SR - R21780 - CO1 - Palm Village Apartments
PALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 1 TO APPROVE AND RATIFY CHANGE ORDER REQUESTS (COR) FROM TAYLOR FRAGER, INC. (CONTRACT NO. R21780) IN THE CUMULATIVE AMOUNT OF $167,500.88 WITH NINETEEN (19) ADDITIONAL DAYS TO THE CONTRACT TIME FOR THE CONSTRUCTION OF PALM VILLAGE APARTMENTS. SUBMITTED BY: BRYCE LYNN WHITE, PROJECT ADMINISTRATOR CONTRACTOR: TAYLOR FRAGER, INC. 43620 RIDGE PARK DRIVE, SUITE 300 TEMECULA, CA 92590 DATE: FEBRUARY 9, 2006 CONTENTS: CONSTRUCTION CHANGE ORDER NO. 1 TO CONTRACT R21780 CHANGE ORDER REQUESTS (COR) 08REV1, 13, 01, 17, 14, 4, 07, 26, 05, 06, 15, 28, 10REV2, 25, 11, and 19 Recommendation: By Minute Motion, that the Agency Board: 1. Approve Construction Change Order No. 1 to approve and ratify Change Order Requests (COR) from Taylor Frager, Inc., (Contract No. R21780) in the cumulative amount of $167,500.88 with nineteen (19) additional days to the contract time for the construction of Palm Village Apartments. 2. Authorize Finance Director to move $167,500.88 from contingency (account number 870-4349-433-4001) to base for the subject change order. Discussion: On April 15, 2005, the Notice to Proceed was issued for Contract No. R21780 Taylor Frager, Inc., for construction of the 36 unit Palm Village Apartments in the amount of $5,839,386. The recommended change order includes enhancements and necessary modifications to this contract. The City of Palm Desert has undertaken ambitious goals to reduce energy use throughout the City, and has sponsored the "Aspen Accord." To support these goals, staff has Staff Report Approve Construction Change Order No. 1 to Taylor Frager, Inc., Construction (Contract No. R21780) Page 2 of 3 February 9, 2006 initiated changes to exceed the Title 24 California state energy requirements for this project. Staff is recommending increasing the exterior wall insulation from R-13 to R-20 by installation of fiberglass batt insulation and rigid insulation to the exterior walls. In addition to the increased insulation and improved sound attenuation, the plaster/stucco will be fiber reinforced and superior to that specified in the plans. The attic insulation is also upgraded from R-30 to R-38. COR Number 08REV1 in the amount of $104,168 with ten (10) additional days as modified is for these recommended changes. The plans provided only single glazing on the patio doors. To achieve the rating as an "Energy Star" qualified home, the glazing needs to be dual glazed. COR number 13 in the amount of $7,452 ratifies this enhancement. Additional scope of work was required to comply with the requirements of the utility service providers Southern California Edison and The Gas Company. Southern California Edison has required 260' of electrical undergrounding on Santa Rosa Way and a service vault to provide electric service to the project. Change Order Request (COR) 01 in the amount of $41,786 is for this additional work. Edison also required the electrical service to be three phase rather than single phase, and modification to the meter stack switchgear configuration. COR Number 17 in the amount of $10,120, and COR Number 14 in the amount of $1,806 are for these Edison required changes. No additional contract time is associated with these changes. The Southern California Gas Company required relocation of gas meters from adjoining individual units to centralized locations requiring much longer service runs and larger gas lines. COR Number 4 in the amount of $17,161 with two (2) additional days as modified is for this additional work. Two minor changes were necessitated for code compliance, one for seismic strengthening to the patio slabs and corridor, and one for fire stopping within demising walls that was addressed by providing insulation at critical locations. COR Numbers 7 and 26 in the total amount of $7,334 with two (2) additional days are for this additional work. Numerous framing changes were required that the plans did not anticipate. COR Number 05 as modified in the amount of $3,304.88 with one (1) additional day, and COR Number 06 in the amount of $463 with no additional days are for these changes. The plans did not provide adequate space for FAU attics in the first floor units requiring that the plans be modified. COR Number 15, in the amount of $11,116.00 with four (4) additional days, is for this change. G:\RDA\Beth Longman�Statt ReportsMhae\Taylor Frag C01 020906.doc Staff Report Approve Construction Change Order No. 1 to Taylor Frager, Inc., Construction (Contract No. R21780) Page 3 of 3 February 9, 2006 Plumbing and fixture modifications are recommended as follows: Install lift and turn drain stops to the tubs per COR Number 28 in the credit amount of ($1,415); install hose bibs that the plans omitted per COR Number 10REV2 in the amount of $2,439; install additional hose bibs per COR Number 25 in the amount of $746; and install bone bath fixtures per COR Number 11 in the amount of $2,898 are for these modifications. No additional time is associated with these changes. The plans for this project provided for clay roofing tile, which is currently not available without delaying the project by approximately six months. Staff is recommending substituting concrete tile, which has been approved by the Planning Department. COR Number 19 in the credit amount of ($41,878) is for this substitution. The cumulative cost of these changes is to increase the contract amount by $167,500.88 with nineteen (19) additional days to the contact time. Submitted by: O �( B yn ite P ject A Vilistrator bl Approval: ---J 14W Carlos L. Orte Department Head: ;z (__JDecGe Yri Direct edevelopment/Housing 'Atllll� pment Paul S. Gibson, Director of Finance Executive Director G:\RDA\Beth Longman\Stan Re1)orts\Whd9\Tay1or Frag COt 020906.doc r� � �w�or�� �� "' ���TI01� C�fG'� ORDE� Contract Purpose: Construct Palm Village Apartments Contractor's Name: Taylor Frager, Inc. Contract # / P.O. # R21780 Change Order No. 1 Contingency: YES Account No. Project No. 12193 X I NO 870-4349-433-4001 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE (Supplemental Plans and Spec'rfications Attached) In Contract Price Change Order Requests: 01, 04, 05, 06, 07, 08REV1, 10REV2, 11, 13, 14, 15, 17, 19, 25, 26 and 28 and add Nineteen (19) days to Time of Construction TOTALS: NET CHANGE IN CONTRACT PRICE: JUSTIFICATION: TOTAL BUDGET FOR PROJECT: Less: Expend. & Encumb. To Date Less: This Change Order Amount: BALANCE OF BUDGET REMAINING FOR PROJECT: + 5,839,386.00 CONTINGENCY: 5,839,386.00 Amount Approved by Council: 167,500.88 Less: Prior Change Order(s): Less: This Change Order: 167,500.88 Balance Remaininq of Continqency: INCREASE In Contract Price $167,500.88 $167,500.88 + 583,938.60 - 0.00 - 167,500.88 416,437.72 The amount of the Contract will be (8.,,. ..,.. .#) Increased by the Sum of: One Hundred Sixtv-seven Thousand. Five Hundred and 881100 Dollars (a 167,500.88 ). This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 1. REQUESTED BY: EXECUTIVE DIRECTOR 2. ACCEPTED BY: CONTRACTOR 3. CERTIFIED FUNDS AVAILABLE: 4. APPROVED BY: 2/9106 FINANCE DIRECTOR JIM FERGUSON, CHAIRMAN Date Approved NOTE: No payments will be made prior to Exec. Dir. and Agency Board approval 2/9/06 SECRETARY Date Approved Chng-Ord RDA ��_�It��:� FRAGER A TAYIAR Consuredon Croin Conw��ny 43620 Ridge Park Dr. Suite 300 Temecula, CA 92592 Title: Revised Stucco and Insulation Project: Palm Village TO: Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, California 92260 951-296�892 951-296�893 COR NUMBER: 08Rev1 DATE: 5-0ec-05 24920 Install modiHed stucco system consisting of exterior 1" rigid foam insulation and 5/8" stucco system. In addition exterior wall D.sc►iption: insulatlon is upgraded from R13 unfaced fiberglass to R15 unfaced flberglass and roof insulation is upgraded from R30 unfaced fiberAlass to R38C high pertormance batt in the vaulted ceilfng areas and R38 unfaced flberplass in all other ceiling areas. CSI CODE DE5CRIPTION SUBCONiRACiOR IAVIT PRICE ! UNIT LINE TOT�4L 072000 Revised Exterior Wall InsulaGon Sierra Inuslation Contractors 1 Is 55,181.00 $5,181.00 072000 Revised Roof Insulation Sierra Inuslation Contractors 1 Is 51,860.00 a1,880.00 092100 Revised Slucco Systems Inland Plaster Inc. 1 Is $83,520.00 $83,520.00 Subtotal OH&P Total Change Amount EXCLUSIONS / CLARIFICATIONS: This work shall extend the contract time by: Owner Bryce White, Palm Desert Date t � �b'QYork Days $90,581.00 15.0% $13,587.1� 5104,168.00 Contractor Chris Dunn, Taylor Frager � �ZlS/os' Date ��'` . . �N CONTRACTORS, INC. i�YLOR FRAG�R 41661 SNTF.RPRTSE CIRCLE ATO STE 2I7 � Z'II��CiTLA, C�! 92390 Fttone: 951 296-9892 F'AX/296-9893 ATTN: C�3RIS I I'M1r� V t 120 S. Wineville Ave. � O�Mrio, CA 91761 {904j 390-9944 � FAX (909j 390-1144 www.�ertai�wbliot�.com SWE l�c. tJa. 749962 Job Name • . . Jab Phone: PALM YILLAG� A,BTS 73-6I0 SANTA ROSA HAY PAT�M D1s�5�RT, CA REVISED RE¢VEST k�0lR CAANG� O�R PER PROPOBA� REQLTEST NO 02 L�A�D 6-27-05 AS �VZLOAPS: .2 . Ci�GE' �.,• •��. ►� •�,tc WALL IN3US�ATION FROAi RI3 UNFACED FZi�EI2GZ�ASS 2� RI5 DNFI�.CED FZ�FRQ,ZASS (�9, S87 SF) . UP�RA.DE RZ3U TO R15b (x 9, 587 SF) .$ 4, 505. OD �- � x5$ O/P $ 676. 00 • T+DT�.L $ 5,181. 00 CRANGE ORDER REQUEST EXCI.ULI�SS RiGID INSUI.A2'ION S80WN ON OiTTSIAE OF AtALb . �8E PIC.KED UP 8Y ST4CC0 SUB . 2. CX�1NC� ROOF 2xs'aLATIDN fTzoM �t30 UN1r'�CED £IBERQZAss TO R38 UNF'ACED F7�ERG.T,ASS. DPGRADE 1Z30U Zt0 R38U j2Y642 SF) CF7�iNGE R30V (C) Ti0 .R38U (2808 SF) 15$ O/P � $ 1,513.00 $ Z22.00 $ 245. DO " `� $ 1, 880. 00 � BIGS P.E��:�NCE �BATT F?GORED �OR YAQLT.ED CE�LINGS AI2F.AS G�TGLA TO STANA�IiiD R38 A5 STi7D SIYE 8AS BEEN INCREASED TO 12n. PAYMENT FOR WORK DUE UPQN COMPLETION UNLESS OTHERWlSE AGREE� UPON {N WRITINC TMIS BID B�COMES INYAUD 30 DAYS �ROM DATE OF PROP�SAL UNL,�SS OTi1EF�1MSE STATED A�GY� �te: 12/2105 Price: � A.� rvcn�n nBorr� EStlCilat� �/: Ti�'RRY AN['.:T.L' pate Aocepted: � n 11/22/2065 23:07 9519261756 i �! �aland ���ter In�c. Labor P.O. BOX 961346, ESCONDIDO, CA 92046 �O1VE 760-7a7-91S5/ FA,X 760-747-8934 I To: CO: PHONE: FAX: � DEC�T�ON: PAGE 01/91 Lic. 83S7A2 FAX TRANSMxTTAL Chris Dum FROM: 5per� PA6ES: i Totcl DATE: 11/26/05 (951) 296 - 4893 RE: Palm Village-Riqid Foan M4tericJ Bt�eakdown Chris. H�re is 4 breokdown of material Qnd iabor for the rigid foom insufation c�dd. B{dg. A or 8 EACW Matt�tria�l 1" Rigid Insulatfon � J-Mold Large J-Mold w/Weep Fib�wnll Cem�t �� % � 6,458.00 � 1,394.00 � 625.00 � z.r�i.00 Il, ?o $ INLAND PLASTER INC T'otc[ l.cbor sld� C Materiol 1~ Ri9�d rnsul�ion � 16, 990, o0 l�a T-Mold � 3,622.00 Larqe J-Mold w/Weep $ 1,751.00 Fibrewait Ceme�t $ 6.900.00 G ra� 'Co�•i ��.y �Y � t'4►�e,��l f31�5 1� �� I.,:b,:� p�y G 1�+4�+� 61t��g (_ �^�►5p,f" rT.1. . Total Labor �IrZ�$ X Z � ZZy41(v �,ti zz x z; t 3; gyy �z �, Z�' � l�,44 �- � �� 5�Z-t� � 6,922.OQ $ 17,997.00 12/05/2665 01:40 9519261756 �l'YkU�'UAM'� � 1.�UC:I:t.IMA 1 tS� ��1vHcmc Prn�lu�tsan�l5cr;i�Ps Seanr:h Help .. .��� BW�d�i'��& �aos���a�n ; �'�•�jrct inferr��atinn � Rrv,duct inforn�ation i rn��:nu,�;o� 'I Fn�bvr_tion� �'lhore tn fiu}r f?o!�t �n•j Il�bityt � For �Iun�aniY{ tQri�aci U� � Do�•r Foam Sealan*s � i: RdliPsives . � ._:aS�4'•`�, � "�... � 1 learn �foer_ • • � • � � , , R�� Dk�rn :a��ey2't�,i ��AR �-�. : . ����� U.S. RL�1�?�NTI,�kL sr�rRo�oann� sTucco�na�* PAGE 05/09 ra ciui� 3 . � North America Horne � Globa( Mome STYROFDAM Sf UCCO MA extn�Qed ►�';i':>;.:;�' - , . PoNstYrene .f � ` �- -<,t�:� ��� �`��°<, . insalaticn � ;.-` � ` ;u.: ; : �wi' -�';:•" is e foam "; �`�;'`r.'a;;�' a��' ,;,r�;\: ':;:... �;. ; :: . �:b` r: f:'~����..�.`��:-�.. .... .. �(15U�At�Ofl .`, :�,�, �. .�- ��* `\ ,,Y. `,��"�r*`'� g•'`^''�; �" board witt� .,. �r;�'�;'�:�;=.� .� gr+poved _ ` `''.� , . - hortzonW i . ���'.-'�•-::� ' channels •' � '�`' '�'~=�. spaeed 2" '`� � � �;�<� on center �k;,;;,:�: ori the `�:��.*'� =��;"�»,. . outslde !`ace of the baards a�d verdral channels spaced S" on center on the Inslde er back face of the boards. Tongue a�d groove edge treatment. Desfgned for use as a non-absorbent sheathing base beneath one- or three-aoat stucco systems applted on residential frame walls. Nominal Produd Min � T� � Board R- Board �dge Co�npressive . Thlckness�x Value* S�� Treatment Strength*'► 1.0" 5.0 2' x 8' �ongue & 15 psl Groove sullding Code Compllance Meets IBC/IRC requlrements For Foam plastic insulatlon. See ICBO-ES ER Z257, BOCA-�S RR Zi-OZ, NES N�R 699, und. Lab. Inc.4� Uassi�ed, see ClassfHcatlon Cerdficate D369. 7'E � ; ;'� �F. �nline Videos And More Why and where STYROPOAM beneflts your home. Enerov Manaoement Insulaco wood framing and reduce alr Intl Ihation. Moisture ManageMent Protect against outside moisture and condensatlon. Exoert Cart�er Featuring tips from Mlchael Fioqgan, the ho�t of "Your New House". Resldentlai Poured in Fface �.eam more about Insulated Concrete Systems solutions. Sci�nce of Tberrnal Mass EffPc� Learn about R-value, mass enhanced a-v�lues, and Thermal mass ef�ect . .... . ....................... ....................... f'Not �II product sizes are avallabl! In �II rRgions, iR mfens re;.istance to heat flow. The Itlgher the R-value, the gr^at�r �H:S; r.:.; :• the insulating power. R-valuts arr. expr+essed in k2•h•°F/Btu. �,.���, ;.: '" �� rtVerticel tomp�essive strength is rNen�ured ut 10°rb deformation ar at ' �' ' ' ' yield, whkhever occurs first. Related Ioformatian �.__.. _ ...--- --.--.-. .--- �oi� Stucco Aaalicatian Sales Sheet STYROFQAMY„STUCCOMATE' Selt.51iget (7911CBPDF� Warraney INLAND PLASTER INC file://C:�Aocuments and SettingslSpencer.inlandplaster�T.,oca1 Settings\Tezinporary Internet ... I2/5/2005 12/05/2005 91:40 9519261756 IN�AND PLqSTER INC PAGE 97/09 � �po FibrewallT� Fiber Reinforced Stucco Systexn DESCRIPTION US�: An alternate stucco wall system providing a rep(d construction, energy efficient wall iar resfdentfel and commercial structures. COY�RAG£: One So-pound sack of Expo Fibrewall covers appraximately 10 square yards at 3/8-inch thickness. COMPOSITION: Expo FibrEwall is a proprletary compound of portlancl cement, hydrated lime� chopped fiber and ottier addittves. Fbrewall concentrate is mixed wlih wzished plaster sand and water on the jobsite. ADVANTAGES: F�cpo Flbrewall "One-Coat" system is designed to be a sin�le, fiber-reinforced 'brown' cuat that can be finished an the following day, saving at least l/3 the time of a conventional plaster schedule, Expo Fibrewall provides an ener�y-saving R-i9 wall in a system of 2 x 4 studs, Z-inch foam insulation board, R-13 betts and 1/2-inch drywall. Expo Fbrewall provides superior tensi{e sVength, abrasion and chemica� resistance, crack r�esistancE, resistance to freeze/thaw conditions, impermeabillty and solid bondin� to the substl'ete. SHEt.F LiFE: Three (3) months ff kept in dry condition. JOB PROC�DUR� SUBSiRAT6: Expo Fbrewall can be appfied over a wide variety of substrates including polystyrene foam insulatlon board, �ypsum sheathing and plywood. � M1X1NG: £xpo Flbrewall should be mixed mechanically at a ratio of one 80-pound sack to 240 pounds of washed plaster sand and 4 1/2 to 6 gallons of clean water. Mix for at least five minutes. . APPUCATION: Expo Fbrewall is applied to a minimum thickness ot 3/8inch by hand or machine. The followin� finish sequence is recommended when machine applied: 1. Darby, being careful not to overwork. 2. Even the surface wlth a trowel. 3. Allow Fibr�ewall to "take-up" (about 1/2 to 1 hour). Flnish with rubber tloat. Cl1RfNG: Expv Fibrewall is self-curing under moderate weather conditions. tf the temperature is above 70°�, or if the weather is windy and dry, water cure to assure complete hydration af the cement plaster. ������•��� FA'AGER w rwrzoA cowxb+.�+e.,. aw.w c•�wura�tr � 43620 Ridge Park Dr. 951-296-9892 Sulte 300 951-296�893 Temecule, CA 92592 Title: Provide 314" dual glaze low-e glass at door type F ProJect: Palm Village TO: Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, Californfa 92260 COR NUMBER: 13 DATE: 2-Dec-0S 25920 Descriptlon: Provide 314" dual gleze low� glass with 8 intemal girds at doortype F per letter from Owner dated 11/�9/05 CSI.CODE i3E5GRIPTION SUBCONTRACTOR UNIT PR[CE 1 UNIT LINE TOTAL 088000 Altemate Door type F Allco Millworic 36 ea $180.00 S6,480.00 Subtotal OHBP Totd Change Amount EXCLUSIONS ! CLARIFICATIONS: $6,480.00 15.0% $972.00 57,452.00 This work shall exten the contract by: 0 Wo k Days � /J . �" p p,�v�. �s Gt,n�,� �P �S �,�0!�r�u,� �LoCa�, � � Owner � � �r�� ,'v Contractor Bryce Whito, Palm Desert Charlvs Br yl Frager t Z� -�' �2 - Z- o�' Date Date .��J �.� Carlos L. Ort , City Manager Date AL%CO MII.LWORK PRODUCTS 1428 E 6 TH. STREET CORONA, CA 92879 . PH 951-272-4446 FAX 951-27Z-4489 Bip Tc TAYLOR FRAGER 41661 Eaoerprise Cu+ck N TcmcColet, CA. 9Z590 Ptt 951-Z96-9892 Cris Dann Fax 931-296-4893 P.O. Number Tvtms CHANGE ORDF.it Due on rcocipt quantit�r Item Code � Hallow metat Extra To Contracf P. O. Box 1267 �� ��o� � MAILING ADD�RESS ��t G�. 92878-126y . l iRZ/2005 7d38 PVA ,. t ,� Rep Shlp 11/Z2/2005 Description Ship To Palm Villtga Ar ,.. .� � �.c� via WD wII�mOw P... n00R iYPE F: AI.TERNATE: ADD 3�4 bUAL t3LA+ZE LOW-E t�LASS, wiTt� 8 UTE TNTERNAL GRIDS. TOTAL S ,6480.00 Totat Pa9Q 2 F.O.B. Prioe f_ach G.480.00 Projed Amour�t 6,48Q00 a C � r� • � i ��s;:;: l�R.�I GER � ���,,var:�.�.�.�. c,�,�...�. . . 41661 Enterprise Circfe North Suke 217 Temecula, CA 92591 Title: Offsite Electrical Project: Palm Village 961-296�9892 951-296�9893 COR NUMBER: 01 DATE: 4,Aug-05 24920 TO: Bryce Lynn While Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, Cali(omia 92260 IDeseriptfon:.Offsite Electrical I � „�;... ;:;P'E'.:': ?;'.� :`<;»•`': >-13�";::�iI..10it�E::;?:;;»r.:;.>;::<<;<;.';:;:`<::�::;.:>`:s�`S►i7 �:Gdd��:';;�::;;;<.;:;;�;;»:;;';;;` 'IT��'>"'::�ftH2�:�:.` i-;•:>'i:<'•::; .. �:.<: ::<:: �:::;::;::;:>. . . .:;., ;: :.;; . : • :;. . • ;, .. >:c�:ccx�:. :.�:;< ..:; . ; .�: � scc���r...... � .��a�:;;:`:.> . ... . . ..: .,.... .: :.;. : . ; : ,.:.:.: : . : , . . . . :: : .. . ;.<.;,:,.... . . .....:. :..: ..:. . . . . :. .. . ;�. . . : . :.. :: ,.: .: < .; . ,.: ,:: ....: . . :.. . : . : . . ... . . .. .. . . . . . . ... , „ . , , ;�;��" 16000 Eleclrical Brudvik t Is 536.336.00 536.336.00 Subtotai 536,336.00 OH & P 15.0°� 55,45Q.40 Total Change Amount EXCLUSIONS ! CLARIFICATIONS: This work shall extend the contract time by: 0 Work Days Owner Contractor Bryce White, Palm Deaert Charles Brown, Taylor Frager � � v� 541,786.00, Date Date � 95l23/2985 16:55 7683233302 t • r ^ ~ � `�IIYC, �f _� T�ylox' Fragex 41G6� E+.w w�.a..fi r C{[��lG 1t� �21 ! Te�oaila, CA 9253ro PAC� 02�11 ��� ���� � 760 324-4429 F�x 760 323 3302 I�oene � 43�6�3 ,� � Mr. ll�iae Knbb�„ �: p� � � � �, r�, �J 1VIr. Kubba Upon tcviow of�a Southcr�o� Ca�ifcania pc�c natc t1�;.£ollo�ng �ddit�ioas to tLe aco�pe. May 23, 2005 E�l1DVIK INC �,�.c �y,, .- � '�' � � � �. ��t�-� _ �,�. � �..� . t4.,,� �. � �,��-- � . � ��Z�( 2 on�Ce aad off�ite .�t ,, �, � �'. .�, daitcd 0 /�05, Pl,ptsE ON-S1TE � propose to ' and install sli sad materiai to pmvido i oc�lete on�siie nnd�xgs�ad badc�o�c ' S ' ac CATY £or � add af S3 5,449_OQ. This pai�oe inctadea all tti+a�clua,g, oonduits, mder- �and � � �,� ,�� �„:.. � putl and man-dn7li�g, �s ta�or+ad bY' tl�e re:sPediv�e utilid,es. '� � r�� �� �..C__ TO,___r'f11TA1S�'S� 143�1U � ia� � I11nx�181 II� ip pI'a91dC ppWfX i0 �C �1i'DgOCt ELiCr �l3 r. ; ��.. � � i oQ t�1C �Z1N0�1�/ COmTII$ f110�I118tt QOStiIIg ►S�i' 1lIOd r�,, , �� V..1 PdLi�, �+OC[. Z� �f.`d WeSt OE�IC 1N sibc, 5ot a tdal �dd o 5 36. 336.00 'Ii�s price inuchides the fdlv�nmg; — Saw�g, tr.moval and replacing ooacrete dt asp}relt, — Tieach / BuJcfill dt Co�oo -- d" PVC Ca�hnit � shown — F.fisott �,� . �� �� ecntcy t�o vanh. — r�a�,-uf��n �. A4 �, BN�i►!�C �iC�S OtY,g7� k,.'��, J.� VYi3 � CD p�3R4 �AC: �7CC.S 8i �'/d Uft�. �IL' 01��S1iC dC �� �.� �c a�s ofm� ��i �. Fiad �ed bid ptoposAl dat�ed 3auuary 1�, 2045. showiag dse [kiGty site wak as exd�dcd f�u tLe w �. ��, �,�,��, Alao fmd �ttscbed a oaneptde btrabdo�rm of this c�anp;e ecda nquesc for ya�r teview. Pleasc fod frx to eall inc with any que�tions. � S«dar Project M�gcr Brudv� Lo�c. ■/_!I�•��� FRAGER A T.�YLOK Conrtn�ctlon Group Cu�wpawr 43620 Ridge Park Dr. 951-296�892 Suite 300 951-296�9893 Temecula, CA 92592 Title: Revise Electrical Equipment in Bidgs A 8 B to 3 Phase Project: Palm Village TO: Bryce Lynn White Palm Desert Redevelopment Agency 73-51U Fred Waring Drive Palm Desert, California 92260 Descriptlon: Revfse electrical equipment to 3 phase In buildings A& B per RFI t112. CSE CODE DESCRIPTION 1&000 Change to 3 phase equipment in Bldgs A 8 B Subtotal OHB�P Totd Change Amount EXCLUSIONS / CLARIFICATtONS: This work shell Qxtend the eontract Hme by: Owner Bryce White, Palm Desert Date SUBCONTRACTOR Brudvic, Inc. 0 Work Days COR NUMBER: 17 DATE: 6-Dec-05 25920 UNtT ' PRICE / UNIT LINE TOTAL t Is $8,800.00 $8,800.00 15.0% Contractor Chris Dunn, Taylor Frager _1��/",." � � ��� IZIS/OS Date $8,800.00 $1,320.00 510,120.00 uo�: yo u� tu: J ia �C . . � O 1C'I?C�R—� Deccmber 6, 2005 Taylor Frager Constructian 41661 F�terprise Circle, Suite 217 Temecula, CA 92594 AUn: Ciuis Dunu Re: Palm ViUa�a,e Aparmaeads Switchgear C'b�ange Orda p.2 GOOE�encRcad Patm Sp�ings, CA 92264 Pl�oac:760320-4�429 Fax: 760 323 3302 i;om.e��2623 Mr. Duun, Please n�te an add of 58,800.00 to revise the electrical equipmeat ia b+u'lding� A& B fivm sungle pbase to tb�rx phase as per Tayloc Frager RFY #I2 ciated 7/15lOS. Piease fce1 fiee to call if yoa have any quasdons. (760) 320-4429 Respectfuliy Submitcod, Jas� F Projax Maaagtr Brudv�c Inc. Jul �6 z4U5 13i3z Taylor Fra��r 619-233-9533 _:�`ZT� Ofi/Z1/�005 '�BU Y3:3� FA� -+a� TR Pal� Yilla�e �O��/OQ! Jwt 21 DS 06:OBp JorCdn��n Arch�t.ct� 3��8�6i0082 . p.g L7/18�29D5 1 b: 09 7146399T3i D�� C 91��iE-C1RR PAGE 97/0� �ul'�5 Z003 lOt�� T:ylo� Fr�te� • � 61@-@�a-�aa� • �.i , ��u. • . ..•r+�.. ' . ,afA�f,. .. .. � � Ai�R�7��• . w t • • • � V riY .r `� ti �����. �► � • /.M� . • • � 'A i� ti � . � • t • ._ • 1: . , • ,A r � � r� ,.�ee �r��lnee�. � ,^e.s�se � �-.� � + � i ' �1 CRAG��R � �v�sT �oA xrnaonn�w�o�t � , Na Q043z � �no�ec�Mf.aw. o.wv.d..�r•�r . ; . . �.e�o ��w aw� a.y - w..e� ��� �� ; ��Yr �i► 3 ►,t�► o��, c� suao �� ' �,� 1e��» 7� d�:`I Y"g� � Zrr�a: vou� �a��paa , b�►�r�r:7n sno4s rxa,ti�� rat�n v�u�e wp.rons�►�, � �os� ��o '�'a ARa: H�1 B�r ' ' : Robbin� ���ep�eu Cl�topbss . ' . ZIOQ 1.�yltiye�t� . � . Nev�poct Hsaeh, CA' 9?�469 • � pbo�; 9�i9-S�d-OQ=O Fau: s49-s�i-OD�1 ' . , , �tLQV1AEUt �R?�003 �y .� • • i �r `M7 ..••. . , �.��. . ��•�ii�i.� .., '�����••��.��.. .� ,. • • �� •• . �A? i01M �t1�0�1}d �i r� 1„Oin ElNeY� B�Ctl�O �O�Cel13lf� 1'bi 'Yoili� f'Oq11��Cq�y1u i1�1' �AL�mA j� Ad�. OM�I�I �?�rit.all lbr I�OV?�44 da�t�� t�R �dWo� dt�'w�tp ic�dle�ta IZ4�'10f,�o�tt 3 pl�w po�e� Br.dvMM 9�do� !► if �t+. powar i: d, r11! c�� v�q :.�asA etr�l� �...nd a►e ain ia�� chs *ub �ed 1e�ds naoa� 1ba � pba�e�. P�s�as ►�yLr. I1'a�nY�d tl�. Nvl��r,r� daed te b� ero=der.d �r � to r�udnhlnllMQW�rsq►+eh�dn3�. ' . . • ; �1+qrNM�n'f�71 pw �e. ' DaUe 7Il'�QtloS sy,.��.l� . , • - ,►-� _ 0 � ���-- . ' ' � , . . . . , . � . 0 Il�I1MN'�is,Ttlti►►IPI iOfp�YM �i1+1iR�►�ra � �� rcat aa�er � 0 , n�u: . . ' �� ? . . 0 0 t • .�+�.�- • +�� ■�_ s �•���ci �RAGER A TAYbOX CO�aeowcrion Growr G'ei�npaMy 43620 R(dge Park Dr. 951•296-9892 COR NUMBER: i4 Sulte 300 95'I •296-9893 Temecula, CA 92592 Title: Changes requested on switchgear RECENED �TE: 5-Dec-05 Project: Palm Village - 25920 � TO: Bryce Lynn White DCIr — S'� Paim Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, Califomia 92260 JQ?GENSEN �;�:.t�:: r.�rs Descriptfon: Mod(fy meter stack configuration of awltchgear per original switchgear submittals dated 11-09-05 CSi CODE DESCRIP710N 16000 Modify meter stack configuration SubloWl OHBP Tatal Change Amount EXCLUSIONS / CLARIFICATIONS: This work shall �xtend the eontract time by: Owner Bryce White, Palm Desert Date Sl3BCONTRACTOR Brudvik 0 Work Deys UNiT PRICE / UNIT ��NE TOTAL 1 Is 51,570.15 S1.570.15 15.0% Contractor Chris Dunn, Taylor Frager ��. � I Z/ S-l� � Date $1,570.15 5235.52 51,806.04 �' ■!�� . ,�� -� .., • _ � • 60oF�eRa�d Frlm Springs, CA 92Z64 pl�ooe: 76Q 3Z0-4A29 Fax:160 323-3302 tioee.eA48?613 Nav�saber 23, 2005 Taylor Fr�ag�cr Coalstincxi�a 41661 F.ntapriae Circic, Suite 217 Tn�xula, CA 92590 Attn: Cl�is Duan Rc: Palm Vil�agc A,� �� tr...,..ts Bldg "C" Sv�ritc�r Rcvision Mr. Dtsmt�, Plcasz note an add oi S 1,570.15 to tCvisc t� �1cCtrical oquiptnart in bu�ding C anoording to fbe acchiceu's notes oa� the switr,hgear sabm�ttals da�ed l 1/04/03. The rev'ssioa roqucsts a ci�c ia tl�a a�ctar staolc �guratian. Pkase foel frx to call if you hav� auy quastiau�s. (768) 324-44Z9 Respoctfull� Submit�d, Jasoti Frases Projcct MarlagCr BrudWiic Inc. 60/E0 3�d xI1►QfklB zOE�EZE09L Bt �9S 506Z/6z/TZ 0 ri��i�•�s� FRAGER A r.4rGnR C-onrtruet4rw Cm`tv � �K.r 41661 Enterpris� Circls North 951-296�892 Suite 217 931-296•9893 Temecula, CA 92391 Trtle: Relocate Gas Meters and Upsize associated lines Project: Palm Viilage TO: Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, Califomia 92260 COR NUMBER: 04 DATE: 31-Aug-OS 24920 IDescrtption: Raloeete Ges Meters end Upsize gas Ilnes at all buildings per RFI #9 CSI CODE DESCRIPTION SUBCONTRACiOR UNIT 150400 Relocate Gas Meters/Upsize gas lines SSW Mechanical Constructoir 1 Is Subtotal OH&P Totai Change Amount EXCLUSIONS / CLARIFICATIONS: This work shall extend the contract time by: Owner Bryce White, Palm Desert Date � �B''�Vork Days PRtCE / UNIT $14,922.92 15.0% LINE 7�DTAL $14,922.9� $14,922.92 $2,238.44 =17,161.00, Conhactor Chris Dunn, Taylor Frager � _ .�� . r�i�1�� Date JAN-10-2006 TUE 04;15 PM SSW MECHANICAL CONST. FAX N0, 760 323 0418 �.�� F I R �� .. . � . �j�' `� Mechanieal Construction, Inc. September 12, 2005 Taylor Fragcr Tesnecula, CA Ph.951-491-6490 Fax:951-296-9593 Attention: Charlie Change Ord�r #1 Description: Buildin�s A& B(4 Units each� 1. G'hange drops at FAU and range to'/," in liett of lr�" ell units. 2. Inarease foota�c for ncw meter locativn 2 units each bttilcling. P ecap: I. 16 Units c3�ops ?44' x 4= 960' '/." 2. 18Unitsx7U=Sb0' 1" Buildins C (20 unitc� 1. Change draps at FAU and rangc to'/" in lieu of �" all units. 2. Inarease footage snd size (1 '.G" inste�ad of l'� 12 units. Recap: 1. 20 units dmp 600' '/" pipci 2. 12 units 1020' 1 li4"pipe Material Total: 1560'-3/4 Blk pipc SGO'-1"Bllc pipe 1 o2a 1 1�'Bik pipc 1 Lot Fitting Yncrease 1 Lot Str�pping I T,ot Pipe Dope Etc. Credit for'h" dmps�1560'-1/2 Blk pipe Taac $0.52 $0.83 � 1.05 , � .n �811 �0 �64.8Q $1,071.00 $500.00 $260.00 $50.00 <$624.00> $2,532.20 $196.25 $2,728.45 P, 02 y . P.O. Y30X 3160 PALM SPRINCrS, CA 92263 -(760) 322-Ofl 11 Fax (?60� $23-0418 e-mail: ssw�sswimechanieal.corn JAN-lU-1UUb 'l'U� U4� 15 t'M SSW f1�CHRNICAL CONST. FAX N0. 760 323 0418 J.`'''�' .r: y . �, . , ;����s' `� Mechani.cal Consfiruction, Ync. � i� �� t , rTaylor Frager Chan�� Order #1, Page 2 Labor. 36 hrs. plumber (drop in�rease) $58.0014ir. I20 hrs. plumbcr (nevv mains) $SS.00/hr. 151�. #'oremau (layout etc.) �75.00/hr. Matcrial Total (forward from pg.l} Pmfit and nverhead �a,oss.00 $6,960.00 �i.2ao.00 $14,245.00 $2.728.45 $12,976.45 �i.946.47 $14,9�2.9� Pleasc feel free to cont�ct me at your convenience with any qucstions or comments. S�Y� � D Sean 'aVaod � F, 03 P.O. BOX 3160 i'Ai�i SPRiNGS, CA 92263 -(760) 322-0911 Fax (760) 323-0418 e-mall: ssvv�sswmechanlcal.com JAN-10-2006 TUE 04:15 PM SSW MECHANICAL CONST, FAX N0. 760 323 0418 -0�-l.8=2005 14:42 76AT716877 �1 a8l�i5r�OQ� T9D lo:i6 FA� �'� Pata� YillaBe .. �o0i/0or . �, ����� � ���ST FOR Il�'4RMATION . No.00009 A!q!2'� C� � �,� 1 �ir+o�r Cw�i+R+�v • � 4tsat R�rt�i,pri�aa�,xac� ' S�h 21i 1'� 931,Z96�9d4'l 'l�ecud, CJ, 7�90 BiuC 9S1,z96-9193 1'1��..&: � C3� 1lV�et�t Loc�esiA �'1tOJ8�(.'r=P�lm'�l'illa�e �parimettu �ro: w�tn: H,t aalar Rabbina Jap,meooa C�riatop�or Za00 Lsyf�cy�tct Nowpv�t B� CA 926b3 Ybo�ac; 9�49•56fi�0084 F�ac; 949-S66.Qp$� DA�'B: 5/Z9/1009 aos: 2s�o � i RRQIIIitED: 9/19l2005 jj��'''`� w.1Qj�i1Os7ll�lAT.6.W' � •7'������ .�'��h: ��iM � `�'�A� h� '��'M��':�r7 �w�7�f�.: �"�J��'d�9!!di'�e ,. '•' '�r Mi�+�kstti +�+ilMI�IW�•. �111'Y�od S �i�7N�'4ii�i�.at�S:. '1�0 C7t/ �10y► pRCh'idOd i ��1 �ilQW�t1� �G 1+OQU�Oli � �OP i� $�f �dA �l i� �� b1:n��++i�• T�Y ' •��• roqu� �be mete�a io ba staolmd �� in � t�zttnl 1o�stl,o� �vMch ili �a�Y to �a Ca�ntr�wt Y3oaa�wnts � atww ane metar locatod at cseh �. �utldi�g C w� bave tt D} matas on oadi an4 =ad 8uilding A, � 8 will • � �(4� mote� rt aah eQd oitba bu3ldinga. T�tloar Ft�sgct w�l fmwan] a aopy of the pletl provided b�+ �+e C3a� �o. tsap. bot wautod tv pcavidc tbe �an aJ�► ia ths �rm of as RPI eo tt�t � Me�amcal � can va�iijr that tbe pipe aizo u sdeqwt� givao tbe langer r� flom � moter m asah mit. ,-�.�,.�la� � .�_, POC QfLO �'L00�t1Q Wi� $l0 $q CO'I��j► 2I�C �'� (�i'�� �10 �0130�9VlRg 8�30Gts ]�2i�y0 l�M loa� �'�a gu »u�ecn ar aPP�� bY � 8� °W�Y �'�a�ive. �la�ac .d�►f:e it�a�e locado�e �rc acoe�bbic �o i�t the �pp3ic�tloa f+o�r tho ma�ert rngy b� tubmitbod u w�n as poeeibla . �R�+tq�d 1�iT i�+ b�q. B�' r _ Ch� � iw� ��r e..�t-• •,t,.�.y �l�7hi�' ' •. ��4YY�iF,i►Qi'� ' �'Y.:'L' .t , -r•��R�f�.�l�a' yy'��1i.� •;��li�M� Jl:Y1;Y�.!-r"''tl��: '%�S� ��� idw�ilr. , ��J1`i!:'�v• .'t�.'A't''FkL'�i i::tii�`:1�-... • .r�d�., �,'JIL^�e+)i. 'CriKl " �:..: •'►Q � � ��roser� �4s ��T�'�- �.�`��ac�s /� s'/ Z��G� /� YI�� f � ��r� � � � �/�'rrSc.�" �iZ o G�.�� . y. �.�� s � �$� ' � � 0�9/ �o� �~ � A�,►aod . � �� S�Md: / � P, 04 F 09;��''�S 12:35 '76877168TT . P�i t�= � � ���:i FRAGER ATAYI.O� Cww�b�elb� CAorV ��11 43620 Rld�� P�rlc Dr. Sulb 3Q0 T�m�cuh, CA 92592 Title: D�ill and Epaxy Dowels Project: Palm Village To: Brycs Lynn Whits Pdm Desert Redevelopment Agency 73-510 Fred Wariny Drivs Pa1m Desert. Califomia 92260 m 9s�-z�aesz 9S1,Z96�a93 COR NUMBER: DATE: 07 13-Oct-0S � 24920 �D�soHptlon: D�III and �poxy 1/2" nb�r dow�ls �t p�tlo sl�bs p�� Inap�etor's Corr�ction Notic� '� . .... ...... :: . .::: :..: : :. : . .. .::..:.. .. . .. :. . . ; CSI COpE: :: � : DESCR�ilON ; SEIBCONTRACTOR`: � : ` : UNiE:` : ; ' • �jNl'r' ..::" :: . TOT/�L 03000 Drlll and epoxy dowels Tidwefl Concrete 1 Is Z3,324.00 a3,324.0 Subtotal OH&P Total Chang� Amount EXCLUSIONS I CLARIFlCATIONS: Thfs work shall ext�nd th� contract tim� by: Owner Brya� Whit�, P�Im Dssert �� � V � ll f t� Date � JI'GVoirk Drys $3,324.00' 15.0% a498.6G SS.aZ3.00 Contrsctor Charl�s Brown, Taybr Frp�r � � �s-t r`0 �' Dats 0 ' FROM'TAYLOR FRAGER 619-298--3072 (TNU)SEP 29 2005 16:07/ST.16:06/N0.6327799795 P 4 Change Order Tidwell Concrete Const Date: s�t�b� 13, 2oos 39-205 Leopard Street o,a►n�: Taylor Fragcr Palm Desert, CA 92211 Pmjoc� N•acne: Palm villag� Apts 760-772-2544 Change orda' no: 003 ...: , �� �AttJl .• .................................. .. . . .... �IfAt1�.��tii�:OY!.d�I�t�;�i[���4AQlP]A�WOX�cfO:�RE�AI't�R �:Cif Ct . . . • s�.ia as t s�any r n�u �a �oxy Fonrman 2 Labostir: Seut. L2. OS: Dril! aad epaocY CLAage the origi�al contr�ct f�mount by: Payment to bc madc as follows: Epoxy 18' Dowds Forenun Labore� ESwxY �R� �� 8 i�n BMse� 1 t� 350 ea 4 i�c� 2 lrs 6 tnba 100 ea S �736.00 5864.00 SS0.00 5700.00 5368.00 sto6.00 5300.00 S1011.00 JJ���W We agree to Nmish laDair dc mataials complc�e m accordar►ce Ab�ov�e acWitionAl work to be pa%rmod onda t6c aame coadidaos wich the abovc �po�ifications at above stated price. i�s spocifiod in ari�nsl cwitract uoless otf�vise stipulated. See AKacbed Sacicap Tidwcll Caaaste Dm Datc Note: Thls chattgc order becomes part of and in accordaticc with thc originat contract, • 10—@1-2005 10:30 7607716877 � CITY 4F PALM DESERT Departrt�ent of Bullding 8 Safety (760) 776-6420 NoT�c� - J ��� � �/ t'!� { ��.�T.�3 - f� �,a r�� — � ,P,9 fi's Type �{ �•"�, �s��%.tL F!� Permit or Ai�%%/��%J f.�e�.� � �nscecuon .9'�I�,S Number � . P�ffAs� �,v5 T.�cG %" ,�� �.�,� �a�c s ��..•� � O JCOG�� � irJT¢ �ATlQ cSL-���' �� ���G � �� �•v ia 7�0�?"�� G, " �,�7'� P�a�'�.. 8Ln b� o�� 7!�! /0.� ins�iors n� �%�/ � %/� DO NOT REMOV� THIS CARD FROM JOB �� �4l1«� : C �1 �e , S D.��-� . � � ■�� � / ���: � FRAGER � - ;, r�� ��.,,�.��. �.� �o.,.a,., � .20 Ridga Per1c Dr. Suka 300 Tanocula, CA 92592 Title: Additional Fire Stops Project: Palm Village TO: Bryce lynn 1Nhite Pakn Desert Redsvebpment Ayeney 73-510 Fred Waring Drive Palm Desert, CslHomis 92260 ss�-�s�a92 951-296�8893 COR NUMBER: 28 DATE: 17�1an-06 25920 . D�sc►ipdon: Provida addkfonal Insulatlon flre stopa per Building Departmont Corcectlon Notice and Lottor from Ownor datad 1l6f06. CSI CODE- DESCRIPTION Si16CONTRACTOR UN(T : PRICE / UIQIT uNE TOTAi. 07200 Instell add'Aional firestopping insulation Sierra Insulation 1 Is 33,053.00 33,053.00 I Subtotal OH&P Total Change Amount EXCLUSIONS J CLARIFICATIONS: This work shall extend the contra�'t time by: Owner Bryce White, Palm Desert n �G�� i-- �o - b6 Date 2 Work Days 15.0°k Contractor Chris Dunn, Taylor Frager ���� � /� �r�� Date $3,053.00 5457.95 53,511.00 s�ie i� � �ciu0 ia. 1J 17U7J7U114Y �� � '1VSU�AT�ON COIVTRACTORS, INC. � �� . TAYIAR F'RAG�R 4 � 661 �RISE CZRCLE ,N4 STE ,217 �tCMtH i1�pULH 1 lUN PAGE 01/01 120 S. Wingvil{e Ave. • Oniario, CA 91761 �909) 390�9944 � FAJC (9�9) 390-1144 www sierrainsuleHo�.com Sun Ltc. No. 7d9962 Job Name • p,�q� y7Ly�y,y� Ap�s � 73--610 SAr1R�, ROS,A iPAY � Tk��CUi�I, CA 92590 PAI.M DLSIL'RT, CA • Phone: gs1 296-9892 �� �ne: �AX/296-9893 ATZRJ: C1�2IS CHA,NGE QRDER PROP03AL �R ADDITXONAL T4�RK: � 1. R30 U11,r �,ar,xGyASS DRAlr'T STOPPZNG AT PAR'�'IC WALLS 10' VERTICAL iav��i+T,rS, Z�' F'1'�OO�t 1'�Op P�'.ATE, TOP AND 803"1'DM PI,ATE OF 2"D F,t�00R (R36 A� TOP P�.A�TE O� 2� �t,00R) — 2102 SF OF R30 AND 5x2 5F O�' R3B k�1TET�� *. $ 1, 360 . OU LABOR 1, 295, 40 (32 .�145 @ 40. 97 PER F3I2) 15$ O/P 398.OU To� $ 3,�53.00 ' PAYMENT FOR WORK DUE UPON COMPi.ETiON UNLESS O?HERWISE AGREED UPON IN Wi�ITIN4 'iI�IS BiD BECOMES INVALID 3p DAYS FROM DATE OF PROPOSAL UNLESS OTHERWISE STATED ABOY� z/Y �/06 �'�te: $ 3, 053. 00 Date Accepted: PhCe: TERRY AN6I.E Estimated by: By: f VUJYlOJ f G � � Ri!/�1 rHLI*I 1JC.JGR � r►�ac r��++ r�`+ CJlI CI:N LVCIO_ 1 f . 1 f . .._w. �l • . . . . • • . � � � � • =; - . . . crry oF Pa�.M aEs�ar � � � DepartmeM of Butiding & Satety , ! , �7so} ns-sa2o : . . �. ,. 0 Smio � �. � � � , Insploto►'"a Nami � t � DO NOY RQrAOVE THIS CARD F'�iOM JOB ' . ,� _ � � � � � � '� . '°b � ) ��� . C�.LT.� ��.�•� � . ; 4dd►es� + � • • • , � �i • � i y�e � ' I p�sntt • 93' « � � � , ' ' ���� { Number 9' 3 ? i� . y3 -�-�7� ; . . . . ; � ,� � ����C����laz .B� , ; . , r ' rS tm� � o �� ���..; ,�a�2 r_y�:.�i,c� %� � . , , . . Sl�L +4 �'.'/o►sr /� I� s d � f�L'�._���G ��JGl�R-s Tt t- ; • , . • . � J� ' �.. ii � ' �T vn . � f : . . . � a , � i . • , � .a ��'. G`� ' '. rt.,���t.t21�4.�! � ��•d ,��' P�4.e�t�-�,.,�2�-'��"':.-�I"ll-�T - . � �. �. �a �:� ��,,.� cgr0 ; . . �01 . ��- , � , - . , ;' �_��,� ../a1a1�: � � � . : r ' .� • ; " . • ; i f tr a, . . • . I , . 7� . t 1 • • .. • �+; 'ti • � T• � . a�'. . c _ �` . • �` � . • r , ,. � A ri������li FRAGER A rAfZfJJt G�w.sefb. C�rew l'.u�wwr . 436Y0 RIdQ� P��ic Dr. Sulb 300 T�m�cula, CA 92392 Trtk: Rough Carpenby Changes Project: Palm Villaye TO: Bryce Lynn Whita Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, CalHanla 92260 931-296-9a92 9S1-Z96-9a93 �Daaiptlon: Multlpl� Rough Carp�ntry Ch�ng�s as d�hil�d b�low. CS� COQ�. : .: ;. : . GF.SaRIPiiON SEI�CONii�AC�OR 06100 /4eid° , . . : �� . , � , 06100 AddRbnal Rougfi Carpsntry aasocfated with SK-9 810 06100 Additional Rough Carpentry assoclated with RFI #37 06100 Additlonal Rough Carpentry associated with RFI ff39 06100 Additional Rough Carpentry associated with RFI #44 06100 Addidanal Rough Carpentry asaoeiated with RFI #47 Subtotal OH&P Total Chang� Amount EXCLUSIONS / CLARIFICA710NS; This work shall �xt�nd th� contract tim� by: Owner Bryc� Wh1t�, Palm D�s�rt 1 l.� � V � � Dab Tandem West Tandem West Tandem West Tandem West Tandem West Tandem West � ,�fYoric Days � COR NUMBER: 05 DATE: 12-0ct-05 24920 1 UNiF:: ARICE./ : . . . .I:WE . UNI't' TOTAL. 1 Is �3,G7�.OQ_ , . 1 Ia 51,452.41 51,452.41 1 Is Z694.94 5694.94 1 Is 5148.70 5148.70 1 Is 5115.98 S115.98 1 Is 5461.78 5461.7E — <t� r,,r�j � �, �3t•o? �� �'� 3,3o�.g8 . , Contract�a' Charl�s Brown, Taylor Frag�r �d -�7� a r Date i�/���� TANDEMWEST GROUP TO: ��1� � �'c�+�t r PROJECT NAME: .Q�4,w1 V� III?C7 �%� OTS TR.ACT#: LOT#: � CHANGE ORDER#: CHANGE ORDER DATE: `t - �y3� � � CONTR.ACT TRADE: ROUGH CARPENTRY THE FOLLOWING CHANGES/ADDITIONS/OMITIONS ARE TO BE MA.DE: : :i ,� �2�. FC�r� F -tc� .5 !�c - J D , �i i�� c�s i �.�? --r1� _.� �vFs.�: 3`tz x t 1� i�S X 1�' G. v �� . -� �3 Nrw � X�) X �c7' � � �' �'7`1Z•yl : �1 � 5 -� w, �,.� � 1� �c � � .�,., s ;� r l �k CQ�p � -- LABOR @ $ s� X HOUR TANDEM WEST GROUP BY: �. c::, jC.iZ� DATE: �- ��'�� I TOTAL HOURS: I TOTAL LABOR: � TOTAL MA.TERIAL: I TOTAL C0: i 2, �.a. %Q , " �7�tZ� yl I�f �2.�! u S� - --.._! . ` . _ Gr �'� . � . _ ._� _. � Framing with Wood, Steel & Pride 30-875 Date Palm Drive, Suiie C2 Cothedrol Ciiy, California 92234 phone (760] 770-3303 fax (760) 770-3611 i��# �»zso CHANGE ORDER �,�--��xl�-� � / � r � � 1 0 2405 � .. � ._ ! ' __._..:_.:_._. �' t . _�r:.: " • e � : . � �� . , i�� TANDEMWEST GROUP 30-875 Dale Polm Drive, Suite C2 Cathedral City, California 92234 phone (760) 770-3303 fox (760) 770-361 1 i��# »>2so CHANGE ORDER T0: �/�, �►�5 �L PROJECT NAME: Q�-L vn l! �!`��i �? f�'� T S ' TRACT#: LOT#: � CHA.NGE ORDER#: CHANGE ORDER DATE:�p�.� -c7 S CONTRACT TRADE: ROUGH CARPENTRY 0 THE FOLLOW�nII�tG CHANGES/ADDITIONS/OMITIONS ARE TO BE MAD� �N R�.YC�JZQN�C �L� �, �� '�� 3 % , t,v � f�'�� D t1�C'. S � /N/.� —�"�2 —� x 1 y X 2 c� ` � 9�� 'S r 8� �p - S' x 4 k �l ' � s� � u�, b�l 5�0 -� y. + �i�x Y 3 . tr�. �ooy,30 � �`�5 °ro yd . �� - ��y,sy LABOR @ $ .�S X HOUR TANDEM WEST GROUP BY: � ! ��� . DATE: 1 � �—�� Framing with Wood, Steel 8� Pride I TOTAL HOURS: � TOTAL LABOR: � TOTAL MATERIAL: I TOTAL C0: � C� . ��y ��1 �� yy, �y r-- -i _ C ' ' �. , ,'. .�;,� � G �, r � o �oo, ;, , . . . • . • r.......' f�c . " _y� ! i � ' ��t^ . -...,.�,.,��.....�.. �.-..� � ; � THE �'OLLOWING CHANGES/ADDITIONS/OMITIONS ARE TO BE MADE: � �=N R2 ��2xE�CL 7U 12. F-t- �-- 3 q �'E- l�eQ ': �v�c.�n �S�.j,�6 __ 4- ux,oxc2� �7.sn ��o� 7A-�t '� 3 D ��y, 3v �'S "� 1 °1 �.�-- : l�In.7� ��� i�� TANDEMWEST GROUP 30-875 Date Polm Drive, Suite C2 Cothedrol City, California 92234 phone (760) 770-3303 fax (760� 770•361 1 ���# »�250 CHANGEORDER T0: r�y�aQ F-�4h �1L PROJECT NAME: �Y�yn �� ����. ��T S � TRACT#: LOT#: CHANGE ORDER#: CHANGE ORDER DATE: j(.� -�/ - o� CONT.R.ACT TRADE: ROUGH CARPENTRY LABOR @ $ S� X HOUR TANDEM WEST GROUP BY:�����.t'Z �. DATE: I C� `- �'� S- Froming with Wood, Steel & Pride I TOTAL HOURS: f� � TOTAL L.ABOR: � _ TOTAL MATERIAL: � f 1�g,►� I TOTAL C0: I %�/�,'%Q C �� . / D/ S ��'.S G �� r � . � i► �� TANDEMWEST GROUP 30-875 Date Palm Drive, $vite C2 Cofhedral City, Califomia 92234 phone (760) 770-3303 fox (760) 770-361 1 i��# �»zso CHANGE ORDER To: ��1�. �'�� �. , PROJECT NAME: i�v�+ V i`�6�-- ��PT`S TRACT#: LOT#: CHANGE ORDER#: CHANGE ORDER DATE: � t� -- �-o j CONTRACT TRADE: ROUGH CARPENTRY THE FOLLOWING CHANGES/ DITIONS/OMITIONS ARE TO BE MADE: � N ?�'� e��-cE � (��-.� � � �f �' E �4-�2 e. p�.c�, �s�r ;�,� I- 6 X�ZX r C�' � q7s ��o -�—.a.,� `7t x 5�_ ,�D�. ��' , 5-�, 1 �"", 13 � �.,5 ,�i �3 TANDEM WEST GROUP �oR @ $ S� x xovx : D ATE � TOTAL HOURS: I TOTAL LABOR: � TbTAL MATERIAL: TOTAL C0: b C� � /�� y� i�s y� ������� ,� , 1 C �-o S r- =, � � _�-�� �; i � , , , - - - � __..._' _�'� � �'. , � ' �,, �; � , � ;. .. � I OCT 1 0 2005 � Framing with Wood, Steel & Pride � � � .�..:.. : �._., ' i� :{'. . y � �� 1 � � � I � � S G � , ��' i i�!��� TANDEMWEST ' GROUP 30-875 Date Polm Drive, Suite C2 Cathedral Cify, California 92234 phone (760) 770-3303 fax (760) 770-361 1 i��# �n2so CHANGEORDER T0: �`��M��l�f��. PROJECTNAME: �i�L+�+'► �r�►�6ltfid� j�,�7�5 � TR.ACT#: LOT#: CHANGE ORDER#: ' CHANGE �RDER DATE: J b-� os CONTRACT TRADE: ROUGH CARPENTRY Ifi THE FOLLOWING CHANGES/ADDITIONS/OMTTIONS ARE TO BE MADE: ?�N QE.�'E�CE � P �S �,L - �/'� � S � - !2 � X7'�A '77 �. � i'Y74?� � E l t 5 _�- Z. � Iv � l O� � � S 3fl t l7. �7 •7 — �X � }( C¢ � A_ . $tiS � �H� �g '3 D � �/2 x �/aC .R � � , Hlo� `�y �l_L1.• ��o�3S� '�. IY?�/v '_?� �7L� S T/1.X ` f�i •,?!-j � � �. � /1y�5�i 1 �"�1.;� I '7 , 14 !`3 %, 7� LABOR @$ ; j 5� X HOUR TANDEM WEST GROUP BY: .J�n: .l�j� E12.�c.. DATE: Iv—�`�5 Framing with Wood, Steel & Pride TOTAL HOURS: � TOTAL LABOR: � TOTAL MATERIAL: I TOTAL C0: � _7i 3� • � I 131� 7� I y��� r� 1 i�t'...�. ;: <, _ , - - V , � / 0 T � Q5 ' � "� � � ��� � .: �-; .I - -�. . . ., . .,: . , �. . .. . . _ ._ :_Y __ .�G.�_._�. __.___.� � ,�"��� � ■►�_������{ FRAGER d TAYfLlR Cwb�stb� (Av�4 Q�qs ��o r�do. �■�c dr. Suib 300 T�m�cula, CA 9?,39Z es� z9e�a9z 951-296�893 COR NUMBER: 06 DATE: 12-0ct-05 24920 Titla: Extension of Handrails Project: Palm Viltape TO: Bryce Lynn White Paim Desert Redevelopment Agency 73-510 Frod Wevinp Drive Palm Dssert, Cdifornia 92260 �D�so�iptlon: Exbnd Handralb atsWrs 2,3,5.6 _ :. . : . : ::: : ..... .. :_ . ...... . _ . . . : � . :: ::: :.:: .::: ::: •:: .: : :: . .. . . . . . : : .. ..... • . �SI c;OF� :: -' • :: � ;_ • : : QF..S4RIP�iON : : ' : : : � : ::: : .. SURCoIV7'RA�T9R .:: :: ::` :• .: :lJM�.: : : :•:t1N17'' : .: : : 'Ci?1'AL ::.. . 05500 Extend hendraila at atairs 2,3,5,6 per Istter from SoCal Ironworks 1 Is 5402.90 5402.90 Brycs White dated 9-26-Q5. Subtotd OH&P Total Chanp� Amount EXC�USIONS / CLARIFICATIONS: This worlc shsll �xt�nd tl» contraat time by: OW17K Brye� Whlt�, Palm Da�rt l% � Date ��'%��`f'�" v�—c.—'�- v $4029G 15.0% $60.44 S�s.oa O Wot1c Days 0 Contracbor Chul�s Brown, Taylor FrapK � /�.t y. o �.. Date Oct 04 2005 9:40RM Socal Ironworks 6194291487 p.l � . ... s. s : 2�;. ;� ` l - Change Order # One 1548 JAYKEN WAY� STE. B CHULA V1STA. CA �'191t Phone: 81 �.429.t48b Fa�t: 6'1�.429.1�7 Carnsact Tisla : P�n V�Iage Apar#ments Projoct � 322 Gcncral Contracmr : Taylor �`nger wtteution: CLris Dua Descriptiom a�' Work: A- Extenslon of handrails at stairs 2,3,5,6 �+m Ot work Sab-Coo/ncfnr A.- Matee�l� Sales Taz (7.75%) �- Sabtatal: F.- Sabco�ctore Ore�esd sed Profit (lOx. � E) G - Total .Fstimated Time Fade�.siar andJusfification: Siginatw+e di 75tie of Preparer: (S � f� . � � ... .e.CbC) ���� /� .Toa� xneu - r.nject M�ga� i6-.seaos � Qw�ntity Unit Cast 1 Lot 5340.00 Tdat Co�t 5340.00 S26.35 - ---�--- , , ; 5366.35 535.64 5402.99 Sig�tunt dt Tiik of Appmover. �IJGLGlill � �... � Ir I L 1.? � ■r � � i.��1ci FRAGER , w TAYLOK Con..m.cdow Orowp Cu,.,wonr 43620 Ridge Park Dr. 951-296�892 COR NUMBER: 15 Suite 300 951-296�893 Temecula, CA 92592 Title: Rough Carpe►rtry per SK-04.3 and SK-04.4 DATE: 5-0ec-05 Project: Palm Village 25920 TO: Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, Califomia 92260 Rouph carpentry costs aaaociated wkh SK-04.3 and SK-04.4. This price has been edJusted based upon the letter recelved from the Doscripdon: Owner on 11N5/05. In addklon the original price for this work which was included In COR #5 has bsen removed end Is repleced with thls COR. CS! CODE DESCitIPTION SUBCONTRACTOR UNCT PRICE ! Uf�'T �'�N� TOTAL 06100 Additlonal Rouph Carpentry auociated with Tandem West 1 Is $9,666.00 59,666.00 SK-04.3 and SK04.4 Subtotal OH&P Total Change Amount EXCLUSIONS / CLARIFICATIONS: This work shdl extend the eontract tims by: Owner Bryce Whits, Palm Desert Date 4 Work Days 59;666.00 15.0% $1,449.90 511,11s.00 Contractor Chris Dunn, Taylor Frager IZ���d.� Date DEC-05-2005 MON 03:33 PM TANDEMWEST GROUP FAX N0, 7607703611 � � ... . � PROP08AL-ROUGH FRAN[!NO TANDEM W�S7 GROUP Geneni Contrsetor - ilcease #777250 30875 DA'C� PALM bAIVE CAT�i�DRAY. CYTY CA. 9ZZ34 P6one: (76Q) 77�303 Y��uc: (760) 770-3639 Submitted to Address :ity, Stab! Zip Date of Plans TAYI.OR FRAGER JUNE-28-05 � S!C-0! P, 02 pate 5-Dec-OS Phone FAX 851-298-9893 Job IVamo PALM VILUIGE APTS. Job Locatlon PALM DESERT Price Mdudes all fabor, lumber, glulam beams end Simpson csllout catalog Ifsted harQware to complete per plans. TRASH REMOVAL NOT INCl.UDED. POWER SUPPUED SY O7HERS. Prioe iAcludes all labor to complele to framing inspectinn. Prioe does not include instaA�tion ci windows. Prke Qoes nCt inciude instaAation ot door jambs, atumunum s�det frs�mes, skylitss or flashing. My changes from bid set of plana must be fn writing �nd will be charged at the �ts oi $55.00 per hour IaDor, and cost plus 1596 on arry sxtra materials requtred. (No �tion o� extras) Any eustom fatxicated har�dwars is excluded from this bid but ean be suppNed at cost plus 15°�. InstaNBtbn of Custom ha�dwaro for wood to wood conneC.tlons is included in bid pricas. Progress payments as foUows: BiA by 20th. Of mont� tlueu�lt e�d of month- payabl� by 15th of next month. MATERIAL EA. UNIT LABOR EA. UNIT TOTAL EA. UNIT =Z71 izss . =537 X 1Q UNITS� s8,666 REVISED 12-3-05 ADOITIONAL FRAMINC3 FOR REVI8ED HVAC INSTALLATION PER SK-04.3 AND SK-04.4 �8 MUST STAE�T WITHIN 80 DAYS OF ACCEPTANCE OR JpB MAY NEED 70 BE RE-�UOTED. XCLU310NS: EMB�dM�N`CS �tymoMs to be made as follows: �ALLS STANDINCi-60% ROOF SHEA7HING�096 RETENTION-10°ib I material fs guaranteed to be �s speci}fed. All wa7c Auttw�ized bs corr►Qleted in wo�k�n8nlike mannef ac�atdiny to 8ignaturo: andard pradioes. Extra work orders aro required for Proposal good for. I deviatbns to aipinal specifications. xepted sy �te � ,,- f � 7 DAYS 1 r*' Jor�ensen Hrohitects 19495660�82 P-2 , Se� 07 05 02:54p .. : � ... , .,, _ _._._._ . ._ __ , i _.. �;� . -. : -�.._ _ �--- --� .•.._ .. .(}•- ._... -• .•-•- -. .. _..___ _ .. ..__ `... .. ._._.� � IT`'� i 3-- '• .. ._.�.. ..-,�ii . _ ._ . ��� -i'T�.�_.. , �" -- — �- �'� -. � �� . �. ,. . • _ S �' r ' `'�' � � _ . �- r .. �'' �� . .._ � T ....�•�. ... .. ._�- � �� _��.�___ . . . � � F• �' . .. � �. � � +.i.ri._• . .. . .... • � . .-,.r. r4 - - t - � � ,'•2� °-- _ _ _ . . _.. . ._. �-,!v`i `.�--:� ��_' T i..... ��".� , � � - � � ,.... k�_ . ,1 _.�_ ,�- _,��.__.�_ _r?( .. -�� I t� . �. M'.;� - _ .�„'_ ` . - � . . . . . . .. _ . �..�74a�9 Q��` ';� '�.`� i4 .i _. � � _ � i�' ' y' ". � , .. . . � '_"���� �_ . "��_ � if�' . � .�+. ; � ` � '� � � ` � , J.. ^. r . .. .' Y'., ... ._ .. _ l,. o�"}�� �.. "' 1. \ '�.____._� j ; ' l �Z � 4 } �(1 � F ' ` .�j —1-• .. _ _ ._ . . „ . . . l� J ) ,� ` . `2 � ! .� � + t1� ` _ . . '� . ` 1 , . . . . . _ . . .. ... . _. . .����. - `' ` . _ ' - + � � ' �1. i , �aa..r. r.�w. .` � ,,,,,,C�„i� . '' " r'..` � � f � .. _ �. t..__ . �., , � ; , i �. � --.. .-- :� ��Y . �� �:, , � - ; �. l � �_ j"' :, ' � �` � _, • ;'� � .:. �,, � . ,.,,� .1 . 4 i , r � � � ��. r. :,C; �'•' . .. �\.. . . : ! .._ _ _ - '� .. ` , � � � j� +� '� T.-`- : - -•.. . _..--.-� i _ •-�j'-. f. . _ �� { .. ��, �- - ,_ 7_ �..-� ��\�+. .. _- -.•-'`s- `,,'�. t`....- - . , � u _ � � � Ia � \ � 1► ,,. t + � � 'ti'r.6_. ' +."\. _� . . � .`t ; 's �-j.. ,. � .-..�.:► :�.. � .. `i �---ti�. ..��' ^ � � '- � "���'_ � � '� ' a3 ti . ��- k "-1- i ' � ) � � t.r'`+ � �- °,: - � ; � -�`-:� i� � � � `�,..�`�,-, s � �... .;. . �"�... � � i�! �� � -� � � ,.. , ,� }� : - - - ►. - ._ ,� . _ ��� _ ... _. .. . ;� �... ... - � � �- {� � �� ^�'�`i� • '� :��..x� . r-, . � �{ '.,. ... ..' '_ J.6 �' . !. �. a ' � .. ;i . ".� �:, .�_y� . u„3 _ _- - c� r � � � �� '--.-•,_ - •�� �a'�., c, � � � � ^L;' � �' � t � �' '� t � � . � �� . � -,�.. ++ M C i _� j . � `�!? _� i � �j�.. .: �i : _ .... � . _ •.►L : � :,:'�. . . <;;. -� , ��-`' . „'� `'� ':J' � ` �`� . . . '� 11 '._ ., � �� .,.. :�. - -- � - � �sl �- ��� . �. � � �. . ,. ., � � _ _ `� -� �e . . , — �-s • • •-• � t - � . j _. .. .. ._ . . _ . _. _ .�._ ;.• � ..._�. . . . . .. _...._.._ . .. ... . . . � ""a�+� � t .� .--��• � ^ � . '�'J rr - � �,_ r x `, 'r . . .., �-�� .t t .. ,^ : .t; ;r: r . . . �,� �,: 4 � ',. .., �_ . __ _ :��.�� � •� : !� . �"� � . 1 . �• ','+�.�I . �` .. . ._ � �� � � �y... � —y.� y i � •+ �_.�,�{ T � ^�t ~,I 7' t�^ ' 1� j � �^ � ♦� � ' ''�'� ' ' .' ' ..._ . y ti � �+ � .� � ' � . _ J I �.� ' 'r'. .[1 � � .1-- t � i^ r" irs:. 1' _ � , t. 1 yt1., ,�, . . 4_� 1 ` , y .. �.- ._... �� - ----- � - �� y� fi--.��,:-�->--�--� .:��. .: �..�. —�:.,;� � ( � .._ ,� . � � : • � ;.. � . '..� :. , � ` • � �- �� �� a . .�.. ,4 �� -t �� `�� �� ��, r� ��..� r�1 �� ��C;�• ��� '� �J r � � •� � � �y' � . � � �.7 t � �: � � ` � �I r % r � � 5 � . �? ,� � _ .� _`S� �;� �:�. ��� . � �. � �: _ �- .t� �. � . � tj : � i �.-' t� , � l .-! �. �.5, � � t �< �" ; � ' „►� . ._` � . . . (� � r��� 111 �� . _ 'x. ._._{ --t-� r .. � � .- j[� ` `+/, '�'T'�tr` � � �. � .�: ' r � l I ,� � . . : : . _� _� . ; ��.; . ..._� + �� � ._.. :� .. .. . . . . ! �i. � t� `— - -... � � . '_� . . �. ( • —� . "=�_ [:. �;� _ ____�,-• -� �"�• w .. . .. .. �v.��..�. I r . _ 1� . f r.j . �. M. .� ._. . _. _ . _.. .� , � � , .._�7. � . . - �"' { 1 F �ri � . _ F _,a� .. ' � . '.� ..,� �' � Q . . ..___ � ` �': X � y ! : � � _ �._ �� � . '� Z: � . . ..'$_. � � �rt � �,� �, � ,� •��- -... ._. _ C.� . . -. ` .� , � � ; �I�-- _. �L_� .._ �. _. r:f � - < . _ �_ �,� ; � _�� � � _�f .,�.�;.-�--� �a : J � _.._..__ �..� . . _ _ 9 � U� v� �y. ,,, ,.�� '- --. � _ z_ ... .. .. � - .� ... t �� `„1=?� . . ' . ,-1..�. _ � �.t��� ;; �� 4 �„ �, _,. � .. �_ _. 'U��. _ . - :� � --' `i' - `—� , -L"�,� -- � ,_= ,,,�., �, ` �'' ', � '�,� � �.� �.r. �'`^ S3�M, � �." ..; � ''� � �� -- ,� �,� `'•"� ��..� — • � . . , r � :J! _ . . . ���. _ u _ .._. I - +� ,\`\ �I ' a �'t � � y � . .. �� 1 ry � �.. — �v X ;�. — ��w ; : .,r�. _ � x � � i �� _ � , Ct � ���},+', ; _.. , _ .,��;.j'�7 �•� � �� � `'}r.'._. __._�� �r r�t�i 1 � ''� ' :�— �l� Q•'=� -.��f + ' ' � ,� � ' , 1sr i •r�1 � � � .-� L � � Ti �-:"�� � *. �� ' 1 � �. �� � �+���J ,'�'~ t� , �= .. ..-_. � }. .�.. � .:.y..._ i_.... ___t..l � � �,_�:..�. �:�'x • � � � ` � `� •.r� —�. l 1 Yr� ��' \ � :, ► l i�„_ -� �--�i . �! � �� 4 �, � � ��� , .� ��. .� `�j' . 4� � 19�g��600e2 � Ar��s��c�5 � } �oc���5e a��� ~ 05 o2:y4P � � o 5 . �} � r ,t . � � �i n��•�.�" t `�� �� ✓/ ' � ♦',,,,, i �t �i ;� ,, � �� - �r , � o�'"���'`° �,�' �„ `' i�G�`���'` �,r� �� ��p�,.�•�'' ; ' �ji�. : {`�� •� ►�,.''• ����� ., �y .���' �s 1�' .s-!/ r�� ' ». �` �i�► � � ``- d S � ` 1 �� ' `` y �, ,��i�',r' � � � �.�i �ta'�`... �`.�r "' 2 �� °S�'d� � �-'''� � �T _ ` �� �3. ��f� ��1���� � ,�ti,�'�,�5 �L W`,� � � � ..�-' �.� � ''�' ���,,a :. . �� �'; ',;� � ti� + � • � 'I �r �, '�.. � �� � { �r � � t \ � �i 1 ` ��.1 ` _ � � << � . � �1 ; . . 1 � ,,,� � ' ; 4 �' :'"_...•----�- � ��,� • , �� i � � ,��- \.,-/"` � ' �(s• ''� G;���' ������`.o�'�" � `+�"` ��.. . � ����� ,,-- �� �,3 , p.�C �X��,a� �' .�'�� '� ,�t-c`� , � �� � ��' �---'i ,'. i � , , I '` i� \ � . f,., f�,... > . ', � � `,..� ,, �,:.-�,1 �j i �` I ���' � . 1C�� � � s � � ' �• '�'\" � ! �� � '. :.;�'� . ��'� �', ` ����+ � 1 s ` , � �_ � . 1 1 �- � ��" � �-� � �' `. ti •. t � t ti1 „� �j � � �'�` ?� . � �q ` • � � , i e a �'•}"��.�t., ! ,� � 1' � � �� �,� s � � �t��� �� � � � �i �� .,�" � �1 �� � L- r ► C � � . � 1-,._,,, �i � � � � / � � / � �� r��� f��,�► , � � ■►i��i���.� ER ATAYU)R Co'v'vveNen QouP f:O1wpenf 436Z0 Ridgo Park Dr. Suib 300 Tomocula, CA 92592 Title: Tub WastelOverflow Fixture Project: Palm Village TO: Bryee Lynn Whke Palm OeseR Redevelopme�t Agency 73510 Fred Wering Drive Palm Desert, Califomie 92260 951-296�8892 951-296�893 COR NUMBER: 28 DATE: 25-Jan-06 25920 D�scriptlon: Provide lift and tum wasto and ovarflows In Ilou of trip lover atyle wasba and ovorflow In all tubs. Por th� plumbing codo tho trip lavx style canrat ba installod wkhout an accass panal. Duo to tFw locatfon of tha tubs and accass panol cannot bo providod. CS! COOE OESCltl4T40N Sll9C0@ITRACTOtt liN4� PRICE i UN1T LINE TO?AL 15400 Credkfor Trip Lever Material SSW Meehanical 36 ea -530.00 -51,080.00 15400 CredR for Trip Levx Labor SSW Mechanical 12 hrs -558.00 -5696.00 15400 Add fo►A68J1 LiR and Tum Waste/OveAlow SSW Mechanical 36 ea 310.00 5360.00 Subtota4 OH&P Total Change Amount EXCLUSIONS / CLARIFICATIONS: 0 Woiic Days 0.0% -$1,416.00 50.00 �1.416.00� Thts work shall extend the contract time by: Owner Bryce White, Palm Desert Date Contractor Chris Dunn, Taylor Frager _��"" �� �IZS/otf Date JAN�20-2006 FRI 03:04 PH SSW MECHANICAL CONST. FAX N0. 760 323 0418 p, p2/p2 SSW MECHANICAL CONS7RUCTION P.O. B4X 3160 PA�.M SPRiNG6, CA 92283 (760) 3ZZ-0911 FAX (760j 323-0448 C�AI��� O�D�R NUMBER: 12a revised . � � ifi7%2oos � pHQNE MTE .►os r� i wcAnoH TO Taybr Fraqer 43620 Ridge Park Drnre, Suite Temecula. CA Chris Dunn Fax 951 296-9893 :Ye he(vby �p1ee b maiks 1he ot►�npe(Bj spec�fted beiow: ,Palm Village Apartments JOB NUAABER Fax �05-1133 i EXISTINc3 CONTRAGT MTE OF E�STING Ct]NTRACT , WA N!A I I 36 Mc Guire ttip lever waste and overflows $ 30.00 ea. 36 AB&A lift and tum waste and overtivws $ 10.00 ea. i .' I I� I ;� . � I � i � 12 hrs @ $58.00 Labor credii Can noi use trip levers do to no acoess will use I'rR and tums insiead, approval of chahqe order w�l indicate approval af product change � � � n / / /i / � / C�NTRACT AMOUNT �u�(oR �wiTu� croR� REVISED � - 'LO - p �p CONTRACT TOTAL ACCEPTED ' � The above price ar�d specificatlons of this Chsn�e C�r�ier Date af acceptance aro satistaobory and are hereby acoepted. AN wotk to bs petfacnteQ ucKi,ec same bB+ms and aondMions as spedfied Signature in originat contract uniess ottterwise stlpulated. I I I is1,416.00) � _ � (owr+�) � _.___� � ��i,o80.00;'- ; �360�00 Is�2o.o0} (;696.OQj � JRN 03 2006 2:31PM HP LRSERJET 3200 . O1/03/20Q6 �1B 13: �4 FA� JAN-03,2006 'fUE 11:47 AT1 SSW 11ECHAHICAL CONST, : � FRX N0. 760 323 04]8 $'��% Mecl�anical Construction, inc. �j001/D0� p � 2 P, 03 0 �J Deoa�ibe� ZSy 2005 ' ?ayloc �rager 73-6I0 SsaRa R+ou Way Pam Dasett„ CA. Fau: 674-,8354 Attration: Aa�s Dvaa 7ob: Palm Ydlsge� Ap�iRmeats Dear Cbris • ?he plaas catl tbc d tt{p kve�r type w�.ste and over8ow, t� do eo the des� of the bathroonas t�esa w�l nct worY becaausc tbaq m�t bsve uf �c� pmd. The wtste es►d et' tbe �bs in saa�a caees ue badc Lo buk a�td o� tha psrty wa1L Nocma�Ty ip this situstioon wa usG abs �u tjpe 1� aad tume, �vbic3i does not re�ins sn aocess paael. .. . .. , � � , • i . . � ' ' . � . •' ' � 't"tm EWeit . Pmjoa Man�gor 0 0 0 f � � ; � �J P.O. BOX 316Q P1►Yd4! SpRiNC3S, CA 92263 -(760) 3��-0911 Fax (760) S28-U418 e�rs�asl: s . oal.nwst • . ■r_�i�•�ci FRAGER w Twrzo/f con,wanon c.v.w cu�wo,.r 43620 Rfdge Park Dr. Suite 300 Temecula, CA 92592 Title: Plumbing Modfications Project: Palm Village TO: Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Warinp Drive Palm Desert, California 92260 951-296�892 951-296-9893 Descr(ptlon: Modity plumbing system per ettached proposd and attached letter from Owner CSI CODE DESCi21PTION 15400 Modify Plumbing SUBCONTRACTOR SSW Mechanical Subtotal �H&P Total Change Amount EXCLUSIONS / CLARIFICATIONS: This work ahall extend the contract Hme by: Owner Bryce White, Palm Desert � �'iNork Days Date COR NUMBER: 10REV2 DATE: 5-Dec-05 25920 UNIT Pl210E ! UPBT �'�N� TOTAL , t� a2,,2o.ez s2.,zo.sz 15.0% Contractor Chri; Dunn, Taylor Frager ��� ,� �, � r�.��� �Z�$�:�5 Date �2,120.82 5318.12 S2,439.00 DEC-05-2005 MON 10:52 AM SSW MECHANIGAL CONST, ' . � TO SSW MECHANICAL C4NS7RUCTION P.O. BOX 316Q PAI-M SPRlNGS, CA 922B3 (760) 3Z2-0911 F'AX (760) 323-04'18 Taylor Frgger 2020 Camino Del Rio North San D'�o, CA 92148 FAX N0, 760 323 0418 p, Q2/Q3 c��E o�o�� NUMBEit: 5B revised .1 �f 2 PHONE WITE 619-843-d220 12/5/2005 �os w��� � �.oc�►noFc palm Viilage Apartments .�oa Nur��R F.x ' 5-1133 674-8359 � '+�osnN� co►�Rncs c�►^r� oF oasnNa coKrRacr - � N/A N/A � _ � � : Fax 6748359 �. . _ .� - - , , ..�. We her�eby apiee ro maka tFea eAa�npe{a) spedfied below: Description: Chan�e Hose Bibb's to ball valve lever handle type, chah�e A.S. to 1I4 tum ball vahres,add Hose Bibbs to upstairs water heater rooms Note: woe do not recommend Hose bibs in WH dosets and assume no tisbility 1 Material: . 16 Ball Vaive Hose Bibbs-downstairs Tax Labor: 1 hr.each to reinstal( 8 x$58.00fir. ! � � 15% Profit � Overhead . 1 2 Material: ADD 18 Ball Vahre Hose Bibbs to 2nd Floor Patio 7 ts t�a�t vaNve Mose ts�n�s � �ax Labor: 1 hrs each x 18 x$58.00ihr. r� � 15°r6 Profit & Overhea ,M NOTE; This Chanqe Order beoomes part of and in confamanc:e with the axistinq coMract. ��WE AGREE hereby to make the change(s) spec�fied above at this price � o�►� � PREVIOUS �� 1Z� o� � n�� � /%I/ I cotrrRacT �ouaT f � AUTHORIZ�D SKeNATURE (C ) REVISED � CpNTRACT TO7AL � ACCEPTED `--'� -- - The above price and specffica�ons of this Change Ordar are satisfacbory and are hereby accmpted. All work to be performed under same terms and cond'dions as speciBed in origins! cor�tract unless otherwise stipul�ated. Date of acceptance Signature (OWNEFi) � $156.U0 ,�12.09 $168.08 �464.OU , $632.09 �94.82 $726.91 �� �b.uu a �� �.vy $168.09 �1.OA4.00 _ $1,212.09 �l81.82 � $1,393.91 s�.� �o.a2 � � ri��/���:i FRAGER ' TAYLbI[ Ceiutrrerlon Gwup Cna.wny i20 Ridgo Park Dr. ouko 300 Temacula, CA 92592 Title: Additional Hose Bibs at Corridors Project: Palm Village To: aryce l.ynn whtts Palm Dssert Redevebpment Ayency 73-510 Fred Wering Drive Palm Desert, CalYomie 92260 951-296�892 951-296�893 COR NUMBER: 25 DATE: 17-Jan-06 259Z0 D�se�iption: Install two hoso bibs in oech common corrfdor of bulldings A 3 B par lottor from Owner datod 1/14/05. CS[ COOE DESCRIP'fION SUBCONTRACTflR . IiNIT'; PRICE 1 UNkT _. LINE TOiAL. 15400 Install (4) edd'Rionel hose bbs SSW Mechanieal 1 Is 5648.60 5648.60 Subtotal OH&P Total Change Amount EXCLUSIONS / CLARIFICATIONS: This woAc shall extend the contraCt time by: Owner Bryce YVhite, Palm Desert Date 0 Work Days 15.0% Contractor Chris Dunn, Taylor Frager _�-G••-' � � �� T /�7" Date 5648.60 a97.29 5746.00 SSW MECHANICAL CONS71tUCT10N P.O. BOX 3180 PALM SPRINGS, CA 92283 (760) 322-0911 FAX (760) 323-0418 FAX FtO, 760 323 04l $ cH��� oRaER NUMBER: 11 PNONE I DAl'E 1 ?J22I2005 . �oa wwaE � t.ocw'no�t 1/17/2006 ' �O TaYior Fra�er , 'Palm Vitlage Apartments - , JAt�-17-2006 TUE 08:36 AM 5SW MECHAt�ICAL CONST, ...�..�. � ' �� ����' ��� �.�.� ��. 43620 Ridge Park Drive, Sufte .ioB HUMe�t F� i 05-1133 ' Yemecula, CA ; oasnHo coNrw�cr w►� o� oasnn� cor�w►c r � IVJA � N/A Chris Dunn Fax 951-296-9893 � . � W hereDy apies w ma�oe tl►a d�arwKa) apeeM{ed below: �. "-' � 9 Add 4 hose bibs 2 ln bld� A and 2 tn bid� B common oo►radors 1 lot material , d hrs plumber 2 $58.00 � 15% profit and ovefiead ; , . � � Q i � a►� I ' � . 0 n/� PREVIOUS � �P l /JK�� CONTRACT AMOUNT � AunjoR�ns��w�Tut�/���� o REVlSED _ _ � CONTRACT TOTAL ACCEPTEQ �' - - The above pric�e arW speaficatbns of this Change On�ler Daia of aoceptance are satFsfactory and are hereby accepted. Ali wcrlc bo bo Pertormed under same terms and conditi�ons as spec�ied Signature P. 02 � .__. $100.00 ` � �p�►v�i� $84;;F30 �648.60 ; � � �648.60 , . ' _ � in or�ginal contrac:t unleesss otharwlsa sbpulat�4. �ow�aa JAN-17-2006 TUE 08�36 AM SSW M�CHAHICAL CONST, FAX N0. 760 323 0418 � . _ � ._.._. �� � . ;�; . . � _+ - . . . Y 12�'14l2895 98:53 76P13416372 . Rpq pp�,M D�SFRT � PALM DESERT REDENEl.OPMENi AC�NCY 79-5'10 Fred Warin� Drive • Pakn Desa�t, G�lifornia 92260 Tele�phone: 780�548-08ii- Fex:760-341-6372 � FACSIMILE TRANSN�{'iTaL. C�VER �HEET �, ,�� - :.. 0 Debe . Decembar 14. 2ooS � To: � ' Ron Hass � ' . . Com xany. 7avtor raaer � • F2�x �Jo.; 7s0-67463b9 Phone No.: VER F�f: 2 page(sj INCLU�INQ thls oover sheet. If this transmlaslon fe Inco� ipiste, call the person designated below: Frort:: Brvice Whita Phohe. No,_ (7601776-6377 ; � � ____� DeNver to reciplent irnmediately '� � _ � In acootdance with your request . � � Har+� copy to foUow COM1kAENTS: � � • Thery arg no hos� b�e shown in� the plan for the 1� and� 2"d Floor CoRldorBak�r►y area � of Bulidings A& 9. Please {�stsil one (1} ball va.lve� lever handle, has� bib to the 1°� ar�d 2"d fioors ot 8uildings A& B per the a�#aohed sheet: Thls wlll be a total of four (d) bibs.. Run water supply lines to the hose from b�throorn localbns as nten� Hose bibs may be instal�ed on elthBr the ee�st or west hatf of the buildings it one ide is more convente�� , +� ' , ,• cc: Ha! Baker (949-566-OOH2) . • � Charles BrowNChria Dunn (851-298-989s) �� � Y 1 � G;�unpnYM!'iql�tlfV�M+ViMQa1�V�HIss1�1�00a0C • . P. 03 P�AG� 92I0Y r' � ■I��/��1�� FRAGER A I'AYZOIt Gwrdrs�dow Oiorp Cu�onr 436Z0 Ridge Park Dr. Sulte 300 Temecula, CA 92592 Title: Change plumbing foctrure color Project: Palm Village To: Doscriptlon: CSi CODE 15400 Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Wariny Drive Palm Desert, Califomia 92260 951-296�892 951-296�9893 Modify plumbing flxture color to �� nd, from stendard white. This change wlll affect 1 toilet, 2 lavatory sinks, and 1 tub per unit C QQne �ui v�' �o Ko�►�- :3is �t� �� 6� DESCRIPTION SUB�OfJFRAC7aR UNIT . PRICE f UNfF: : �-INE . TOTAk: Modify fixturo cobr Subtotal OH&P Totd Change Amount EXCLUSIONS ! CLAftIFICATIONS: This does not modfy fhe kitchan sink, this will be handled in a separate change order. This wo�k shall oxtend the eontract tlrrw by: Owner Bryce White, Palm Desert ���� Date SSW Mechanical 1 Is S2,520.00 0 Work Days COR NUMBER: 11 DATE: 29-Nov-05 25920 15.0% Contractor Charl ow aylor Frager �� //-fi-Or Date 52,520.00 52,520.00 $378.00 52,898.00 �'i�:�' 1 Z r a- �� Carlos L. Ortega City M,anager Date NOV-29-2005 TUE 04�22 PM SSW MECHANICAL CONST. FAX N0, 760 323 0418 P, O1/O1 SSW MECHANICAL CONSTRUCTION P.O. BOX 3160 PALM SPRiNGS, CA 92263 (?60} 322-0911 PAX (760) 323-0418 '4 Tay{or Fra�er 2020 Camir�o Del Rio North San Die;�o, CA 92108 Fax-�t 63SC �S���iA -� qg�3 va ne�y � m� a,s a,s�et:� �anea t�aw: Chan�e Nxtures to aimond 1 Toifet 1 Lav and 1 Tub per unit cHu��� oRaER NUIVIBER: 8 revlsion PHONE DATE :s�s-�3-a22o I 1 il'29/'2005 � JOB NAME f LOf',A110N Palm Village Apartments .be NUMa�It Fs�x !05-1133 674-8359 � F�asnNc� cotdTRAcr DA� oF �x�srlN4 coN'rR�Cr wA N/A 36 units @ S 70.00 ea. � ; i ! WE ACREE hereby to make the change(s� specified above at this price ' aa� PREVIOUS j (� -2 y. p y� ��/ � CONTRACT AMOUNT j AUTHORIZED SIGNATUR T�) �v REVISED ' �� �,;1 CON7'RACT TOTAL � ACCEPTED � VL„% � il The abov�e prioe and spedfications of this Change Order Date of axeptanoe �_ are satisfactory end are hereby accepted. Ail work ta be '�� peKormed undef same berms a�d oonditions as speafied Sigttature '� in originat contrac# un�ess ctherwise stipulated. I � i � $2,520.00 � , �Z,520.00 , „ ' tow►�t) i ; ■i������:i FRAGER A i.�YLOR Coiu»wetton Orow Ceaynnr 43620 Ridpe Park Dr. Suk� 300 Torrwcula, CA 92592 Title: Ro�ng Tile Alternate Project: Palm Village TO: Bryce Lynn White Palm Desert Redevebpment Agency 73-510 Fred Wering Dr'Ne Palm Desert, Ce6fomia 92260 951-296-9892 951-296-9893 COR NUMBER: 19 DATE: 3�lan-06 25920 Dascriptlon: Provide Ona Plece Concrete roof tila manufactured by Eaple, modd Capistrano in Ilou of two place, ono color, clay tllo. CSI CODE OESCitIPTION SUBCONTRACTOR 1pJ1T PR10E / UNIT �N� ?OiAL 073300 Originel bid for cley roof tile Sylvester Roofing 1 Is �175,597.00 -3175,597.00 073300 Revised bid for conerMe roof tile Sylvester Roofing 1 Is 5133,719.00 5133,719.00 Subtotal OH&P Total Chango Amount EXCLU310N3 ! CLARIFICATIONS: 0 Work Days 0.0% -�41,878.00 �0.00 �41,878.00' This work shall extond the eontract dms by: Owner Bryco White, Palm Dts�rt Date Contractor Chris Dunn, Taylor Fragor �� � l l 3 /�Xo Date �an u� 06 11:22a Sylvester Roofing Co., In 7607437210 p.l J� �� :'! ' � i� � y� �r � / � �r:9f.;•. ��y �_ � i '�r.�.�i� .: 'T?li^' . `�;z�-�� 1; �����;; i�i�;t�x�`�:;�' `� PROPOSAL AND CONTRACT ___.=, ..._._. � � . _ �.�� _._. _ - � Taylor Fra.ger 113l2046 Home Phone Chris s , iviailing address: 43620 Ridge Park Drive, Ste. 300 Temecula Job Address: Palm Village Work Phone (951} 296-9892 CA 92594 Fax (951) 286-9893 •-���-:� THtS PROPOSAL IS VO1D UNIESS ACCEPTED WITHIN THIRTY DAYS WE PROP06E TO FURNlSH ALL MATERIALS. LABOfi NECESSARY TO PEAFORM TF� FOILOVyING: Gaural Note�, . • F,. ;� �.� ,z .t', �.�. of roof ag nufax sbali not stact ua� a city utspedoc in�s oompleted toof sheathin8 iaspection. • Roof stufaces si�all be dry and free of foreign maietial. Proja;ting na�s shall be dtivea flush. Sylvester RnoSng assumes tht 'L�ity foc roof oonditioas cdatod to waterPcnofmg W�on ooma�a+csmeat of �v�ck. • To pcavide ti�e nocessaiy ped�trian sai'ay baaicades and arossovas. Sitvate all equipmatt s�ad maierials so as to miainoiu disturbaaa �•L411w.N\N�11riO WV�����YWWS. •(�esA up aaaior roofing debcis da�y u�d upon completioo. • Written 10 year iabor warraaljr / 50 year roof t�e material warraaty • Matecia! rdea�s from our matafa[ supplias ar yau job. • Upon pc�vide catificates of our worlcmans com�easation u�d 51,000,000 �iab�ry inwrance oov�rage poticy. One PFece� �� lile roof - PY+ev�ai7ang wnrges � f13d,719 BO • Instail (2) two 1�yers of ASTM 30 �, fdt as unde�aymeai. � • iastall baked atiamd sheet meta! birdstop. • • I� EaRie Ca�istranor�.t�e (ICEo �a66o) pa ma�uer spea5cations. • Mortar �R beid tiles at lups and ridges. ' . • Instatl6ip and ridge a'ks with ptastic roof cxme�t ova each nad head ova 2" x 6" wood na�7as. ('l�reated ivatba� suppliai & inst�ed by otlicrs) • F[ash aIl walls and c�icnneys wit� sh�eet metai as axded. • Prirnary & secondary roof jacks oa all round vent pipes, prime, aad seal with Vulketn 116 pofyureihan� caiillQng atid pa'snt {SuPpiied by owers) Sheet autal-tr7e �ew - Prevai�g wages SI4,I63.00 Suppty dc Install tbe followiu� 26 gaage gal�vaaized sheet �nsbd to the roof'wg deta�s per plaas: 2" x 6" AntiponcGag / degre� edge ntetal • 2 x S 110 dcgee roof to wall � .7~ iC 1M X 3M �i7W • 24" WV" Vageq-Si�e Crown" • 6" Tilepan • 4" x 14" saddie stocic • Install 57 ncv�r roof dormer veats. $ ' .00 Pro�ess Paymesrts Indusions: As above Ezclasionr. (unless othervvis� noted above) No Danotitioq N� H. V.AC., No s]eeet metal, No insulatioq No wood na�lers, No te,ad shee drains, No pitc3i pockcxs, No pipe 8ashings� No sheet meta[ imstallatioq No carpentry, No asbestos removal, No ssfety railing, No wat�r �roofing, �To subr�aaon of insuraace, No �ecformance bond. - �.i '+*"[C. �!1F.'� tt? iCe-f C�r�'tCo !P'.'�1, r"ZF :^E'1� Fr. J�.�i .i .;,. ^r,..� r^Ev :^.?4i �.�ra s�:� _� /.��. -��r.-�n� ra,r-, �.r.,- a� r � . ♦ PALM DESERT REDEVELOPMENT AGENCY 73-510 Fred Waring Drive Palm Desert, California 92260 Telephone: 760-346-0611 Fax: 760-341-6372 To: Company: January 6, 2006 Chris Dunn Tavlor Fraqer Fax No.: 951-296-9893 Phone No.: 951-296-9897 VERIFY: 1 page(s) INCLUDING this cover sheet. If this transmission is incomplete, call the person designated below: From: Brvice White Deliver to recipient immediately Date: FACSIMILE TRANSMITTAL COVER SHEET Phone No. (760) 776-6377 In accordance with your request Hard copy to follow COMMENTS: The following installation by Department: high profile concrete tile roof tile was selected and approved for Phil Drell, Director of Community Development, of the Planning Manufacturer: Eagle Roofing Products Product Line: Capistrano Product Number: 3605 Product Name: San Benito Blend Description: Terracotta, Light Brown Blend cc: Hal Baker (949-56fi-0082) Ron Haas (760-674-8359) Planning Department, Palm Viflage Apartments File G:WOA�Beth Lonpmen�ProjectsWalm VlllepelFaxes�Fex • Tey Fra Dunn Roof Specs 010608.doc