HomeMy WebLinkAboutSR - R21780 - CO6 - Palm Village Apts....LD PALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 6 TO APPROVE CHANGE ORDER REQUESTS (COR) FROM TAYLOR FRAGER, INC. (CONTRACT NO. R21780) IN THE CUMULATIVE AMOUNT OF $43,135.00 WITH TWELVE (12) ADDITIONAL DAYS TO THE CONTRACT TIME FOR THE CONSTRUCTION OF PALM VILLAGE APARTMENTS SUBMITTED BY: BRYCE LYNN WHITE, PROJECT ADMINISTRATOR CONTRACTOR: TAYLOR FRAGER, INC. 43620 RIDGE PARK DR., SUITE 300 TEMECULA, CA 92590 DATE: JANUARY 25, 2007 CONTENTS: CONSTRUCTION CHANGE ORDER NO. 6 TO CONTRACT R21780 CHANGE ORDER REQUESTS (COR NOS. 69AR, 69BR, 69R2, 74R, 88, 79, 85R, 71 R, 72R, 82, 83R, 75R, 77, 78) Recommendation: By Minute Motion, that the Agency Board: Approve Construction Change Order No. 6 to approve Change Order Requests (COR) from Taylor Frager, Inc. (Contract No. R21780) in the cumulative amount of $43,135.00 with twelve (12) additional workdays to the contract time for the construction of Palm Village Apartments; and 2. Authorize appropriation of $43,135.00 to Account No. 870-4349-433-4001 from Agency's unobligated funds. Executive Summarv: Change Order No. 6 for the Palm Village Apartments is for recommended enhancements and changes to the site concrete, correction of minor errors and omissions in the project design, and costs for extended general conditions. The total cost of all change order work for this project attributable to deficiencies in the plans is 4.6% of the contract amount, which is within industry standards. These changes have been reviewed and recommended by Harris & Associates who is the consulting professional construction manager for this project. Discussion: On April 15, 2005, the Notice to Proceed was issued for Contract No. R21780 to Taylor Frager, Inc., for construction of the 36-unit Palm Village Apartments in the amount of $5,839,386. The Staff Report Approve Construction Change Order No. 6 to Contract No. R21780 (Taylor Frager, Inc.) Page 2 of 2 January 25, 2007 recommended change order includes enhancements and necessary modifications to this contract. Enhancements in the subject change order were for multiple site concrete items. These included adjustments to accommodate existing site conditions, compliance with ADA requirements for accessibility, changes to accommodate posts for future carports, and to reduce future maintenance costs. The site concrete enhancements and changes in COR Numbers 69AR, 69BR, 69R2, 74R and 88 total $18,378.00 with the additional contract time associated with these CORs for this work is eight (8) additional workdays. Miscellaneous corrections, revisions, and deletions include the following: relocation of bathroom light outlets to accommodate mirrors ($1,250); substitution of site lights to conform to City ordinances ($2,721); drywall repair for necessary attic extension for mechanical equipment; ($1,150); additional wallboard metal trim omitted from plans ($2,300); temporary securing of doorways ($380); repair of paint at color transition lines ($1,196); additional tile trim required for ADA compliant kitchen sink counters ($2,710); deletion of playground sand credit (-$1,886); and deletion of wheelstops credit (-$1,478). The additional contract time associated with the CORs for this work is four (4) additional workdays. This change order also contains $16,395 for additional overhead and extended general conditions costs associated with the twelve (12) additional workdays in this change order. Harris & Associates has verified the subject amount is an appropriate cost for the extended general conditions. Payment of funds for extended general conditions does not waive any terms of the Contract Documents or the Agency's right to collect Liquidated Damages specified therein. Submitted by: iistrator Approval: Jus*fVcCarthy A M development" A Carlos L. Orteg xecutive Director Lauri Aylaian, Redevelopment Manager Depart ent Head: �; z Dave Yrigoye Director of Redevelopment/Housing Paul S. Gibson, Director of Finance Wrda\Maria Hunt\WPDATA\HOUSING\WHITE\stfrpts\012507CO6TaylorFraper.doc PAS USEW R-E YELOP NT AGENCY CONSTRUCTION CHANGE ORUR Contract Purpose Construct Palm Village Apartments Consultant's Name Taylor Frager, Inc. Address: 43620 Ridge Park Drive, Suite 300 Temecula, CA 92590 Contract # / P.O. # R21780 12193 Change Order No. 6 Contingency: YES I NO X Account No. 870-4349-433-4001 Project No. Vendor No. 8553 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE (Supplemental Plans, Specifications, and Directives dated Attached) In Contract Price In Contract Price Change Order Requests 69AR, 69BR, 69R2, 74R, 88, 79, 85R, 71 R, 72R, 43,135.00 82, 83R, 75R, 77, 78 TOTALS: - 43,135.00 NET CHANGE IN CONTRACT PRICE: 43,135.00 JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 6,523,381.80 CONTINGENCY: Less: Expend. & Encumb. To Date: - 6,523,381.80 Amount Approved by Board: + Less: This Change Order Amount: - 43,135.00 Less: Prior Change Order(s): - BALANCE OF BUDGET Less: This Change Order: - REMAINING FOR PROJECT: (43,135.00) Balance Remaining of Contingency: - The amount of the Contract will be (Deepea� Increased by the Sum of: Forty-three Thousand One Hundred Thirty-five and no/100 Dollars ($43,135.00). G:\rda\Beth Longman\Staff Reports\White\Taylor Frag C06 Formdoc See reverse Contract R21780 Change Order No. 6 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the Palm Desert Redevelopment Agency, otherwise referred to as Owner. Contract Time Extension 12 Days. Revised Contract Total $ 6,523,381.80 The undersigned Contractor approves the foregoing Change Order # 6 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order # 6 . The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: 3. CERTIFIED FUNDS AVAILABLE: EXECUTIVE DIRECTOR FINANCE DIRECTOR NOTE: No payments will be made prior to Executive Director and Agency Board approval ACCEPTED BY: CONTRACTOR Date Accepted 4. APPROVED BY: 1/25/07 RICHARD S. KELLY, CHAIRMAN Date Approved 1 /25/07 SECRETARY Date Approved G:Vda\Beth Longman\Slaff Reports\White\Taylor Frag C06 Form.doc See reverse ? l ZAJ4kJZi RRAGER A TAYWw Cnnewetlnn C nn CnwMnY 43620 Ridge Park Dr. Suite 300 Temecula, CA 92592 951-296-9895 951.296.9893 Title: Additional Site Concrete at EAST PARKING LOT Project: Palm Village To: Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Wadng Drive Palm Desert, California 92260 IDescriplion: Additional Site Concrete at EAST PARKING LOT CSI CODE DESCRIPTION COR NUMBER: 69-AR DATE: 7-Dec-06 25920 SUBCONTRACTOR UNIT PRICE UNIT 03300 1 Tear off 36 If ready to pour forms per original layout and - DeSoto Pipeline- 1 - Is- $ re -install forms against block wall 2. Form and pour 24 If new curbs DeSoto Pipeline 1 f$ $ 3. Tear off ready to pour forms for islands and reform DeSoto Pipeline 1 Is $ islands per new layout provided by Owner. Lost 2 days labor 4. Credit 121f curbs DeSoto Pipeline 1 Is $ Subtotal OH BP (Total Change Amount EXCLUSIONS / CLARIFICATIONS: This work shall extend the contract time by (1) Work Days Owner's Representative Bryce White, Redevelopment Agency Date 560.00 $ 840,00 $ 900,00 $ (216.00) $ 15.0% $ LINE TOTAL 560.00 840.00 900.00 (216.00) 2,084.00 312.60 $ 2,397.00 Contr to Mike Kub or Frager r 7 ItiS 1 0 6 Date k&11!J2JGi FRAGER A TAYLOR Cnn"/Vvetlnn r W Cn,nry,nV 43620 Ridge Park Dr. 951.296.9895 COR NUMBER: 69-BR Suite 300 951-2969893 Temecula, CA 92592 Title: Additional Site Concrete per Owner's Request DATE: 7-Dec-06 Project: Palm Village 25920 To: Bryce Lynn White Palm Desert Redevelopment Agency 73.510 Fred Waring Drive Palm Desert, California 92260 Descdptlom Additional Site Concrete per Owner's Request CSI CODE ., DESCRIPTION SUBCONTRACTOR UNIT PRICE/ UNIT LINE TOTAL 03300 1. Tear off 531f ready to pour forms per original layoutandDesoto Pipeline _1 is 9.0.0.0.0 $ 900.00 re -install forms per new layout at Palyground Area _ _ -"—' 2. Credit 20 if curbs (concete only 0.5 cu, yd.) Desoto Pipeline 0.5 Is $ (750.OD) $ (75.00) 3. Move storm drain located per civil plans. Owner changed Desoto Pipeline 1 Is $ $ location of side walk ($520 Rejected) 4. Apply bullnose comers at curbing at carport areas per Desoto Pipeline 1 Is $ 225.00 $ 225.00 direct agreement between subcontractor and Owner ($550 Reduced) 5. Add 16 at concrete at electric roam at Building A Desoto Pipeline 1 is $ 200.00 $ 200.00 6. Widen sidewalk at north wnd of West Parking lot and Desoto Pipeline 1 Is $ 560.00 $ 560.00 reconfigura that sidewalk to a handicap ramp ($1,120 Reduced) 7. Excavate and extend 4' by 4" conduit risers for solar Desoto Pipeline 1 Is $ 800.00 $ 800.00 energy to 12' to back of curb 8. Reform at trash enclosure for 5'XT ADA turn around on Desoto Pipeline i Is $ 350.00 $ 350.00 lending deck with 8" additional concrete 9. Relocate 2 clean outs placed per plans per Owners request Desoto Pipeline 1 is $ 200.00 $ 200.00 Subtotal $ 3.160.00 OH & P 15.0% $ 474.00 Total Change Amount $ 3,634.00 EXCLUSIONS I CLARIFICATIONS: This work shall extend the contract time by (1) Work Days Owner's Representative Contractor Bryce White, Redevelopment Agency MI Kydba. Taylor Frager o Date DAte e'6 scot •Jai F'RAGER A T-YW. C-. C...' 43620 Ridge Park Dr. Suite 300 Temecula, CA 92592 951-296-9895 951-296.9893 Title: Additional Site Concrete Per RFQ #001 & #003 Project: Palm Village To: Bryce Lynn White Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, California 92260 Description: Additional Site Concrete Per RFQ #001 & #003 CSI CODE DESCRIPTION 03300 Additional Site Concrete Per RFO #001 & #003 (please see attached Subcontractors Change Order Request) Subtotal l+ OH&P (Total Change Amount EXCLUSIONS I CLARIFICATIONS: This work shall extend the contract time by (3) Work Days Owner's Representative Bryce White, Redevelopment Agency Date COR NUMBER: 69R2 DATE: 9-Nov-06 25920 SUBCONTRACTOR UNIT PRICE I UNIT LINE TOTAL DeSato Pipeline — - — 1 -Is- 0------SEA6'm — --- tSr2$$,e>7 S12g8. S,ISM -I ii $ .it6T.00 15.0% $ !4Q.0o O, DR.00 Mika KContractor ubba, �a rPrager Dat e WJtdPJzAFRAGER w rwYLOR ca,r/ry . emvo enn,yeny 43620 Ridge Park Dr. Suite 300 Temecula, CA 92590 Title: Additional Sidewalk & Curbs at Play Area Project: Palm Village To: Kurt Gray Harris & Associates 74-333 Highway 111, Suite 101 Palm Desert, California 92260 IDescription: Additional Sidewalk & Curbs at Play Area CS CODE DESCRIPTION. 03300 1. Add 3TX4" walkway per Owner Request 03300 2. Add curbs around Trellis per Owner Request Subtotal OH&P (Total Change Amount EXCLUSIONS I CLARIFICATIONS: This work shall extend the contract time by (1) Work Days Owner's Representative Bryce White, Redevelopment Agency Date 951.296.9896 951-296A898 COR NUMBER: 74R DATE: 29-Dec-06 25920 SUBCONTRACTOR UNIT PRICE UNIT LINE TOTAL De Soto_ 1-Is - "$1,200.00 511200:00 - De Soto 1 Is $1,500.00 $1,500.00 $ 2,700.00 15.0% $ 405.001 $ 3,105.001 Contractor Mike Kubba, Taylor alter Mr t I Date t e1/08/2007 08:10 17608379487 HARRIS R MIRAGE ulluo/Nut rKI 1CO rid PAGE 02 4002/002 wastai"FRAOER 47E20 Mdr Peek CW- Dfife",Ow guys no wew4m TOWCOM, CA, WMEW Tills! oemo Sidewalk to Play Area & Raul Pr*joct: Palm Village To: Kul Gmy HartleJ, ABOWWWO 7"34MMAY111'sLontot Palm Du d, Caffunto 92M ve eow Pawn Fe"ftjLMWOC9ffCF*A COR NUMBER: as DATE: 5-Jan-07 23820 . ...... ... ................. &ffiudW - * , I I I I * -11, ............. . ...... . .... . . ...... - ........... ........ ... R ........ ................. ..... . .... :: .. .. . ... . ............ 03.000 Dow SWlk M PbW Am AM HAW on Wo 1-La 46MAD S ZMAD 025= DOMPOMOACrMft rAO$*A0M1t*CWWU mom I Ls smoo 9 25090 vd1h HVAC e:mdsmw aubtow OW&P TOM Chanm Amowit OWLUSKINS IOLAMPICATIONS: Owner: Repmanto"a Kutt Gray, Ca &uctlm Mwagor F-= 1 7 750 15.0% $ 41Z so $ 3,163.001 Ceaetraedat 4 T Vale rKrr•Wvd�I FRAGER w Tnvxow r ,m C..., 43620 Ridge Park Dr. 951.29"895 suite 300 951.296�5893 Temecula, CA 92590 Title: Raise bathroom vanity light fixtures Project: Palm Village To: Kurt Gray Hams & Associates 74-333 Highway 111. Suite 101 I+ Palm Desert, California 92260 Description: Raise bathroom vanity light fixtures CSI CODE DESCRIPTION SUBCONTRACTOR UNIT 16000 Raise bathroom vamly{ight{xturas- _._ Bni.Uoik _ _ 1 LS -- Subtotal OH&P 'Total Change Amount EXCLUSIONS I CLARIFICATIONS: This work shall extend the contract time by (1) Work Days Owners Representative Bryce White, Redevelopment Agency Date CDR NUMBER: 79 DATE: 9•Nov-06 25920 PRICE UNIT LINE TOTAL S1,086.75 _ S 1,086.75 Mike Kubbe, s Date $ 1,086.75 15.0% $ 163.01 $ 1,250.00 01/10/2007 14:31 17608379487 01/09/2007 TOE 9:55 FAI HARRIS R MIRAGE PAGE 03 PHU *.#.-&PRAGER .mix"�. a.,....43M pimp PA* Dr. OWN on TOMA"CA02590 T(HV. Sits Ught FIXIUMS Prajog*! Pam vulagli To: KtOlOW KmTts,AAmQdfftw 74=H9"111,31AD101 pmhDowd, caK9ft"$2m (aosntp0os SNc1.lOM F4tutes 1914MR404 COR NumlaEp—, m 951426400 DATE., Wan-OT 2SI20 .. ...... .. ..... .... . ' -l"..... .; ..... . ...... ........ ....... . ...... . ..... ..... ...... . ............ . AneffrviF Re UP FWrj" FMM WWO D" BtuA1k 1 Ls szmm 5 2.3W20 subtotal CN&P ToW tha AmuLAR EMUSK)NUCLAWTVATMRS: CO) TrAt work chc0l 4xt"d ttic ccr&stl tlrm by P16, Work0l" K,,t SM, C0"1*mcfitM MM40M OWN Ce MIM Kt*", Tay A. I ho $ 2.71A.00 ►Ak491a FRAMER A r.YG R cav/rveNon 11 Cen, Y 43620 Ridge Park Dr. Suite 300 Temecula, CA 92690 Title: 2nd Layer Drywall at Hallway Ceilings Project: Palm Village To: Kurt Gray Hams & Associates 74-333 Highway 111. Suite 101 Palm Desert, California 92260 113"cription: 2nd layer drywall at hallways CSI-CODE DESCRIPTION 09250 Add 2nd layer drywall at HVAC damper locations Subtotal OH&P (Total Change Amount EXCLUSIONS I CLARIFICATIONS: This work shall extend the contract time by (1) Work Days Owner's Representative Bryce White, Redevelopment Agency Date 951.296.0895 951.296-9893 COR NUMBER: 71R DATE: 29-Dec-06 25920 SUBCONTRACTOR UNIT PRICE/UNIT LINE TOTAL NTA Drywall 1 Is $1,000:00 "--- $T,000DO — $ 1,000.00 15.0% $ 150,00 Contra IMike Kubb ylo c $ 1,150.00 r Frager � I5 �06 I i Date !V'1►V * /� f FRAGER A 1ArL -CONirncfOn (irvpp Con ppnY 43620 Ridge Park Dr. Suite 300 Temecula, CA 92590 Title: Add J-Mold at outside Closets Project: Palm Village To: Kurt Gray Harris & Associates 74-333 Highway III, Suite 101 Palm Desert, California 92260 (Description: J-Mold at Outside Closets CSI CODE DESCRIPTION: 09260 Add J-Mold at outside closets not shown on plans. Subtotal OH&P Total Change Amount EXCLUSIONS I CLARIFICATIONS: This work shall extend the contract time by (0) Work Days Owner's Representative Bryce White, Redevelopment Agency Date 951.296-9895 COR NUMBER: 72R 951.296.9893 DATE: 29-Dec-06 25920 SUBCONTRACTOR UNIT PRICE I UNIT LINE TOTAL NTA Drywall t is $2,000.00 "" $2,000.00- $ 2,000.00 15.0% $ 300.00 $ 2,300.00 Contractor Mike Kubba, Ta r or I Dats • ® FRA0HR •'IifYLOR (.'un�vue,/en (irvuu C'emeary 43620 Ridge Park Dr. Suite 300 Temecula, CA 92590 Title: Board Patio Doors W/Plywood Project: Palm Village To: Kurt Gray Harris & Associates 74-333 Highway Ill, Suite 101 Palm Desed, California 92260 Description: Board Patio Doors w(Plywood CsI CODE DESCRIPTION 0760-0 Board Pako Doors WMWood --_ -- Hume Depot - Plywood receipt attached Labor (30 mmutes each + 2 hours driving, etc.) Subtotal OHBP ITotai Change Amount EXCLUSIONS I CLARIFICATIONS: This work shall extend the contract time by (0) Work Days Owner's Representative Bryce White, Redevelopment Agency Date 951-296-9895 951.29"893 COR NUMBER: 82 DATE: 14-Nov06 25920 SUBCONTRACTOR UNITPRICE UNIT LINE TOTAL �t LSi-- 5120.$9 S t-2J:59- 6 Hours S35.00 $ 210.00 $ 330.59 15.0% $ 49.59 $ 380.00 Cent r Mika Kubb for Fragar Date Itl�/+%f�, /FRAGER 43620 Ridge Park Dr. 951.296-9895 Suite 300 95'1-296.9893 Temecula, CA 92590 Title: Repair Paint at Stucco Scored by Owner Project: Paint Village To: Kurt Gray Harris & Associates 74333 Wghway 111. Suile 101 Palm Desert, California 92260 IDe..rlpfion: Repair Paint at Stucco Scored by Owner CSI CODE DESCRIPTION SUBCONTRACTOR —09900—'—'RepairPaint-aCSttmv Seored.hyOwaer MtacatroM _ J-K91Painhno ($130 per location) Subtotal OH&P ITotel Change Amount EXCLUSIONS / CLARIFICATIONS: This work shell extend the contract time by (0) Work Days Owner's Representative Bryce White, Redevelopment Agency Date COR NUMBER: 83R DATE: 29-Dec-06 25920 UNIT PRICE/UNIT LINE TOTAL 1 LS $1,040.00 $ 1,040.00 $ 1,040.00 15.0% $ 156.00 $ 1,196.00 Contractor Mika Kubba, Tayl rager Date AwAlL l:iFRAGER A TAYtPR Ga„v/nre(tpn Urvuv ComYony 43620 Ridge Park Or. 951496A895 Suite 300 951.298A893 Temecula, CA 92690 Title: Bull -nose Trim at 18 ADA Kitchen Sink Cabinets Project: Palm Village To: Kurt Gray Harris & Associates 74.333 Highway 111, Suite 101 Palm Desert, California 92260 IDescription: Bull�ncsa Trim at 18 ADA Kitchen Sink Cabinets CS] CODE DESCRIPTION 093200 Add bulbnose trim at 18 ADA Kitchen Sink Cabinets Subtotal Oil &P Total Change Amount EXCLUSIONS! CLARIFICATIONS: This work shall extend the contract time by (2) Work Days Owner's Representative Bryce White, Redevelopment Agency Date CDR NUMBER: 75R DATE: 29-Dec-06 25920 SUBCONTRACTOR UNIT PRICEIUNIT LINE TOTAL Majestic Tile 1 Is 3 $ 2,356.38 15.0% $ 353.46 s 2.710.00 J Cc r Mike Kub for Frager bate �=�%f1WFRAGER w rnnoa r,...,.r cl.— 43620 Ridge Park Dr. 951-296-9895 Suite 300 951.2969893 Temecula, CA 92590 Title: Credit to Owner for Deleting Playground sand Project: Patin Village To: Kurt Gray Harris & Associates 74-333 Highway 111, Suite 101 Palm Desert, California 92260 (Description: Credit to Owner for Deleting Playground nand CSI CODE DESCRIPTION —029000--.Cmdrt-to'Owner for Delefing-Playground-sand (Price w $4.75 per 1 cu.ft bag + Tax) I Subtotal OH&P Total Change Amount EXCLUSIONS / CLARIFICATIONS: This work shall extend the contract time by (0) Work Days Owner's Representative Bryce White, Redevelopment Agency Date COR NUMBER: 77 DATE: 6-Nov-06 25920 SUBCONTRACTOR UNIT PRICE? UNIT LINE TOTAL 4Otne_Denre 350 each S4,75 $ 1,662.50 Tax @ 7.75% 350 each $0.37 $ 1213.04 Cartage 1 LS $75.00 $ 75.00 $ 1,866.34� 0.0% $ - $ (1,866.00)I Contractor 11 Mik Kubbe, Taylor Fr 7-/7 �l' D ' (Data "A* 0i FRAGER A TAYLOR Gana uettan rrvuu Cammnv 43620 Ridge Park Dr. Suite 300 Temecula, CA 92590 Title: Credit to Owner for Deleting Wheelstops Project: Palm Village To: Kurt Gray Harris & Associates 74333 Highway 111, Suite 101 Palm Desert, California 92260 Description: Credit to Owner for Deleting Whoolstops CS] CODE DESCRIPTION —033000— G7edit to Ownerfor Delettng-56-Wheelsl,�^- Subtotal OH&P (Total Change Amount EXCLUSIONS I CLARIFICATIONS: This work shall extend the contract time by (0) Work Days Owner's Representative Bryce White, Redevelopment Agency Date 951.296-9895 951-296-9893 SUBCONTRACTOR Ran Ulrao pmca-st Tax @ 7.75% Cartage COR NUMBER: 78 DATE: 8-Nov-06 25920 UNIT PRICE UNIT LINE TOTAL 56 each $23.25 $ 1,302.00 56 each $1.80 S 10U.91 1 LS $75.00 S 75.00 $ 1,477.91 0.0% $ $ (1,478.00), Contract N Mike Kubba To r icrager Date I