STAFF REPORT
REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 6 TO APPROVE
CHANGE ORDER REQUESTS (COR) FROM TAYLOR FRAGER, INC.
(CONTRACT NO. R21780) IN THE CUMULATIVE AMOUNT OF
$43,135.00 WITH TWELVE (12) ADDITIONAL DAYS TO THE
CONTRACT TIME FOR THE CONSTRUCTION OF PALM VILLAGE
APARTMENTS
SUBMITTED BY: BRYCE LYNN WHITE, PROJECT ADMINISTRATOR
CONTRACTOR: TAYLOR FRAGER, INC.
43620 RIDGE PARK DR., SUITE 300
TEMECULA, CA 92590
DATE: JANUARY 25, 2007
CONTENTS: CONSTRUCTION CHANGE ORDER NO. 6 TO CONTRACT R21780
CHANGE ORDER REQUESTS (COR NOS. 69AR, 69BR, 69R2, 74R, 88,
79, 85R, 71 R, 72R, 82, 83R, 75R, 77, 78)
Recommendation:
By Minute Motion, that the Agency Board:
Approve Construction Change Order No. 6 to approve Change Order
Requests (COR) from Taylor Frager, Inc. (Contract No. R21780) in the
cumulative amount of $43,135.00 with twelve (12) additional workdays to the
contract time for the construction of Palm Village Apartments; and
2. Authorize appropriation of $43,135.00 to Account No. 870-4349-433-4001
from Agency's unobligated funds.
Executive Summarv:
Change Order No. 6 for the Palm Village Apartments is for recommended enhancements and
changes to the site concrete, correction of minor errors and omissions in the project design, and
costs for extended general conditions. The total cost of all change order work for this project
attributable to deficiencies in the plans is 4.6% of the contract amount, which is within industry
standards. These changes have been reviewed and recommended by Harris & Associates who
is the consulting professional construction manager for this project.
Discussion:
On April 15, 2005, the Notice to Proceed was issued for Contract No. R21780 to Taylor Frager,
Inc., for construction of the 36-unit Palm Village Apartments in the amount of $5,839,386. The
Staff Report
Approve Construction Change Order No. 6 to Contract No. R21780 (Taylor Frager, Inc.)
Page 2 of 2
January 25, 2007
recommended change order includes enhancements and necessary modifications to this
contract.
Enhancements in the subject change order were for multiple site concrete items. These
included adjustments to accommodate existing site conditions, compliance with ADA
requirements for accessibility, changes to accommodate posts for future carports, and to reduce
future maintenance costs. The site concrete enhancements and changes in COR Numbers
69AR, 69BR, 69R2, 74R and 88 total $18,378.00 with the additional contract time associated
with these CORs for this work is eight (8) additional workdays.
Miscellaneous corrections, revisions, and deletions include the following: relocation of
bathroom light outlets to accommodate mirrors ($1,250); substitution of site lights to conform to
City ordinances ($2,721); drywall repair for necessary attic extension for mechanical equipment;
($1,150); additional wallboard metal trim omitted from plans ($2,300); temporary securing of
doorways ($380); repair of paint at color transition lines ($1,196); additional tile trim required for
ADA compliant kitchen sink counters ($2,710); deletion of playground sand credit (-$1,886); and
deletion of wheelstops credit (-$1,478). The additional contract time associated with the CORs
for this work is four (4) additional workdays.
This change order also contains $16,395 for additional overhead and extended general
conditions costs associated with the twelve (12) additional workdays in this change order. Harris
& Associates has verified the subject amount is an appropriate cost for the extended general
conditions. Payment of funds for extended general conditions does not waive any terms of the
Contract Documents or the Agency's right to collect Liquidated Damages specified therein.
Submitted by:
iistrator
Approval:
Jus*fVcCarthy
A M development"
A
Carlos L. Orteg xecutive Director
Lauri Aylaian, Redevelopment Manager
Depart ent Head:
�; z
Dave Yrigoye
Director of Redevelopment/Housing
Paul S. Gibson, Director of Finance
Wrda\Maria Hunt\WPDATA\HOUSING\WHITE\stfrpts\012507CO6TaylorFraper.doc
PAS USEW R-E YELOP NT AGENCY
CONSTRUCTION CHANGE ORUR
Contract Purpose Construct Palm Village Apartments
Consultant's Name Taylor Frager, Inc.
Address: 43620 Ridge Park Drive, Suite 300
Temecula, CA 92590
Contract # / P.O. # R21780 12193
Change Order No. 6
Contingency: YES I NO X
Account No. 870-4349-433-4001
Project No.
Vendor No. 8553
You are hereby requested to comply with the following changes from the contract plans and specifications:
DESCRIPTION OF CHANGES DECREASE INCREASE
(Supplemental Plans, Specifications, and Directives dated Attached) In Contract Price In Contract Price
Change Order Requests 69AR, 69BR, 69R2, 74R, 88, 79, 85R, 71 R, 72R, 43,135.00
82, 83R, 75R, 77, 78
TOTALS: - 43,135.00
NET CHANGE IN CONTRACT PRICE: 43,135.00
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT: + 6,523,381.80 CONTINGENCY:
Less: Expend. & Encumb. To Date: - 6,523,381.80 Amount Approved by Board: +
Less: This Change Order Amount: - 43,135.00 Less: Prior Change Order(s): -
BALANCE OF BUDGET Less: This Change Order: -
REMAINING FOR PROJECT: (43,135.00) Balance Remaining of Contingency: -
The amount of the Contract will be (Deepea� Increased by the Sum of: Forty-three Thousand One Hundred
Thirty-five and no/100 Dollars ($43,135.00).
G:\rda\Beth Longman\Staff Reports\White\Taylor Frag C06 Formdoc See reverse
Contract R21780 Change Order No. 6 Continued from front
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order items for a
lump sum price agreed upon between the Contractor and the Palm Desert Redevelopment Agency, otherwise referred
to as Owner.
Contract Time Extension 12 Days.
Revised Contract Total $ 6,523,381.80
The undersigned Contractor approves the foregoing Change Order # 6 as to the changes, if any, in the contract
price specified for each item including any and all supervision costs and other miscellaneous costs relating to the
change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said
Change Order # 6 . The Contractor agrees to furnish all labor and materials and perform all other necessary work,
inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order
items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood
that the Change Order shall be effective when approved by the Owner.
Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies,
waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of
or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and
indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as
any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
REQUESTED BY:
3. CERTIFIED
FUNDS AVAILABLE:
EXECUTIVE DIRECTOR
FINANCE DIRECTOR
NOTE: No payments will be made
prior to Executive Director and
Agency Board approval
ACCEPTED BY:
CONTRACTOR Date Accepted
4. APPROVED BY: 1/25/07
RICHARD S. KELLY, CHAIRMAN Date Approved
1 /25/07
SECRETARY Date Approved
G:Vda\Beth Longman\Slaff Reports\White\Taylor Frag C06 Form.doc See reverse
? l ZAJ4kJZi RRAGER
A TAYWw Cnnewetlnn C nn CnwMnY
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92592
951-296-9895
951.296.9893
Title: Additional Site Concrete at EAST PARKING LOT
Project: Palm Village
To: Bryce Lynn White
Palm Desert Redevelopment Agency
73-510 Fred Wadng Drive
Palm Desert, California 92260
IDescriplion: Additional Site Concrete at EAST PARKING LOT
CSI CODE DESCRIPTION
COR NUMBER: 69-AR
DATE: 7-Dec-06
25920
SUBCONTRACTOR UNIT PRICE UNIT
03300 1 Tear off 36 If ready to pour forms per original layout and
- DeSoto Pipeline-
1 - Is- $
re -install forms against block wall
2. Form and pour 24 If new curbs
DeSoto Pipeline
1 f$ $
3. Tear off ready to pour forms for islands and reform
DeSoto Pipeline
1 Is $
islands per new layout provided by Owner. Lost 2 days labor
4. Credit 121f curbs
DeSoto Pipeline
1 Is $
Subtotal
OH BP
(Total Change Amount
EXCLUSIONS / CLARIFICATIONS:
This work shall extend the contract time by (1) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
560.00 $
840,00 $
900,00 $
(216.00) $
15.0% $
LINE
TOTAL
560.00
840.00
900.00
(216.00)
2,084.00
312.60
$ 2,397.00
Contr to
Mike Kub or Frager
r 7 ItiS 1 0 6
Date
k&11!J2JGi FRAGER
A TAYLOR Cnn"/Vvetlnn r W Cn,nry,nV
43620 Ridge Park Dr. 951.296.9895 COR NUMBER: 69-BR
Suite 300 951-2969893
Temecula, CA 92592
Title: Additional Site Concrete per Owner's Request DATE: 7-Dec-06
Project: Palm Village 25920
To: Bryce Lynn White
Palm Desert Redevelopment Agency
73.510 Fred Waring Drive
Palm Desert, California 92260
Descdptlom Additional Site Concrete per Owner's Request
CSI CODE ., DESCRIPTION
SUBCONTRACTOR
UNIT
PRICE/ UNIT
LINE
TOTAL
03300 1. Tear off 531f ready to pour forms per original layoutandDesoto
Pipeline
_1 is
9.0.0.0.0
$
900.00
re -install forms per new layout at Palyground Area
_ _
-"—'
2. Credit 20 if curbs (concete only 0.5 cu, yd.)
Desoto Pipeline
0.5 Is
$
(750.OD)
$
(75.00)
3. Move storm drain located per civil plans. Owner changed
Desoto Pipeline
1 Is
$
$
location of side walk ($520 Rejected)
4. Apply bullnose comers at curbing at carport areas per
Desoto Pipeline
1 Is
$
225.00
$
225.00
direct agreement between subcontractor and Owner ($550 Reduced)
5. Add 16 at concrete at electric roam at Building A
Desoto Pipeline
1 is
$
200.00
$
200.00
6. Widen sidewalk at north wnd of West Parking lot and
Desoto Pipeline
1 Is
$
560.00
$
560.00
reconfigura that sidewalk to a handicap ramp ($1,120 Reduced)
7. Excavate and extend 4' by 4" conduit risers for solar
Desoto Pipeline
1 Is
$
800.00
$
800.00
energy to 12' to back of curb
8. Reform at trash enclosure for 5'XT ADA turn around on
Desoto Pipeline
i Is
$
350.00
$
350.00
lending deck with 8" additional concrete
9. Relocate 2 clean outs placed per plans per Owners request
Desoto Pipeline
1 is
$
200.00
$
200.00
Subtotal
$
3.160.00
OH & P
15.0%
$
474.00
Total Change Amount
$
3,634.00
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by (1) Work Days
Owner's Representative Contractor
Bryce White, Redevelopment Agency MI Kydba. Taylor Frager
o
Date DAte
e'6 scot •Jai F'RAGER
A T-YW. C-. C...'
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92592
951-296-9895
951-296.9893
Title: Additional Site Concrete Per RFQ #001 & #003
Project: Palm Village
To: Bryce Lynn White
Palm Desert Redevelopment Agency
73-510 Fred Waring Drive
Palm Desert, California 92260
Description: Additional Site Concrete Per RFQ #001 & #003
CSI CODE DESCRIPTION
03300 Additional Site Concrete Per RFO #001 & #003
(please see attached Subcontractors Change Order Request)
Subtotal
l+ OH&P
(Total Change Amount
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by (3) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
COR NUMBER: 69R2
DATE: 9-Nov-06
25920
SUBCONTRACTOR UNIT PRICE I UNIT LINE
TOTAL
DeSato Pipeline — - — 1 -Is- 0------SEA6'm — ---
tSr2$$,e>7 S12g8.
S,ISM -I ii
$ .it6T.00
15.0% $
!4Q.0o
O, DR.00
Mika KContractor
ubba, �a rPrager
Dat
e WJtdPJzAFRAGER
w rwYLOR ca,r/ry . emvo enn,yeny
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92590
Title: Additional Sidewalk & Curbs at Play Area
Project: Palm Village
To: Kurt Gray
Harris & Associates
74-333 Highway 111, Suite 101
Palm Desert, California 92260
IDescription:
Additional Sidewalk & Curbs at Play Area
CS CODE
DESCRIPTION.
03300
1. Add 3TX4" walkway per Owner Request
03300
2. Add curbs around Trellis per Owner Request
Subtotal
OH&P
(Total Change Amount
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by (1) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
951.296.9896
951-296A898
COR NUMBER: 74R
DATE: 29-Dec-06
25920
SUBCONTRACTOR UNIT PRICE UNIT LINE
TOTAL
De Soto_ 1-Is - "$1,200.00 511200:00 -
De Soto 1 Is $1,500.00 $1,500.00
$ 2,700.00
15.0% $ 405.001
$ 3,105.001
Contractor
Mike Kubba, Taylor alter Mr
t I Date t
e1/08/2007 08:10 17608379487 HARRIS R MIRAGE
ulluo/Nut rKI 1CO rid
PAGE 02
4002/002
wastai"FRAOER
47E20 Mdr Peek CW- Dfife",Ow
guys no wew4m
TOWCOM, CA, WMEW
Tills! oemo Sidewalk to Play Area & Raul
Pr*joct: Palm Village
To: Kul Gmy
HartleJ, ABOWWWO
7"34MMAY111'sLontot
Palm Du d, Caffunto 92M
ve eow Pawn Fe"ftjLMWOC9ffCF*A
COR NUMBER:
as
DATE: 5-Jan-07
23820
. ...... ... .................
&ffiudW - * , I
I I I * -11, ............. . ...... . ....
. . ...... -
...........
........ ... R ........ ................. ..... . ....
:: ..
.. . ... . ............
03.000 Dow SWlk M PbW Am AM HAW
on Wo
1-La
46MAD S ZMAD
025= DOMPOMOACrMft rAO$*A0M1t*CWWU
mom
I Ls
smoo 9 25090
vd1h HVAC e:mdsmw
aubtow
OW&P
TOM Chanm Amowit
OWLUSKINS IOLAMPICATIONS:
Owner: Repmanto"a
Kutt Gray, Ca &uctlm Mwagor
F-=
1 7 750 15.0% $ 41Z so
$ 3,163.001
Ceaetraedat
4 T
Vale
rKrr•Wvd�I FRAGER
w Tnvxow r ,m C...,
43620 Ridge Park Dr. 951.29"895
suite 300 951.296�5893
Temecula, CA 92590
Title: Raise bathroom vanity light fixtures
Project: Palm Village
To: Kurt Gray
Hams & Associates
74-333 Highway 111. Suite 101
I+ Palm Desert, California 92260
Description: Raise bathroom vanity light fixtures
CSI CODE DESCRIPTION SUBCONTRACTOR UNIT
16000 Raise bathroom vamly{ight{xturas- _._ Bni.Uoik _ _ 1 LS --
Subtotal
OH&P
'Total Change Amount
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by (1) Work Days
Owners Representative
Bryce White, Redevelopment Agency
Date
CDR NUMBER: 79
DATE: 9•Nov-06
25920
PRICE UNIT LINE
TOTAL
S1,086.75 _ S 1,086.75
Mike Kubbe,
s
Date
$ 1,086.75
15.0% $ 163.01
$ 1,250.00
01/10/2007 14:31 17608379487
01/09/2007 TOE 9:55 FAI
HARRIS R MIRAGE PAGE 03
PHU
*.#.-&PRAGER
.mix"�. a.,....43M pimp PA* Dr.
OWN on
TOMA"CA02590
T(HV. Sits Ught FIXIUMS
Prajog*! Pam vulagli
To: KtOlOW
KmTts,AAmQdfftw
74=H9"111,31AD101
pmhDowd, caK9ft"$2m
(aosntp0os SNc1.lOM F4tutes
1914MR404 COR NumlaEp—, m
951426400
DATE., Wan-OT
2SI20
.. ...... .. ..... .... . ' -l"..... .;
..... . ...... ........ .......
. ...... . ..... .....
...... . ............ .
AneffrviF Re UP FWrj" FMM WWO D" BtuA1k 1 Ls szmm 5 2.3W20
subtotal
CN&P
ToW tha AmuLAR
EMUSK)NUCLAWTVATMRS:
CO)
TrAt work chc0l 4xt"d ttic ccr&stl tlrm by P16, Work0l"
K,,t SM, C0"1*mcfitM MM40M
OWN
Ce
MIM Kt*", Tay
A.
I ho
$ 2.71A.00
►Ak491a FRAMER
A r.YG R cav/rveNon 11 Cen, Y
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92690
Title: 2nd Layer Drywall at Hallway Ceilings
Project: Palm Village
To: Kurt Gray
Hams & Associates
74-333 Highway 111. Suite 101
Palm Desert, California 92260
113"cription: 2nd layer drywall at hallways
CSI-CODE DESCRIPTION
09250 Add 2nd layer drywall at HVAC damper locations
Subtotal
OH&P
(Total Change Amount
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by (1) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
951.296.0895
951.296-9893
COR NUMBER: 71R
DATE: 29-Dec-06
25920
SUBCONTRACTOR UNIT PRICE/UNIT LINE
TOTAL
NTA Drywall 1 Is $1,000:00 "--- $T,000DO —
$ 1,000.00
15.0% $ 150,00
Contra
IMike Kubb ylo
c
$ 1,150.00
r Frager
� I5
�06
I
i Date
!V'1►V * /� f FRAGER
A 1ArL -CONirncfOn (irvpp Con ppnY
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92590
Title: Add J-Mold at outside Closets
Project: Palm Village
To: Kurt Gray
Harris & Associates
74-333 Highway III, Suite 101
Palm Desert, California 92260
(Description: J-Mold at Outside Closets
CSI CODE DESCRIPTION:
09260 Add J-Mold at outside closets not shown on plans.
Subtotal
OH&P
Total Change Amount
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by (0) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
951.296-9895 COR NUMBER: 72R
951.296.9893
DATE: 29-Dec-06
25920
SUBCONTRACTOR UNIT PRICE I UNIT LINE
TOTAL
NTA Drywall t is $2,000.00 "" $2,000.00-
$ 2,000.00
15.0% $ 300.00
$ 2,300.00
Contractor
Mike Kubba, Ta r or
I Dats
•
® FRA0HR
•'IifYLOR (.'un�vue,/en
(irvuu C'emeary
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92590
Title:
Board Patio Doors W/Plywood
Project:
Palm Village
To:
Kurt Gray
Harris & Associates
74-333 Highway Ill, Suite 101
Palm Desed, California 92260
Description: Board Patio Doors w(Plywood
CsI CODE DESCRIPTION
0760-0 Board Pako Doors WMWood --_ --
Hume Depot - Plywood receipt attached
Labor (30 mmutes each + 2 hours driving, etc.)
Subtotal
OHBP
ITotai Change Amount
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by (0) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
951-296-9895
951.29"893
COR NUMBER: 82
DATE: 14-Nov06
25920
SUBCONTRACTOR UNITPRICE UNIT LINE
TOTAL
�t LSi-- 5120.$9 S t-2J:59-
6 Hours S35.00 $ 210.00
$ 330.59
15.0% $ 49.59
$ 380.00
Cent r
Mika Kubb for Fragar
Date
Itl�/+%f�, /FRAGER
43620 Ridge Park Dr. 951.296-9895
Suite 300
95'1-296.9893
Temecula, CA 92590
Title:
Repair Paint at Stucco Scored by Owner
Project:
Paint Village
To:
Kurt Gray
Harris & Associates
74333 Wghway 111. Suile 101
Palm Desert, California 92260
IDe..rlpfion: Repair Paint at Stucco Scored by Owner
CSI CODE DESCRIPTION SUBCONTRACTOR
—09900—'—'RepairPaint-aCSttmv Seored.hyOwaer MtacatroM _ J-K91Painhno
($130 per location)
Subtotal
OH&P
ITotel Change Amount
EXCLUSIONS / CLARIFICATIONS:
This work shell extend the contract time by (0) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
COR NUMBER: 83R
DATE: 29-Dec-06
25920
UNIT PRICE/UNIT LINE
TOTAL
1 LS $1,040.00 $ 1,040.00
$ 1,040.00
15.0% $ 156.00
$ 1,196.00
Contractor
Mika Kubba, Tayl rager
Date
AwAlL l:iFRAGER
A TAYtPR Ga„v/nre(tpn Urvuv ComYony
43620 Ridge Park Or. 951496A895
Suite 300 951.298A893
Temecula, CA 92690
Title: Bull -nose Trim at 18 ADA Kitchen Sink Cabinets
Project: Palm Village
To: Kurt Gray
Harris & Associates
74.333 Highway 111, Suite 101
Palm Desert, California 92260
IDescription: Bull�ncsa Trim at 18 ADA Kitchen Sink Cabinets
CS] CODE DESCRIPTION
093200 Add bulbnose trim at 18 ADA Kitchen Sink Cabinets
Subtotal
Oil &P
Total Change Amount
EXCLUSIONS! CLARIFICATIONS:
This work shall extend the contract time by (2) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
CDR NUMBER: 75R
DATE: 29-Dec-06
25920
SUBCONTRACTOR UNIT PRICEIUNIT LINE
TOTAL
Majestic Tile 1 Is 3
$ 2,356.38
15.0% $ 353.46
s 2.710.00 J
Cc r
Mike Kub for Frager
bate
�=�%f1WFRAGER
w rnnoa r,...,.r cl.—
43620 Ridge Park Dr. 951-296-9895
Suite 300 951.2969893
Temecula, CA 92590
Title: Credit to Owner for Deleting Playground sand
Project: Patin Village
To: Kurt Gray
Harris & Associates
74-333 Highway 111, Suite 101
Palm Desert, California 92260
(Description: Credit to Owner for Deleting Playground nand
CSI CODE DESCRIPTION
—029000--.Cmdrt-to'Owner for Delefing-Playground-sand
(Price w $4.75 per 1 cu.ft bag + Tax)
I Subtotal
OH&P
Total Change Amount
EXCLUSIONS / CLARIFICATIONS:
This work shall extend the contract time by (0) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
COR NUMBER: 77
DATE: 6-Nov-06
25920
SUBCONTRACTOR
UNIT PRICE? UNIT
LINE
TOTAL
4Otne_Denre
350 each S4,75
$
1,662.50
Tax @ 7.75%
350 each $0.37
$
1213.04
Cartage
1 LS $75.00
$
75.00
$
1,866.34�
0.0%
$
-
$
(1,866.00)I
Contractor 11
Mik Kubbe, Taylor Fr
7-/7 �l' D
' (Data
"A* 0i FRAGER
A TAYLOR Gana uettan rrvuu Cammnv
43620 Ridge Park Dr.
Suite 300
Temecula, CA 92590
Title: Credit to Owner for Deleting Wheelstops
Project: Palm Village
To: Kurt Gray
Harris & Associates
74333 Highway 111, Suite 101
Palm Desert, California 92260
Description: Credit to Owner for Deleting Whoolstops
CS] CODE DESCRIPTION
—033000— G7edit to Ownerfor Delettng-56-Wheelsl,�^-
Subtotal
OH&P
(Total Change Amount
EXCLUSIONS I CLARIFICATIONS:
This work shall extend the contract time by (0) Work Days
Owner's Representative
Bryce White, Redevelopment Agency
Date
951.296-9895
951-296-9893
SUBCONTRACTOR
Ran Ulrao pmca-st
Tax @ 7.75%
Cartage
COR NUMBER: 78
DATE: 8-Nov-06
25920
UNIT PRICE UNIT LINE
TOTAL
56 each $23.25 $ 1,302.00
56 each $1.80 S 10U.91
1 LS $75.00 S 75.00
$ 1,477.91
0.0% $
$ (1,478.00),
Contract
N Mike Kubba To r icrager