HomeMy WebLinkAboutSR - R21780 - CO7 - Palm Village AptsPALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 7 TO APPROVE CHANGE ORDER REQUESTS (COR) FROM TAYLOR FRAGER, INC. (CONTRACT NO. R21780) IN THE CUMULATIVE AMOUNT OF $42,146.00 WITH TEN (10) ADDITIONAL DAYS TO THE CONTRACT TIME FOR THE CONSTRUCTION OF PALM VILLAGE APARTMENTS SUBMITTED BY: BRYCE LYNN WHITE, PROJECT ADMINISTRATOR CONTRACTOR: TAYLOR FRAGER, INC. 43620 RIDGE PARK DR., SUITE 300 TEMECULA, CA 92590 DATE: APRIL 12, 2007 CONTENTS: CONSTRUCTION CHANGE ORDER NO. 7 TO CONTRACT R21780 CHANGE ORDER REQUESTS (COR NOS. 24REV1, 64R, 94, 87, 89R, 91, 93, 95, 92) Recommendation: By Minute Motion, that the Agency Board: Approve Construction Change Order No. 7 to approve Change Order Requests (COR) from Taylor Frager, Inc. (Contract No. R21780) in the cumulative amount of $42,146.00 with ten (10) additional workdays to the contract time for the construction of Palm Village Apartments; and 2. Authorize appropriation of $42,146.00 to Account No. 870-4349-433-4001 from Agency's unobligated funds. Executive Summary: Change Order No. 7 for the Palm Village Apartments is for recommended enhancements, minor field changes, and costs for extended general conditions. These changes have been reviewed and recommended by Harris & Associates who is the consulting professional construction manager for this project. The total cost of all change order work for this project attributable to deficiencies in the plans is 4.9% of the contract amount, which is within industry standards. The balance of the change order work for this project is in support of the Estonia Protocol to increase energy efficiency and has resulted in exceeding the Title 24 energy efficiency requirements by 17%. Discussion: On April 15, 2005, the Notice to Proceed was issued for Contract No. R21780 to Taylor Frager, Inc., for construction of the 36-unit Palm Village Apartments in the amount of $5,839,386. The Staff Report Approve Construction Change Order No. 7 to Contract No. R21780 (Taylor Frager, Inc.) Page 2 of 2 April 12, 2007 City of Palm Desert has received $600,000 in HOME funds towards the construction of this project. This recommended change order includes enhancements and necessary modifications to the contract. Enhancements in this subject change order include increasing the energy efficiency in support of the Estonia Protocol. Exterior rigid insulation was added that resulted in additional costs for metal lathe ($5,718), and required modification of the handrail installations ($5,058), with no additional workdays associated with COR Numbers 24REV1 and 64R. Corrections were required to comply with ADA requirements for accessibility. These included additional ceramic tile at the first floor front doorways ($5,558), and at the patio doorways ($2,236) to allow the height of the thresholds to not exceed ADA requirements. The slope at the walkways to the entries and staircase landings required leveling to not exceed ADA slope requirements ($4,770). The additional contract time associated with COR Numbers 94, 87, and 89 is ten (10) additional workdays. Miscellaneous corrections and revisions include the following: Repair of drywall for relocated bathroom light outlets to accommodate mirrors ($2,732); substitution of toilets on second floor to allow doors to swing unrestricted ($1,242); additional backsplashes for ranges to complete countertops ($365); and installation of handrail at trellis area for safety ($805). There were no additional workdays associated with these COR Numbers 91, 93, 95, and 91. This change order also contains $13,662 for additional overhead and extended general conditions costs associated with the ten (10) additional workdays in this change order. Harris & Associates has verified the subject amount is an appropriate cost for the extended general conditions. Payment of funds for extended general conditions does not waive any terms of the Contract Documents or the Agency's right to collect Liquidated Damages specified therein. Submitted by: D B e n Whi . Project Administrator Approval: J i McCarthy CM edevelopme Carlos L. Ort , Executive Director rD BY RDA ON `C-I a —C,'i artin Alvarez, Redevelopment Manager Department Head: `have Yrigo Director o eve Paul VERIFIED BY K-1 (Gf Original on file with City Clerk's Office G\rda\Maria Hunt\WPDATA\HOUSING\WHITE\stfrpts1041207CO7Taylor rager.doc opment/Housing j rl- co OD 00 N 6 O O j/ a t` O N 0 U -. CV) C)N / C ` U — N m CA (N 0O N C O et Lo M N Ue / O t6 U Z Um 7 z U)O (D (D (h O — N O N U. CO= c� c=F- N CO M ;.� SO/MN m OF-U N c+) O C f_9 O 0) M C- O �- N ` U �M M O c •C O it 0) % In q 2N Z 1O tt VN• 0 CN a 33 F p� cp q a� 0 Q 0 z m� Q o U O% U OD 0 O O O O co O 7 O % m OR r` Oo ao Op m a0 00 M% 0MN�[O-0i O 7 LLn U O co m LC) O O M L6 In Z Oo j N O O N �t U) co L C Lf) T (D (A (O CO (D (D (D (D 0 -0-0 o o Z j m v r• LO r- LO LO p OR Un �n N M (fl (o Oo U / o 04 cri o o .- W j O C7 j -. Oo 1- LO O O O Cl O LL / C OO 00 O O 0 O O co O O 1� �(i ui N 6 (O C)` N OD coM � J / � M co No) . O E - p (O a) 0) r" O qT It N N I� U j O F- C U Z E v, U ° c O uv (, � M c .o c v7 (p C m H C O c '—' O p a ±— d) Q C O aaci (n oaoow'm� 0Eco� U) c E s°-C a) r, c-50 a) } m m O a u) Q u ? U m r- Q m U U U N U O U O` c U X Z N c C O c U C O V .0 C C O U LU '2 .9 O r .0 d .� N CO) Ln > a) .N LL Z O V U tt= m .V O U C M O U c 4 1 U o 4 O m N O Z Z C >. C >, a)>. 47 >, E C C >, O 00 m 2) ,O 2 ,C 2) CO PS r O O N 2)-- U U V c U c N c N c C 0 0 0 a) c U J J N w N: N N N L E C E O N C Z Z tmn O y ui 0 O tOn N U� O c y C (n Q f0 (t! C M C V U O Co [l J C� C7 `) Q1 N c s N U .- N U FQ- �� p L) c c� n u m v m c .N m () O OOF- m G aE aW 82a s E F- U PALM DESERT REDEVELOPMENT AGENCY Contract # / P.O. # I R21780 12193 Change Order No. I 7 CONSTRUCTION CHANGE ORDER Contingency: I YES I NO x Contract Purpose Construct Palm Village Apartments Account No. 870-4349-433-4001 Consultant's Name Taylor Frager, Inc. Project No. Address: 43620 Ridge Park Drive, Suite 300 vendor No. 8553 Temecula, CA 92590 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE (Supplemental Plans, Specifications, and Directives dated Attached) In Contract Price In Contract Price Change Order Requests 24REV1, 64R, 94, 87, 89R, 91, 93, 95, 92 42,146.00 TOTALS: - 42,146.00 NET CHANGE IN CONTRACT PRICE: 42,146.00 JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 6,565,527.80 CONTINGENCY: Less: Expend. & Encumb. To Date: - 6,565,527.80 Amount Approved by Board: + 583,938.60 Less: This Change Order Amount: - 42,146.00 Less: Prior Change Order(s): - 583,938.60 BALANCE OF BUDGET Less: This Change Order: - REMAINING FOR PROJECT: (42,146.00) Balance Remaining of Contingency: - The amount of the Contract will be Increased by the Sum of: Forty-two Thousand One Hundred Forty-six and no/100 Dollars ($42,146.00). W \Agenda Items\2007-Apr 12\CO 7 to Contract R21780\CO7 Form doc See reverse Contract R21780 Change Order No. 7 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the Palm Desert Redevelopment Agency, otherwise referred to as Owner. Contract Time Extension 10 Days. Revised Contract Total $ 6,565,527.80 The undersigned Contractor approves the foregoing Change Order # 7 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order # 7 . The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: CERTIFIED FUNDS AVAILABLE: EXECUTIVE DIRECTOR FINANCE DIRECTOR NOTE: No payments will be made prior to Executive Director and Agency Board approval 2. ACCEPTED BY: CONTRACTOR Date Accepted 4. APPROVED BY: 4/12/07 RICHARD S. KELLY, CHAIRMAN Date Approved 4/12/07 SECRETARY Date Approved W \Agenda Items\2007-Apr 12\CO 7 to Contract R21780\CO7 Form doc See reverse ATAYLOR Cb,uhu[/bn Group CampanV 43620 Ridge Park Dr. 951-296.9892 CDR NUMBER: 24 REV1 Suite 300 951.296.9893 Temecula, CA 92592 Title: Special Order J-Metal for modified stucco system DATE: 21•Feb-06 Project: Palm Village 26920 TO: Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, California 92260 Description: Provide special order J-Motal for modified stucco system CSI CODE DESCRIPTION SUBCONTRACTOR UNIT PRICE/ LINE UNIT TOTAL 092100 Original J-Mold w/o weep holes Bldgs A,B,C Inland Plaster 6,995 LF -$0.08 -$559.60 092100 J-Mold included in original CO w/o weep holes Inland Plaster 6,995 LF -s1.00 -$6,995.00 092100 Special order 1 518" J-Mold We weep holes Inland Plaster 6,995 LF $1.42 $9,932.90 092100 Original J-Mold w/ weal holes Bldgs A,B,C Inland Plaster 5,460 LF -$0.055 -$300.30 092100 J-Mold Included in odginal CO w/weep holes Inland Plaster 5,460 LF 40.60 -$3,276.00 092100 Special order 1 5/8" J-Mold w/ weep holes Inland Plaster 5.460 LF $1.13 $6.169.80 Subtotal OH&P Total Change Amount EXCLUSIONS / CLARIFICATIONS: This work shall extend the contract time by: Owner Bryce White, Palm Desert 0 Work Days Contractor Chris Dunn, Taylor Prager Date Date 15.0% $4.971.80 $745.77 $5,718.00 ,03,/19/2007 11:51 17606379487 HARRIS R MIRAGE PAGE 03 03/16/2007 FRI 11:31 FAX @002/003 aert'®J�R.4�LR AIAIW R fA�Mn.nIM fXvnr iLnfr'Ih 40Ct9 PJOO Peek at. SWIM Temaeuta CA 92M 'rile; Add T'11e at Entry Doers Project: Palm Village TO: K,tai y HntY A 7Ar4wiatC4 01 mMIyfIm1Sed10 VmOi00et AddTR at FrOtd Enby Doom 941-UMOS 951,M-9893 COR NUMBER: 04 DATE; t6.Men07 25920 ... ............... .. ....... .....P::::l:!'::!.. .....: r:::................................. 511000H70AGSDif.: ........ :.._......p; ::.�!;......I:..: .. .. ::....�.�.....�.��..:....�....: �:'i::i::ii.isisi::::::�::iiiiiuiPPIGEI'NP%l,.i:I::i:I:ti ifO3XL 090200 1.Add1twlaittwet220O1b(ee9tep9t Wtw«n MOM 22 Ums f 9a.ar f 2AXA2 ownsrmdednirsov) 2.Add 1 wtibc Ot 14 unds (Owimrp@p tbilaaat) Me)ee0e 14 untie a 193.31 f 2,70024 Subtotal OH aP Tate! Ckmga Aamunt SXCtd218N11C ARIF"Tk NAt This werkshell extend the corrtreat time by (2) Wark D" bwnses RepressMetive Kum bray, owne rucdon Meneper 0 f 4.032.AG 13.0% f 72423 OanMMw Mike Kuhba. Tdzf; dr .r".y osier f s.33a00 nit 1wZUU1 if:dn I IbUtSd 174t3 t HARRIS R MIRAGE PAGE 03 01/02/2007 RT 15:36 FAI boma A'ON-01AFRAGER AmtIOR.mw:•MIw fI O:� MW WAg- F4* Of. $Ulm WO T*Mvcufa.CA929Q TWO; role at Patio Doors an tat Floor Units prolom Palm Village To, Kulk mw DeficApdont rd9otpooDmWent"Ficocurdto 951-MAM 951054m COR NUMISFR' 27 DATE: 2-la"? . 26M ...... ... .g ..... . ..... .... ....... ...... . ....................... .... . &Wc* Add Fourift-XIVUWA et Pam dmusen IstOwUnks M*66C T&B 1 b Subbbd OH&P Tatel Change Amount mmusioNs I cLANFIcAlIONS: This W*M Shedl Mdend the amWadt Oms by,K'Vomrk bwe owner's ftpre2mme" Kurt Gray, Coaradm3flon manager Date $ 1,944.00 15.0% $ 291.60 J Cmom �5 a $ 2".00 09/14/2006 TO 11:03 FAI 0002/000 43020 Rides Pak bf. "I Ins aw 3,9.300 481+200d093 Temectft CA 02M Tide: Stucco Repairs at Handrails Project. Palm Village To: aryfeLvm Wnm Pain tmaed RedwrolspmsM AOsf rcy 73510 CFeed W dCrimOisrva Pals c2ZW Subtotal OH&F ITotd Chaigs Amount EXCLUSIONS I CLARIFICAMONS: This work shall extond'tho contract time by (0) Work Days Owner Bryeo WhRo, Palm Gosart Date COR NUMBER: m DATE: 14Sep-06 26620 s. S 4�itri.00 28.096 S 738.05 MkCtT" U11bFreOar � Gaff $ 5,643 08 a$ DS4S D� 01/22/2007 09:02 17608379487 HARRIS R MIRAGE PAGE 05 uViu/caul FRI 9:h4 i�'Sb �000i000 w,xv,.oleArM."w•raw o COR NUMBER, a 6184B R{OggPaMer. 861.'t�4BBS 8pa4S� 88938gigaB ZUnast�x CAg� Tills; Smiling compound a Decking at Ehb7sa of Building "C" DATE: 19Jan4T ' Pmjaet: Paton Village ��20 Te: nutow• HepkaAwod7.irs _ PaYn On�M ptttfanit6 i . �aamplkm Sloping antppaand&Doc" at Polo* ofedwing Iw �..... ... .... .._r..a3R:n:ui:n.9:..�..�.. ............n.......U. u..,am:r.:r:c::...,rl...:....:....�..;...__... ri... Ir:I;: ..AaJi•1..�-. nr"-.: •• ._._. v":In.ii:,,,•"i. •'•CSIY100E'.. __................I:L:i:i.W�'� 7 , t � �.._._... .cc:.aa� _ .iti�ioc••:o:v. 4^::I:::CI..............._.^..:..._�..�................:L:.i1¢::pm:Cin:.�.,..�....a:"ptiii.9•:.i•:i.............__...._....I:p:::N:p:::.. �.. q.... ......._.::J�r.. '�i�..':: 07g00 m*Q cenpau" a omxog at Blowala:aft V. WMa I Le $4,141= 9 4,148.110 eubvw OHBP Total ChIN JOAmaa:t EKOWO)O IMARRlaMiMM: This wont4hYt wtt4SA tM t'caVaattlnr by wgok OWear.R&Prft"O#" tsJ Kul Wa�l.OetrtWrilat Man*Ha* Kuaba,TCo 4.""a a 4'""D 02/06/2007 TUE 10:44 FAX 9002/004 m - .FRa0J5n AYAY.9 Lbv .. Rrvvv Cb— 43620 Ridge Park Dr. Suko 300 Temecula, CA 92500 Title: Patch Drywall at Raised Vanity Lights Project: Palm Village To: Kurt Cray Hams A Ar4' OCIe1N3 74-333 Highway 111,S00e 101 Palm Desert, CalifoMa 02260 Description: Patch d"ll at rahsd vanity lights Subtotal OHSP ITetal Change Amount EXCLUSIONS / CLARIRCA7IONS: 951.296-9895 051-2868893 This work shall extend the contract time by (0) Wort Days Owner's Representative Bryce L, White, Contract Administrator feyy T-6 Date COR NUMBER: 91 DATE: 6-Feb-07 25920 $ 2,376.00 16.0% $ 356.40 $ 2,782,00 , Contractor Kubba, Taylc r r PQ2/14/2007 15:48 17608379487 02/14/2007 WED 9:16 FAX HARRIS R MIRAGE PAGE 02 &AMA.0 "-PRAGER 43020FddaGPWk0r, 901.004M sufla = "1.2sOOM TeffWW;4CA9=0 Vile: Roplace, 2nd Plaor Tolle* Field Directlyoola Project; Patin Vn1W To: AAOMY MIMAAs W" 74-M9 HOW 111. SPRO 101 PRIM bmrk Calfamw am COR NUMBER: 93 DATE "Ghla? 25920 IO9gOdpdom . . .. ..... . ...... ........ I ..... ... ... ww;b-o-ft-m ..... ..... .... . ......... ...... ...... .. ......... I90400 KQMm ElOvWed TdhW %MRXWTmNMm Crmg IaOmff for O)dTaW 94YU M1croneal T"WrIaly 18 600h 3100.08 15 rKA (9iom) S 1,000.00 .$ (T10.00) subbow OH&P 1 T,uI Ohqnge Amount IMLOWONG f CLAROCAMW This Wmik ahall Waftd tho c*nWW time by (a) We* Dep Owneft Kort"mswa Kud ", 00haeUction MfflagtW R" $ Ilufflaup 16.0% 4 182.00 6 1.242AD 0311,9f2007 11:26 17608379487 HARRIS R MIRAGE PAGE 03 03/19/2007 MON 9:42 FAX U002/004 Yr AWO1 o)- FR AOER a21WNer G+.MM.w.eu,wy.b•,fnn• 49620 Rldps Park pr. 867•y9H�a696 suist k0D 951•,29a9693 Tsdtaeuls,CA62690 I Title: Back Splash for AIDA Stoves Project: Palm Village To: Kurt Bay Hank: & Am wsy 11 74.333 sail, sytt1,5t02 601 PeYnDeasd. CstRomfs 922fA Ioeaadpil.: DaakBphmh WADA IXavos i :tt fi,Q�11s.:i..::ni,.i,,.i.n.............:t�itpN'..........::.::.._.............................., ....... .::�.................. ...................__....._.... �,.,. �..,....., $t1BGOA1rR......,.,..,,.....i::,d:;:tl:I:iElE741NISi D,PRICLyiIffid�% Tbft a SACK) Pmvi9a2esrk8p4anhrarADAetwor BAS 2 un113 5 155.40 $ MAD COR NUMBER: 99 DATE: 19•Mar07 25920 subtatel $ 315.80 OH A p 15.0% $ 47.62 Total Chmae Amaunt s 26400 E%Ct.11510NS ICLARROATIONS: i Cod This work shall mdend the aontraet timo by/4Wotk boys Owners Representative Contractor Kurt gray. Cwnvtmtcdon Menagor QV�(�/j� Mlka Kubba,T or ! lr Pate 02i97/2097 9BD 8:29 FAX MRMMIa R 19IMHUC PAGE 63 9002/004 .,tzAJ=RAOE'R w rxr WN C1N•/�' eo:r 4wwm a7b7a kPoOa Rera M. Sul, no 70,11"U , CA 0M10 Tdtq: Add Handrail at Trellis Area Project: Palm "11090 To; ieatra�ooem yAMM otwett, CAMnim 2WO 661+18r•0890 6614084M COR NUMBER; -W Ca DATE 7•FeW 25220 1Ducdpdae: Add N.adralt atTmlrbArrlt 1 ... ........._. ..•. :•tu .•... ..••............n .. y.. p... oaia:n.::: L.(��.. .. •• i...t......:. i ... ... i ':....._.. .. .. .........::c¢:::_ "7t CGaC... ...:.:. .. .... �....IbLC�,Cil ..... _".::::::..... �:.......... ....::�SUBCaRiRI{aYOR;F::::::::::::::�•�:itt[ii%i'�ALi:.� Gnaw AAO MrrM0 at7re0s Area Cprcm Sntuh 96 Ahmedc 9 Le S700.08 6 ?MM aand D1 7 (340" subtotal .. 011ap IT*tw ChanOa Amount t7(CLUSION6I CLAMFICA710KSI This w kahen extend the contncltime by (0) Work Days Ownets ReprosaMadee Kurt"; CmwtmmUah Manager .f i 700JO 16.0% d 106.00 Cadracror W-t, ►Kubhe. Tq