HomeMy WebLinkAboutR21780 - CO#2 - Palm Village ApartmentsPALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 2 TO APPROVE CHANGE ORDER REQUESTS (COR) FROM TAYLOR FRAGER, INC. (CONTRACT NO. R21780) IN THE CUMULATIVE AMOUNT OF $92,327.87 WITH SEVENTEEN (17) ADDITIONAL DAYS TO THE CONTRACT TIME FOR THE CONSTRUCTION OF PALM VILLAGE APARTMENTS. SUBMITTED BY: BRYCE LYNN WHITE, PROJECT ADMINISTRATOR CONTRACTOR: TAYLOR FRAGER, INC. 43620 RIDGE PARK DRIVE, SUITE 300 TEMECULA, CA 92590 DATE: MARCH 9, 2006 CONTENTS: CONSTRUCTION CHANGE ORDER NO. 2 TO CONTRACT R21780 CHANGE ORDER REQUESTS (23, 16REV1, 30, 21, 22, 09, and 27) Recommendation: By Minute Motion, that the Agency Board: 1. Approve Construction Change Order No. 2 to approve Change Order Requests (COR) from Taylor Frager, Inc., (Contract No. R21780) in the cumulative amount of $92,327.87 with seventeen (17) additional days to the contract time for the construction of Palm Village Apartments. 2. Authorize Finance Director to move $92,327.87 from contingency (account number 870-4349-433-4001) to base for the subject change order. Discussion: On April 15, 2005, the Notice to Proceed was issued for Contract No. R21780 Taylor Frager, Inc., for construction of the 36 unit Palm Village Apartments in the amount of $5,839,386. The recommended change order includes enhancements and necessary modifications to this contract. The City of Palm Desert has undertaken ambitious goals to reduce energy use throughout the City, and has sponsored the "Estonia Protocol." To support these goals, staff has initiated changes to exceed the Title 24 California state energy requirements for this project and to achieve the rating as an "Energy Star" project. Staff is recommending higher efficiency appliances for each unit with the "Energy Star" designation. COR Number 23 in the amount of $4,016.00 with no additional days is for these recommended substitutions. To provide additional energy conservation, Staff is recommending substituting higher efficiency 13 SEER condensing units for 10 SEER units. In addition, the plans did not include HVAC ducts and Staff Report Approve Construction Change Order No. 2 to Taylor Frager, Inc., Construction (Contract No. R21780) Page 2 of 2 March 9, 2006 equipment for the second floor utility room. COR Number 16REV1, as modified, in the amount of $21,735.00 with one (1) additional day as modified, is for these recommended substitutions and additional work. Occupant safety required changing a portion of the second floor units' windows to uniquely provide internal railings. COR Number 30, as modified, in the amount of $9,269.00 with no additional days is for these changes. The electrical plans for the interior lighting layout in each unit were not consistent. COR Number 21 in the amount of $4,135.00 with one (1) additional day is for this additional work. The Multi -purpose and Maintenance Rooms required additional lighting and electrical outlets. COR Number 22 in the amount of $762.00 with no additional days is for this additional work. The structural roof plans specified roofs and interior ceilings of the second floor units to be trusses. However, the vaulted ceilings over the living rooms shown in the Architectural Plans could not be achieved by trusses and required conventionally framed ceilings and modification of the trusses that had been built for sixteen (16) units. COR Number 09, as modified, in the amount of $47,084.84 with fifteen (15) additional days, as modified, is for this additional work. Several framing changes were required to allow installation of fire sprinkler lines, roof drainpipes, and additional doorways. COR Number 27, as modified, in the amount of $5,326.03, with no additional days, is for this additional work The cumulative cost of these changes is to increase the contract amount by $92,327.87 with seventeen (17) additional days to the contact time. Submitted by: +Bryynn4)hitdtor bl Approval: Department Head: S� Dave Yrigoye Director of edevelopment/Housing alt-I ent Paul S. Gibson, Director of Finance Carlos L. Ortej a, Exeq tive Director G \RDA\Beth Longman\Statt ReDons\Wnne\Taytor Frag CO2 030906 aoc PALM DESERT REDEVEILOPMENT AGENCY CONSTRECTION CHANGE ORDER Contract Purpose: Construct Palm Village Apartments Contractor's Name: Taylor Frager, Inc. Contract # / P.O. # R21780 I 12193 Change Order No. 2 Contingency: YES X I NO Account No. 870-4349-433-4001 Project No. You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE (Supplemental Plans and Specifications Attached) In Contract Price In Contract Price Change Order Requests: 09, 16REV1, 21, 22, 23, 27, and 30 $92,327.87 and add Seventeen (17) days to Time of Construction TOTALS: NET CHANGE IN CONTRACT PRICE: $92,327.87 JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 6,006,886.88 CONTINGENCY: Less: Expend. & Encumb. To Date: - 6,006,886.88 Amount Approved by Council: + 583,938.60 Less: This Change Order Amount: - 92,327.87 Less: Prior Change Order(s): - 167,500.88 BALANCE OF BUDGET Less: This Change Order: - 92,327.87 REMAINING FOR PROJECT: --92,327.87 Balance Remaining of Contingency: 324,109.85 The amount of the Contract will be (Decreased) Increased by the Sum of: Ninetv-two Thousand Three Hundred Twenty- seven and 871100 Dollars ($92,327.87). This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 1. REQUESTED BY: EXECUTIVE DIRECTOR 2. ACCEPTED BY: CONTRACTOR 3. CERTIFIED FUNDS AVAILABLE: 4. APPROVED BY: FINANCE DIRECTOR JIM FERGUSON, CHAIRMAN Date Approved NOTE: No payments will be made prior to Exec. Dir. and Agency Board approval SECRETARY Date Approved Ong fkd RUT 0 � �r�ri�•�:� FRAGER w rw rtoR c...r.ew.. o.w a.wwr 43620 Ridp� P��1c Dr. s�rc. soo T�rtMcul�, CA 9?b�2 Title: Energy Star Appliancas Project: Palm Village TO: Brya Lynn Whib Palm D�s�rt R�devdopm�nt AQ�nry 73-510 Fr�d Warfnp Drhr� P�tn D�s�rt. Califomi� 92260 9S1 •2D6�92 �st-t��s p�seifptlon: Provid� �n�rpy star DlshwuMr and R�irip�rator pK Ovm�s nqu�st CSI CODE �ExRIP'TION 110410 En�rpy Star Dishwas�r (No Cost) 110410 SLndard R�frip�rator 110410 En�rqy Star R�frip�ntor Subtotal OH&P Total Chanpo Amount EXCLUSION31 CLARIFICATIONS: This worlc shall axtond tho contract Umo by: Owner Bryco Whito, Palm DaseR Date SUBCOItTRACT01t ea.s. B.A.S. B.A.S. 0 Work Days COR NUMBER: 23 DATE: 11 �lan-08 25920 UNIT PRlCE / UTAT u� I rosa. � .. w.00 so.00 36 N -SS1O.O7 -518,362.52 36 N 5607.OI 521,854.52 15.0°k Contractor ChAs Dunn, Taylor Frapor �� � � Q Date 53,492.00 5523.80 t4,018.00 Jan 06 06 10:45a . ' _ � euildcr's Apptianco Supply 272 La l�+oss� Av�e. � 06 :a�on, c�► 9x;u aos) ��s90 Fax ��� s�-�ss� Jack Hryant Tayior Frager 43-62� Rklge Park Dr. Ste 300 Temecula� Ca 92592 851-296-9892 551-296-8893 760-776-6802 QUorA�rolv 1/6J2006 co�tac� Chris Dunn Quoted by: Jack Bryant Palm Valle�► A�a�tments QTY �AODEL DESCRlPTIt�I�!1 UNIT TAX INSTALL EXTENDED GE Sta�ndard 1Nhibs WA RMV1435W Micr�o OTR� TumtaWa S 185.00 S 12.76 i 40.00 i 21T.T6 RGE�,524P1F G�S.$BpqSFL� lan. S 3tT.00_ S_.. 2_�� i b0.00 39l.57 Enery Star HOA2000 Dishvrasher, 4Gj�t.9opt i 190•00 i 14.74 .00 S z54.74 � Enery Stat GTS186CS 16.8CF Std wire,64 1/4" H S 517.00 S 40.0T S se_On S 807_O7 GFC3�0 Di� � 50.00 S 3.85 WA S 53.85 S 1.524.99 i ti I , Price are good from 1.1/OB through 6/30�108 if accepted by 1/31/06 . t I All parts needed tor insallation arem include in our prioe of installati�on � we use �u� own ir�sialle�s p.l Accepted by: ❑ ■�:�/���:i FRAGER w rwrr.oK u�..a,.ou.�. a,.w c...v...r 43620 Ridp� Pvk Dr. 3ult� 300 T�m�cula, CA 92592 Title: HVAC Modifications Project: Palm Village TO: Bryc� Lynn White Palm D�sert R�d�vslopmsnt Apsncy 73-510 Fnd Wa�inp Driv� Palm D�sert, CalHomia 92260 951-296�892 951-296�893 COR NUMBER: 16 REV1 DATE: 12�1an-06 25820 p�M��: Chanp� �II (36) unks irom 10 S�K to 13 3��r. Add 2�ton 13 s� �ir condltloninp unit, p�s fum�c�, ductwork and dl aec�ssorl�s in Floor Mdnt�nanc� room. l�dc�p¢w��d�xh�st�ya��mror Irun�y r�orrrv�j�d� CSICODE oEscwanoN SUBCONTRACTOR UNIT PRICE / UI�T 15500 Chanp� squiprr�nt from 10 S��r to 13 Sser Randal Air Conditbninp 15500 Add (1) 2 ton 13 s�er air conditloninp unit, Randal Afr Conditlon(np fumac�, ductworfc and all a�sori�s 15500 �� i�ll on �sr �nt,6ip��ers/fnafi Randal Air Conditlonfnp ry v� d tln •■ faf �x ust �uct�fS n roo In� na n. Subtotal OH&P Totd Chang� Amount EXCLUSIONS / CLARIFICATION3: Multi-purposs room in Buildinq C to rnaintain HVAC requlr�msnb as ahown on th� plans. ThIs work shall �xt�nd th� contract tlrr» by: Owner Bryc� Whlt�, Pdm D�sKt Date j ,2"Work D�ys 1 Is �fS�T�50 1 Is 56,270.00 1 Is �Ao 15.0% Contractor Ch►is Dunn, Taylor Fr�g�r �J%G►" ' ^^ - 111v/o6 Dat� ur� 70TAL �� 2UD o0 i�t9'.�.iC � � 7� -ie:�9e� � veQ� ' �1 � -f3i�ipp,pp 21��S,Q� 0 � X � � c� � C (0 � � _ � d � � � / � � a �+ � L d � L. Q m � :�. � t :� i.. � :: e� � �+ N W � C� CJ 0 0 0 0 0 0 0 0 0 0 0 0 0� 0000000000000 O O O O O O O O O O O O O A w m •c o � c � 0 � Q �� y � 1 •O � a- � L � � N c� ._ � (� � � 0 � � N c�i � � � S � � � a� � � � m ` 8 � � .. � o °1 � ..c�. .c�. � O a c� c�i � � � �y � 5 �L� N N m � U � � � N � � t � � ^ � U � � � � J Q � � � --�� 0 � � 0 N t� � V! J 1� � •. �� r � � Q � Y � C� G � � :. � 0 � � N � 0 U M M M ch X � � � o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � o 0 0 0 0 0 0 0 0 0 0 0 0 0 �00000000=oocc000� � � „ L � Q 2 � � eo > E � a �+ � L � � � d � C � .� L w d � E � � W � � � H y .. � �� � N �p M � C � w � � � � v v o � � c° O � � � U c � � r. �� �� �� ,� ;- i � � � � � d 0 0 0 0 co M Ef3 � � 0 0 0 � � � lL` N � -�p C M � �U o � N cII 8 Q Uj • • S $ � � w W � _ 0 N O _1 H Q .� O � � `"' O � `J � Q . N " � J H � . . � . u � � 0 � � Y � � � � �^� \J � � �n .�a I � � O 'a C E O U i� ri�ri�•�c� FRAC,ER ATAYL.OR G'urlVn�Yon Gror� co1ws.wr . 43E20 RIdQ� P�Ac Dr. 951-296�892 Suk� 300 �51-296�693 Tom�cul�, CA 92692 Title: Doors, Frames, Finish Carpentry and Window Changes Project: Palm Village TO: Bryos Lynn White Palm Des�rt R�dev�bpmsnt ApMey 73-510 Fnd W�rinp DrNs Pdm Dsert, Califomi� 92260 D�serlptton: �ro�d��oc�% fjYr�is' �ilsh�ir¢r�i��i�window chanQ�s as d�tall�d bdow. � C31 CODE DESCRIPTION 062000 ebset InQ. Ad nal h�ipht lywood p� II rsquf dditbnal lu r. 1000 A n�l soler �t door in b p C 2nd }loor int. Room Odi ddkiond w h�atK door Dldp C 2nd maint. Room 06 Additlon�l tom firo ris doors bldp� A, 3 C 1000 Add 24 4' bwK Bld A 8 B d room doors 081000 Add doors at Bld . A38 for sol� b/extn d OE1 C • Bldp C E nl Room 1 double door o sinple , �ddition�l •r� rpuind ". - 088000 Dal�te windows typ� B 6 � in !�°�� 2 0( Bldps A 3 B 088000 Add doubw hunp window lyp� C;Trfb�dmoms 2 d&d� A 8 B 066000 D�leb windows lyp� D�t dininp rooms of Bidps A, 8, 3 C 088000 A`�d�whdows� D--�t�n �roorrr. _� Bldps A, B, � C 08a000 riw�d��: srl i�iT : Is�.nd�y����i Subtotal OHBP Total Chanfle Amount EXCIUSIONS I CURIFICATIONS: This work ahall oxtend tho contract tlmo by: t7 pq,�s Ownor Bryco Whito, Palm Desat Sl)BCONTRACTOR AAea Aieo �Milwork Ico MiNwork AAco MIIIwor1S, i-- ANco Milworic AYco Milwak Aflco M!/work AMoo MiNwork A1co MfNworlc COR NUMBER: 30 DATE: 8-feb-OB 25920 UNR PRlCE / UNIT M 3100.00 - LiNE � T'QTAL 1 w S1. .00 613.00 - 1 .00 5�6.00 �- N 31.535.67 54.607. 4 u 5402. 51,6 .00 4 e� =931 , 26.00 1 Is S .00 5550.96 / E �a -St30.00 -51.04a.00 a .. s6so.00 ss,zoo.00 6 �a -j192.00 .51,152.00 6 e� 5842.00 55,052.00 , .. s�.�a,ao� rg D6o.,:z� �i?P,'!9`9�96 15.096 ��1 �' � 4,26q. W Contractor Chris Dunn, Taylor Frspor ��-L� �l8/OF� Date Date � �,Lco �.wo� p,�o�vc�s Extra To Confrac� 1428 E 6 TH. STREET CORONA, CA 92879 P. o. Aox t z67 D°t° t""°�°' # Mn�L�Nc� nn�Rrga �n� � y��a-t t�� PH 951-T71r4446 ?J7ROOb 744b PVA FIIX 951-272�4489 Btll To TAYL,OR FRACi�Fi 46620 RIDCiE PAItK DR1V1's STI?, 3(10 Tcmccule. CA. 92392 Ph 931•29E►-9E92 Cri� Dunn Fax 951-296-9893 Ship To Pplm Vill�c Apartmcnts P.O. fYumber Terma Rep 3hlp Vla F,O.B. Uue on roceipt Z12/2006 Quantitty ftem Code De�aipricn P�ioe Eaoh Y ,i'� VVlndc�ws dc Tr... Rr.P1.ACRdO W(NDOWS B. 4,160.00 (!( AT RFnRpOM �i �, ON BLDO, A a B. m � vrNYT, �HL. Hl,'NO CN.LEb U2. WITH V6TVTS TOP, ANU BO'I'('()M. ROTTOat VENT TEMP�;it�U: 8 E:A 3061) UBL. I1lJNC Gl� S 320.00 � S 4.160.00 (�IVQ� 8 EA. INCLUDES CRTsnIT QF S 130, ^ EA, t� r �.00 Gm�iS j3'Windvwaat'l'r._ RCPI.ACMGVI/tNpOWS D ATDININU. DI.DG. A lt F� � C, TO D-2 W1NL�WS. GHANaF, TO A pR. Of 2�6" x 3�cr xo Mtrl.r.�� QVF.R. A PR. QF 2'6" X 2'0" W T�.MPF.RRn FTXED: 4 EA. SU30 Si.iDiNG MUI.LED OVBR 3U2b FiX, BLU(i. A �. Fi 2 rA. 5030 SLtDMO Miil.t.m Ovr.•.R 50�0 FTX. Rr.nG. C 6 EA. Q S 63n.U0 � S 3.900.00 �� 6 FA. D" lNCLUDF. CRI?T)TTOF S 194,00 EA. ���� � �� �r��" ��`�Z.�� � T., w w� cr•. cR �s , TQTAI. S 2.341.0(I ITOtal 3.900.00 ���� Pro�d Amount �.160.00 3.900.00 .-�.o� : ..♦ . :.,,..: , r � � ■ri � r i �•�ri FRAGER w rw rc�iR c..r..,r» o...M ce.+..s 43820 Ridp� Paric Dr. 961-296-0892 Suko 300 951-2968893 T�m�eula, CA 92592 Tfde: RFI #58 and Rovisod Bullding C Electrical Floor Plan Project: Paim Village TO: Bryee Lynn Whfte Palm D�s�rt R�dwdoprtwnt AQsncy 73-510 Fnd Wuimy Driv� P�kn Des�rt, C�IYomM 92260 COR NUMBER: 21 DATE: 11-Jan-06 23920 Dae�iptlon: Provid� 2�dmtlonal can IIpMs In tM kkch�n of � unks on tl» flrst Iloor of buildnp C p�r tM �thch�d sk�tch �nd RFI A56. csi cooe oescwPnoN 16000 Add 18 can liphb in kRch�ns Subtotal OHBP Total Chanpe Amount EXCLUSIONS I CLARIFICATIONS: Thls woiic ahall oxtend tho contract Ume by: Owner Bryco Whlto, Palm Dasort Date suscor�►cTote BrudvRc 1 Work Days UNIT PRICE / UNtT Up� TOTAt 1 b 53,595.50 33,595.50 15.0% Contractor Chris Dunn, Taylor Frapor ...� 1/II /Q� ��ce 53,595.50 5539.33 54,135.00� �' �I�T �� M. • _ �A � 600Fqge0eR0�d P� S�xing� CA 9Z264 Pl�aoa 760 320�429 F�x 760 3?3,3302 Ua�e�.�4Q6�7 r�► a, zoo6 Taylor � const�udion 416b1 E.,c��r::.��. cirale, suioe 2�� TamoauLi, CA 92590 At#a: Chris Dwa Ra: Palm VIlls�e Apartmm�s Bldg "C" Csn I�hts Mr. Dunn, Please n�o�te ;a add o� 53,595.50 to add 2 oatt li�ta ia t� ]dtcban of 9 umits oa t6e 5nt 8�oor of build'uo� "C" £oc a total add a� 18 can lig�ts. 50o atta�o�d dravtr�g. Pkase Sed free to call if yw l� �ay quoatiaas. (760) 320�4Z9 �P�uY �� Jason Frasaac Prg«x Mw�ar &udvik It�c. 80/z0 3Jdd NI/1QflzlH z6EEEZE09L bT �bT 900Z/b6/i0 � F ■►�������:� FRAGER A T.�YUlR C�w�breA.w Oww GwY+ws 13620 Rldp� Park Dr. Suk� 300 T�m�cul�, CA 92692 Titlo: Elect�ical Changes por RFI #78 Project: Palm Vlllage TO: Bryc� Lynn WhtO� P�kn D�s�rt R�d�v�bprtrtit Ap�nry 73-Sf0 Fr�d Warinq Driv� Palm D�sert, CdYomt� 92260 �,-��z Db1-296-0a�3 D�seriptlon: Provld� dl modlficadons to d�ctrlcal syst�m p�r RFl s1d raporw. CSI CODE DE9CRIPTION SUBCONTRACTOR 16000 ENeMaI Chany�s Brudvi� Subtotal OH&P Total Chsnqo Amount EXCLUSIONS I CLARIFICATIONS: This work ahall extend the contract tlmo by: Own�r Bryco Whito, Palm Desort ��ce 0 Wor1c Days coR NUMe�t: as DATE: 11�lan-OB 25920 uN1T PRICEFUI�T UML T07�1i. 1 w 996Z.T6 Se62.T5 1 S.0% Contractor Chris Dunn, T�ylor Frp�r _s� +�— t �� . Dste 5862.75 599.41 3762.00 j ' .�1� � � , � ��«. • �. 600F��eRa�d Palm Spring�. CA 92264 Ptione: 760 32��429 Pa�c 760 323 9302 Liom��M4t�l�] Jaasary 4� 2006 Taylar Frager Cona�ucdca 41661 F.atayriso G�+Cle, Suita 217 Toaaocvla, CA 92s90 At�: Cbris Ihma Re: Paltn V'illege Aparttm�t RFI *78 Mr. Duim, Plesse naoe an add of 5662.75 to fornish aod ia�ll all eledrical roquirod to add and/or ie,loc�e oloctric�l dcvioes par RFI �78 and tbe drsvv� �tnched t� that RFI. Plase £ed froa to nll if you l�vee aay quoe�ioas. (760) 320-0429 �o�uy S,�a, ) .�.. � 7ason Fra�er �� � Bnidv�c L�c. 80/56 3Jtid NI/1QfklS Z0£EEZE09L bt �bt 968Z/b0/i6 rr_ � i•�•�ci FRAGER w 7AYLOR C.w�a+wtlo. Oivav Cu.v.wr 43620 Rldp� Prk Dr. 951-296-8892 Suk� 300 951-296�893 T�m�cul�, CA 92592 Title: Palm Villag� Truss and Vaulted Ceiling Change Project: Palm Village To: sryc. Lynn Whit• Palm D�a�rt Red�vsloprtwnt Ap�ncy 73510 Fnd Warinp Driv� Palm Desert, Califom(a 92260 COR NUMBER: 09 DATE: 27-0ct-05 25920 D�scriptlon: R�vis� Uuss end conv�ntlondly fram� vwlt�d csilinq In Ilvinp room bas�d upon RFI M64 nspons� d�t�d 10H8/2005. CSt GODE DESCRIP'FION 061000 Bufldinps A&B R�vfsions 061000 Buildfnp C Revisbns SllBCON'ERACTaR Tandem West Oroup Tand�m Wsst Oroup � Ut�'T PRICE / UI�T UNE 70TAL ��.�5� � 1 b 521,550.82 �ily-iiGA 1 b 532,452.26 ii2�4isai 2B,?.ZG.Ss � Subtotal OHBP Totd Chang� Amount EXCLU310N3 / CLARIFICATION3: This work shall �xbnd th� contr�ct tlrrN by: Own�r Brye� Whit�, Palm D�s�rt Date �S �t Work D�ys ��,o�.$y �� �46:'.: �e '�8-�16Q:�6 � �I?� 04�•S� CoMractor Charl�s Brown, T�ylor Frag�r �� /0-2'1-O,s' ate t ie zooa f,r,,.,.,�•.•,- . �► l � • 2t27PM t -, . .� - • � � HP LA8ERJET �200 _ � ,�� . .•�► I� J ' • � ,� � . ' ' . I. �"'�r'!'- ' . _ . . �• � . . . � � � � . ' � � �. �► �� — _ � , 3. +� i � '�.� . J � . j . , j . . � . ,�y � . ' I � � � � 1 �' ._ � H4 __ "_,._- � 0 � � � � . I .� I 1 �' � � ����`_ ��•� `+� 4 � � � � � IM ` 4 M � ' � t.�. ��i JJ�� I �.�. '..� '" • � � � � � � �� � � . ��� 'I � - / \ � . �_�y� a � ��YL/ • � I � � � � i . . � ' . ' I + • I M � p.3 � � 1 � � W . � • � .' � �.' • ';. , �� . . � ' � �. 1 . � . �-' � i` � T ! � ~�,i �/ �� � '� 1 . . �. k--��.�I � � , . � ~��`�. . ' �----_ � - ' � �—..� ti�titi�Ytil1..�V � � 1� 11 I�ill ��_ •• ���i �r�+�.K tr� � �.V��, � � � �'�l'Iw ,l " ` ' . . , , . �"'� i �i ���..�" , � � �. � . � � � � -�-; �� � � . � � + ` � . �� %� u �. t.. � �, / � I '� r` � I 1 �� ' � . =C � „ . ,� �Y� . �` 1 � � �. � � , l -�.�-,, . � •. i z,f . � � , . � . � � �j � � � � � �� � � I .. �E � 02I23/2006'1'�[114;41 FAI �oaaioa6 �EB-20-2008 t10N 09 � 32 A�! TAt�E1t�1ES'1' GROUP F'A�( I'!Q. 7807703E11 P, 02 /!%��� 30-07s Dar� Patnt Driv�, Su1M C2 . CaMNdr� Ciqr, CaliFomia 9n3+1 TAHOEMWEST �k�-riin�'�0-3303 t� psq no.96t 1 CROUP TaylatlFrage� 2020 C�o Det Rio North Suit+e 30Q San Die�o, Cs. 92108 . . •Feb. 20, 2006 Att�srtidn : ChrLn Dtmn Tt,�: P�Im Villago Aprs. Ravised sloped cei]iags ut livin� rooms per dra�vutga recelvod 10.I9-0S. Buildin�.�► � . l.Ivla�cni�1: 8-3.5 7C 11.8�5-13' LYL 4 S1,08$.00 242X12 -14' � S 3b2.00 64-ZX12-18' y 51,243.OQ 16-4X4-8' = S 124.00 LP-2X4�480' - S 150.00 12�X43/8" OSB STR-1= S 179.00 • Total= 53.14b.0� 7-3/49�. Tax- S ?�3.82 l S%nserlc-ua - S SOS•47 Mate�ial to�taal� 53,898.29 2.�MW Tmst revision (in plent) Tatal � 58,200.Op �-�'s �.�,,,,1. �: ' ���.'-L TotAl = i�9�38�9" $� 20A� � Froming wtth Wooc� Stee1 a Pride 02/23/2406 T�i114:41 FA� FEB-20-2006 MON 09 � 32 Att TANDEt'�1' GROUP 3.TWCi rolasai labor, ach uni� �i. Sct poat� aad LVL's — 2 ht�. P� Oi� l��ri ii� ��r�7 = 1 il[r C.X-tr� to framo 1Z� waU I.L.O. V' wnll � 2 ius. D. Gi�t RIt's — E. 3taok ItR'a � 2 hrs. a �. F. NGsa. s (drivor.au�•) " ?j� T� far 1 uait — 13 �na. X 8 unita � 104 h�s. Totals for Building,s A dc B %�. MeLe�li� a B. �Mw tn�ss �vvision � C. Labor a 104 �us. X S6S.00 per y Total � F(�X NQ. 7607703811 S 3�898.29 s$� S ¢.760,Q0 S�9e� l�, $'$.2�{ �404J008 �P, 03 42/23/2006 '!"�[I 14:4? FAI h�8-20-2U06 t]ON 09:32 Atl TANDE!'�1EST GROUP .. , Proposql To: JOHNNY COLOCCtA tANDE�A VYEST �oa�e ar a�rn or. s'r � a�th�ar+� G�ti: �t . ,_ � JMW TRUSS & GOMPON�NTS at�,A,r i�ss �,�e Dl�e. �k� Or 8t�1 itb aeti.a� abc c� saw � f�..�e cwwo� oRb�R 7�USS REPAII� co�rrno ro 4ccEu,t�r+c6 :♦ ; ,.t FAX 1�0. 760T703811 �oo�looa P. 04 r� �,� r je��os ���� �R+v ��w+ a�t r�s: eeuwtati p� � 14f7+Vl006 . �- . :'' . ►wa iroa►sstOl � �r� WOOb it00P Til�Bb �i .�,' � � ; I ; . PALM V1Ll.AG� APARTMENTS p.ue ae..rc asdwMopr� hous�,p . PJLLM p�a��, . . �n �t Y472lL.. �e.2oo �'� � � � d� �Y t• *�i � ,K ! �',' , . � V `•!;' . •�� �� �� �'r i �� � � � � � 1 ~D 1 �5 j . �� Ti�n� Ya%I ' � • r1ot.11�10Nsr ' JC TAk!'�.JOYMtlORWIlIY. HMW�}�.lTAf10�1'O OI1fOK11 , • Oi0l1q101� ' • . 77�{Af 7�Q OlAY MAlI0a6 TlIU�/{�►�1!'�n 4.00K.I1YJ:f Qili. Vllff�l e40CKt1. eqA/W 11{.00�d �p �OCK iVtil0iNi0Y01C AIO 11i110lR INtDCALL ,. �a . Y�1�IR�/1dD � y�i�a �:,� 1, . . TrN �frtf (t01�0� MN� f�ION 1lORf�IAML� �� �il� �JR.YIa# OMAIXATI�1�. OIM 111111D1� Pflli.�M► n�01V ONa AT TM� OR QiDqR 1'ON Ct�7't�1As MMTN NO CRAMJ�Io OI�CIf �OOOUIR. ��'OM 0�11'�A1. IIIVoIOt 7�W! AIN A{ A�0l�D sY AOCOIIMI'/10 c4MIfM�NY. /1110/ cluof! 1NY.D 1'�R �0 a111'b !'1�47� S►A�{C7' TO CH�UKI! 1M�AN YiAN R�VA1011R OR �Of11T10��. �i�t� GHAl10� 01� f 1�7i MIR MONTN Or't� TOT�L IIlY�O OOtT MLI. Nt WGR� ON Ati. o�l1t NDt TAlmf r0�s11rQ11 oRM�MN a� QAhs OR MOTIOt T1NT IM1*IML1� AYA�.A�[ 7q7R sf1�M�NC. A A or Ma nak a�qt wu auwe�ao iw �u. oMracs �TtMN�D Lfl�AD plt AIfY lId11DN M i1i PNiA1R�lAL MiiTUM1M ON I,IMOH i1fiY 1�IIR DRAMML Al1Y C11Al10li 111A: w1VRH110R1MNITT�I1A�RiWA6. PA.r.YY11AM1�M� '�:'•+ � CONTiiACT ACOR!"I'ANOt : • . � � • t1�nN �aMew 1r w��tq �M M hrn�raMt at� etm4w Aq, dMwK �►�M.► M M Ir M.... rn. ue�espmf s�.�. �s �er.uew.,n. pAo� quoN 1�r a. pwri�t u� IM� %1 / V�' �q w10! JAMr T�s aM OO�IM WMM If» M�d MT1n� 4r MW RICHAFiD D. W11BW�1 � Subniltl�a by us�e U�la • 02/23/2006 TflU 14:41 F�I FEB-20--2006 t10�1 09 � 33 Art TAt�E[14tEST Gl�OUP FAX t�0. 7607703811 /���'� 30�aTS Dah Iblm D�M. Sulb C2 Co�+�dml C�6 Gali(omb 9Z23, TA�1�pE�111/ES� �'°"° �'601 na3sx� � p� no-�i � i��* nMso GROUP Tayla/Fn,gcr 2020 Camino Del Rio No�fi Suitc 300 Saa Die�o, Ca. 92108 ra�. 20, 2oa6 Attorition : Chris Dunn Ro: Palm Village Ap�s. R,ovised slopod coilu�e st livia� moms per drawing,s roca�ved 10-�9-05. �uildi� C . � 1.Ma�driml: 8-3.5 X 11.875- � 3' LVT, = S 1�088.00 32-2X12 �14' = s 4$0.00 32 2X12 28' a 51,344.00 32-2X12-22' _ � 830.00 � 16-4X48' = S I24.Q0 L.['�frJ��'�'fOU� � � ISU.W LF-2X6- 1,056' = S 491.00 12-4X43/8" OSB STR 1= S 17'9-00 TotalY 54,686.00 7-3/4y6 Ta�c= S 363.17 15% marlc-�m = S 7S7•38 MatuiBI total= 55,806.55 2.JMW Tn�ss nwisicn (in pl�ant) Toal — 514,000.00 FT+-►�� ���...� c����r�_—. , ..�•�. TOtel � �}f,i�A+6A �y�pop � � �ao6roaa Q. o� Fr4miep with Wood Sf+�sl � Prlct� 02/23/2406 Tg[I 14:47 FAI F'�B-20-2008 MON 08 � 33 Afl TArIDEI�tES'l' GROUP 3.TWf� relatod labar, each uni� A. Sot posts an�d I.VL's = 2 tua. B. Set lc',d�CI aud t18n$C[9 = 1 hr. C.X-trs to �ama 12' wall •I.I,,.O. B' wall �- 2 hr3. D. G�rt 17R's = � 2 iva. E. Stack RR's � a hra. F. f:sme soffets dt cj. � 3 hrs. Ci. Misc. � (driver,super,) = 2 hr�• Tot�tl for l uait � l b hn. X 8 units a !28 tus, Tomis for BuiIdi� A dt B FAX N0. 7807703611 A. Mataial y $ 5,806.55 �`i 1Co.� 8. JMW � revision — ��6;f0�0A C. I.abor — 2 28 tua. X 565.00 per — S 8.37A.Q0 � . ToW � $ 38�6;iS 2$,Z�S� �oo7ioo8 P. 06 -� - `14:47 FAI �048I008 02/23/2406 TBU Q, aT ' �e-2o-2aoe rax oe � 33 A� TA�E�'�' �R�P F� �. 7807?038i i , . ��� �c/ �;� -�-�f�( i�l,��� � � � �� �^�'� JMW TRUSS � COMPbNEi�T8 �' � �s,nea.e. �r„or. aup.a�s G`M►wdr! C�ty, cA OR� Propos�t 70: J�HNNY C040CCW TANDEM WEST' 30876 O�b iyin Dr, JT? Caltl�seldC�i; C�14 COYIAfiT6D 70 �XCBLLBNCfL WOOD R40F T14U� �e. et�n.rx� . F7ELD FtEP111R PAL.M V{ LLAG E APARTM ENTS pakn p.art Ib.a.M.�opm.nt rlow�n� PALY D�$ERT. CA �?d6.. f14,00D � � i14,OW � � , J � tmnK Yeu. v�oa��t 0 rw�.e�vaa��t�w R.�rprq.�RNw !!q hY: DEU1{i1/0 DdrC ftl�JU'�06 � �� rr�o �►f��w � • t � � � . l � � ', . . � ' A� � � ��J�' • � j �� . •� /- • U'�' . ,. ✓'j , �Q . x r� ,�oe.rrn oes�vner, k�wase�.T�+m .Aaa� � Wo�.u�or�k • • � , 1Rw� 70 se�M MAM�C 111t4�ODNtaR�1.0CK t*UM 0« V�M'f!p ROOIt�. �HAI� �OCIla !Ro �LpcK, �T110NO�AAK.IVb U11AGq01111711iM{./ • TL'1�1! AI� � . 'i!!i liI110d11' (NN.N Nlt! IION 1�1./ DlTO�f Mq1� MOR TIItM� Q�ItA1A.AIK�IR � Mt�ICII!!0 �f �OO�fi hN� M'1i�s OR ORPiiI /O�1o11�T01Mf11� WRI! 110 tsTA�t.�1�Da�PrfACtqMf. I�OM OfR7a/N'r11O�ML� . MWOD� Y�RMi �pR Af ArlQlfdKA0001Mi:10 OOMR11�fL !'N0!'Auo1� YA�.D �I171 AAV'{� IMOc7e� �Ya!!lC:T'friC+lAtl��M�ONlLAK!lVIM(i1wORAdpRplM. �t'01111�Ci111MOA0l11aMHRndrTM ar tMs 70TAt Nv01Lm dOST tiYR(. ri y0�� ON 1q.L 011Dw11� NQTTAIi�I M�iirOM OI M171� a0 W1t7 0I NO�IQ�TNATWI7�IIMLINl�YAIIAMaPOK�l�IRqr A�AROPf�MMMpI[t71�IM�.L�Af�AflALLOMIlQIR � lS7�i�1� 1�PAD MORAIVY�ItA�ON 11f� 711f I�iAir01L N/11lSJTION ON 1�IIONTl�f IN� CIIIMI�L ANY �M�l� MI�T FI�IIC�'IYORIMlIfTiaNArrlIOVAI.. RO.�.Y111M►nryOOIM • CONTltA�CT ACCJp'TAXCi araw.oua�t w sM�IwR�e we..R... ln Iws�.. oo�s �lx�n. n,, , ���ru t�w.. w..... w r..Md q«.a.a �(1�_ T1n w�{rM1K �p►�at b(1n �Mul� M�1w �eh� pb br tlM 111NqM�� 1���! � N�� d MM� YMO MHr prwA�� aQfw�Nil! wM+ JYYY TiaiM aed OO�M�+00 WMh yw M�MO M1M1� 1M �It �10 eMl/I�M p�lllhyr tMI1Mf Ar SIIIr1�Ma11 �i�p � � o�o �o�•au�� �.eu�. u.x 0 0 c ri-�i�•�:� FRAGER w rwru)t C�.rwN+ or.r Gwwiss 19620 Ridp� Park Dr. Suk� 300 T�m�c�d�, CA �2592 TfUa: Rough Carpentry Changos Project: Palm Villago TO: Brye� Lynn Whks P�kn D�sert R�dw�bprtant Ap�nry 73-510 Fnd W�mp Driv� Pakn D�swt, CalYomh 92260 o�sedptlon: Provld� addklonal rouph carp�ntry p�r th� bnakdown Edow. OSf OODE CESCRIPi10N: 061000 Furt wiYnps in bnezwvays �t buYdirps A38 061000 Add door op�ninps io Anris�n �nd solar ebsets 061000 Ezbnd t�od s�ctb� for dow�spads 061000 Add �oflib �t rw patlos bufldirq C, Eo eovK roof„ d�ralns 061000 ���•t�( ( � ( ��C-_�__�T"'�f 951-2�6�892 �51-296-0893 SEIBCONTRACTCR Tand�m W�st T�nd�rn W�st T�ndwn W�st T.�a.�„ w«c Tandwn W�st COR NUMBER: 27 DATE: 2.5�1an-06 25920 llNFT PRlCE/U18T �� fOTllt. 1 k S1,E73.22 51,873.22 1 b 3850.25 3850.25 1 b 31,418.29 51,41a.29 � a s4a�.s� s�9.s� 1 M �i�:;d99!22 �:1�!! Subtotel OH & P 15.076 Totai Chanpe Amount EXCLUSIONS ! CLARIFlCATIONS: Nob th�t thb o�ly induda tlw rouph arp�nM Pation of ��ch of tlNs� chanp�s. Th�n wil b� �dditbnd oosb fa mo�t d this Ibrts from dMr tnd�s. Thls work shall oxtand tho contract tlme by: 0 Work Days Ovmer Contractor Bryco Whito, Palm Dosort Ch�is Dunn, Taylor Frapor Date i � llz�/�� ��c� � q O S32b-� JAN-25-2006 WED 11�07 A11 TANDEI4WEST GROUP FAX N0. 7607703611 PROPOSM.-ROUGH FR/WING TANDEM WEST GROUP �ea.ra� cooaaator . Llao�s N7772.io . ]0875 DATE tALM DRIVR CA771xDR�l. Ci'I'Y CA. 92134 Pbone� (760) 770�303 �as: (760) T/0-3639 �t�bmitted b �f+ess ky, 3tate, Zfp ►abs of Plana TAYLOR/FRAGER I u os�e f�hone JoD Nam� Job 4.ocadon PROPOSED CHANQES AND EXTRA WORK AT PALY VILLAGE APTS. FURR CEILIN0.S IN BREEZEWAYS AT BLDGS. A 3� B. MA7ERIAL =1,200 LF. 2xs LABpR � 2 MEN , 10 NR3. EACH 2b,lAn-08 PA�M VILLACiE APTS. TOT/1L� REM �'1 7�TiC�61GNL�A_T SOFF�T AND CEIUNOS FOR PROPOSED 8TUCC0 SYS7EM,S1'UCCO CONTRACTOR3 sCAFFOLDINO�a�eE-H�EQLO lN3TALL BACKlNG. _ __ MATERIAL =1,700 i�r�ot � A�AR+�4�tN . BO HR3. EACH � ADD D�OR OPENINO3,(5), TO FIRERISERS AND 90LAR CLOSETS. MATERIAL= Z16 L.F. Zx�1 LABOR =1 NIAN, 8.S HRS. TOTAL, ITEM �Z TOTAL, ITE1A R1 � EXTEND ROOF SECTION FOR DOWNSPOU7S, BLaGS. A d� B AAA7ERU1l. = 60 LF. 2x4, 4-4x8-3/8" PI.Y IABOR � 1 MAN, 24 HRS. TOTAL� REM �4 I ADD SOFFETS AT REAR PAT10S , BLDG. C, TO COVER ROOF.ORAIN PIP�S. MATERwI. = 32 LF, 2Xa,2�4x8-'In" PLY LABOR � 1 MAN 8 HRS. Y07AL., I'�IM w6 11 materlal !s �uarenteed to be as apedfled. A!I work � b� complsted in woctcrnanlik� mennsr Aocading to tandard pracdces. Extre werlc ordera aro nequirod for II dovtatlons to oripinal spedflcaUons. �P� gY � Authoris�d SipMlium: , Proposal �ood for. ,.' . l /'� P, 02 tna.zz s�,�ov.00 i1.873.22 , .00 S3i32•75 s4s7.'SO i�O.ZS s98.28 s1,320.00 i1 �413.20 s4e.s7 5440.00 i4s8.67 7 DAYS ,