HomeMy WebLinkAboutSR - R21780 - Palm Village Apts.PALM DESERT REDEVELOPMENT AGENCY
STAFF REPORT
REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 4 TO
APPROVE AND RATIFY CHANGE ORDER REQUESTS (COR)
FROM TAYLOR FRAGER, INC. (CONTRACT NO. R21780) IN THE
CUMULATIVE AMOUNT OF $75,235 WITH NINE (9) ADDITIONAL
DAYS TO THE CONTRACT TIME FOR THE CONSTRUCTION OF
PALM VILLAGE APARTMENTS.
SUBMITTED BY: BRYCE LYNN WHITE, PROJECT ADMINISTRATOR
CONTRACTOR: TAYLOR FRAGER, INC.
43620 RIDGE PARK DRIVE, SUITE 300
TEMECULA, CA 92590
DATE: AUGUST 24, 2006
CONTENTS: CONSTRUCTION CHANGE ORDER NO. 4 TO CONTRACT R21780
CHANGE ORDER REQUESTS (51, 41, 33, 37, 61, 34, 48 Revised,
56, 59, 36, 60, and 18)
Recommendation:
By Minute Motion, that the Agency Board:
Approve Construction Change Order No. 4 to approve and ratify Change
Order Requests (COR) from Taylor Frager, Inc., (Contract No. R21780) in the
cumulative amount of $75,235 with nine (9) additional days to the contract
time for the construction of Palm Village Apartments; and
2. Authorize Finance Director to move $75,235 from contingency (Account No.
870-4349-433-4001) to base for the subject change order.
Executive Summary:
This report presents Change Order No. 4 for the Palm Village Apartments. The majority of
the cost of Change Order No. 4 enhances the energy efficiency of the project and reduces
future utility and maintenance costs. These changes are the result of staffs continuing
efforts to increase energy efficiency of Agency -owned properties in support of the goals
established by the Estonia Protocol. The balance of this change order is to correct minor
errors and omissions in the project design. The total cost of all change order work
attributable to deficiencies in the plans for this project is 3.7% of the contract amount,
which is within industry standards for a project of this size and nature.
Staff Report
Approve Change Order No. 4 to Taylor Frager, Inc. (Contract No. R21780)
Page 2 of 3
August 24, 2006
Discussion:
On April 15, 2005, the Notice to Proceed was issued for Contract No. R21780 Taylor
Frager, Inc., for construction of the 36-unit Palm Village Apartments in the amount of
$5,839,386. The recommended change order includes enhancements and necessary
modifications to this contract. The changes are divided here into those that are energy
related, and those that are routine errors and omissions type of changes.
Ener_gv Related Chanqes: The City of Palm Desert has undertaken ambitious goals to
reduce energy use throughout the City, and has sponsored the "Estonia Protocol." To
support these goals, staff has initiated changes that exceed the Title 24 California state
energy requirements for this project.
To provide additional energy conservation, a three coat radiant reflective elastomeric
coating will be applied to reflect up to 15% of the sun's infrared rays. This product also will
provide a superior finish color coating with reduced maintenance and long life. COR
Number 37 in the amount of $37,019 with no additional days is for this change.
For even more energy conservation, rigid insulation was added to the exterior of the
buildings. The thickness of this material required adding base screed above the roof to
wall transitional metal in various locations. COR Number 48 Revised in the modified
amount of $1,535 with one (1) additional day is for this additional work.
The Agency Board has authorized Agency staff to negotiate an agreement with SunWize
Technologies for the design and building of carports and photovoltaic systems designed to
provide sufficient electrical power for nine units and all common areas. Prior to installation
of the above photovoltaic systems, it was necessary to install conduits inside the walls for
the direct current electric lines. COR Number 51 for $2,361 with one (1) additional day is
for this additional work. The photovoltaic system required installation of underground
conduit from the carport photovoltaic panels to the electric rooms. Additional exterior
lights powered by the photovoltaic systems at patios and stairways were also required.
COR Number 41 in the modified amount of $8,461 with five (5) additional days is for this
additional work.
Routine Error and Omission -Type Changes: Numerous rough carpentry changes were
required as follows: openings to access fire sprinklers; corridor wall modifications; chaise
for photovoltaic conduit; lowered corridor ceiling to accommodate common lights; wider
wall and soffit for laundry room dryer vents; and lowered window sills to conform to
Building Codes. COR Number 34 in the modified amount of $5,721 is for these changes.
Additional expansion joints were required that were not clearly identified in the plans and
lathe material required replacing. COR Number 56 in the amount of $2,460 with no
additional days as modified, and COR Number 59 in the amount of $1,052 with no
additional days as modified is for this additional work and corrections.
G \RDA\Beth Longman\Staff Reports\White\Taylor Frag C04 082406.doc
Staff Report
Approve Change Order No. 4 to Taylor Frager, Inc. (Contract No. R21780)
Page 3 of 3
August 24, 2006
The Building Department required an additional light circuit to be added to the attics of
each unit. Additional exterior lights were also added. COR Number 33 in the modified
amount of $4,828 for this additional work.
The Construction Plans did not include Second Floor hallway closet doors on the door
schedule. COR Number 36 in the amount of $6,755 is for this additional work. The
Construction Plans and Specifications did not include installation of blinds on the exterior
French style doors. COR Number 60 in the amount of $1,927 with one (1) additional day
is for this additional work.
The construction plans did not include painting exterior closets. COR Number 61 in the
amount of $2,979 with one (1) additional day is for this additional work.
Staff recommended extending the laundry room countertop by an additional 30 inches.
COR Number 18 in the modified amount of $137 as modified is for this recommended
change.
The cumulative cost of all changes described above increases the contract amount by
$75,235 with nine (9) additional days to the contact time.
Submitted by:
Airl Bryce Lynn White
U Project Administrator
Approval:
--�,,,- C
lopment
,ector
Department Head:
eve Yrigoy
Director of development/Housing
!/1
Paul S. Gibson, Director of Finance
CI-GU2G/BY RDAON
VERIFIED BY
V
Original on file with City Clerk's Office
G:1RDA\Beth Longman\Staff Reports\WhiteWaylor Frag C04 082406.doc
��� li7i�ll!!1 ��V� ��1��
F.���U��l� ��Lil�� �
Contract Purpose: Construct Palm Village Apartments
Contractor's Name: Taylor Frager, Inc.
Contract #/ P.O. # R21780 I 12193
Change Order No. 4
Contingency: YES x I NO
Account No. 870-4349-433-4001
Project No.
You are hereby requested to comply with the following changes from the contract plans and specifications:
DESCRIPTION OF CHANGES DECREASE
(Supplemental Plans and Specifications Attached) In Contract Price
Change Order Requests:
51, 41, 33, 37, 61, 34, 48 (Rev), 56, 59, 36, 60, & 18
and
Extend contract time by nine (9) days
TOTALS:
NET CHANGE IN CONTRACT PRICE:
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT:
Less: Expend. & Encumb. To Date:
Less: This Change Order Amount:
BALANCE OF BUDGET
REMAINING FOR PROJECT:
e�
CONTINGENCY:
Amount Approved by Council:
Less: Prior Change Order(s):
Less: This Change Order:
0.00 Balance Remaining of Contingency:
INCREASE
In Contract Price
$75,235.00
$75,235.00
+
583,938.60
355,713.80
75,235.00
152,989.80
The amount of the Contract will be (Be�re�ed) Increased by the Sum of: Seventv-five Thousand Two Hundred Thirtv-five
and NO/100 Dollars ($ 75,235.00 ).
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have
required signatures as per the purchase resolution.
1. REQUESTED BY:
EXECUTIVE DIRECTOR
2. ACCEPTED BY:
CONTRACTOR
3. CERTIFIED
FUNDS AVAILABLE: 4. APPROVED BY: 8/24/06
FINANCE DIRECTOR JIM FERGUSON, CHAIRMAN Date Approved
NOTE: No payments will be made prior to Exec. Dir. and Agency Board approval 8/24/06
SECRETARY Date Approved
Chng-Ord RDA
PALM DESERT REDEVELOPMENT AGENCY
CONSTRUCTION CHAN�E ORDER
Contract Purpose: Construct Palm Village Apartments
Contractor's Name: Taylor Frager, Inc.
Contract #/ P.O. # R21780 I 12193
Change Order No. 4
Contingency: YES x I NO
Account No. 870-4349-433-4001
Project No.
You are hereby requested to comply with the following changes from the cont�act plans and specifications:
DESCRIPTION OF CHANGES DECREASE
(Supplemental Plans and Specifications Attached) In Contract Price
Change Order Requests:
51, 41, 33, 37, 61, 34, 48 (Rev), 56, 59, 36, 60, & 18
and
Extend contract time by nine (9) days
TOTALS:
NET CHANGE IN CONTRACT PRICE:
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT:
Less: Expend. & Encumb. To Date:
Less: This Change Order Amount:
BALANCE OF BUDGET
REMAINING FOR PROJECT:
+
CONTINGENCY:
Amount Approved by Council:
Less: Prior Change Order(s):
Less: This Change Order:
0.00 Balance Remaining of Contingency:
INCREASE
In Contract Price
$75,235.00
$75,235.00
+ 583,938.60
- 355, 713.80
- 75,235.00
152, 989.80
The amount of the Contract will be (Beeree►�ed) Increased by the Sum of: Seventv-five Thousand Two Hundred Thirtv-five
and N01100 Dollars (a 75,235.00 ).
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have
required signatures as per the purchase resolution.
1. REQUESTED BY:
EXECUTIVE DIRECTOR
2. ACCEPTED BY:
CONTRACTOR
3. CERTIFIED
FUNDS AVAILABLE: 4. APPROVED BY: 8l24106
FINANCE DIRECTOR JIM FERGUSON, CHAIRMAN Date Approved
NOTE: No payments will be made prior to Exec. Dir. and Agency Board approval 8/24/06
SECRETARY Date Approved
C'hng-Ord RD.4
PAi� D��RT i�1�0�'ll�' A�E1��
����V �� �..II��LT�i �
Contract Purpose: Construct Palm Village Apartments
Contractor's Name: Taylor Frager, Inc.
Contract #/ P.O. # R21780 I 12193
Change Order No. 4
Contingency: YES x I NO
Account No. 870-4349-433-4001
Project No.
You are hereby requested to comply with the following changes from the contract plans and specifications:
DESCRIPTION OF CHANGES DECREASE
(Supplemental Plans and Specifications Attached) In Contract Price
Change Order Requests:
51, 41, 33, 37, 61, 34, 48 (Rev), 56, 59, 36, 60, & 18
and
Extend contract time by nine (9) days
TOTALS:
NET CHANGE IN CONTRACT PRICE:
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT:
Less: Expend. & Encumb. To Date:
Less: This Change Order Amount:
BALANCE OF BUDGET
REMAINING FOR PROJECT:
�
� ��
CONTINGENCY:
Amount Approved by Council:
Less: Prior Change Order(s):
Less: This Change Order:
Balance Remaining of Contingency:
INCREASE
In Contract Price
$75,235.00
$75,235.00
+ 583,938.60
- 355, 713.80
- 75,235.00
152,989.80
The amount of the Contract will be (Bea�ee!) Increased by the Sum of: Seventy-five Thousand Two Hundred Thirtv-five
and NO/100 Dollars (� 75,235.00 ).
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have
required signatures as per the purchase resolution.
1. REQUESTED BY:
EXECUTIVE DIRECTOR
2. ACCEPTED BY:
CONTRACTOR
3. CERTIFIED
FUNDS AVAILABLE: 4. APPROVED BY: 8/24/06
FINANCE DIRECTOR JIM FERGUSON, CHAIRMAN Date Approved
NOTE: No payments will be made prior to Exec. Dir. and Agency Board approval 8/24/06
SECRETARY Date Approved
('hng-(hJ RDA
.06�02/2006 FRI 14;15 FA� ��� PV BRYCE
�•��!�,iFRAGER
.. �,.,�� � �---•-�.�- �:,..,, �.,�
43620 Rldpc Park Dr.
3ulte 300
Temsoula, CA 9Z88Z
Tltle: Electrical Worfc at Solar Rooms
Project: Palm VillBge
TO: 9ryce Lynn Whke
Palm D�c.R Redr�ebprr�eM Ageney
73-510 Fred Waring D►ive
PaYn Desert, qilforNa 9Z260
9K7 -Z96�89Z
957,296�883
� 402/006
COR NUMBER: S�
DATE: 2+lun-06
23820
Dweelptlon� Elactrica! Work ot Solar Rooms
. . . . .
.: .. ............ .........
..... .. ..
.. ... .
.
C51 CODE : . . : : . . . . . :DESC121P.71oN : . : : � . . .. . .. . . . . . 9UBCONiRACTOR. : : . :. : UHI'F; " :'PRICE I:UPhL. : .. . .'iONE
.. . . .. ..... . .. ...
. ........ ... .. ... .... .. . :..:. : . ... .. TAC. : '
18000 4' co�duRs to Sdar Rooms, Z' skeve conne�t solar roans Brudvik 7 Is S 2,OSS.00 S 2.053.00
to ekctrk room, wire aahaust fare suppNed by dhers,
edd other misc_ i6eme (plewa aaa a�s CO raques!)
Subtotsl
OHBP
Total Change Amount
EXC W SIO NS ! CLARIFICATIO NS:
Th16 vro►k shaG oXtond fhe contract tiror by (1) WoNc Dsys
Owner
Bryce White, PMm Desert
o�t�
S 2,053.00
15.0% S 307.95
S 2,361A0
06/02/2006 FRI 14;15 FA� ��� PV BRYCE
.
. ' �� i� ,
. , -�..�. . _,.�,� -
June 1, 2006
Taylor Frager Caospucaon
41661 ��erpr;so Circle, Su�e 2i7
T�oeqil� GA 92590
,�tm:lVblce Kubb�
Re: pa6n �ill�gc �°►pareomts
� 004/006
���
� s�, cA�a
Pbnaa 760 3?0•4�t29
Fa�C 760 3Z3-3302
�+a�e4�9Zstt
Mr. Kttbb�s„
p1ease note aa add of $2,053_00 ta fuaai9h affi ia5�11 aIl ele�ctrical �oeasa�y to iastall � direded in the �c,�d by
&yc�e Wtit� tc Bntdvt'ic e�anpbyee C1nis Tanloo. 'Ibis pricx i�c,iodes thc SoDo�wiqg:
■ RAube 4" p'YC in Bk� A a�d Bldg B for so�ar. These cc�duits sre cvrnudy �mdergnonnd ac� bo tbe solar
ia�aaxS aa�d naed to mtar tbe build� t��lt tbo
■ install 2" siaev�e botw�een soler room aad �a.tic r o� dgs A aad B.
■ I� �st fau in the aolar mom �Blcjgs A� B, and C. (E�am�st Fan iurnidhed by dbar)
■ Add pawer fiot cande�sing �t and FAU fio� t�e 2� floor Ma�Ue�aua cnan of Bldg C_ Add swidci�
light, end rx�op�scle in the attic ne� W t�e �AU.
plesse £xl fi� to caU �i' you ba,ve a�+ questians. (75U) 320-4429
�Y ��d,
rascn ��er
Pngc�ct Maa�r
Bn�dv�lc In�c.
b0/Z0 3Jdd xIJ1Qfk'18 ZOEEEZ£09L 9� �Et 900Z/L0/90
��I16/2006 TUE 11:35 FA� ��-� PV BRYCE �002/018
■C��������i I�RAGER
A itYl.Qx CetiArw�M�M Qnwr Gb�utM�
�J6TA Ridg� PaMt D1'.
Suib S00
Tcmeeule, CA 92342
7itls� Electrical Wwk
Project: Palm Vllago
TO: Bryco Lym Whi1e
P�Yn DK�t Red�veWpmerd AyencY
73-510 Fred Warirp Drivs
PeYn DeseR. CaRtomia 92Za0
9b1-296-0E92
951-096-9395
COR NUMSER:
DATE: 9 6-May.06
28920
41
o���: PhAt6 uo�E6:�. cv��.w� a..,�(- l�y�' �'ix�re o��s�►a�s
.. . ...... . .. .... ... . . . . ........... .. ..... ........ . .... . . . . .. . ... .
. ...... . .. .. ...... ...
. . .. ....
........... ..
E . . op�: . r,aL
SI C . : .::�•:D[SC!llRifOlJ :: : : :: : :::.:: ' : °::: :: ; :. ::: .: : :: :SUBCOn17RA�tdfi::: : ::. : :.: :.::: :•:�cin1F'f�•:: ::.�PItICE 1'UN1T:.: :; . •�1
�6000 �.i�r�us•Pvccw�e�.e.ro�so�►syoyc�, sr„e�ra� �� s e,�ss.s� s s.��.a�
2. Add fahires to sfs'rwry� at Buldings A 6 B BrudNk 1(s 3 1� S 1 ��.�3
�!�µ��� :F, ;," ' Brudvik 1 k S 1�1 S �y�'--� •��
4. Ad to at Bu�di A B b►udVlk 1 la S 1.158.56 s 1,/56.66
}!i����u�d'6�✓0� Brudvi7c • b S 2� S -
subtotai �L►clv� ��73, l�, bN t S S�y�e'r.E1 $�I�SSI
�& P c�s� of�"�r,3s �.ya ts� �r�c3.� s� s �.�w�r 3a�• �
Totsl Chango Amount
EXCLUSIONS ! CLAPoFIGATIONS:
This wo�k sFall extand th� wotract timr by (� Wo�k days
Owner
Bryee White, Pdm Deswrt
Datt
: ,z,,.f� ,g,y6l.A�
r�v■c�w
C bb�, Tsylor F
ti /� � �d �
Date . .
�
O�/1fi/2406 TUE 11:35 FA� ��� PV BRYCE
. ,.
� � �� ��'�_ .,�.�
f� 404/418
�oo��
�s�, c�►�a
Pboa� �60 �w-4azg
F&c 7b032i-3302
1.ioaie*�Ri�73
�y 1i, zoo6
Tayl�u �'ragec Caostrnc�an
a16s� �pr;se C�rcl� saioe zt7
Temet�.la, CA 9ZS90
,�1tbp�: Chris Durm
Re: Feha Yilla�e Ar�_:._:,.:,► tJndorgt+c�tod So]ar Cmduit
Mr. D�no,
Pka+�e aobe an sdd of 56,165.87 ta furaish a�ad ia�11 �ll elocmcal � m ins�all4" P'VC imdagtnuad �or
sa�arwia�iog.'I'lnis pricx ia £or ��osfc dooaup b May 11, 2006. Tl�eet wiII be 5mu�e cl�e ad�s fioc �olar �vock
dooe in e� of the bwldi�e, t�ood tv � f� tbe wodc wa've alrri�'spwt mc�bny' o� bofpre � a�a p�voead
with �y a�d� firtun a�alar �vctk.
P�ase f�d �nec �o oxll if ��ou �ava azry q�oeations. (760) 32Wi429
�Y �
� F�
Prajoct M�g�
8radv�7c rnc_
9i/89 39t/d 71I11Q(k{H ZOEEELEd9L 00:6T 990z/��/50
O�/lfi/2006 TUE 11;35 FA� ��� Pv BRYCE
� ` � M �]� j �
`A v� . ��1._ -- ��'�
Ma� 11, 2006
'I�ylAr Fraper Co�troctiaa
4166 t P�tcapdse G�rcie, Suisa 317
T�, CA 92590
�ao7�o18
� ��LL
Pqhm�„ C�lL92a64
�G 7ls0 32(W4Z9
Feuc'!6U 3233302
���
At�a: C�a Du�,
Rr. Palai Ys7iage Ap� Bldg A� B S�vay Li�as
Mr. purm, t �l0$ • i3
Pleasc naOc sa add o�S� to i'ivad�l► �nd install alt alactiica! .� �.. ��..y� to add 2 type 118� a� 4 type
10 S�ues to tbe �lauvways a[o�bldg A amd bldg B.
pleaSe �el &+� ro call if yai La�ro sery qu.,►,ti.y..�. (760) 320�429
�tY ��+
Jaaon ras�r
�� �
Bia�dv�7c �c.
9�/�� 3�d �IIAC�t21H -- ZOEE�LE09L 0b �8T 98AZ/I'L/59
.05/16/2006 TUE 11:36 FA� ��� PV BRYCE
* � ,�i �
A��M. • : rl M ! '
Msy 11, 2�6
r�F��
41c�61 �iei�uisc qrole4 suite z 17
Tea�aila, CA 9259Q
Atn� G'6tis D�ma
R� Palm Vi11ag� Apum�s Bldg A& B P�o Li�
�013/018
600�geile�i
P�ffi Sp� C�A92264
Pbc� 760 �-4429
F�c 76032�3Q2
I�om..1��3
Mr. D�,
Please aote �n add a��1,156.56 Lo fun�sh �oad iaatall al1 �r�l �sary to add 4 iypo 3� to tbe addCd
�a;� o�� A ana � a. C o�h�,� RvoM pafi�S )
Plesse fcd froe to call if you havos auY qur�s, i760) 3?A-4429
�h' �d,
Ya�on �r�r
pto�ect Ma�c
Bcvdv�7c inc.
9tlbt 3�tfd NIIWfIa$ ZBEEEZE09L Bb�BL 969Z/LL/86
■i��ft���FRAGER
.\ 7ilYLOR L'u�aseri�cflnn C.rnuo C��mnanV
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92592
Title: Electrical Changes
Project: Palm Village
TO: Bryce Lynn White
Palm Desert Redevelopment Agency
73-510 Fred Waring Drive
Palm Desert, Cal'rfarnia 92260
DescripUon: Electricel Changes as described below.
CSICODE
DESCRiPTION
160000 j, Add 2 sconce lights at entrance to stainvell of bldg. C
160000 Z y+�d�t�h e�pe�c�gh�,eCer�t� �pE�i uf+it'
� I�g
160000 7,, Add 1 switch, 1 conveniance receptacle, and 1 keyless light
fixture in the attic space of each 2nd floor unit (18 total at the
FAU access hatch
Subtotal C � ���Zdp•3y (�R ( 1'�
OH & P `lS�v a� ' � 148.7� %�ts '�S'26�9�
Total Change Amount
EXCLUSIONS / CLARIFICATIONS:
This wor{c shall extend the contract time by:
Qwner
Bryce White, Palm Desert
Date
951-296A892
951-29fi�9893
SUBCONTRACTOR
Brudvik Inc.
Brudvik Inc.
Brudvik Inc.
COR NUMBER: 33
DATE: 18-Apr-06
25920
UNIT PRICE I UNIT
1 Is $583.23
1 Is 3,5!S��Y
1 Is $4,141.41
� 5.o�ra
0
Contractor
Chris Dunn, Taylor Frager
�f �"�� -
��i�/���
Date
LINE
TOTAL
$583.23
��
54,141.41
��t Z�1 b�{
$�5
. $� t��,�
s�
�{� 82$.,00
�l
�i.ECT O
��
600 Et�eae R�ad
Palm Sprmgs, CA 92264
Phooe: 760 32(?-4429
Faz: 760 323-3302
I�om�e*4az623
March 27, 2006
Taylor Fragcr Cona-t�vcti�
41661 Eaterprise Circle, Suute 217
Tanocula, CA 92590
Atm: Ctuis Uuna
Re: Pa}na Village Apart� Bldg "C" F.�eriar Sconce Lights
Mr. Dunq
Please note aa edd of 5583.23 to add 2 1� locx+tiwos at the � to t3�e stairwell o�f Bldg "C" as per
Bryce WhiLe. ��. S�e 0� CAf��L� vl°Cni�.S Aed� �Au�►��'y rDa�
Please £eel free Lo call if you bave anY questions- (760) 320�1429
��Y S��
� �
.r.- �.-..-
� �
Jasou . ?Iasei'
Pro}ect Maaager
Bt�dvik Inc.
8Z/0Z 3Jdd �1IJ1Qf121g ZOE�EZS99L E5 �9� 900Z/LZ/E0
�r�c.
ECT O TaR �
��
GOU Faigesee Ra�d
Palm Springs, CA 92264
PLone: 760 320-4429
Fax: 760 323-3302
t�oe000�as76z1
MarCd12�, ZOOfi
Taylor Frager Ca�strvcdon
4166� Emerprise Circle, Suite 217
T�tla, CA 92590
Attn: Chris Duna
Re: Palm V'tllage Apar� Attic HVAC Devices
Mr. Ihmn,
Please a�ote an add of S4,141,� 1 to add 1 switch, 1 caavenienoe reoe�Wcle,, ead 1 keyless light fi�iuz in the attic
spacc m eech 2� floor unit (18 toral) st the FAU access h�cb. Ti�is add is pet itLspector's request duriag a 3l27/06
walk thnough.
Please feel &oe to call if you bavc a� quastio�s- (760} 320-4429
Respectfully Subinia�ed,
�
,��..r
�
i�sa�n Fraser
�J� M�B�
Arudvik luc.
b0/Z0 3�Jdd �iI/1Qfl�g ZOEEEZE09L E5 �60 900Z/8Z/£0
�i�rit•�_� FRAGER
AT.IYt.nR (:u.wen�r.Nnn �rnun �'umoonv
43620 Ridge Park Dr. 951-296�9892
Suite 300 951-296-9893
Temecula, CA 92592
Title: Provide Radiant Reflective Exterior Stucco Paint
Project: Palm Village
TO: Bryce Lynn White
Palm Desert Redevelapment Agency
73-510 Fred Waring Drive
Palm Desert, California 92260
Description: Provida elastomeric rodlant reflectiva euterior paint for all stucco.
CSICODE
099000
DESCRfPTIOfJ
Provide elastomenc rediant refleclrve extenor paint
Subtotal
OH&P
Total Change Amount
EXCLUSIONS / CLARIFICATIONS:
This worfc shall extend the contract time by:
Owner
Bryce White, Palm Desert
Date
SUBCONTRAC70R
J Kel Painting
0
Contractor
Chris Dunn, Taylor Frager
_� "'S/1'"
������
Date
COR NUMBER: 37
DATE: 18-Apr-06
25920
UNIT PRICElUNIT
1 Is $32,190.00
15.0%
LINE
TOTAL
$32,190.00
$32,190.00
$4,828.50
537,019.00
e
02l�1/2006 12:31 19517355800
JKEL PAINT
PAGE 01/01
�.KEL P,AINTING & IN,ALLCOVE��NG �NC
, .
James K. Kelly, President Lic#754163 Office (951) 371-047�
2047 Applegate Circle FAX (951) 735-5$00
Corona CA 92882-3720 CELL (951) 232-2707
B�D PROP�SAL
DATE OF BID: February 21, 2006
��� �a��q���
PLANS/SPEC'S DATED; 1/26/04 JOB NAME: Palm Vil�age Apartments
Elastomeric coating
SPEC SECTION; Paintin9 J�B ADDRESS: 73-610 Santa Rosa Way
Palm Desert CA 92260
BID AMOUNT: $32,190.00
elp INCLUDES LA80R, MATERIAL, LIFT EQUIPM�NT,INSURANCES !4 TAXES AS AApUCABLE TO JOB OR AS NOTED:
WE PROPOSE TQ CUMPLETE 7'HE FOL�OWING WORK AT THE ABOV� JOB �OCATION I.IMITEp A9 FOLI.OWS;
INCLUDES: Exterior coating to be radiant reflective ma#erfa�manufactured
by Life Commercial Products
MSDS wil( be provided upon request
rox. 25,753 sq�t
Three (3) coats of material�— products are se{f-priming
EXCLUDES:
ADDiTIONS:
Any items andior areas not noted above
n/a
ANY AL7ERATION OR DEVIATION FROM ABOVE SP�CIFICATIONS INVOLVfNC3 EXTRA CO3TS WIU, BE EXECUTED ONLY UPON WR1i7EN
CHANGE OF2DER AND Wl�l BECOME AN EXTRA CHARGE OVER AND ABOVE THE ESTIMAT�.
N07�: THIS PROPOSAL MAY B� WITHDRAWN 8Y US IF NO7 ACCEPTEp fN
RESPECTFU�LY SUBMI7T James K. Kel1y, Estimator
3D DAYS,
CELL (9511232-2707
04/21/2006 FRI 10;49 FA�
04/20/2006 03:21 I9517355800
JKEL PAINT
�oo3ioo7
FACf 04/H8
F1i�QM : AVAI�i E5THER BOL I H FAX N0. : 7143T11695 Mar. 07 20pJ( 11: 40PM P17
' ,;' . � py�,y7� �i��� ';r,.:L • • . �' .f �� ; ' �. , • ��; �:. ,+�SY �� h,r �":' �7 ; . . .y,.- . :.�.'-.=
i�V � � r.. � � . �•if1-�Y'•, �/y, 1 ',�' f� ry�1'.�t "� • � • . �i� i �/,�?��ET� �rf ,� , y' �f��~ �� i�'��:�n��^•i' .
i�� _ � ;'���•• - 1 ti � � •i 'A• �� �, � � ^' �^ ��:. �
�__ _ ' ' , ;, `yYr - •� 1� ��;��" : " ' �'��, ,nM1� �.. s� - �,' _ . �^Y.�'�r�q,
.'l� :.� .S�•. ��;%'';�;�_" �,:�,; Y=.r:.;��:::SF;,,,-�
��: `��' � . • ' . -,•y F .1 '1,^' � . -� �'' � � "�"
�'�.�';�I`�`�, �� .I'. ji.i;(,4�•!�,'L �s1' ••N•t:R�.�Ei¢Mt+• :>/� i'�.� *,i�n�i'17,����i.���.,' �n'�♦:r�+�T"��/;�(y��� �n.'�. �.'LC:�i7i.
i y , � � � '� ��•��' f .Sr'r1 •il,'{i:� . '�'.
';;.,;. a,�,r ;ro 4•�, .i. .�..�-�.� ���r��' : :r . a.' , "'-- �.;r�'-
..�eSY'. .:.1"•r., :}'� �.'s�� . �.. t``�k�,� � 't�S 'f�•.� • .... . .. �M'•r.•li�••i��Ti r ,r ��.�'�°�i.Yt:�e��•ii�: � ���i�.~.:�:•: �� . �•,�w:�i
_ r: � "•`Ji�i
►���� � ,
,�S �er��i�s - � � �
High Bu��d. W�te�r�f
�moat,� . �iast�r�er�c
Ca�a�ing
� A heat r�flec�e aoatfng fYx wa�t�
D�oarf,�r ,
A endrolURl quality► hk}h twAd� �OW G.�i�rr 100°6Aaylk Lal3ac
8�stomeriC coatjrig fber �ciorwafl stufaoesthat wiff �lect
'up?5�6ofthe�un'slnFra-r�drays. Afi�dbi�CdaitMgtt�thas
ane�ictyfacbnro�900910. tUp� iSm�swet'fdmt�liClme�s.)
o�gn� ba r+�eflect the.ui�awtol�t cay: oPi#fe sun titeneby
�d�f1Q t�1E SUiti`�CE is �� , :,��l�.�e.
- . - ,� ,�
✓ Bridg� hairl'me caacl�s
✓ R�ssks�s wittd drivest ratn
(P� ASTM @96,17Cr5S5-R)
✓ w�Aer vapo� tra�an (Br+�eJ�u�ty) -
A'errriS 1.9 /1.STM E�96�S4
✓ Fxtremeiy resistant iA �irt pidc�,p.
✓ M81rit�1ns �dhesion and il�dbtllty e�n In odd
tamperabu+�s. .
�✓ SUperiot rc�r� t,� i�ItraVlalak 1"dy .
bt'egkde�wn. .
��
✓Masa�11Y
✓5tlxaa �
• ✓Blad� WaILs
.Konaete �
t/1NO�d .
dt�tal ' .
� , ,
�
LirE f�Ak7�T Q0. S�NFA F� 54RINAS, CA 90670 (S6� 9d4-K'd�� C� �ltl-bN51g '�N �A. www.i�irKoom
�saofrtcs - . , . � . -
08/11/2006 �RI 11:28 FA� ��� PV BRYCE
�►y��t���s{ FRAGER
w Ywri.rHt C.n.r.s.nN,rw 4..w Cue.ranr
43620 Ridge Yarlc Dr_
SuRs 300
T�mecula, CA 92592
Tltle: Additional Paint Worfc
Project: Palm Village
TO: Orycc Lynn Whik
Pnkn De.:ert RedevebpmaM Aflency
79-510 Fred Wariny Drivo
Palm Deso�t, Caifomia 92260
951-2B6.9S92
95�•296�JII93
�oa��oo3
COR NUMBER: 61
DATE: 9-Aug-06
2sszo
Oacoriptlon: Additional Paint Work
. ..... . . ... ... .. . .
. ::. . . .
.: CSI GODE:' . . . . . . . . . : . : .OBS�RI?T60N; . ° . .: :..; : .:.' :':' : ::.: :':'.:.: .' :SEI¢�ON�'E211C`fOR.: :::. .. . . . .. ::.: l]N(T;;�: : :PRfCE.1 lJN}7 : .. IOIAL .... .
09900 Paint cbse� J•Kel Pair�t"np 72 eacfi = 35,00 S 2,520.00
Palnt Inve�tu rmmc J-Kel pslrthg 2 e�d+ S 35.0o S 70.00
Subwtai
OH&P
Total Chenge Amount
EXCLUSIONS / CLARIFICATfON9:
This w�k shall extsnd the eonVact tlmo by {1) Work Days
Owner
8ryee White, Pdm Descrt
�e
S 2,590.00
16.0°k $ 388.60
S 2,979.00
Contratt r`r
�Iko Kubba, —aylor Frag
J j� / I . �.�t
r �, �
�`
�
tSet
08/09/2006 �ED 9;12 FA� ��� PV BRYCE
FRAGLR
� 001/001
a3szo adqe aa� odve
suite 300
Temecula, CA 925�'L
Phor�e: {951) 2.98-9896
F2x (915) 2969893
A 7i! i'LOR Ca►nauc�ion Graup CuwyxtrtY
Ga�,u Nu, 59S27?
August 9, 2006
Sent via facsin�ile to 951-735-5800, 6 pagc�(s) total
.;.Kel Painting 8� Wallcovering, Inc.
2047 Applegate Cirde
Corona, CA 92882
Attn: James Kellv
Project: Palrn �llage Apartments
Subject: Your Meeting with Mr. Bryce White
Dear Jim,
Attached is Bryce's letter of August $, 2006 documenting the issues discussed at your meeting
witn him yesterday. Please review and make sure that all agreed upon items are executed to the
satisfaction of all parties concemed.
In addition, please provide a proposal far painting the dosets and the 2 invecter closets in
buildings A& B($35.00 X 2 X 36= $252Q plus $35.00 X 2= $70 f�or a total of $2,590.00} so that
we may submit for a change order request. As you can see from the letter, Bryce has already
apprvved this additional work.
Sinoerely,
TAYLOR �y�AGER, INC.
� `
�
!
�
Mike M. Kubba, Ph. D.
Director Of Operations
cc:
Bryce White, Senior Cvntract Administrator
Ron Haas, Project Superintendent
File
�I=�I��J:� FRAGER
.\ litYLllX C.u��r����ct�on f.inuu C'<+mnoi�v
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92592
Title: Rough Carpentry Changes
Project: Palm Village
TO: Bryce Lynn White
Palm Desert Redevebpment Agency
73-510 Fred Waring Drive
Palm Desert, California 92260
Descriptlon: Rough Carpentry Changes as detalled below
CSICODE
DESCRIPTION
061000 ver
p�prt.v�Ai �,.�di�rt�
061000 ftit�uLl�dgMa-4'„a w� vww���� r..;;uu' T�::II,:I::n., l,,3-&L
061000 Cut in 24 access holes, bldgs A, B, & C at storage room, upstairs
exterior patios for sprinkler access
061000 Chop walls on a 45 degree angle at laundry af Bldg. C
061000 North side of building C at laundry, fir out exterior wall to
accommodete solar conduits
061000 Fur down breezeways at building A& B to eccommadate
12" deep light fixture. This would heve been required even if
the framing had been instelled per plan. The light fixture neads
12" oi space and per plan a 2x12 (11 1/4" nominal dimension)
would have been installed. 3/4" short of the space needed.
061000 Framing of laundry room wall and soffit, breezeway
061000 Framing of laundry raom wall and window modifications on
buildings A & B.
Subtotal
OHBP
Total Change Amount
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by:
Owner
Bryce White, Palm Desert
Date
951-296-9892
951-296-9893
SUBCONTRACTOR
Tandem West
Tandem West
Tandem West
Tandem West
Tandem West
Tandem West
Tandem West
Tandem West
COR NUMBER: 34
DATE: 18-Apr-06
25920
UNIT PRICE / UNIT
1 Is
1 Is
1 Is
1 Is
1 Is
1 Is
�G2�?DC
����
$923.00
$460.00
$517.00
51,460.00
LINE
TOTAL
ya'Z�UD^
35,�oa99 —
$923.00
$460.00
$517.00
$1,460.00
1 Is $994.00 $994.00
1 Is $621.00 5621.00
'� ��-Fi.�&tT35346�
15.0%�, $1,702.95
�Z�.(,�s�a;e�e-oo�
0
Contractor
ChNs Dunn, Taylor Frager
e
�'-�"""• .
�((�j�
Date
Rpr 05 06 07:21a Ron Haas 760-674-8359
Ti �V
F ��NSTRIJCTI�0�1
Dba Sel�ct Build
30-875 DATE PALM DRIVE, ��Z
CATHEDRAL CITY, CA 92234
760) 770-3303
760) 770-3611 FAX �
....i-: � �,,,� --�--, �� ,
CHANGE OI�DER ���?`��� I
To:� l� �'�.
l
PROTECT NAME: �c� 11iv� � ( �4�-� ��
TRACT#: LOT#:
CHANGE ORDER#:
CHANGE ORDER DATE:�•-2F�'�'�
CONTRACT 'IRADE: ROUGH CARPENTRY
T'F� FOLLOWING CHANGE5/ADDITIONS/OMITIONS ARE TO BE MADE:
Lt�T �y� •�.� p cc�s s �tj��-S �.� i�%� ZC �- r�T�
�v r�z. �'��• ,��rs ��. ��,�n G s w�� � p�� h. � l-�,r
�5S �
1. VY�Y1 1 � ��.i` S
� �2-' 2-�-`�
LABOR @ $ �� x xoux
TANDEM WEST GROUP
BY: ,.1'��n � ���e-��K�
DATE: ��-Z���
� TOTAL HOURS:
I TOTAL LABOR:
� TOTAL MATERIAL:
� TOTAL CO:
��
�S�r�
.�i � � .�
� � `�
p.8
,-
\ l ��/ - ' �/'
Framing wiih Wood, Steel & Pride
Rpr 05 06 07:19a Ron Haas 760-674-8359 p.3
iW� CoNsTRUC�'iaN
Dbn Select Build
30-875 DATE PALM DRIVE, #C2
CATHEDRAL CITY, CA 92234
760) 770-3303
760) 77�-3611 FAX
-p ro �os�c. \
CHANGE ORDER ��—.�7� �..�;!
TO:`t�`�i��'�r�`�'_ PRO7ECT NAME: � VII��e� �'N'�
TRACT#: LOT#:
s. �n(1 S �ic,;n ►� CHANGE ORDER#:
CHANGE ORDER DATE: 3-245��
CONTR.ACT TRADE: ROUGH CARPENTRY
THE FOLLOWIl�IG CHA.NGE5/ADDITIONS/OMITIONS ARE TO BE MADE:
1�' L.cw� 1�� F���, G. �� r•�.e+,� I �►., �
4 S" .
1 ✓Yt�.n fi� �'i �'S
,fii� ' �c Y
LABOR @ $ � � X HOUR
T�NDEM WEST GROUP
.
BY: �,� �-�.i�fc-�
DATE: 3 ��' �� `�'
� TOTAL HOURS :
� TOTAL LABOR:
� TOTAL MA.TERIAL:
I TOTAL CO:
g
�'�� ►_"
n� D► —
��Q �
Framing with Wood, Steel 8� Pride
ppr 05 06 07:18a Ron Haas 760-674-8359
-��v� co�s�rRuc�-roN
Dba Select Build
30-875 �ATE PALM DRIVE, #C2
CATHEDRAL CITY, CA 92234
760) 770-3303
760) 770-3611 FAX
�,�p Q nSa �
CHANGE ORDER j�--�"7q �-c� l
TO: C�n�S Dv y� v1
' (ze.y lo ^ �� �L-
PROJECT NAME: t�W� �i ,I � ��7 S
TRACT#: �.OT#:
CHANGE ORDER#:
CHANGE ORDER DATE: 3' 2� z�
CONTRACT TR.ADE: ROUGH CARPENTRY
THE FOLLOWiNG CHANGES/ADDITIONS/OMITIONS ARE T BE M.A_DE:
�IIOC` li�t S t�-�. �/5 �... C. .� 1 �av v► �[,�/ ,� �. i� �" )C' l
�X�.t \ o v i �p �4�rc�wu�cZ.:-� ,Sn 1 a� A p v�v ,�r-s ..
! �o` �-X�
Z i�.Ev� 4 1� �` S
LABOR @ $ � �X HOUR
TANDEM WEST GROUP
BY: �ov'� �i�l'�-
DATE: 3 -2 ��' �`
I TOTAL HOURS: R
I TOTAL LABOR: 4y �► '
� TOTAL MATERIAL: -
I TOTAL CO: ,�,/ 7 "
p.2
Framing wifh Wood, Steel & Pride
Rpr OS 06 Q7:18a Ron Haas
ll' .
i��
TANDEMWEST
GROUP
�o: c�,� 5 u���
- ��Y 1 �` ��:Ej-c�
�.S —t�7� 1-�� (
p.l
PROJECT NANg?: ��� �''�, � � II�`�� � � �
TRACT#: . i.o3'#:
C�iANGE ORDER#: � `
CHANGE ORDER DATE:�` - 3�- o C�
CONT].2ACT T'R�iDE: ROUG�I CARPENT.it2Y
THE FOLLOWING CHANGES/ADDITIQ NS/OMITI4NS A�2E TO BE MADE:
�o C�. I��-nc` r ��'� h�� 1- � � aQ ow,� ��i`�c � i�.w c,� v S
�� { � /� ��% c ��' 't' Yi•'C�- G ti'1'? / ✓i / I'Y1 �1 YY'1 �
n� �'� �-,D t i.iv �e has � cu lT� h�t ���
1 ��� � �TL'% j 1: �� ��li��n_ �1 ��t'.�i W�L � '%v Llrt'C� T�
SI D� e. �- 1�'1'1 t"Vl I Z %1 f S
�O' 2y�� _�140,�
LABOR @ $ �$f X HOUR
TOTAL HOURS:
TOTAL LABOR
TOTAi MA.TERIAL:
TANDEM WEST GROUP
BY: �,�.�����
DATE: `� .- �'� �
Froming with Wood, Steel & Pride
760-674-8359
30-875 Oa►e Palm Drire, Suiie C2
Caihedrol Cify, California 92234
phone (760J 770-3303 fax (760) 770-361 1
��� �r�zsa
�(�j �'OS�c. �
R
�.�rr�
��
i�� 2c�. �
�I�p,_
� �y�t� ` �
��.-�f� .� �s/�
o��
TANDEMWEST
GROUP
30-875 �ate Palm Drive, Suite C2
Cathadral City, California 92234
phone (7b0) 770-3303 fox (760) 770-361 1
u�# »�zso
EXTRA WORK ORDER
1����`���
� FOREMAN'S NAME: �Dr► 15 �'�"k'�
CONTRACTOR: Tw �
, PROJEC7ADDRESS: � V Y�T'����
� TRACT NO. . LOT NO.
TIME & MATERIAL X :
WORK ORDER #:
DATE: � '" �'� ` D �
PLAN N0.
CONTRACT:
LABOR @ $55/ X HOUR
IF WRI7TEN, ATTACN TO THfS SHEET, IF VERBAL, WRlTE SUPER►NTENDANTS NAME BELOW
NAME DATE
(�� v,ci�/ ('oovh wai � A s��,'rr' �i �re.��►��/
' DESCR�IPTION OF 'CNORK
� NAME �
� �oy c �bado
Fxu++�� TuPrv, �
�ishr� �s�
�✓�s �inQ���.�
I
SUN MON I TUE WED THUR
I I I
�TOTAL LABOR
�DESCRIPTION PIECES SIZE LENGTH
I zx4 �2, /y'
I �Xl� 12 l�
I
I I
i I
I I
USEAGE
SUPERINTENDENT SI HERE TO SiGNIFY WORK
SHOWN ABOVE ;
%l'�, • �
WORK CERT lE BY.
�Ynminn �n�i�f+ INnnri C+ncl R. Pri�10
FRI SAT jTOTAL HRS RATE � AMOUNT �
� I '3 � SS I /,:%� I
� I � f Ss' .' "� I
5-5" '> ,''
� I "y � ���- I
I g �s � � I
I i
I I
I I
BD FEET
/� �'
j� ,�'
PRICE
.tr�/'�
r y `1
. .�
AMONT
��
��l . .
.�.�.•77
i:
� TOTAL '
�SALES TAX �
�15% �
�TOTAL fJ�ATERIAL �
�TOTAL LABOR �
I 70TALI
/-�/' y'� �
/7' • o,�' I
?� y, �� j
, '7G • `'� I
��y�= i
���
TAI�iDEMWEST
GROUP
�c� ,��/� 3, j�
30-875 Date Pa{m Drive, Suiie C2
Cothedral City, Califomia 92234
phone (760) 770-3303 fax (760) 770-361 1
i��# 7nz5o
%��? �� `c�i
EXTRA WORK ORDER
FOREMAN'S NAM�: _J6ri�, ��ce'��'e
CONTRACTOR: �T (,L 1"
PROJECT ADDRESS: �ct,�,wt V t CIQ� 1� � S
TRACT NO. LOT NO.
WORK ORDER #:
DATE: � �' % ��� �
PLAN N0.
TIME & MATERIAL X : CONTRACT:
;
LABOR @ $55/ X HOUR
1F WRlTTEN, ATTACN TO THIS SHEET, 1F VERBAL, WR1TE SUPERlNTENDANTS NAME BELOW
NAME DATE �
_�C.v vtc�.�l F,,x�-1 � � 1�!'Yt ►'� �, � r S � 6v t o w,} o v� �$. � � v►�4 YI ��j �C 5
DESCR1PT10N OF WORK
� NAME SUN
�05� �4a�
� �w �
I
I
I
MON
�
�
TUE WED THUR FRI
l SAT TOTAL HRS� RATE � AMOUNT
2 .�',S� � %%;� • : .: .
{ g .�-S i : -_ - �,
I I� I I f
I I •, I I I
I � � I I
1 I
I I
�TO?AL �ABOR
�DESCRIP710N PIECES SIZE LENGTH USEAGE
I � �X�f cb Gr��r�d..r�
it� �c.� �` t�[���
�
� �
1
SUPERINTENDENT SIGN HER� i0 SIGNIFY �NORK
SHOWN ABOVE
WORK CER I lED BY
BD FEET
.��
/y
TOTAL �
ISALES TAX I
`15% j
ITOTAL fv1ATERIAL �
�TOTAL LABOR �
I TOTALI
PRICE AMONT
, ��o,� =�'�' -�^
L/! "' •, , - �
, � �<� a. >
� �
� �
f 1
I l
.57- � �
y, s�� �
>- ��` �
7! � y-' �
�`� • �% I
-t
�-i���
/'L � �
Frnminn �niit►, 1Nr+r+� C+ool R Pri,ao
�6i08/2006 T�,' 9;33 FA� ��� P� BRYCE
■i��It+�1ci FRAGL�14
A Z'�Y/�J[ GLnMrw�JOM (INwY CwwWA/
436Z0 Ridge Parit a'.
Suito 300
Tontseula, CA D2502
Title: Add J-Mold at Roof Z-Bar
Project: Palm Village
TO: Bryee l.ynn Whita
Ps1m Geext Redwabpment Apency
7s�510 Frod Werirp Drhro
Palm D�saR, CaBfernia 92280
951-098�882
951-298-9893
� 001/006
COR NUMBER: 48 Revised
DA7E: S.lun-08
25920
Dascriplioa: Add Jallofd at Z$ar
..
. .. . .. .. ... ..
.... : ....
. CSI CODE .: . : : : . : : : . . . DESCRI?T�DI; ;: "' : ' : : . .: ': . .. . . . Sk18('.ONiRACrTOR:::"::'.'...: . . . ' : .IJAj(!..:; �:PRIC@ f 1111LLT: .
..
. .. .... .. . . .
� . : : : : ::. .. . . . .. ..... . .. .: : : : . . .:: . : ... . . .. . . .. . . . .' 70TAL . . .
09200 Add JJVIOkI et R�f 2-Ber to eccommodaEe shicoo system Inl�nd PL�ate�itq 1 Is $ 3,700.00 : 3,� �� �
Subtotel
OH 8� P
Total Chango Amount
EXCLUSIONS ! CLARIFICATION9:
Thls work shall eute�d tfi• co�Hract time by {1) Work Days
Owner
Bryce Whlta, Pdm Oesert
Date
S �.ae0:d0 ' I � �' 1I�
,S.o% s 4za�ee Z,o�,a
: 3� ��s• a
Tayb�
.
� -
' �
� .�.�
��
u6/08/2006 Tgi1 9; 33 FA� ��-� PY BRYCE
06/b£i/2006 06:49 55192E175E
i�an �asTER zNc
� 004/006
PAGE 01/03
� �
�
X�t�t� �'i�te� �i�.
z6561 Wincheater �td., 7�emet, C�A 4?S45 P�ON� 951-9Z6-9889/ �AX 9SX-9zG-1'156 �,ic. # 835Z42
I To=
+ CO:
� PHONE:
I FAx� �
i
DESCRIPTION:
Hello Mike,
____ F�1X TRANSMTTfAL
Mik¢ Kubt�a FROM� Spet�cer Foulkenberg
PA6ES: ,� �.Tataf
_ _ _ __ . DATE: _ 6/7/2006
�1) z96 - 9893 RE: __ Pn{rn Village 7-Mcld Add @ Z-Bar
I received your faX today regarding the credil for,th� J-Mold add ai� the Z-bar. I have revised
my pricing per the footage.s that yau provided, The new prices nre as feliows; _
I
I — Bldg. A,�7'�' .,� ro �' C�%
I Bldg, B �ff� � (St.0 , � -
Bidg. C _ $�73� ��` ��b�
TOTAL =�_ �„1335.�
Please re-Quthorize if You npprove. Also see second pa�e for breakdown.
I---- --
C
Thqnk You,
Spencer
01i 10/2046 �ON 9: 33 FA� �-�-� PV BRYCE
ir����•1:i I�RAC3ER
n Ywrtuit CowRwemw r:..rr c�o�wr�a^r
43620 Ridpe Perfi Dr. 951-296-9892
Suite 300 951-296�9E93
Samecula, CA 92592
Title: Change F�cpansion Jolnts, Replace/Repatr Damagsd Corner Aids
Project: Palm Village
TO: Hryos Lynn White
Pelm Desert Redevebpnent Ags�cy
73510 Frad Wering Drive
Pahn Deeert, Gtifomie 92260
oeevipden: Chengc Expanelon Joinn, ReplsodRepelr OamegM Cerner Alds
�002�004
COR NUMBER:
56
DATE: 10-J W-06
zs9zo
. .. . . . . .... . . . . . . . .... . . .. : : . : ...... .. . :.:. ::: : :: • .. . . .
: : : : :.: .. . .. . .. . .. .... . .: . .. . ...... . .. . . .. . .. . . ... . ..'.. ..
�: CSI:CODE : : ' : : : : : : .: . .: .:': : :DESCRlPTlON: . • : . ... .:..'SUBGOMRIYC.T.OR.' :.' ' :'. .: : ' : :l1fiYT : .� . :PRICEI:UNEi: . :: 'iOTAL' : .
09200 1. EY�,nslen.loi„t Chanqes per Ow�er Inls�d PSssts�ing �0 Frs Lesor S 78•00 S 780.00
1 Mebrisfs S 201.83 S 201.83
2. Replace/repa"r all damaqed Caner Aid. per Owner Inland Plo�eriny 14 Hra Labw S 7b.00 S 1,Q92.00
1 M�teraik 3 65.32 S 85.32
Subtotal
OH&P
Totni Changa Amount
EXCLU310N3/ CLARIFICATtGN3:
V�
Thls work shall axtend tha convact time by �Work Oays
Owner
8ryce White, Palm Desert
Date
S 2,138_95
15.o`/e 3 a20.b4
i 2,480.00
Contractor
AAlko Kubba, Tayfor Fr�er
+
. Q.
.
.
/ �
� / �Q�
' 07/10/2006 �ON 9; 33 FA� ��� PV BRYCE
• 4 � �, � �
� inland rlaster Inc.
- - . . — . — � - - --- — -
PO Box 461346 ��scoadido, CA 92046 • l�hoac 760�747•91 SS • pax 7Ga74y$934
EX'�'RA WQRK ORDER RE�UESi'
f� 003/004
,u. r s3satz
1436
e,�� R���: �/a�% REC1tJ�.ST�D BY: I�IeJGE . .
flOMPNYY: �/�lYr � r'r�%Z. _ �pg: Q!!LJ"i �/!l.L.IICr�AI�I�HASE: JO� �i: _��/" 1`� i
LOT �: /'� PLAN; 6'�liCCb OQ�LQR'.
LOT I10DRES^a: ' HOi�AE OVYI�JR: PH.1i:
D�Sl�i1PTI�N OF WORK REQU�,STED: [�� l�1.,�1�� %�AM�f3 Go�_A__Ib
1
HOURLY AA1'E: S� v PLIiS MATERIAIs. ,
iNsrRu�,p,-AoioEstiuw: ,�EOc.,.a�� e� _ l�-E .QrR. A���?�o!'-►.ac.-F�' C�.a� L2._
IIIATFAtALS pATE NA11E O� 7AADFSMAN JIND b�SCR1P'fiOtt OF WORK CONPLL'7E0 �IoN HRS.
sc+��a.d � F� .,.�(vt,�.�?.!� ..d(r...._....�'.���.Q.��..� :...�...�......__.�_._.._.._..._....._......__._.�. _.._..�......w _...._._...1,.�: v
wwE rds. ....w..... ,�!L�.�.. �sa�..��l.l�--M�i?..�rr..�.�c3�l,�•.,.�.r�..�.e'��'.��E.l►? _.�...,_........_�.._.
ie. wm Ye�. ..�...�.....�,'��..PD ..�:1���au�..r�.� 1� �4rf.{ ..�..�I��cN.,..�..�............_..�._._.�:._....�.._._.�. ,. 4! �
WM7G r4 �����r..w..�uw�M���N� ..rw� • �rw��w� N�111. � ......rr �r w.M�wN���rM�.r�x�n��w�i�.r�N.�.w�.��...w....�..�......r..�...��. .
�
ao�Q r� ._�.....�._._._ ._.._� __ ., _..�..�.._ ...._......._..w_...�._....._�.». . ............. ._�. , ��,._._...._.:...
v�uxu� .�,......._.....-___._._._�...� ..�_...._..._.._.� -__ .».,.,.....___._.�.�... .�__._._._.�........___.�....�....._..._..... ...�. �....._...._..._
,�r ...........__._._.__�....�._�._....,.,,,.,,,...� _....W._..._._.�._�._...�.,......,.��._..._......._..�.�. ..�._.._._._ ..._...._.....�.�_.�. _�.:_.....,.....,
SAtJ� Yds. _._...... .-.- . .....,,....«,«.....- .... .._._._._._...._........_.........._�.._...........,...._...�.........., .� � ��«.� ....»,....,..«..�.. . .._..._.........._....m......
CfiN1�iQr Baps ._..........._.__ .....,�.......»�«� ...�..��....�.. .__....... .....��..._._.._.__........- .._._....... .__ ................�........ . � . �. ....�...�, ,...._.. _.
5TtiCCOBeps , ........_._.�._....._..�..... .,.,«,...,.,,,,.�.,_....�..� �...____........,,-.u.,......__....._............�...� ..._ .................-....._.._..�.._..........��.
FaGBags ....�._ ......... ......m.,,.......r.. ..�....._..�..............,.,,.........._.................._......_....__....,�...«.».M..........._._.........�._ ....._.__....m. ........
wnT�a � Ga1s. ........_......._.. ....,.��... ......._._ .............._...�................._.�.......__......__....._._._.....,�.......,.,,� ....,,«.»....m.. ........._.._.__._........._...�._.
vISCiUE�N RI� ......._._..._...._ ..................�.�......_........,.�._.�__._»....,.�.�«.».�..... .._......___..__.._........_._�. ....,..........,_....»�...,.,�,�,.�...., ....�.�..._.�._
PAPFAFpa. _...._....._.,.._...._ ................ ......�.........._...... __. ......,».�......�...... »_._._.............._......_..,...........»....,,............,........_.......�. ,.r....___._.
TAPBRIe. ...........__..._ ... , «.,.,....«..._...._......__.W .....................___...._.__....._........—.W........_......... �__.._ ..._..........,.....».»...... ,�..._..........m
POLYBOND 82gs .�.__.._........._......,...«w ............._....._........ �....,..,,«,....«.........._�- ......_._..._.._.�............»....... .....
WSC. .............._...... -_......,.«......�....._...__.......... ..............�«.«.._..._.��. _..........._�......._....,......._�.............. ........,..,,.. �'°bor.. ,..j�G�,
�1�.._
MISC• .,...... ..................,..............., ,...,...._......................�.......,......,»,..:..............�.� ..............._....._.............._.... ._--•... �torlalS..��!�'..
ANSG. ...«�� ....................._..... _... ........ ..........�.............. _._..................... ,...................... . ...._....,.......... T� ��. � �
MiSC. . ___ .. ..................._.....�...-• -----•••_•........ ..«._.. ... ._..__............. ............^«..... ................,.o�.�nat�a,ts...h-�:...N.
RCiE 0 NO C1iARGE TO7AL : y �+� ���,.�e
Project Menngersign�ture S/��il6y /Rl�fi
90/L6 3�tid �NI �131Sti-Id �nrcf'1NZ � 98988b9iS6 60�&T 999Z�L0/L8
07/10/2006 �ON 9; 33 FA� ��� PV BRYCE
• • �� )� � �^
�f,"U �V � `� ['�.��
� Ynlaad Plaster Ync. ���
� ��� ��y �����
PO Box 461346 • Esco^���+, CA 92046 • P'houc 76Q74'1�9155 •�X 7%0.7475934
EX'TRA WQRK �3RbER REQUEST
� 004/004
��,�s�
- - --- -- �-��s�-=
'[ 435
DAl'E FtLOl1ESTED: '�' � Olo REQUf�T�D g1f: ��,,(� C'� �
O�MPaNY: TA,���'� ^- Joe: ��/Gt lIlL�� PHnSE: JU6 �: ,i [.�rr I'"fll
LOT x: A t C� F�.iW: S'rllCCO L:OLUR: — --..- --
LQTADDRES6: HOME OMf[VER; PH. i:
o�scw�naN o� wa�c �cau�stea: �x�A�isiex! CN� c.o•� PE'� [3R�',f
FiOUf�Y RATE: �� PLUS MATERIALS,
INS7RLJG170N TO TfiAAFSMMJ:
WIATF_RlA[.5
f"cs�P�3a� .
�� / �,G p�.
IIAY'� NAN� QF TryADE$10AN ANp DE�CRIPTIQN O�WORK CONPL�ET�D
0
v�nAE Y�. ,� ..........�.�_�,.�.. .,F..�;�:�T.'.._��.P..� .N..�1�Y ._j-?��.T_.E.1.� m_._....�_._.._...___.�_�....
N. u7H Yds. ._...._..........�__..._...._....._.._.._........._........«.�..»��«�.....»..... __._......__........_..._.....w .......... ........�_.,.... .� .
BAS� FC
Aip Pt
YAucuM
JIFFV
1RAl�! FiRS.
. �
� �
S/IND Ytla. �.,...,...».�r......��AT�..� ..%�.�S�LRi� ..��il.�...1��� �tZ���._.�...��F.�t�.. �..1.!J ......._..........
c�n�xr e� ...._._....._._ �ES�...�.£:...�!�°zF�.. �.,rF.a t i�X'� �',t,r.�� .P..��..�r�v._...,,
.
srucoo ea� .._._.._�..._._ .�rk,S. .�.I._�..c...��r.�r.1�,�.�+,4� ..._......_._._._.
war�t s�x. c� .� _._�._ �� ..,�.t![�:L�l.�.l,�,�.�_.�...+E�1�6f..?�.lS[~��N-,�Q£�P,1.°E�...(�LS�.. ........�..��� ..��� �
�
vt�r� t�c. .�......._.. ..t�.F.R,aF?.�...E�P��!�!':�.l.�.��.�eltrE� _.�_ ._..._�._._._._._�._..,..�.��w...._._...._._._.__.___.
P/1PE�i Ris .......«.�..�..�....,....,...w�..�.�...._�.........,.._,........�f _.......»....,,.«�,.»,« .... ...................... . ......,.��.,.«�......,�..�.....»....».�,.. ..�,,.�. ����...«.. �..
TApE
POLY AOfVR
titl�.
�
MlSC,
C.
E
�
Projact Mai „
80/99 39`Jd
as. ._._....._._.�..��.��l��,ta .=,�R�,�.��.aavS,r,Qi� �.�?t?�L? .�..�!_._�:6......�.d .._.
� D
� ��.__�_.._._ .��rr,��.�r_.�...�.. _ .. . �►..f.�4� .r..p�e�ck._._._._ iI 3 .
Labor � �
::.:�:-::::���..��r��g-�:s:+��s:.:--:.�.�A.�s�,�,�,�.���. .,:.:::�^^.�� aot;tr�;�
,..._ .............M ��..,,i.��.Tw�!3..�..:9.�?1.'�.r.�'...�.f...� ���.X'�,�a. .f_r! : r°r�u_._..�! .•l�
i. . _ �j 17.,ae �OMead-Ptokt _yC
.. - - ---� �_�_ , �
�NI �J.SV�eI �NtI�NI 9898869i56 E0 �EZ 9y0Z/L0/L0
�8!03/2006 TgU 11:25 F�I ��� PV BRYCE
�i�r��•�:� FRAG,ER
,. T,..,�.,e �e,,.�,.. �,.... �,,..,,....
43620 Rldpe Perk Dr.
$ulte 500
Tertrcul� CA 8259Y
Title: Repair Damaged Comer Aids
Project; Palm Village
To: eryce lynn Whlte
Pakn Desert R�de�ebpment Agency
73-510 Fred Wating brhr�
Palm Deaert, CaAforrria 92260
951-2BB-9892
9S1-2B6-0893
� oo2�aa4
CbR NUMBER: 58
DATE: 3-Aug-06
25�20
poscription: Rapair Damaged Cortt�r Aid
. ..................
. . .. . . .. .... ... . : .•.::. . ... . . . .. . . . .... . .. . . . .... .. .. .. . . ..
.. .... ........:......::::. :::.•::::. .
.. .. ... . . ..
C!SICOD� : : .' : :DESGRiFTiON : :.. : : ' .: iWC41NTRACTbIC":: ':: : :.:' :.' : ' : .UFIlT : :. f'RICE.! UN17 ' . " �TC�i
:.
... . . . ....:. . : ... . ... . . .. ... . . . . . . . : .. : .:. :.. : !U. : . :
092a0 Repair Demegsd Comer Aid per Owner'a �equest INahtl Pkste�lltg 1 le � 445,00 S 445,00
see etleched
Ropair Damayod Cornet Ald per Owners raquast friend Plestemy 1 I: S 470.00 S 470.00
aee etleohed
5ubtotal
OH 8� P
Total Chango Amount
EXCLUSIONS 1 CLARIFICATIONS:
�
Thls work shafl extend the eantrect tima by,(l�jWork Days
Owner
Bryeo White, Palm Desert
W�te
S 9�s.ov
15.0% S 137.26
i 1,052.00
Corrtr�o►
Mike Kubb:+, 7aybr Frag
-.__ 4 i 3% v 6
oat. ' ' '
� 08!03/2006 THU 11; 2� FA� ��� PV BRYCE -- -- -_
0��2d�26d6 �b:04
�sisgee6es �003/00�
� ' - .. INL.AND
,�"%� �T�'�nd PJ�ster , � !/ ^ li r��� INC
� Iric. ��� --- � Fac� e2� �a
� �x 4G�1346 . U ���'~' �j� � GrJ
�'��o�lido, � 92� � Ph�c � ��
7�79755 • F� 764-747,g9i4
�ar�'���o- � � ��A WOpK O�pER R�Q�E Lfc.f$35Z42
�MPANY: REQU�g `'Sr
i&D $y; ���
�ot�, �.�/� 12 2 �
-"� �4N: JO�: '~�
�.OT ADDAESS+ ~-� S7tl�p ��; - -
b�9C}�prJ� �F WORK R�QCI�ST� . � �M$ PHASE. �� J08 �F: �C��• `�7 I
1.� �1NN,El�. � �
� � �� f'W. #• ��
HOURLY RqTB; a — - -� F
lNSTqUCT� �� MA7k`Iqtq�g��
ON To rq,(o��: C,r.� - ��
��. •
— _ _ co� A ���
� ���
_. . --�
�, "_ _
� ... . � _
. �-�_ '--t� - � ~-�
MA7'�RIA1,S _ . _ ��
�1'A� NAA�E OF' TAqpFSt�l1N AND b `'— - '��_
�t° '"" �'` � taF'ryq � �_
�RE �r"'°"j/�......,. �, vlL����„ � RI( pAy,�E7,�p
`-.r Yd� �� ......��, _ ��. M�Y t� �
� car� � Y� _.�....� Y . .,�,�. ,.4r��, .R.C,+E,,.,,CSIhC� „�,, p��„f f.: ,'�+�d '_ ..� .. .� .. ,... ..,�... , .. . .... ,,l � i
� . , -,�.. �.� _�_.......... ��._.�.�.�. ��.�..�_...�r... .�. � � „��� ,��,�!Q.l,��.�.,... . � "�W �
„ .!�........_.���.�.... _..�._... . ......�._..�...... w......�. �.�� .__ �.....���...._ ... �. .. .� ......... .........,.... � ��...� �
' a�a •�� � ...»..�.,,. . ,.. .....LA�E �...� �..�u.L�-,����_r4�.�..�...,�.�.� ....... .......... ...�_M_.. ':
vuKVM -._.. _� �....».%�tii.�?�.�L.�A"i' � �c�'r? -ot.rt�..,t''�,,��t,a�,- ....h. .»Sc;»'.o._. - ��
,n�r . _._...�. .'��.�.'�!4�.,..�'rc:�1, ,1�.�° ...�-_.G...�:_...�A.l.� ��e..41„� �...�^......._._..._._ ...... ........„. ..,� �
.....: .....
sHr�a Yas. . ...........__ ........._...... _......._.........��.�._.».� .............».,....,.,..,.�....�,,,....w....._........_......_ ......_ w........�..._....�..�= I
' c�A�EM' eags . _........ .. ... �._....... ,�...._.. _�.�.�.�...........�_.._..r .... .. ........». ......................_...w........._.._........ ... ............ w... ...��j..t..5,,,� } !
�
Sfl1CC088gs .,........_..�.. _........_..._. ._...__ ............. . ... ..�.+.�.. »...,.,.,.�..,...«,...........,._....,......................._._.... ._...__....... '
i�QO B� .�..... _...... ��...���.. , ...., ... ......» ... ............. ...�........ ...................... .... ...�_. .. .........»....
wx� s� am�. ._..._.._._._�.. -..�..�.__...... .._.� ...�. ._._. .... .�....� �,,...�...»....�....�. »..,,,...._.�..�.� ..............._... ......_.....�_
�ITluG1�17 {'113. .�.......� ................r............ ... N.�..r��«...........-................_.................-..n......�.......-
PAP�R fils. ._..,_ � ... ..... ......_.._........ .. _... ...�. ......�........ .».,. � .�,...,».,,.,..... ..._............. .......,...........,..............._..._..�......_..._....
r� r�s. ........_..._.�.. ._.........� ...... ........ .......�,.. .. ._.�... .. ...,....,.,.�., .,,,._.....�.w....._....._..�._.� �...._......�.�....�...�.__..�..._......._.w......��._.. _.
PQLY90NA 6egs ...................... ...... .. ......._.,,. ... ... .,..... .»....»..... .,,,...........,,............................_............._._.._...._...�Y...
11�SC. ....w .............._.............w.....«.......,......,.............»......�.........w...w....._........�..........._......_.�.........._....._... .._. ...,_... �abot_.. U `�"�''
AAISC. ...... ... ........... .....�.� ,..........,.,..,,.,.,.,,....�,..,,...,..,,..,..�.............,_._._.._._.. ...._...�......._.......,........�......... _..._...� ,. ......Matect2dc ��"j .,""
t�lSc. .._....» ... ....... ................... .....�,..,,.,,..�,,...,,...........,..,.,.., ...�......... ..._�.._�., .... ................_...... ..... ... ........ .... ..oiHe" 'sw�rott ,�� ?„�
11118C. _..� ......... .......... .............................. .. _ .. .... ..... ... ......_. ..on,Metedatg.. ... �;" .�_.
�R4E C7 NO CNARGE _ - - . _ ., it?TAL : S C..�"r'1 �"�-
-- . �,.._ � �
.t ..� . �L'Y--'
48!03/2006 T�,' 11;25 F�I ��� PV BRYCE
07/24/2006 10:04 9516988686 It�,AND PLASTER IhIC:
.•� �
� �tlaud �'last+e�r �atC. �
PC� lic�x 461'S4H •�scr�dicfv, CA y204t • Phone 7(ic�747•9155 • T�x 760-747�934
ExTRA woRK oRDEFt REQUEst
f� 004/044
PAC-� 04/04
r.ic, r8i57it2
1222
a�� a�qu�sr�Q _��/� �u�s�n BY: �g I C�
OOMPJWY: ' �, .IOB:��Ll� % e!/_`�', PHASE:�_ JOB ii: �C�fv-` "fl�
LOT �Y:,�.�� PLAN: STtlCC'A COLaR:
LOTAbbpESS: � �: ?'IO�M� OM1NNER: PH• x: - -J
oescA��n, oR wo�c r� Es�r�a _ 3� p.4 �►� •F'"�� .�•"-.`/�� Q �r-�- a,v r��,�, ,�-� �
-- :e� �� 1
i� �
HOURI..Y RAi'E: S�� p�.US MATEAiALS.
IMSTRUCf1pN 70 TAADE.S►�W�:
,• „ �
MATERIALS pATE NAW� OF TRApES1�WN AND D6SC��TIVN pFM1pRK CahIPLEi'ED
SC�4FF�LD Ft �� .�a` . ��,_..��..�....�+�i.:.�.�..Z.
1MR� Yde. ... ..............._...,........................_....W......._....--•-----�--•....
M. tJ1171 Ydb. ..�7.+fiR �% ,.�ll..d!L..a.�.d.l�ti..r...,:�•-•-•--- -„_....._....
BASE Ft ...._,......... .���Q.k!6.... ��� �.�...»...._._.
wo .�. �. .,_....._._.�..., � A.�L?....�'Q a !"�._'1' . �✓...�,�
AIAIi kM�3.
_...�; �
va�.� ' �� ----W_.,...,�1.�E.�'.'..�,.....�.�.a�.......�.._.___........._.._.._..__....._. .. .........,,�..,....�...,,.�...,..� .............. ,.�_._......�..
,�Flr ...,,,,.,�. ��»�.. � ..............._..............._..........................................._.........._..�_.................w..--•--�--•--•---��--------�---•-•------_. .-----......._...
SAND Yds. ��.5�.6.......%..�.�1'�I�IAi►!�r,....�r.,,,,,,.�M......._..
c�vr eees .��_............��t�.�.....lCrAl',�,?,�51.��T.'.Y`./,�.1,�,.,
sluoco e�gs .�...w....._._.......��f.����.1{I�e`'�9�'�!'..�......._._
�OG Beqs ............ ......�.: f�+.�... �I,'_.�. '�'?�:t5. �!�,Y_.. ��s'�. :..1R
wn�R s� �;e�. .�....,.....»...... �,�s�1...��.. _ . .,_ __._�
VISQt1�N Rls. .........._
PAP�i Rls. .� __,,...
TAPE Fils. ...........
POLY BOND eeqs .__....._.
�
MISC.
NASC_
AYSC.
p5L �MAAQE
! '
�r� ,:'.,i..�:.!�!7»r r.�'�'�y�. ,�:�.� .
�,�� .�i!.l.�b� �� :.�!.
�-ar��c.dsr�.l�"�.__ .._.��_
.......� ...
s: s'
� ............. �...._ ...,..,.,,.........�,,.,.......:`''.._.................-.--------.--._....__._._...._.........._.._....._..,....,,_..........�........_..�... _y�.. -~
Mste�telr �� �
...................... �----•..............................,................,..............,..,..,..,...,.,.,..�................,......_w..................,,.............�....._..%leil . `-�..�iGW
-• ---- _...,.' .....�......� .............. ....... ..:.......•----•.--....,......,..,..........�,�.,�,���„�.,�.�,»,.�.���.���.�,.��������»�,.���.�.,� .,......°�.M..��„.,,�,..�.� ...' .!......_.� .
�,, ...- ---
• .. ..
NO CHARC� T�TA� : 9 �-'i�, V
Pro)e�t Managor Signature����u-G�-Q
C5i 08/2006 YON 13; 41 FA� ��� PV BRYCE
�isr ���_� l�'I4ACiER
ATaYlORc� _ __C�wCO11►�.
q36xp RIdAc Psrk Dr.
5ulto 300
Temacul�, CA 9Z592
Title: Add doors at small linen closet
Project: Palm Village
TO: brya Lynn 1NhHa
Pelm Desad R�devefoprt�ent Apdtty
73610 F�od Wa�4tq OMQ
Palm Des�rt, CaNfemis 0�280
961,Z98�892
951,Z96�93
� 002/403
COR NUMBER: 36
� DATE: 8-May-�
zsgza
oeaer{ptlon: Add doof3fhAnt��dw�re st smM lirMn clw�t otRtldo badtrooms or3� mtib. Hand(aap uNts eb tlot=ho*r. Ur�n olos�t.
. . ... . . . ..... . .. .
.. .. . .... . ........ .. .. . . . ... ....... .. .... ... . . . .
. .....: ...: ::: :: . • .
C31 CODE D�CRIP7WN SUECON!iRAQTOR:' :.. ..::.. . . :: 1JNIT.. �:.fR '14Ef�JNfT :.'.� . T{37�►1. '. ..
Od.i000 Add 10 ac+moll Unan ebwt outr�ide Pro�CraR 7 k Sb.674.00 f5.8T4,00
tuYwoorna at nnNloer, iidue8np a bdl caEoh ond not a dooc handk.
Sub�tal
OH&P
Total Chin6eAmount
EXCLUSIONS � CLARIRICATIONS�
Thia work ahffit extend thc aontraot timo by:
Ownor
Bryoe Whits, Palm D�sert
Date
E6,E74.00
95.096 5881.50
Ss.7d6.00
0
Con tor
� Frapar
;
� .C� fo`
�
' Date
G5i 08/2006 MON 13; 41 FA� ��� PV BRYCE
PR0-�R�4►�
Created Dale: March Zl, 7A06
iylfMtl iY�'
Tayk►r Frx�er
43620 Ridgc Park Dri�c, Suile 30�
'fcmvaulx, CA 92S�Y1
Ph: (95 I) 296-9892 Fax: (951) 29G-9893
� 003/003
, .., ...�. �.
•�.�i�.iiiti�Ci��`.:'Q'��� �y
1 �, � I 1� ►,� � d s�/� �I
4."f12i.8u4Nteeti6 Pf,frk pr.' w T9me�U�e ' iA 92590 ll�i.9S b76�7:1$- FA�f 6789263
Princ DaLe: Msy 8, 2A06 E�imntor; Danid iLw�h
Bsdmaba No: Q6�2
1�4s�w�ra Job No: 30145
Patm Village Ap�rtmenb
T3C10 SxnlaRosa Wuy
Palm 1h�cR. CA
Linc Quanti,ry Size/UOM Descriptim
t. . _..---- .
.....:............:..................•------i---------------......................................................
: llG x Gl8 ......-•-•--------
2; 1G ...�.4 9/16:13/4" 3ol�d Crn+e I-IYrd I3c�rd SP�int arade) Door -1'ro-Hw�...
• 3 - -----•--- -_._--------• .............._....................... ------
—4- ---...... ..................... .. «.........................� . -•---•---•-------------�.�_........................_.
-•5 . i.... 32 . .... 3R273 ..... :5/8" Plain Bearin� ltes W&t 3.5" x 3w5�.I-L°lp� !!s26D........�.... .......�
.................:..................�_.._...----•-- •_• _---- ----�...
6; 16 ? F170-E1.A-G2G :Sla�lc numm,y EIw.Lovor (Grade 3� ua'1bD .....•••••••........_
7 r••-• i� -•-�: —•----• ........... ...•-_.
3z1R 26D EBa1l C.c�h �bn ------_____
--8 .. ......... ..................... .� ..................................._----------------_�_...
..9 . ......... .......................i•-• ---------.�_-------••-•-------...........................,
10-�• ......... . ................. ..... '' .................. ....:Y----- --------.___--_.--------
11 �' �
. �� �...........5 .........................:............. Incluaions:
is �...........��......._.�----------;-----------� Dvor, �rame b Hardware
.i4 r....--•-•—r---------------_._----z-�._._....., �I18i8���1011
-15 ' .........:..........................:............,
. ........... ..................... ........
. ..:.. ..:.. ..:.. __.
16 i : ------�- EJCC{USIO[1S:
...........................-..----•---- --------•--•
.t7_: E ------ � ---------., Framin Modification
18 2.........•---r•--------•- -:- 9
------_ ...........:.........................� ..........., Casing
..1�9 .. ......... ..................... .:. ..........,
-Zi-�----------7------•--•-•--•---....... i ..........., NOtl:
--=-----------L---- _ • .............................,
-zz � ? All Above Doors Lead-Time is
�23 �......� ..�....�.........� _......�.., 2 to 4 Weeks from Factory
.� .. _
-ZS - ---------- -----------•-----_. .................................................._..........
•� • ------------r---_ .................. ...........................................................................•-
. .
.....: ..................................................................................................�----------------
27 .............................. ---------------------__..._...__---------
I,Abo! to InstAll IncladCd
Gr,u,d Total �a874.00
hdau.tio� �Ldi�y .oa ,�lm uX m ioomaoa unln. ome�w�..o.acea m ma boay of mi, sam.te. �w �lea�, mlwc a�+�wia .u�d a axet�a�d. St«� �
� docxs wuh �heir avra�,ondiog henlwate ia exeludod. femllation of Ft�me fn CMiJ walL Sbok or 1�t Ups aooladd. Rkw� 4�tl a� !6m for 3� d�yt. No
^Chsne� Ordss' wil l b� p�acased withwt waiuw aJ6oeiration Lnm ompowetod oanpany repramttlive. 8igo�Rue ao thi� wtiuwme imdicaces tFut yau haw mv'
�11 amns an �his cow�Jet md awhorim thuu fa produotion �nd J a acqniaitioa
— -_ - �
Fpr Qoicicdt Siomos Plsase Reviow, 3i� And Fu D�ck To:
,��. �� _
� ( °�
Deposit AmamC � BnlmCo lhtc:
08/11/2006 F'RI 10; 56 FA� ��� Pti' BRYCE
���ri�•�=� FRAGER
w YitYi�]Q Cb�unar.+fw. G..w. C.w�.�a�.,.
41020 Ridge Park Dr.
Suite 900
TanatYls, CA 92992
Title: Blinds on Doors Type "F'
Praject; Palm village
ro: Bryce Lynn White
palm Desert R�devebpmatY Ageney
73-510 Fr�d Waring OrNe
Palm Oeaort, CaNfomla 92Z80
961 •296�89T
95StiZ98A893
� U01/001
COR NUMBER:
60
PATE: 11-Aug-06
259�0
Doccriptbn: Blind: on Doot Typo "F'
. . ... . .. .. ..... ... .. ...... .. ...... .
. ........... ...... ......... ............. ........... ..
Y'i91•GODE . . : .:: :: :: .. ;DESCR1PfifON: . .:: : . ; . . . p : : . :
. . : : SEIBCOM7RAc.�1'GR: ; �::.� : :.": : : : :yNR'::.: : :PRlCEl,uNiT: :' : iOT
.
08200 Dlinds on Doors 7ype "F" Tolal 40 �vorc Contraot DAca, Inc. 1 k s 7,675.56 S l,675.56
sso altached
Subtotal
OHBP
Total Chango Amount
EXCLU310N91 CLARIFICATlON9:
This work shall oxtend fho contract time by (1) Work Days
Pwner
6ryce White, Palm Desert
Dffie
a i;s�s.s�
15.076 $ 251.33
S 1,927.00
C ractor
Mike K q Tsylor Frag r
�
' ,��
� :
! �-----� � 1 r, i ��'
Date � j
0.8i01/2006 �ON 15: 42 FA� ��� PV BRYCE � 003/003
Al7G-07-200B 110N 02�12 PM Contract decor
■
�
�
P. ol/o�
(�L� "� �- �
��
,,
r
12/9 N. G� AUTRY TRAIL • PAL.01 �NGS, CA 9225! '''i0�6 • FAX 7�� • �DI �oCMTRACTIIE+COR.Col/
F*.�*�* *�*�+ *E�T .
.�.
TO: Taylur Fra�ger GonStruction
�s�
FAX:..9A��296-9893
ATTN: Rn n Haas
FROM: Tnm Hyde
FAX M0. 760 320 3673
DATE: Aug 7, 2QOfi
70TAL P�0.GES TRANSMITTED� INCLUDING TH1S PAGE: 1
SUBJEGi': Window Treafinerrts
Project: Palm Ullage apts.
Job # 2592t1
.���.�wli�i'iC"'»�.wi�R�t� � 4��tr2Q.^r:�11R'.��^.:w.r���^.���� �:..������.^�� ��:.-^���.=_'
I just received tha approved submi s that X p�rovided to you some time ago. A
notation was placed on the Blinds L cufion pag�, The notatian s�id that "aIl door
iype F dooxs are to receiv� blinds".
Our bid to you included a11 exterior wvi adows. No doors were included in our
pricing nor '�vas any indication af doa to be included xn thc specs or plans.
�D
In order far us to inelude the type F c� rs�6'each), we need a change order for
$ .00, '�iiis amount ineludes del v�,ry, sales tax aad instal�at�an.
l � b"15.5'b
If you have any queslaons rega�ding :h is, please call me at 760-320-5566.
Sincorcly, /
�z�^— 9'��
Tom �Iyd�:
■r_��i�•�c� FRAGER
A TAYLO/t f:nnrlrucrlon G.uuo G'on�uonv
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92592
Title: SK-12 Laundry Room
Project: Palm Village
TO: Bryce Lynn White
Palm Desert Redevelopment Agency
73-510 Fred Waring Drive
Palm Desert, California 92260
951-296-9892
951-296�893
COR NUMBER: 18
DATE: 3-Jan-06
25920
Description: Modify Laundry Room Countertop and add stalnless steel slnk.
CSI CODE DESCRIPTION
15400 t� A�dri: inlocsstael ei�k
2• Modify CounteRop
Subtotal
OH&P
Total Change Amount
EXCLUSIONS / CLARIFICATIONS:
This work shall extend the contract time by:
Owner
Bryce White, Palm Desert
Date
SUBCONTRACTOR
�9W"k1=J..�::;.:�1
CounteRech
b
it Work Days
UNIT PRICE / LINE
UNIT TOTAL
� I. �P, ,
30 in $3.96 $118.80
�a�- t �$$G
15.0°!0 $y�32�6T `��
sz,�,�.eo l,3'1.0�'
Contractor
Chris Dunn, Taylor Frager
/) /..—•/--_'7
/.��'_ -- ' �_�
1/3/O(,
Date
L
J
12254 IavelN Way
Poway. CA 9�064
P�tOPOSAL
TO:
Mission Valley Cabinet
CounterT�Ch
ifiG
Established in 1979
NO. CCr7340�6
Taylar/Frager Constructian
Job Name:
Palm Village
Off: (858) 748-0935
Fax�858)74$-2304
Page i vf z
Attn: Mike Kubba/Cluis'`Dunn
Phone: 951296-989� � Fa�c: 95 i 296-9893 � Dafie: 12/ZS/2005
We hereby subm(t spedfications and estiinabe,s fnr:
Fabri�ation of the following counberbops and jor ftems lis�ed below:
❑ Reld Measure ❑ Solid Surface ❑ No Backer
❑ Defiver �] Pia�ic l.a�minate x[] Gatorply Backer
❑ Ir�tatlon :� P�rtide Baard Core ❑ PhenoHc Backer
Q Wi[ICall � Pfyt�ood Core ❑ WIC Certi�icaiion
❑ Demolition �.�` Medex CAre ❑ Prevailing Wage
r] Shtp � MDF Core ❑ loca( Jab
,x[—'� Support SysGem [] S�.�btop Induded � Out of Tovm 7ob
Qty Ed�es D,esc�lptl�n Color � Prk� -
i Req Wat�fa� x5"D X i?6"W Top w/4" r,ove badcsplash Startdard 5(�p� �
1 Req Waterfall 25"p X 72"W Tap w/4" Cove badcsplash Standard �� 5� 0�0
5 Req A&M Met�! Bradcet5 Standa�d
� Total
� ���
ContinUed on next paqe
Q�-�S .00�lti��' ' ��.� /�.��
� 3rf'� � � ,�6 = l ��.�
a.us -rax $ �s5.00 �