Loading...
HomeMy WebLinkAboutSR - R23390 CA10 - ComDyn - Falcon Crest & La Rocca VillasPALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVE AMENDMENT NO. 10 CHANGING THE SCOPE OF THE DEVELOPMENT AGREEMENT (CONTRACT NO. R23390) WITH COMDYN PD, LLC FOR THE DEVELOPMENT OF BOTH THE FALCON CREST AND LA ROCCA VILLAS PROJECTS IN THE AMOUNT OF $369,791.47 SUBMITTED BY: CATHERINE WALKER, SENIOR MANAGEMENT ANALYST DEVELOPER: COMDYN PD, LLC 2800 28T" STREET, SUITE 206 SANTA MONICA, CA 90405 DATE: JUNE 14, 2007 CONTENTS: CONTRACT AMENDMENT NO. 10 Recommendation: By Minute Motion, that the Agency Board: 1. Approve Amendment No. 10 changing the scope of the Development Agreement (Contract No. R23390) with ComDyn PD, LLC, in the cumulative amount of $369,791.47 for the development of both Falcon Crest and the La Rocca Villas. Funds are available in the low/mod Housing Set Aside fund (Account No. 870-4698-466-4001). Executive Summarv: Approval of staff's recommendation will allow for increases to the Project Costs, both included and excluded from the Stipulated Sum, to accommodate both work outside the scope of the Agreement and Agency approved increases to design costs. All are necessary for the timely completion of the Falcon Crest single-family development and La Rocca Villas. This Amendment represents 1.2 percent of the total budget for both developments. Discussion: On July 14, 2005, the Palm Desert Redevelopment Agency Board entered into an agreement with ComDyn PD, LLC, for the development of affordable housing on the 20-acre site known as Falcon Crest and the LaRocca Villas. The amendment can be broken down as follows. The original Stipulated Sum Agreement addressed public agency fees and permits; however, since negotiations were finalized, these fees have increased. Pursuant to Section 2.5 of the Development Agreement, it is the Agency's responsibility to pay for the increase in these fees. These fees represent $96,827.90 of the requested amendment amount (See Exhibit A). After careful City/Agency review, a number of the design elements were upgraded over the ComDyn budget after model construction to reflect a higher quality of design. These items were not only aesthetic in nature, but represented functionality issues for the potential buyers. Exterior aesthetic items requested to work in accordance with the architect's original vision Staff Report Approve Amendment No. 10 to Contract No. R23390 (ComDyn PD, LLC) Page 2 of 2 June 14, 2007 include awnings and brick and tile elements surrounding door frames. Interior elements to aid in the functionality of the homes for potential buyers include easily assessable telephone and power jacks (second floor Plan 3 and 4), the in both the entryways and kitchens for the purpose of withstanding long term family usage, and a kitchen island in Plan 1 that would accommodate family seating. Garage doors were also changed to reflect the look and appearance in design as reviewed and approved by the Architectural Review Commission on October 26, 2004. These changes have been implemented in the model homes and Phase I. They have not yet been implemented in Phase II and III. Many of the items were requested to be tested for implementation in the model units to determine if they were necessary. The total amount of this work requested by ComDyn is $243,341.24. Please refer to Exhibit A for detailed information. The CVWD reclaimed water line (removal and replacement) was a condition placed on the construction of the development by CVWD after the agreement with ComDyn was executed. An existing irrigation line running along the Portola Country Club and underneath the site of the western barrier wall for Falcon Crest servicing adjacent residents was extremely aged and deteriorating. CVWD informed the Agency that any construction would shatter the pipe and it would be the responsibility of the Agency to replace the line. CVWD worked in conjunction with ComDyn to remove and replace the line, preventing further damage to existing construction. The amount of this work requested by ComDyn is $29,622.33. The final item is a deduction for work to the interior of the senior management/laundry facility at the La Rocca Villas. After analyzing the functionality of the management/laundry facility, the original interior design would not allow the space to be properly utilized by management staff and those residents seeking to use the laundry room. The total credited amount is $42,239.00. The Agency -approved contract expressly states and defines the Owner's responsibility for additional costs in Section 4.1, Items (a) through 0). Although the work was requested at an earlier date, staff was just presented with associated costs and requests for amendments to the Stipulated Sum in May 2007. Staff has reviewed ComDyn's request for additional funding and agrees that the requests are substantiated by the Development Agreement. The total amount of Amendment No. 10 represents 1.2 percent of the total budget for both Falcon Crest and La Rocca Villas. Please refer to the attached Exhibit A, which outlines the additional costs associated with Amendment No. 10. Submitted By: �Al X"/w Catherine Walker Senior Management Analyst J i McCarthy, ACM Relevelopment Carlos L. Orte_ a, Executive Director G.\rda\Beth Longman\Staff Reports\Walker\ComDyn Amend 10 061407.doc Department Head: �e Yrigoyen / Director of Re velopment/Housing P 1 Gi on, Director of Finance kU 6Y RDA 5 —c7 oN to -14.0'7 VERIFIED BY RK.101(Affl Original on file with City erk's Office Exhibit A To ComDyn PD, LLC, Amendment No. 10 Staff Report NO. ITEM DESCRIPTION 1 First American Title Recordation of the 20 easement and Fees attest forms for the Portola Country Club 2 Transportation Mitigation Fee (TUMF) Phase II and III 3 CVWD Sewer and Water Plan Check Fee 4 CVWD Reclaimed Water Irrigation Line (removal and replacement) 5 Senior Villa Sink Upgrade 6 Plan 1 Kitchen Island 7 Telephone and Power Jacks/Second Floor Plan 3 and 4 8 Awnings As of January 2007, a fee increase in the amount of $1,043.13 per home was instituted CVWD fee changes as of 9/1/06 affecting CVWD Water System Back- up Facility Charge, CVWD Irrigation Meters, and CVWD Impact Fees Senior Management Building Existing irrigation line servicing adjacent Portola Country Club running north/south was advanced in age. Informed by CVWD that construction movement would shatter the pipe. Line was replaced for Falcon Crest and the adjacent residents' benefit to prevent any possible damage and insure longevity. Elected stainless steel kitchen sinks instead of white enamel in La Rocca Villas. The purpose is for longevity and in accordance with existing units. Has not been implemented. Requested design amendment to improve existing kitchen island design feature in Plan 1 of Falcon Crest. Did not accommodate sedentary usage. Total of 24 Plan 1 homes. Have implemented the change in 10 homes and implementation is intended in the remaining 14 homes. Requested telephone and power jacks to landing desk feature on second floor of Plan 3 and 4, not functional without power. Total of 49 Plan 3 and 4 homes, has been implemented in 16, intended to be implemented in 33 additional. Architectural elements conceived by KHA architect partially represented to ComDyn. Agency to divide cost of implementation with ComDyn. COST CONTRACT 707.00 Authorized pursuant to Section 2.5 of the Development Agreement 31,793.90 Authorized pursuant to Section 5.9 of the Development Agreement 64,327.00 Authorized pursuant to Section Exhibit B.3 C of the Development Agreement 29,622.33 3,329.37 7,935.00 5,670.00 18,702.65 Exhibit A To ComDyn PD, LLC, Amendment No. 10 Staff Report 9 Brick and Tile 10 Entry and Kitchen Tile 11 Garage Doors 12 Add photovoltaic panels to 1 home on Lot 9 13 Senior Management/Laundry Facility Architectural elements conceived by KHA not clearly represented to ComDyn during RFP process. Has been implemented on 29 homes and models. Has not been implemented in Phase 111. ComDyn's bid proposal reflected the use of 8 x 8 the in the entry and vinyl in the kitchen, which is not standard in terms of aesthetic or functionality in Palm Desert. Have the tendency to deteriorate at a faster rate with daily wear. 18 x 18 supplemented for both entry and kitchen. Implemented in 29 Phase I homes and models. Not yet implemented in Phase II or III. Architectural elements conceived by Kristi Hanson Architects and approved by ARC on 10/26/04 were not shown in significant detail in the RFP. The doors represent 20% of the front view of the houses and reflect the elevations approved by the ARC. The door type allows for the variation called out by KHA. Standard metal doors will not achieve this effect. On 7/13/06, the Agency Board approved the photovoltaic program for 75 Falcon Crest homes and the La Rocca Villas. On 5/22/07, ComDyn presented information to the Agency requesting the inclusion of the home on Lot 9. Further evaluation showed that 1.89 kw of PV would be added to this roof elevation. Utility and functionality of management/laundry facility analyzed. The amount budgeted in contract for a portion of conceived built-ins and interior decorating credited to the Stipulated Sum. 57,734.06 94,687.16 84,000.00 13,522.00 (42,239.00) Budget line items 30- 3303 & 70-7306 TOTAL $369,791.47 G:\rda\Belh Longman\Staff ReportsMalker\c mDyn Amend 10 061407.doc Y. N � O V Z cr M W 0 0: LU d 0 0 O 3 W Q ~ J W U LU LU 2 W gZ O V oZt) N U J 0 � LL 0 ZOn. 5, LU C N = U H z 0 0 .a w O Q C O m CL O n CL Q cc c 0 U �z Uw 0 z 'TZZ~ coo 00 O Q Q Q CY) z z z U U U coo000 C U (D O (d C O C7 Ocav Z Um 0 z U o LL O oF=-V :.. c N O N Z O Q CL 0 U-) Q =� (0 00 00 LO O 'O V N Q) U +� UIt F� N N I` O 1 6 c 1 O qT N 1-: V-: �-- f� O d d' LO LO O (D Il- (D O f— N N N d Il- d (D 00 0 T- r- c- c- e- Ln r. 00 06 O) O) O) O) 4: O) N N N N N N N (N N 0 0 0 0 0 0 0 0 0 d' r- co M O r- CD 0 1- d LOI-•--000T-N Lr)vc0000001 0 00000 0001- 0 O w 0 M L()'c 014, Q) ` C P- OOO) O r-M00r- a)�� r- �' 072 0 N� O UsUUQ CV)co 9 L0!) �NNLO e- V- Z O V � N C O o� '+ +� c U f� C N CL �C �a E U cc v �Q) O Em O U O LL m(n� O m w U- O N Q' E c5 c�co c0i "ch 0 Q°, � � a U .0 m O N >-0LL O O W U M L; cad U Q CL ytn O Q) N U _ 0 (� U x ti ,�, >. c OLU U Q.OQ' ODU�a.J a_ �= C N (D(CO ( dU�M J I—�U 0 U ti N CM N M N M v T- M m J 0 H Or O C z LU O f- 0 z LU N O z O 0 c O d N is m C O LL PALM DESERT REDEVELOPMENT AGENCY Contract # / P.O. # I R23390 Amendment/ 10 PROFESSIONAL SERVICE AMENDMENT Change Order No. Contingency: I YES NO X Contract Purpose Develop affordable housing on 20 AC site Account No. I 870-4698-466-4001 Consultant's Name ComDyn PD, LLC Project No. Address: 2800 28'h Street, Suite 206 vendor No. 8948 Santa Monica, CA 90405 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE DESCRIPTION OF CHANGES In Contract Price In Contract Price Change scope of Development Agreement for Falcon Crest and La Rocca Villas per Exhibit A attached TOTALS: NET CHANGE IN CONTRACT PRICE: JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 29,177,129.67 CONTINGENCY: Less: Expend. & Encumb. To Date: - 29,177,129.67 Amount Approved by Board: + Less: This Change Order Amount: - 369,791.47 Less: Prior Amendment(s): - BALANCE OF BUDGET Less: This Amendment: - REMAINING FOR PROJECT: (369,791.47) Balance Remaining of Contingency: 369,791.47 369,791.47 369,791.47 The amount of the Contract will be (Decreased) Increased by the Sum of: Three Hundred Sixtv-nine Thousand, Seven Hundred Ninetv-one and 47/100 Dollars ($369,791.47). W \Agenda Items\2007-June 14\ComDyn Amend 10�A.mend Form doc See reverse Contract R23390 Amendment No. 10 Continued from front This Contract Amendment covers changes to the subject contract as described herein. The consultant shall perform all work as necessary or required to complete the Contract Amendment items for a lump sum price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as Owner. Contract Time Extension Days. Revised Contract Total $29,546,921.14 . The undersigned Consultant approves the foregoing Contract Amendment # 10 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Contract Amendment # 10 . The Consultant agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Contract Amendment items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the Owner. Execution of this Contract Amendment by the Consultant constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Contract Amendment, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of productivity, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: CERTIFIED FUNDS AVAILABLE: EXECUTIVE DIRECTOR FINANCE DIRECTOR NOTE: No payments will be made prior to Executive Director and Agency Board approval 2. ACCEPTED BY: CONSULTANT 4. APPROVED BY: RICHARD S. KELLY, CHAIRMAN SECRETARY 6/14/07 Date Approved 6/14/07 Date Approved W \Agenda Items\2007-June 14\ComDyn Amend 10\Amend Form doc See reverse NO 2 3 ITEM First American Title Fees Transportation Mitigation Fee (TUMF) Phase II and III CVWD Sewer and Water Plan Check Fee 4 CVWD Reclaimed Water Irrigation Line (removal and replacement) 5 Senior Villa Sink Upgrade 6 Plan 1 Kitchen Island 7 Telephone and Power Jacks/Second Floor Plan 3 and 4 8 Awnings Exhibit A Contract Amendment No. 10 DESCRIPTION Recordation of the 20 easement and attest forms for the Portola Country Club As of January 2007, a fee increase in the amount of $1,043.13 per home was instituted CVWD fee changes as of 9/1/06 affecting CVWD Water System Back- up Facility Charge, CVWD Irrigation Meters, and CVWD Impact Fees Senior Management Building Existing irrigation line servicing adjacent Portola Country Club running north/south was advanced in age. Informed by CVWD that construction movement would shatter the pipe. Line was replaced for Falcon Crest and the adjacent residents' benefit to prevent any possible damage and insure longevity. Elected stainless steel kitchen sinks instead of white enamel in La Rocca Villas. The purpose is for longevity and in accordance with existing units. Has not been implemented. Requested design amendment to improve existing kitchen island design feature in Plan 1 of Falcon Crest. Did not accommodate sedentary usage. Total of 24 Plan 1 homes. Have implemented the change in 10 homes and implementation is intended in the remaining 14 homes. Requested telephone and power jacks to landing desk feature on second floor of Plan 3 and 4, not functional without power. Total of 49 Plan 3 and 4 homes, has been implemented in 16, intended to be implemented in 33 additional. Architectural elements conceived by KHA architect partially represented to ComDyn. Agency to divide cost of implementation with ComDyn. COST CONTRACT 707.00 Authorized pursuant to Section 2.5 of the Development Agreement 31,793.90 Authorized pursuant to Section 5.9 of the Development Agreement 64,327.00 Authorized pursuant to Section Exhibit B.3 C of the Development Agreement 29,622.33 3,329.37 7,935.00 5,670.00 18,702.65 9 Brick and Tile 10 11 12 13 Entry and Kitchen Tile Garage Doors Add photovoltaic panels to 1 home on Lot 9 Senior Management/Laundry Facility Exhibit A Contract Amendment No. 10 Architectural elements conceived by KHA not clearly represented to ComDyn during RFP process. Has been implemented on 29 homes and models. Has not been implemented in Phase III. ComDyn's bid proposal reflected the use of 8 x 8 the in the entry and vinyl in the kitchen, which is not standard in terms of aesthetic or functionality in Palm Desert. Have the tendency to deteriorate at a faster rate with daily wear. 18 x 18 supplemented for both entry and kitchen. Implemented in 29 Phase I homes and models. Not yet implemented in Phase II or III. Architectural elements conceived by Kristi Hanson Architects and approved by ARC on 10/26/04 were not shown in significant detail in the RFP. The doors represent 20% of the front view of the houses and reflect the elevations approved by the ARC. The door type allows for the variation called out by KHA. Standard metal doors will not achieve this effect. On 7/13/06, the Agency Board approved the photovoltaic program for 75 Falcon Crest homes and the La Rocca Villas. On 5/22/07, ComDyn presented information to the Agency requesting the inclusion of the home on Lot 9. Further evaluation showed that 1.89 kw of PV would be added to this roof elevation. Utility and functionality of management/laundry facility analyzed. The amount budgeted in contract for a portion of conceived built-ins and interior decorating credited to the Stipulated Sum. 57,734.06 94,687.16 84, 000.00 13, 522.00 (42,239.00) Budget line items 30- 3303 & 70-7306 TOTAL $369,791.47 W.\Agenda Items\2007-June 14\ComDyn Amend 10\Sta11 Rpt.doc