Loading...
HomeMy WebLinkAboutWhitestone Lane and Flagstone Lane Sewer ProjectPALM DESERT REDEVELOPMENT AGENCY REQUEST SUBMITTED BY: DATE: ATTACHMENT Executive Summarv: OFFICE OF THE EXECUTIVE DIRECTOR STAFF REPORT INFORMATION ON WHITESTONE LANE AND FLAGSTONE LANE STREET SEWER PROJECT PAT CONLON, SPECIAL PROJECTS ADMINISTRATOR J U N E 9, 2005 VICINITY MAP PRELIMINARY ROUTE OF SEWER PRELIMINARY COST ESTIMATE The preliminary cost estimate of providing sewer to 24 lots on the above streets is $921,747 or $38,406 per lot. If an assessment district is formed by a vote of the property owners, the project cost would increase to $1,290,445 or approx. $53,768 per lot. This increase is attributable to the administrative costs associated with the formation of an assessment district. A 50% participation by the Agency would reduce this assessment to $26,884 per lot, assuming that the property owners wish to form an assessment district for the sewer project. Discussion: Flagstone and Whitestone Lanes are the only public streets in south Palm Desert without a sewer. The homes on these streets are on private septic systems. There are nine lots on Whitestone Lane and 15 lots on Flagstone Lane. After meetings with the engineers at Coachella Valley Water District (CVWD), it was determined that the only way to get a gravity flow sewer system on these streets is thru the golf course fairway at Shadow Mountain Golf Club and connect the new system to the north at Fairway Drive. The design would require an easement between Shadow Mountain Golf Club and CVWD allowing the CVWD sewer to cross the golf course. A second easement would be required with an owner of a vacant lot on Flagstone Lane. This proposed design crossing the golf course is required because the new sewer line in Flagstone is approximately 12' below the flow line of the existing sewer on Portola Avenue. The Whitestone sewer line is approximately 10' below the existing sewer line on Grapevine Street. CVWD will not allow a mechanical lift station on this project due to maintenance and energy costs. CITY OF PALM DESERT STAFF REPORT JUNE 9, 2005 Preliminary Cost Estimates: Attached to this report is a preliminary cost estimate prepared by the Keith Companies. $921,747 is the basic cost for this project, or approximately $38,403 per lot. Assessment district formation is expensive. This would add approximately 40% to the cost of this project, or approximately $370,000. This additional cost would bring the estimated project total to $1,290,445 or approximately $54,000 per lot. If the Agency elected to participate with 50% of the cost, it could bring the assessment down to $27,000 per parcel. Regardless of cost, it is unclear if an assessment district is even desired by the property owners. No property owners from Whitestone or Flagstone Lane have approached the City requesting this project. Also, regardless if the cost issues were worked out, the project could not proceed without cooperation from Shadow Mountain Golf Club. Engineer Proposal: The proposed engineering firm for this project, if approved, is the Keith Companies, a Palm Desert firm. The proposed sequence of work is as follows: Phase One: Involves the preliminary design with CVWD approval, cost estimate, and the CVWD/Shadow Mountain easement documents for the golf course crossing. After the easement documents are signed and recorded then: Phase Two: Construction Drawings and Bid Specifications. After the bid process and award of contract: Phase Three: Construction, observation, and administration. If the Agency members so desire, staff will return with a formal recommendation on the engineering services at a future date. If you have any questions please contact me at Ext. 386. Submitted by: Pat tonlon p I,Proje d nistrator / Carlos L. Orteg City Manager Concurrence: Dave Yrig ` Director edevelopment — WOW Pif.,�. *I1 t ..T •` � '�' ` ��t :�'$ �l � ..i t Y��..�:"�� .tom ' it .. .. , _ .. .... ,f�i.rs:� .\\� :-: Fxivwr.•rtvr.:r-a,- •-.r.. .; �..swn :,c.,.+w. \x me Air 10 c }~ } t f _ t ~\^,`` a. - } y.y;; �1 '+v. - yr +•y � � � •" � � - "' ram+.' 1 �v;, jj']1{ M _ 1 ._ .. .. - r. • t , _ y M mow+. .. .� �~ �'ft¢ �. �e•.5.•s+�+� N 4 �^'+'-.M+'., -� ti,�s{ i` j �. i+.��,rr[r ..' 40 Jq 0 LEGEND Proposed Sewer 4M Existing Sewer FAIRWAY DR '40= Channel and Flow - - - Direction • Manhole 73820 ; 73840 46105 73800 _ 46105 73860 73880 73920 ' ' 7380� _ 73900 46125 0 ' 73825 73845 -- 0 73940 -' 46155 Shadow Mountain 73885 Golf Course ' 73905 O 73935 s Resort 46205 • a - - - 46255 m 73820 73840 73860 73880 1 73800 73900 73920 - 73760 -073940 ` 46305 SE 0 1N�1 46355 . 0 i 46405 m 46455 ! 73760 73780 73800 73820 73840 73860 73880 73900 73920 z 73970 i - 73950 GRAPEVINE ST MARRAKESHDR -.-�_...-- - --_-- - -- Conceptual Layout - Sewer Mains t `�=eet City of Palm Desert _—_ Figure 1.0 0 100 200 400 PN 5876 - 05/26/05 CITY OF PALM DESERT SHADOW MOUNTAIN RESORT FLAGSTONE LN & WHITESTONE LN SEWER ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS ITEM DESCRIPTION MOBILIZATION 2 PM10 & S_WPPP IMPLEMENTATION _3 _ 8" VCP SEWER MAIN PER CVWD STD. _ 4 _4" VCP SEWER LATERAL PER CVWD STD. 6 48" SEWER MANHOLE PER CVWD STD.- 6 RAISE MANHOLE TO FINISH GRADE The Keith Compenlee UNIT QUANTITY UNITS COST 1 LS $ 5,000.00 5/26/05 TOTAL COST 5,000.00 1.21 AC_ $ 7,500.00 _ 9,039.26 _J 3,500 LF $ 48.50 169,750.00 25 EA $ 2,500.00 62,500.00 _13 _ _ EA _ $ 5,950.00 _ 77,350.00 13 EA $ 850.00 11,050.00 7_ REMOVE & REPLACE A.C. GOLF CART PATH _(2" THICK) _ 200 _SF $ 3.00 _ _ _ _600.00 e REMOVE & REPLACE LANDSCAPING _ 25,500_ _ SF _ $ 7.50 _ 191,250.00 9 REMOVE & REPLACE 3"AC PAVING OVER 6" CRUSED AB 21,000 SF $ 5.75 120,750.00 SUBTOTAL 20% CONTINGENCY ENGINEERING / CVWD PERMIT FEES TOTAL ESTIMATED COST TKC PN5876 $ 647,289.26 $ 129,457.85 $ 145,000.00 $ 921,747.11 PLEASE NOTE: THIS OPINION OF PROBABLE COST IS BASED ON THE CONCEPT PLANS PREPARED BY OUR OFFICE. UNIT PRICES ARE BASED ON THE BEST INFORMATION AVAILABLE AT THE TIME, BUT MAY NOT NECESSARILY REFLECT ACTUAL CONSTRUCTION COSTS INCURRED. TKC MAKES NO GUARANTEE AS TO ACTUAL CONSTRUCTION COSTS.