HomeMy WebLinkAboutSR - R25590 - PHII La Spiga Civil ImprvmntsPALM DESERT REDEVELOPMENT AGENCY
STAFF REPORT
REQUEST: AUTHORIZE AWARD OF CONTRACT NO. R25590 TO JACOBSSON
ENGINEERING CONSTRUCTION, INC. FOR CONSTRUCTION OF THE
LA SPIGA (PHASE TWO) CIVIL IMPROVEMENTS AT ENTRADA DEL
PASEO
SUBMITTED BY: MISSY WIGHTMAN, PROJECT COORDINATOR
CONTRACTOR: JACOBSSON ENGINEERING CONSTRUCTION, INC.
P.O. BOX 14430
PALM DESERT, CA 92255-4430
DATE: NOVEMBER 16, 2006
CONTENTS: CONTRACT NO. R25590
Recommendation:
By Minute Motion, that the Agency Board:
(1) Authorize the award of Contract No. R25590 in the amount of
$695,584.80 to Jacobsson Engineering Construction, Inc. for the
construction of the La Spiga (Phase Two) Civil Improvements at the
Entrada del Paseo;
(2) Authorize the Finance Director to set aside the amount of $69,560 as
10% contingency (use of contingency requires additional action).
Funds are available in Account No. 850-4358-433-4001.
Executive Summary:
Approval of the staff recommendation will allow construction to begin on the La Spiga (Phase
Two) Civil Improvements at Entrada del Paseo. This will allow for construction of a new building
pad for the La Spiga restaurant and development of the westernmost portion of land on the
Entrada Del Paseo site. After the La Spiga restaurant construction is complete, there will be one
remaining undeveloped portion of land.
Discussion:
The La Spiga Civil Improvements project at Entrada del Paseo has received approvals from the
appropriate committees, internal departments, and outside agencies. The work to be
accomplished consists of the civil improvements necessary to fulfill obligations under the La
Spiga Disposition and Development Agreement (DDA) to provide a finished building pad, street
improvements, parking, parking lot lighting, and utilities. Additionally, the civil work in this
Staff Report
Authorize Award of Contract No. R25590 to () for Construction of the La Spiga (Phase
Two) Civil Improvements at Entrada Del Paseo
Page 2 of 2
November 16, 2006
project improves the undeveloped site that lies in the westernmost portion of land on the
Entrada Del Paseo site.
On August 24, 2006, the Agency Board authorized the City Clerk to advertise and call for bids
for the La Spiga Civil Improvements at Entrada del Paseo. The advertisement for bids was
published in the Desert Sun. Bids were submitted by six contractors and were publicly opened
on November 3, 2006. The following summarizes the bid results:
Jacobsson Engineering Construction, Inc. (Palm Desert) $ 695,584.80
Dateland Construction, Inc. (Coachella) $ 837,316.20
Cora Constructors, Inc. (Palm Desert) $ 881,179.00
Alliance Streetworks (Anaheim) $ 988,142.00
Mocon Corporation (Indio) $1,292,938.30
Zondiros Corp. (Torrance) $1,331,778.60
Low bid for the construction of the La Spiga (Phase Two) Civil Improvements was submitted by
Jacobsson Engineering Construction, Inc. of Palm Desert, California, in the amount of
$695,584.80. Staff has reviewed the bid and bid documents and found them to be in order.
Accordingly, staff requests authorization of award of Contract No. R-25590 to Jacobsson
Engineering Construction, Inc for construction of the La Spiga (Phase Two) Civil Improvements
at Entrada Del Paseo.
Submitted by:
4AZL;L��
Missy Wightmo
Project Co inator
ApprovaI
Carlos L
Department Head:
/?T,
Dave Yrigoy `J
Director of Redevelopment/Housing
OAU)Z/A"�-
ent Paul S. Gibson, Director of Finance
()1Kd BY RDA
ON I k A ID_ G(p
VERIFIED BY
Original on file with City CJwk's Office
G:\RDAWelissa Wightman\La Spiga\QvAStatl Report- Award Construction.doc
CONTRACT NO. R25590
AGREEMENT
THIS AGREEMENT is made and entered into this 16t" day of November 16,
2006, by and between the Palm Desert Redevelopment Agency of Palm Desert,
California, hereafter called "OWNER," and Jacobsson Engineering Construction, Inc.,
hereinafter called "CONTRACTOR."
WITNESSETH
RECITALS:
CONTRACTOR has submitted to OWNER its CONTRACTOR's Proposal for the
construction of OWNER Project,
1. PHASE TWO CIVIL IMPROVEMENTS AT ENTRADA DEL PASEO PROJECT
NO. 967-06, CONTRACT NO. R25590 in strict accordance with the Contract
Documents identified below and OWNER has accepted said Proposal.
2. CONTRACTOR states that it has re-examined its CONTRACTOR's Proposal and
found it to be correct, has ascertained that its subcontractors are properly licensed and
possess the requisite skill and forces, has examined the site and Contract in
accordance with the Contract Documents for the money set forth in its Proposal to be
paid as provided in the Contract Documents.
AGREEMENT:
IT IS AGREED BY THE PARTIES AS FOLLOWS:
1. Contract Documents: The entire contract consists of the following: (a) The
Agreement; (b) The Notice Inviting Bids; (c) The Instruction to Bidders; (d) The
CONTRACTOR's Proposal; (e) The Bidder's Bond; (f) The Performance Bond;
(g) The Payment Bond; (h) The General Conditions; (i) The Special Provisions;
(j) The Standard Specifications as modified in other portions of the Contract
Documents; (k) The Plans; (1) Addenda Nos. 1, 2 and 3; (m) The Determination
of Prevailing Wage Rates for Public Work; (n) Any Change Orders issued; (o)
Any additional or supplemental specifications, notices, instructions and drawings
issued in accordance with the provisions of the Contract Documents. All of said
Documents presently in existence are by this reference incorporated herein as if
here set forth in full and upon the proper issuance of their documents they shall
likewise be deemed incorporated.
J-1
CONTRACT NO. R25590
2. CONTRACTOR shall commence the work within ten calendar days after the date
of the Notice to Proceed and will do all things necessary to construct the work
generally described in Recital No. 1 in accordance with the Contract Documents
and will complete said work for the on -site improvements within ONE HUNDRED
THIRTY FIVE (135) calendar days from the Notice to Proceed date to the
satisfaction of the OWNER's REPRESENTATIVE. Contractor shall also
complete grading of the future restaurant pad and restaurant lot, including
backfill, (if required), compaction and pad certification within THIRTY (30)
calendar days from the Notice to Proceed date to the satisfaction of the
OWNER's REPRESENTATIVE.
3. Contractor agrees to indemnify, defend and save OWNER and its officers,
agents and employees, and the ENGINEER harmless from:
a) Any and all liability, claims, damages, losses or injuries to any person or other
entity, including injury to Contractor's employees, and all claims which arise
from or are connected with negligent performance of or failure to perform the
work or other obligations of this Agreement, or which are caused or which are
claimed to be caused by the negligent or intentional acts or omissions of
Contractor, its subcontractors, its agents or employees, and, all expenses of
investigating and defending against same.
b) Any and all liability, claims, damages, losses or injuries to any and all
contractors, subcontractors, material -men, laborers, or any other person, firm
or corporation furnishing or supplying work, services, materials or supplies in
connection with the performance of the Agreement.
Attention is directed to the General Specifications pages GS-25, through GS-30,
which specifications are made part of this Agreement as set forth in Agreement
paragraph 1, above.
4. Attention is directed to Section 6-9, "Liquidated Damages" of the Standard
Specifications and is hereby amended to substitute the Palm Desert
Redevelopment Agency in place of the Agency. Liquidated damages shall be
$1,000.00 dollars per calendar day of delay, for each of the two milestones
described in paragraph 2, above.
5. Should any litigation or arbitration be commenced between the parties
concerning the works of improvements as referenced herein, the prevailing party
in any such litigation, being the OWNER or the CONTRACTOR, should be
entitled to a reasonable sum for attorney's fees incurred in any such litigation
relating to this Contract.
6. This Agreement shall be binding upon all parties hereto and their respective
heirs, executors, administrators, successors, and assigns.
J-2
CONTRACT NO. R25590
7. CONTRACTOR shall be paid in the manner set forth in the Contract Documents
the amount of its proposal as accepted by OWNER, subject to such additions
and deductions as may be made pursuant to the Contact Documents and
applicable law.
8. Execution of the Agreement by the parties constitutes their agreement to abide
by all applicable provisions of the California Labor Code; constitutes
CONTRACTOR's certification that he is aware of the provisions of said Code and
will comply with them; and further constitutes CONTRACTOR's certification as
follows:
1 am aware of the provisions of Section 3700 of the California
Labor Code which requires every employer to be insured against
liability for worker's compensation or to undertake self insurance
in accordance with the provisions of that Code, and I will comply
with such provisions before commencing the performance of the
work of this contract."
IN WITNESS WHEREOF the parties hereto have executed or caused to be
executed by their duly authorized officials, this Agreement which shall be deemed an
original on the date first above written.
PALM DESERT REDEVELOPMENT
AGENCY
By
Jim Ferguson, Chairman
ATTEST:
Rachelle D. Klassen
Approved as to Form:
Dave Erwin, City Attorney
JACOBSSON ENGINEERING
CONSTRUCTION, INC. (signature to be
notarized)
Name, Title
ATTEST:
J-3
State of California
) SS.
County of }
On , before me,
a Notary Public, personally appeared
, personally known to me (or proved to me on the basis of satisfactory
evidence) to be the person(s) whose name(s) is/are subscribed to the within
instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the
instrument the person(s), or the entity upon behalf of which the person(s) acted,
executed the instrument.
WITNESS my hand and official seal.
Signature
DESCRIPTION OF ATTACHED DOCUMENT:
(TITLE OR TYPE OF DOCUMENT)
(NUMBER OF PAGES)
(DATE OF DOCUMENT)
(SIGNER(S) OTHER THAN NAMED ABOVE)
(seal)
Right Thumbprint of Signer
(Optional)
PALM DESERT REDEVELOPMENT AGENCY
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT WHEREAS, the Palm Desert Redevelopment Agency (sometimes referred to
hereinafter as "Obligee") has awarded to Jacobsson Engineering Construction, Inc.
(hereinafter designated as the "CONTRACTOR"), an agreement dated November 16,
2006 described as follows: PHASE TWO CIVIL IMPROVEMENTS AT ENTRADA
DEL PASEO, PROJECT NO. 967-06, CONTRACT NO. R25590, (hereinafter referred
to as the "Contract"); and
WHEREAS, said CONTRACTOR is required to furnish a bond in connection with said
Contract, and pursuant to Section 3247 of the California Civil Code;
NOW, THEREFORE, we, Jacobsson EngineerinQ Construction, Inc., the undersigned
CONTRACTOR, as Principal, and a corporation
organized and existing under the laws of the State of , and duly
authorized to transact business under the laws of the State of California, as Surety, are held
and firmly bound unto the Palm Desert Redevelopment Agency and to any and all persons,
companies or corporations entitled to file stop notices under Section 3181 of the California
Civil Code, in the sum of Six Hundred Ninety -Five Thousand Five -Hundred Eighty -Four
and 80/100 Dollars ($695,584.80), said sum being not less than one hundred percent
(100%) of the total amount payable by the said Obligee under the terms of the said
Contract, for which payment well and truly to be made, we bind ourselves, our heirs,
executors and administrators, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said CONTRACTOR, his or
its heirs, executors, administrators, successors or assigns, or Subcontractors, shall fail to
pay for any materials, provisions or other supplies, implements, machinery or power used
in, upon, for or about the performance of the Public Work contracted to be done, or to pay
any person for any work or labor of any kind, or for bestowing skills or other necessary
services thereon, or for amounts due under the Unemployment Insurance Code with
respect to such work or labor, or for any amounts required to be deducted, withheld, and
paid over to the Employment Development Department from the wages of employees of
said CONTRACTOR and his or its Subcontractors pursuant to Section 13020 of the
Unemployment Insurance Code with respect to such work and labor as required by the
provisions of Section 3247 through 3252 of the Civil Code, or for any amounts required to
be deducted, withheld, and paid over to the Franchise Tax Board or Internal Revenue
Service from the wages of employees of the CONTRACTOR or his or its Subcontractors,
the Surety or Sureties hereon will pay for the same in an amount not exceeding the sum
specified in this bond, otherwise the above obligation shall be void. In addition to the
provisions herein above, it is agreed that this bond will inure to the benefit of any and all
persons, companies and corporations entitled to serve stop notices under Section 3181 of
the Civil Code, so as to give a right of action to them or their assigns in any suit brought
upon this bond.
ON
Ci:\RDA\Mclissa Wightman\La Spiga\CivilThase 2 Bid Specifications Am
The Surety, for value received, hereby stipulates and agrees that no change, extension of
time, alteration or addition to the terms of the said Contract or to the work to be performed
thereunder or the Specifications accompanying the same shall in any way affect its
obligations on this bond, and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Contract or to the Specifications.
No final settlement between the Obligee and the CONTRACTOR hereunder shall abridge
the right of any beneficiary hereunder, whose claim may be unsatisfied.
CONTRACTOR and Surety agree that if the Obligee is required to engage the services of
an attorney in connection with the enforcement of the bond, each shall pay Obligee's
reasonable attorney's fees incurred, with or without suit, in addition to the above sum.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this day
of , 20
PRINCIPAL/CONTRACTOR: SURETY:
Jacobsson Engineering Construction, Inc. (Typed Name of Surety)
By: By:
(Signature)
(Typed Name and Title)
The rate of premium on this bond is
The total amount of premium charged: $
(the above must be filled in by corporate surety).
(Signature of Attorney -in -Fact)
(Typed Name of Attorney -in -Fact)
per thousand.
IMPORTANT: Surety companies executing bonds must possess a certificate of authority
from the California Insurance Commissioner authorizing them to write surety insurance
defined in Section 105 of the California Insurance Code, and if the work or project is
financed, in whole or in part, with federal, grant or loan funds, it must also appear on the
Treasury Department's most current list (Circular 570 as amended). THIS IS A
REQUIRED FORM.
Any claims under this bond may be addressed to:
(Name, Address and Telephone No. of Surety)
(Name, Address and Telephone No. of agent
or representative for service of process in
California if different from above)
M-2
GARDAWelissa Wightman\La Spiga\CiviRPhase 2 Bid Specifications.doc
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
That whereas the Palm Desert Redevelopment Agency has awarded to Jacobsson
EnQineerinp- Construction, Inc. after designated as the "Principal," a contract for: PHASE
TWO CIVIL IMPROVEMENTS AT ENTRADA DEL PASEO, PROJECT NO.967-
06, CONTRACT NO. R25590.
WHEREAS, said Principal is required under the terms of said contract to furnish a good
and sufficient bond for the performance of said contract:
NOW THEREFORE, WE, the Principal, and
as Surety, are held and firmly bound unto the Palm Desert Redevelopment Agency
hereinafter called the OWNER, in the penal sum of Six Hundred Ninety -Five Thousand
Five -Hundred Eighty -Four and 80/100 Dollars ($695.584.80), being 100% of the contract
amount in lawful money of the United States of America for the payment of which sum
well and truly to be made, we hereby bind ourselves, our heirs, executors, administrators,
and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounded
Principal, his executors, heirs, administrators, and successors, or assigns, shall in all things
stand to and abide by, and well and truly keep and perform the covenants and agreements
in the said contract and any alterations thereof made as therein provided, on his or their
part, to be kept and performed at the time and in the manner therein specified, and in all
respects according to their true intent and meaning, and shall indemnify and save harmless
the OWNER, its officers and agents, as therein stipulated, then this obligation shall
become null and void; otherwise, it shall be and remain in full force and virtue.
And the said Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration or addition to terms of the contract or to the work to be
performed thereunder or the specifications accompanying the same shall in any wise affect
its obligations on this bond, and it does hereby waive notice of any such change, extension
of time, alterations or additions to the terms of the contract or to the work or the
specifications.
Should it become necessary for the OWNER to institute a lawsuit or any other legal
proceeding to enforce the terms and conditions of this bond, then all costs of said
proceeding, including attorneys' fees, shall be awarded to the prevailing party.
N-1
GARDAWelissa Wightman\La Spiga\C'ivilftase 2 Bid Specifications.doc
IN WITNESS WHEREOF, identical counterparts of this instrument, each of which shall
for all purposes be deemed an original thereof, have been duly executed by the Principal
and Surety above named, on this day of
2006.
SURETY
C'3'A
INSURANCE COMPANY and/or AGENT
ADDRESS
TELEPHONE NUMBER
N-2
PRINCIPAL
M.
6ARDAWelissa WightmanIz Spiga\Civil\Phasc 2 Bid Spec ifications.doc