Loading...
HomeMy WebLinkAboutR24710 TO HCI - UNDER GROUND TRENCHING AT LAGUNA PALMS APARTMENTSPALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: AWARD CONTRACT NO. R- 24710 TO HCI INC. TO TRENCH AND LAY CONDUIT FOR THE UNDER GROUND DRY UTILITIES PROJECT AT LAGUNA PALMS APARTMENTS SUBMITTED BY: JAMES CONWAY, PROJECT COORDINATOR CONTRACTOR: HCI, INC. 3166 HORSELESS CARRIAGE DRIVE NORCO, CA 92860 DATE: JANUARY 12, 2006 Recommendation: By Minute Motion, that the Agency Board: 1) Authorize the award of Contract No. R- 24710 to HCI, Inc. in the amount of $243,478.32 for under ground trenching and conduits at the Housing Authority property known as Laguna Palms Apartments; 2) Authorize a 15% ($36,521.75) contingency for unknown conditions which would require executive directors approval; and 3) Authorize Chairman to execute all documents necessary to award the contract. Executive Summary: Approval of request will authorize HCI Inc. to perform trenching, install pull boxes, transformer pads and conduit in addition to new gas service lines. This will allow new service lines to be pulled by our local utility companies prior to site renovations. Failure to award contract will delay the ability of staff to go out for bid on the exterior renovation/site improvements at Laguna Palms. Discussion: Staff recently put out for bid the under grounding of dry utilities project at the 48-unit complex known as Laguna Palms. This project received only one bid with eleven underground firms picking up bid packages and five firms attending the pre bid meeting. Staff has reviewed the proposal checking it against the $300,000 dollar engineers estimate and recommend awarding the contract to HCI Inc. Staff Report Award of Contract to HCI Inc. for under ground at Laguna Palms Page 2 of 2 January 12, 2006 Laguna Palms is currently awaiting final approvals to renovate the entire site. Due to the extent of the site / building improvement, staff conducted inspection on all utility services within the complex. The findings showed that the overhead power lines will be required to be placed underground in the future. Staff determined, through past experiences, that proceeding with the under grounding on the property at this time will save the Agency significant costs and eliminate unsightly overhead utility lines. In addition, this will complement the interior rewiring of the units and give us an opportunity to install new electric meters on the buildings as well, which will allow for energy solutions (photovoltaic) to be incorporated without future modifications. In order to keep on schedule with the entire renovation project, staff recommends awarding the bid for the under grounding of dry utilities to HCI Inc. Submitte b is James V;UV'ray--� Project Coordinator Department Head: v:b Yrigoyen Dire: -;tor of Redevelopment/Housing Approval: Division Head: 8usin e thority Administrator e- / r /on Paul S. Gire of Finance GARDAWAMES CONWAY\HOUSING PROPERTIES\LAGUNA PALMS\AWARDUNDERGROUNDSTAFFFRPT.DOC