Loading...
HomeMy WebLinkAboutR24030 Ratification - Wallaroo Child Care FacilityPALM DESERT REDEVLOPMENT AGENCY STAFF REPORT REQUEST: RATIFICATION OF THE AGREED UPON RENOVATION OF THE WALLAROO CHILD CARE FACILTY TO ADDRESS IMMEDIATE PUBLIC HEALTH AND SAFETY CONCERNS SUBMITTED BY: CATHERINE WALKER, SENIOR MANAGEMENT ANALYST JANET MOORE, HOUSING AUTHORITY MANAGER DATE: OCTOBER 13, 2005 CONTENTS: PROPOSALS FROM: AAVCO ELECTRIC - $5,616.00 A.R.C. CONCRETE - $3,744.00 GEORGE BRAZIL PLUMBING - $2,897.65 H & H ORNAMENTAL IRON - $8,760.00 ZEUS CONSTRUCTION - $9,300.00 Recommendation: By Minute Motion, that the Agency Board authorize: 1. Ratification of health and safety issues in an amount totaling $30,317.65. 2. Executive Director to execute any documentation necessary to complete. Funds available in account 850-4545-466-4001. Executive Summary: Acceptance of this staff recommendation will ratify work that needed to be completed by the Agency prior to September 22, 2005, at the childcare facility, located at 44-911 Cabrillo Avenue as required in our agreement with Desert Sands Unified School District. The work addressed immediate health and safety code issues, and allowed for the facility to accommodate Palm Desert's displaced students by the start of the school year. Discussion: The Agency Board approved the lease agreement for the building known as the Wallaroo Children's Center between the Palm Desert Redevelopment Agency and Desert Sands Unified School District on July 14, 2005. The agreement outlines the duties and responsibilities of each agency with regard to the renovation of the facility. Staff Report Ratification of agreed upon renovation of the Wallaroo Child Care facility to address immediate public health and safety concerns Page 2 of 2 October 13, 2005 The Wallaroo facility sat vacant for approximately one year prior to the Agency purchasing the property. Once owned by the Agency, the facility was broken into and vandalized by vagrants during the negotiation process with the School District. Much of the work needed to be done at the facility was the direct result of the numerous vandalizing incidents, which left the building a safety hazard to the community. The Agency was tasked with accomplishing the improvements as set forth in the agreement in the most expedient way possible to avoid any health and safety threats to the community, and to accommodate the Desert Sands students that had to occupy the facility by September 22, 2005. The work has been broken down into two phases. The first phase addressed all immediate health and safety issues, allowing Desert Sands School District to accommodate its recently displaced Palm Desert students at the facility by September 22, 2005. The second phase addresses health and safety concerns that pertain to functionality. Phase II work will total approximately $12,000 and will be brought before the Agency Board for ratification at the second meeting in October 2005. Submitted by: Q Catherine Walker Senior Management Analyst Jane Moore 1•tQfising Authority Administrator Approval: if y§tik McCgAhy, Ay�'M Redev*pment —Dave Yriaovefi Directordf development/Housing Paul S. Gibson, Director of Finance G \RDA\Beth Longman\Staff Reports�WaikernWallaroo Ratification 101305 doc AAVCO . Roberto Saavedra Electrical Contractor Proposal License# C 10-769393 0, -' City of Palm Desert Fax (760) 341-6372 Job loc. Child Care Center ATT. James AAVCO Electric is pleased to summit a Quote for the following scope of work. Replace a total of 120- 4' t12 fluorescent lamps and 10 —ballasts for 4'- 21amp fluorescent fixtures. Install 20 flood lamps for outside light fixtures, replace batteries for exit signs and emergency lights, Install vanity light in N/E bathroom, replace all bad light bulbs in stairs and bathroom lights, install Two motion sensor light fixtures in outside area and hard wire irrigation timer. 2. Install gfci receptacles in kitchen ,north wall and at two center rooms,replace duplex receptacles that are Painted, replace a total of 16 plastic covers for light fixtures, install one breaker at each sub -panel to Separate 2wires connected to one breaker, strap flex conduit in storage room under stairs, cover All open boxes and cover all unused box openings. 3. Supply labor and materials necessary to complete project. All work to be done in a workmanlike manner and according to code For the amount of $3692.00 dollars. Excludes permits if required. Sincerely, Roberto Saavedra 13824 Faraday Street Whittier, CA 90605 Phone (562) 946-3429 Fax (562) 946-4389 AAVC0. Roberto Saavedra Proposal Electrical Contractor t&�License# C10-769393 City of Palm Desert Fax (760) 341-6372 Job loc. Child Care Center ATT. James AAVCO Electric is pleased to summit a Quote for the following scope of work. I. Relocate conduit, wiring and disconnect switches to relocate two ac units to new Location behind gate on same north wall. 2. Supply electrical materials and labor necessary to relocate both ac units. All work to be done in a workmanlike manner and according to code For the amount of $930.00 dollars. Excludes permits if required. Sincerely, Roberto Saavedra 13824 Faraday Street Whittier, CA 90605 Phone (562) 946-3429 Fax (562) 946-4389 AAVCO Roberto Saavedra Electrical Contractor Proposal License# C10-769393 City of Palm Desert Fax (760) 341-6372 Job loc. Child Care Center ATT. James AAVCO Electric is pleased to summit a Quote for the following scope of work. 1. Inspect and tighten wiring in main panel , sub panels and disconnect switches. 2. Inspect electrical boxes, devices and lights. Advice on any rgxtirs required. All work to be done in a workmanlike manner and according to code For the amount of $994.00 dollars. Excludes permits if required - Sincerely, �v�^�'G�N✓? �`��j Roberto Saavedra 13824 Faraday Street Whittier, CA 90605 Phone (562) 946-3429 Fax (562) 946-4389 A.R.C. Concrete 42900 Virginia Ave Palm Desert, CA 92211-7616 (760)345-8554 /345-3229 fax Lic # 664512 Name / Address CITY OF PALM DESERT 73-510 Fred Waring Dr Palm Desert, CA 92260 (760) 346-0611 ext # 337 272-6262- James Conway Proposal Date Estimate # 9/6/2005 631 Terms 10% start up Description Total PROJECT LOCATION WALLAROO DAY CARE CENTER, PALM DESERT R & R PARKING LOT SIDEWALK APPROACH j HANDICAP ACCESS TO WIDEN PLAYGROUND ACCESS SAW CUT & REMOVE Y x 5.5' WALL (at gate opening) $450 STUCCO CUT EDGE TO MATCH REMAINING WALL SAW CUT, REMOVE 30' PARKING LOT CURB, REMOVE (approx 350 sq. ft., max. 4" thick) CONCRETE SIDEWALKS TO LOWER WALKWAYS TO PARKING LOT LEVEL $1,098 ' REPLACE CONCRETE with GRADUAL SLOPE/PITCH $2,196 Walkway @ parking lot entry to have scored surface finish Walkway @ gate to have broom finish 3,744.00 * * * Concrete removal in excess of 4" thick subject to additional charge* * * * * * Lowering concrete sidewalk will pose wall surface* * * Signature �---� Please sign authorization and return fax Total $3,744.00 H3Woisno flop - NNVHI a3w,OlSflo flop->INVHI 83Woisno flox - NNVHI 83misno flok - NNVHl m CL Cl) O ce) rn a N c cu � O O o N C13 Ln LL N N r- M �(D � 0) M M o Q C co m colo r I .� •7 ONi O � O O CD C U�� c3��� N '- 0) .� O (1)Uvcn U (1) m v co c) N M p O T (D m cD U CU W ` O Q U LL m Q %.0 m v ®s s co E E3 w Q z 0 0 Q z N Z m a 2 + U 2 ¢ cr F' U z �"O i Z a Q ❑ x Q ��o Z=- o U, ❑ 3 ❑ W ; a LU ❑ <Q T �U w r W Vi U z 3 cc ¢ `' w ❑ ci -T o ¢ z a W J ' Z ' a= Z >a m 0 z a a � w ZE _ - cj oU z U Q ai w W 1� a 0 U w o O ❑¢ ❑ W 6 z Y H x1 c as ma oU) U FWD cw N = ow Z< a 0.2 a 'Ci N ` Wa ¢ cu .. w a r m m _oz a •• � O U 0 Y'ma oa W ¢ U �m 0 2 _ o O ZZ_ } U. E S PUL o¢;r U em�OLN� Q 8.q � Piyg. LU `"B 0 Gomm U U��a9 a a �m� c ¢ms o N O > ¢ O'z .� s 3 vm U sf V��T6a y o�Q8 d IL zsat° 3 T W Npp� k m LL'o c-I i �U 1mC LUG W_D`a 3 �W�..>�Ama Q��oEs o, Na$� m o�g o x F=-�SE�1c� c p o �FoZ�19 cep Ncr +' z = �E Y0Cp OxQ m r YJ9 W� O��g� m rz T w Z Viz' c.u::: i _' L Qua. 8 L:i N cN a0 0 0 � U N � c c:2 C'= a a� to co m L U Y p_ O O_ 3M m« 00 O M �� x f6 m �c c �E `E N Y . c mm mE L`o 03 — M PROPOSAL H & Ornamental Iron 88713Perez Road #12 4 e Cathedral City, CA 92234 PROPOSAL SUBMITTED TO: `'� WORK jTT: O BE PERFORMED A NA / ; �j V Ls A � 5 cH 006 'C D /L. N 6 't. ADDRESS DATE OF PLANS PHONE NO. Is ARCHITECT SHEET No. DATE s _ Zook �C�•vc � Sc2 EFti . We hereby propose to furnish the materials and perform the labor necessary for the completion of Al iGcc> T e.4 s (2 6 -4 7<< S b 16 . to f T k Co •c oc o5 ;PT-6 d wt F r•r-L . N6w .4c fc pS.S 04q IV 5 C (_.4Ter S 1 k S'j ___5 c>zer<_z ,t) i•v s r d F je-`F , ae c< A tj (5,,¢ TC`S f •� /l e- 7(z Ir."f f}- 6' N L`'0 f t ! •n F •2 ; �i� % N 1 �C�i ,� R % / 0 !ge/F C/oIry f47 All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifi- cations submitted for above work and completed in a substantial workmanlike manner for the sum of Dollars ($ ) with payments to be made as follows. Respectfully submitted Cl-,l7 �lT�vt Any alteration or deviation from above specifications involving extra costs will be executed only upon written order, and will become an extra charge Per p/Q� (`i�Lc-Ica=GC1 over and above the estimate. All agreements contingent upon strikes, ac- cidents, or delays beyond our control. G E �� Z % Z - 0 3 �• .-- Note —This proposal may be withdrawn by us if not accepted within days. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You a authorized to do the work as specified. Payments will be made as outlined above. 9 Signature Date �': C v z� Signature 01/ .°-,- NC 3818-50 PROPOSAL v MADE IN USA Zeus Construction fnc. Builders and Engineers " since 1979 " lic#A-B # 373193 RECEIVED 74-478 Hwy 111 # 218 Phone: (760) 779-8069 PROPOSAL -CONTRACT SEP 0I 20or To. Faun Desert RDA Waldron pre School 44911 Alasandro ��' Palm Desert Att James Conway Tour Order # Oar Order # Sales Rep: FOB Slip Ka Terms Tax 0 Dm 0 Quumity Item Description; I Repair pre school to re -open , Supply and Install (3) double (4) single steel doors to exterior including safety glass viewing windows to one set of double doors facing play ground Price includes hardware and installation Additional Glass inserts add 675.00 per set P Q..m:;To drs br- Dan quoumm siV here and nrsa�e�.vi.y.iaw.a ails a.4amdaas�wd �� Aug 26 2005 U ni t P $ $ 9,300.00 s s s H 9,300.00 Ba $