PALM DESERT REDEVELOPMENT AGENCY
REQUEST:
SUBMITTED BY
STAFF REPORT
AUTHORIZE PROFESSIONAL SERVICE AMENDMENT NO. 1 IN
AN AMOUNT NOT -TO -EXCEED $5,000 TO STANTEC
CONSULTING, INC. (CONTRACT NO. R24310) FOR
ADDITIONAL SERVICES FOR THE ALESSANDRO ALLEY
IMPROVEMENTS
BRYCE L. WHITE, PROJECT ADMINISTRATOR
CONTRACTOR: STANTEC CONSULTING, INC.
73-733 FRED WARING DRIVE, STE. 100
PALM DESERT, CA 92260
DATE:
MARCH 22, 2007
CONTENTS: PROFESSIONAL SERVICE AMENDMENT NO. 1
ALESSANDRO ALLEY IMPROVEMENTS ADDITIONAL SCOPE
OF WORK
Recommendation:
By Minute Motion, that the Agency Board:
Authorize professional service Amendment No. 1 in an amount not -to -
exceed $5,000 to Stantec Consulting, Inc. (Contract No. R24310) for
additional services for the Alessandro Alley Improvements; and
2. Authorize Finance Director to move $5,000 from contingency balance of
$31,237 (Account No. 850-4341-433-4001) to base for the subject
amendment.
Discussion:
The Alessandro Alley runs behind the commercial area on the north side of Highway
111 from Las Palmas Avenue to approximately 300 feet east of Monterey Avenue. The
conceptual plan will widen the alley by 26.5 feet to a total width of 46.5 feet; providing
parking at a 900 angle on the north side of the alley; and close off San Marcos Street
from the alley to San Clemente Circle. The conceptual Alessandro Alley design
contains 169 parking spaces along the north side with landscaping and a barrier wail
protecting the adjoining residential properties.
Staff Report
Authorize Amendment No. 1 to Stantec Consulting, Inc. (Contract No. R24310) -
Alessandro Alley Improvements
Page 2 of 2
March 22, 2007
On March 23, 2006, the Redevelopment Agency Board entered into a contract with
Stantec Consulting, Inc., for professional engineering services for the Alessandro Alley
Improvements.
Additional services are required to prepare renderings for submittal to the Architectural
Review Commission identifying the proposed alley improvements including landscape,
wall, pilasters, and light fixtures in an amount not -to -exceed $5,000 which Staff
recommends approval,10.
Submitted by:
A
Bry e . Whi
P ' ct Ad jniat7or*
mh
Approval:
J ti McCarthy, AC development
Carlos l!�eg , Executive Director
Department Head:
�ve Yrigc
Director of
nt/Housing
Paul S. Gibson, Director of Finance
wr BY RDA
ON 1-�5 . -� G%
VERIFIED BY �irl`lYl
J
Original on file with City Clerk's Office
Wrda\Maria Hunt\WPDATA\HOUSING\WHITE\stfrpts\032207Amendl ContractR24310.doc
PALM DESERT R-09YELOnUNT AGENCY
PREWESSIONAL SERA E- ANNNSWNT
Contract Purpose Engineering services for Alessandro Alley project
Consultant's Name Stantec Consulting, Inc.
Address: 73-733 Fred Waring Drive, Suite 100
Palm Desert, CA 92260
Contract # / P.O. # R24310 13050
Amendment/ 1
Change Order No.
Contingency: YES X NO
Account No. 850-4341-433-4001
Project No.
Vendor No. 1 8991
You are hereby requested to comply with the following changes from the contract plans and specifications:
DECREASE INCREASE
DESCRIPTION OF CHANGES In Contract Price In Contract Price
Additional engineering services 5,000.00
TOTALS:
NET CHANGE IN CONTRACT PRICE:
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT: +
317,375.00
Less: Expend. & Encumb. To Date: -
317,375.00
Less: This Change Order Amount: -
5,000.00
BALANCE OF BUDGET
REMAINING FOR PROJECT:
(5,000.00)
CONTINGENCY:
Amount Approved by Board:
Less: Prior Amendment(s):
Less: This Amendment:
Balance Remaining of Contingency:
5,000.00
5,000.00
+ 31,237.00
- 5,000.00
26,237.00
The amount of the Contract will be (119s€eased) Increased by the Sum of: Five Thousand and no/100
Dollars ($5,000.00).
G \rda\Beth Longman\Staff ReOorts\White\Prof Svc Amend No 1 Form.doc See reverse
Contract R24310 Amendment No. 1 Continued from front
This Professional Service Amendment covers changes to the subject contract as described herein. The consultant
shall perform all work as necessary or required to complete the Professional Service Amendment items for a lump
sum price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as
Owner.
Contract Time Extension -0- Days.
Revised Contract Total $317,375.00
The undersigned Consultant approves the foregoing Professional Service Amendment # 1 as to the changes, if any,
in the contract price specified for each item including any and all supervision costs and other miscellaneous costs
relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on
account of said Professional Service Amendment # 1 . The Consultant agrees to furnish all labor and materials and
perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required
to complete the Professional Service Amendment items. This document will become a supplement of the contract and
all provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the
Owner.
Execution of this Professional Service Amendment by the Consultant constitutes a binding accord and satisfaction that
fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or
equity, arising out of or related to the subject of the Professional Service Amendment, whether known or unknown,
including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of
productivity, as well as any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
REQUESTED BY:
3. CERTIFIED
FUNDS AVAILABLE:
EXECUTIVE DIRECTOR
FINANCE DIRECTOR
NOTE: No payments will be made
prior to Executive Director and
Agency Board approval
2. ACCEPTED BY:
CONSULTANT Date Accepted
4. APPROVED BY: 3/22/07
RICHARD S. KELLY, CHAIRMAN Date Approved
3/22/07
SECRETARY Date Approved
G:\rda\Beth Longman\Staff Reports\White\Prof Svc Amend No 1 Form doc See reverse
CITY OF PALM DESERT REDEVELOPMENT AGENCY
ALESSANDRO ALLEY IMPROVEMENTS
ADDITIONAL SCOPE OF WORK
PROFESSIONAL CONSULTING SERVICES
I. ARCHITECTURAL REVIEW COMMITTEE RENDERINGS
TASK I: Conceptual Rendering Development
In coordination with City Staff and the project team, Stantec will prepare renderings that
identify the proposed alley improvements including: landscape, wall, pilaster, light
fixture with alternate ornamental light fixture options.
..............................................................................Fixed Fee. $ 3000.00
TASK II: Project Management Services
Stantec will attend additional meetings for coordination, and presentations with the City,
consultant team, and agency committees, during the conceptual rendering approval.
These services will be charged on a time and materials basis against this budgeted
amount. Budgeted amounts shall not be exceeded without Client's authorization.
..............................................................................T&M 2 Budget: $ 000.00
FEE SCHEDULE FOR ADDITIONAL WORK AUTHORIZATION
February 13, 2007
Stantec will provide the Additional Scope of Services according to the following Fee Schedule.
TASK I: Conceptual Rendering Development .......................... Fixed Fee: $ 3,000.00
TASK II Project Management Services ................................. T&M Budget: $ 2,000.00
Total.............................................................................. $5,000.00
• The following items are not included in this scope of work:
• Landscape Construction Documents
• Architectural Design
• Architectural Color Boards
• Off -site studies or improvements
• Electrical Engineering / Lighting Design
• Graphic Design
• Structural Design
O \201 1029\201_102900\dues\addendum\07-02-13 Allesandro ARC Scope and Fee (3).duc