authority,
hereinafter called Authority, and S & T Contractors Service, Inc. dba Service Master
Restoration by S&S, hereinafter called Contractor. The Authority and the Contractor for
the considerations stated herein agree as follows:
ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the time
stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility
services, and transportation to complete all of the Work required in strict compliance with
the Contract Documents as specified in Article 5 below for the following Project:
Stair Top Rail Replacement at One Quail Place Apartments
Project 821-19
Contract No. HA37350
The Contractor and its surety shall be liable to the Authority for any damages arising as
a result of the Contractor's failure to comply with this obligation.
ARTICLE 2. TIME FOR COMPLETION. Time is of the essence in the performance of
the Work. The Work shall be commenced on the date stated in the Authority's Notice to
Proceed. The Contractor shall complete all Work required by the Contract Documents
within 90 calendar days from the commencement date stated in the Notice to Proceed,
hereinafter the Contract Time. By its signature hereunder, Contractor agrees the Contract
Time for completion set forth above is adequate and reasonable to complete the Work.
ARTICLE 3. CONTRACT PRICE. The Authority shall pay to the Contractor as full
compensation for the performance of the Contract, subject to any additions or deductions
as provided in the Contract Documents, and including all applicable taxes and costs, the
sum of One Hundred Sixtv-Four Thousand Six Hundred Sixteen and 00/100 Dollars
($164,616.00), hereinafter the Contract Price. Payment shall be made as set forth in the
General Conditions.
ARTICLE 4. LIQUIDATED DAMAGES. The Contractor acknowledges that the Authority
will sustain actual damages for each and every day completion of the Project is delayed
beyond the Contract Time. Because of the nature of the Project, it would be impracticable
or extremely difficult to determine the Authority's actual damages. Accordingly, as
provided in Government Code section 53069.85, it is agreed that the Contractor will pay
the Authority the sum of $350.00 for each and every calendar day of delay in completing
the Work beyond the time prescribed in the Contract Documents for finishing the Work,
as Liquidated Damages and not as a penalty or forfeiture. In the event the Liquidated
Damages are not paid, the Contractor agrees the Authority may deduct that amount from
any money due or that may become due the Contractor under the Contract. This Article
1
77802.00000\24431586.2
Contract No. HA37350
does not affect the Authority's rights to other damages or remedies specified in the
Contract Documents or allowed by law.
Should Contractor be inexcusably delayed in the performance of the Work, Authority may
deduct Liquidated Damages based on its estimate of when Contractor will achieve Final
Completion or other milestones. Authority need not wait until Final Completion to withhold
Liquidated Damages from Contractor.
Liquidated Damages are not a penalty but an agreed upon estimate of the actual
damages that would be sustained by the Authority for delay, including but not limited to
loss of revenue, inconvenience to the Authority and the public, and increased Project
administration expenses, such as extra inspection, construction management, staff time
and architectural and engineering expenses. Liquidated Damages do not include actual
damages the Authority incurs on account of claims by third parties against the Authority
on account of any delay.
Should money due or to become due to the Contractor be insufficient to cover Liquidated
Damages or other offsets due, then Contractor forthwith shall pay the remainder of the
assessed liquidated damages to Authority.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT. The "Contract Documents"
include the following documents, each of which is incorporated into this Contract by
reference:
• Notice Inviting Bids
• Instructions to Bidders
• Bid Form
• Contractor's Certificate Regarding Workers' Compensation
• Bid Bond
• Non -Collusion Declaration form
• Contractor Information and Experience Form
• List of Subcontractors Form
• Iran Contracting Act Certification
• Contract
• Performance Bond
• Payment Bond
• General Conditions
• Special Conditions
• Technical Specifications (including Appendices)
• Addenda
• Permit Requirements
• Approved and fully executed change orders
2
77802.00000\24431586.2
Contract No. HA37350
• Standard Specifications for Public Works Construction (Greenbook), Latest Edition,
except Sections 1-9
• Any other documents contained in or incorporated into the Contract
The Contactor shall complete the Work in strict accordance with all of the Contract
Documents.
All of the Contract Documents are intended to be complementary. Work required by one
of the Contract Documents and not by others shall be done as if required by all. This
Contract shall supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW. Each and every provision of law
required to be included in these Contract Documents shall be deemed to be included in
these Contract Documents. The Contractor shall comply with all requirements of
applicable federal, state and local laws, rules and regulations, including but not limited to,
the provisions of the California Labor Code and Public Contract Code applicable to this
Project.
If the Work involves federal funds, the Contractor and all its subcontractors shall comply
with all requirements set forth in the attached Federal Requirements.
ARTICLE 7. INDEMNIFICATION. Contractor shall provide indemnification as set forth
in the General Conditions.
ARTICLE 8. PREVAILING WAGES. Contractor shall be required to pay the prevailing
rate of wages in accordance with the Labor Code which such rates may be obtained
online at http//www.dir.ca.gov/dlsr. and which must be posted at the job site.
ARTICLE 9. NOTIFICATION TO AUTHORITY. Contractor acknowledges that the
Authority provides forty-eight (48) hours -notice to residents in advance of the start of any
Work that is to occur at any residential unit. Contractor shall provide sufficient notice to
the Authority before beginning any such Work so that the Authority may provide timely
notice to residents. The Authority shall be given at least 48 hours -notice prior to the
creation of any condition affecting pedestrian paths of travel. Contractor shall
continuously inform Authority of the progress of the Work or of any impacts of the Work
upon residential units or facilities.
ARTICLE 10. LOCAL LICENSES AND PERMITS. Unless the Contract Documents state
otherwise, Contractor shall be responsible for securing City of Palm Desert business
license(s), building permits, and any other licenses or permits necessary to perform the
Work.
3
77802.00000\24431586.2
Contract No. HA37350
IN WITNESS WHEREOF, this Contract has been duly executed by the above -
named parties, on the day and year above written.
[NAME OF CONTRACTOR] PALM DESERT HOUSING AUTHORITY
By: By:
Signature Signature
Name and Title:
License No.
DIR Registration No.
4
Name and Title:
Attest:
Rachelle Klassen, Secretary
Approved as to Form:
Robert W Hargraves, City Attorney
77802.0 000\24431586.2
A notary public or other officer completing this certificate verifies only the identity of the individual who
signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of
that document.
State of California
SS.
County of Riverside
On , 20 before
me, , a Notary Public, personally
appeared , who proved to me on the basis of
satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within
instrument and acknowledged to me that he/she/they executed the same in his/her/their
authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or
the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
5
77802.00000\24431586.2
A notary public or other officer completing this certificate verifies only the identity of the individual who
signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of
that document.
State of California
County of Riverside
On , 20 before
me, , a Notary Public, personally
appeared , who proved to me on the basis of
satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within
instrument and acknowledged to me that he/she/they executed the same in his/her/their
authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or
the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
END OF CONTRACT
6
77802.00000\24431586.2
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WHEREAS, the Palm Desert Housing Authority (hereinafter referred to as
"Authority") has awarded to S & T Contractors Service, Inc. dba Service Master
Restoration by S&S, (hereinafter referred to as the "Contractor") an agreement for Stair
Top Rail Replacement at One Quail Place Apartments (Project 821-19) (hereinafter
referred to as the "Project").
WHEREAS, the work to be performed by the Contractor is more particularly set
forth in the Contract Documents for the Project dated November 15, 2018 (hereinafter
referred to as "Contract Documents"), the terms and conditions of which are expressly
incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the
terms thereof and to furnish a bond for the faithful performance of said Contract
Documents.
NOW, THEREFORE, we, S & T Contractors Service, Inc. dba Service Master
Restoration by S&S, the undersigned Contractor and
as Surety, a corporation organized and duly authorized to transact
business under the laws of the State of California, are held and firmly bound unto the
Authority in the sum of One Hundred Sixty Four Thousand Six Hundred Sixteen and
00/100 DOLLARS, ($164,616.00), said sum being not less than one hundred percent
(100%) of the total amount of the Contract, for which amount well and truly to be made,
we bind ourselves, our heirs, executors and administrators, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or
its heirs, executors, administrators, successors or assigns, shall in all things stand to and
abide by, and well and truly keep and perform the covenants, conditions and agreements
in the Contract Documents and any alteration thereof made as therein provided, on its
part, to be kept and performed at the time and in the manner therein specified, and in all
respects according to their intent and meaning; and shall faithfully fulfill all obligations
including the one-year guarantee of all materials and workmanship; and shall indemnify
and save harmless the Authority and City, their officers and agents, as stipulated in said
Contract Documents, then this obligation shall become null and void; otherwise it shall be
and remain in full force and effect.
The obligations of Surety hereunder shall continue so long as any obligation of
Contractor remains. Nothing herein shall limit the Authority's rights or the Contractor or
Surety's obligations under the Contract, law or equity, including, but not limited to,
California Code of Civil Procedure section 337.15.
1
77802.00000\2443 1586.2
Contract No. HA37350
Whenever Contractor shall be, and is declared by the Authority to be, in default
under the Contract Documents, the Surety shall remedy the default pursuant to the
Contract Documents, or shall promptly, at the Authority's option:
(1) Take over and complete the Project in accordance with all terms and
conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms
and conditions in the Contract Documents and upon determination by
Surety of the lowest responsive and responsible bidder, arrange for a
Contract between such bidder, the Surety and the Authority, and make
available as work progresses sufficient funds to pay the cost of completion
of the Project, Tess the balance of the contract price, including other costs
and damages for which Surety may be liable. The term "balance of the
contract price" as used in this paragraph shall mean the total amount
payable to Contractor by the Authority under the Contract and any
modification thereto, less any amount previously paid by the Authority to the
Contractor and any other set offs pursuant to the Contract Documents.
(3)
Permit the Authority to complete the Project in any manner consistent with
local, California and federal law and make available as work progresses
sufficient funds to pay the cost of completion of the Project, less the balance
of the contract price, including other costs and damages for which Surety
may be liable. The term "balance of the contract price" as used in this
paragraph shall mean the total amount payable to Contractor by the
Authority under the Contract and any modification thereto, less any amount
previously paid by the Authority to the Contractor and any other set offs
pursuant to the Contract Documents.
Surety expressly agrees that the Authority may reject any contractor or
subcontractor which may be proposed by Surety in fulfillment of its obligations in the event
of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept
a bid from Contractor for completion of the Project if the Authority, when declaring the
Contractor in default, notifies Surety of the Authority's objection to Contractor's further
participation in the completion of the Project.
The Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the Contract Documents or to the
Project to be performed thereunder shall in any way affect its obligations on this bond,
and it does hereby waive notice of any such change, extension of time, alteration or
addition to the terms of the Contract Documents or to the Project, including but not limited
to the provisions of sections 2819 and 2845 of the California Civil Code.
2
77802.00000\24431586.2
Contract No. HA37350
IN WITNESS WHEREOF, we have hereunto set our hands and seals this
day of , 20 ).
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal) Surety
By
Attorney -in -Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence
of corporate authority attached.
(Attach Attomey-in-Fact Certificate) Title
The rate of premium on this bond is
of premium charges, $
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)
per thousand. The total amount
3
77802.00000\24431586.2
(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety and
Agent or Representative for
service of process in California)
Contract No. HA37350
4
77802.00000\24431586.2
Contract No. HA37350
ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity of the individual
who signed the document to which this certificate is attached, and not the truthfulness, accuracy,
or validity of that document.
State of California
County of
On before me,
(insert name and title of the officer)
Dersonally appeared
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
oerson(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature (Seal)
NOTE: A copy of the Power -of -Attorney authorizing the person signing on behalf of the
Surety to do so must be attached hereto.
5
77802.00000\2443I586.2
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the Palm Desert Housing Authority (hereinafter designated as the
"Authority"), by action taken or a resolution passed November 15, 2018 has awarded to
S & T Contractors Service. Inc. dba Service Master Restoration by S&S hereinafter
designated as the "Principal," a contract for the work described as follows:
Stair Top Handrail Replacement Project (821-19) (the "Project"); and
WHEREAS, the work to be performed by the Principal is more particularly set forth
in the Contract Documents for the Project dated November 15, 2018 ("Contract
Documents"), the terms and conditions of which are expressly incorporated by reference;
and
WHEREAS, said Principal is required to furnish a bond in connection with said
contract; providing that if said Principal or any of its Subcontractors shall fail to pay for
any materials, provisions, provender, equipment, or other supplies used in, upon, for or
about the performance of the work contracted to be done, or for any work or labor done
thereon of any kind, or for amounts due under the Unemployment Insurance Code or for
any amounts required to be deducted, withheld, and paid over to the Employment
Development Department from the wages of employees of said Principal and its
Subcontractors with respect to such work or labor the Surety on this bond will pay for the
same to the extent hereinafter set forth.
NOW THEREFORE, we, the Principal and as
Surety, are held and firmly bound unto the Authority in the penal sum of One Hundred
Sixtv-Four Thousand Six Hundred Sixteen and 00/100 Dollars ($164,616.00) lawful
money of the United States of America, for the payment of which sum well and truly to be
made, we bind ourselves, our heirs, executors, administrators, successors and assigns,
jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its
subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay
any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials,
provisions or other supplies, used in, upon, for or about the performance of the work
contracted to be done, or for any work or labor thereon of any kind, or amounts due under
the Unemployment Insurance Code with respect to work or labor performed under the
contract, or for any amounts required to be deducted, withheld, and paid over to the
Employment Development Department or Franchise Tax Board from the wages of
employees of the contractor and his subcontractors pursuant to Section 18663 of the
Revenue and Taxation Code, with respect to such work and Tabor the Surety or Sureties
will pay for the same, in an amount not exceeding the sum herein above specified, and
also, in case suit is brought upon this bond, Surety or Sureties shall pay all litigation
expenses incurred by the Authority in such suit, including reasonable attomeys' fees,
court costs, expert witness fees and investigation expenses.
This bond shall inure to the benefit of any of the persons named in Section 9100
of the Civil Code so as to give a right of action to such persons or their assigns in any suit
brought upon this bond.
1
77802.00000\24431586.2
Contract No. HA37350
It is further stipulated and agreed that the Surety on this bond shall not be
exonerated or released from the obligation of this bond by any change, extension of time
for performance, addition, alteration or modification in, to, or of any contract, plans,
specifications, or agreement pertaining or relating to any scheme or work of improvement
herein above described, or pertaining or relating to the furnishing of labor, materials, or
equipment therefore, nor by any change or modification of any terms of payment or
extension of the time for any payment pertaining or relating to any scheme or work of
improvement herein above described, nor by any rescission or attempted rescission of
the contract, agreement or bond, nor by any conditions precedent or subsequent in the
bond attempting to limit the right of recovery of claimants otherwise entitled to recover
under any such contract or agreement or under the bond, nor by any fraud practiced by
any person other than the claimant seeking to recover on the bond and that this bond be
construed most strongly against the Surety and in favor of all persons for whose benefit
such bond is given, and under no circumstances shall Surety be released from liability to
those for whose benefit such bond has been given, by reason of any breach of contract
between the owner or Authority and original contractor or on the part of any obligee
named in such bond, but the sole conditions of recovery shall be that claimant is a person
described in Section 9100 of the Civil Code, and has not been paid the full amount of his
claim and that Surety does hereby waive notice of any such change, extension of time,
addition, alteration or modification herein mentioned and the provisions of sections 2819
and 2845 of the Califomia Civil Code.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this
day of , 20
(Corporate Seal)
(Corporate Seal)
Contractor/ Principal
By
Title
Surety
By
Title
Attorney -in -Fact
Signatures of those signing for the Contractor and Surety must be notified and evidence
of corporate authority attached. A Power -of -Attorney authorizing the person signing on
behalf of the Surety to do so much be attached hereto.
2
77802.00000\24431586.2
Contract No. HA37350
ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity of the individual
who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or
validity of that document.
State of Califomia
County of
)
On before me,
(insert name and title of the officer)
Personally appeared ,
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same iri
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument thel
Person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
Paragraph is true and correct.
WITNESS my hand and official seal.
Signature (Seal)
NOTE: A copy of the Power-of-Attomey authorizing the person signing on behalf of the
Surety to do so must be attached hereto.
3
77802.00000\24431586.2
S&T Contractor's Services, Inc.
21163 Centre Point Parkway
Santa Clarita, Ca 91350
Phone (818) 335-3176 or (661) 388-1003
Tax ID# 26-2552975
Contractor's License #950263
November 5, 2018
Property: One Quail Place Apartments
72600 Fred Waring Drive
Palm Desert, Ca 92260
ESTIMATE
We propose herby to furnish material and labor, complete in accordance with estimate
specifications. All work to be completed in a substantial workmanlike manner according to
specifications submitted, per standard practices. Any alteration or deviation from above
specifications will become an extra charge over and above the estimate. Any hidden damage to
be addressed separately.
PREVAILING WAGE APPLIES
Remove existing handrail - Provide and install 4332 linear feet of poplar handrail,
custom coated and treated with Polyurea and finished UV Coating. Color to be
determined.
$38.00/LF x 4332
TOTAL: $164,616.00
Thank you.
S&T Contractor's Services, Inc.
PARKVIEW
0 (
7 4300
4ipo
14206 : 4209
4705 ' 4207
4204 4202
4203 - 4201
#S 6
- '142%.!
�o ,, aA`osl Jg
370q „ 1� � 0
..$i:..1 POOL •'/
]
1Ye�
— #4
ems_
jaw
11008
.!.
±l= i
lag ai-;s,-Tx
1000
1006 I wee \�
loos ,.7
02 1004 1 1002
1003 i4r,001
be- 900 600 $` ( POOL
_w ( i-o`� l
a
III« I ' :osr •\
1
\$$?.-
J 06 «.v 8o0V� 700
990909 1 706 1 709
0 I 907 i 706 1 707
;,119W 1 102 704 1 702 1
E 903 901 703 ! 701 f
-ri
r _•
f7s ! T
1 W 1]5�1
1703 J"'
1600
SITE MAP
f
300
.000 VS 1ST FL - EVEN f.S2NO FL
7E0015
70c
PAGE 3
FRED WARING DR
i
COURTS
itiL 1900
IT' 1910 1 1912 1914 1911
0 1 1909 1911 1913 1916 1
ay�19M I f906 11 19 12
' 179T 1.1909 1903 9p/ �y/�6yp
—p1fl.laur1 ilia 1nt6 i`211iT2/u ¢116I
9Al a 1 12109 In11 2113 12113
K f IKQG 12/09 12106 2104 in03
p 12107 2106I 2103 �21011
u m� I Im ' '�
Y�
O
pJp m V e 0
1 S
One Quail Place Apartments
72-600 Fred Waring Drive
Palm Desert, CA 92260
▪ Water Shut -Off Valve Locations
• Electricity Shut -Off Valve Locations
Gas Shut -Off Valve Locations
▪ Interior Fire Extinguisher Locations
TO
PARKV1EW
AVE
ODD VS 1ST FL - EVEN w S 2ND FL
9LDGS WITH LIFE SAFETY SPRINKLERS
ON THE DONES= WATER SYSTEM
n.{
� 2700 di 2400
12710 2712 1 7714 2715 4,.1, 1
2709 2711 2713 2715 5 «l5=
07
7 6 2709 ( 27042 Y702702
;76s 2/01 I 0 ^l.
ti«I:'ti
30
TO
FRED
WARING
O R
1
0
T
PAGE4
▪ Interior Fire Extinguisher Locations:
In each Clubhouse adjacent to stairwell
1 upstairs & 1 downstairs.
▪ In each Laundry Room above utility sink
1 per Laundry Room.
. In each Apartment in Hall Closet
1 per apartment.
77802.00000\24431586.2
SITE MAP