HomeMy WebLinkAboutSR - R26540 - SCE Installation of Dist. LinePALM DESERT REDEVELOPMENT AGENCY Contract No. R26540
STAFF REPORT
REQUEST: AUTHORIZE THE EXECUTIVE DIRECTOR TO SIGN AN AGREEMENT
WITH SOUTHERN CALIFORNIA EDISON FOR THE INSTALLATION OF
A DISTRIBUTION LINE TO SERVICE THE 14-SELF HELP LOTS
LOCATED ON MERLE STREET
SUBMITTED BY: CATHERINE WALKER, SENIOR MANAGEMENT ANALYST
CONTRACTOR: SOUTHERN CALIFORNIA EDISON
P.O. BOX 11982
SANTA ANA, CA 92711
DATE: MAY 24, 2007
CONTENTS: SCE RESIDENTIAL ELECTRIC LINE EXTENSION AGREEMENT AND
CONTRACT
Recommendation:
By Minute Motion, that the Agency Board authorize the Executive Director to sign
the Southern California Edison contract for the extension of an electric distribution
line and residential line extension agreement to service the self-help lots along
Merle Street.
Executive Summarv:
The attached contracts allow for the installation and all service associated with the extension of
the main electricity line, currently servicing the Falcon Crest Development, to the fourteen (14)
self-help lots along Merle Street. All costs associated with the extension of this line are included
in ComDyn's Stipulated Sum, and therefore, represent no additional expenditure on the part of
the Agency. The installation of this line will allow for service to future development.
Submitted by:
Catherine Walker /l�
Senior Management Analyst
Approval:
sti McCarthy, ACevelopment
G:\rda\Cathy Walker\Word Data\STAFF REPORTS\Staff SCE MERLE.doc
Department Head:
i
Dave Yngoyye�
Director of daR
L.
UN e5- a H-01
)pment/Housing
Itor of Finance
:ecd a Director
VERIFIED BY L91 n1 f�
Original on file with City Clerk's Office
SOLIHI RN ( AI If ORNIA
EDISON'
u /MSO\ I\IlR\ IIIU\ Il llonp.M
December 12, 2006
PALM DES REDEV AGNCY
73-510 FRED WARING DR
PALM DESERT, CA 92260
Subject: SCE Project Number: 6479-1857, 61807
Project location: HOVLEY/COOK ST
PALM DESERT, CA 92260
Thank you for the opportunity to assist you with your electrical needs.
The information provided below indicates requirements needed to complete
your project. Please read and follow the directions so that your project
may be completed in a timely manner.
o Enclosed are two copies of our revised invoice. Return one copy of the
invoice with your payment.
o Please return all applications and/or agreements fully completed.
o Easement documents will be mailed directly to you from our
Right -of -Way Department. Please complete and return as directed.
o An Edison Inspector must approve all underground systems. Call
(760)202-4237 prior to construction.
o Call the Edison Company at (800)684-8123 to make application for
electrical service.
o Final electrical inspection from the Local Governmental Building and
Safety Department must be received before we can energize your service.
o ENCLOSED ARE COPIES REFUNDABLE AND DISCOUNT APPENDICES. PLEASE SIGN
ONE AS "CHOSEN" AND THE OTHER AS "NOT CHOSEN" AND RETURN.
Please return the documents and/or payment in the enclosed self-addressed
envelope. After receipt of the required documents, your project will be
scheduled for construction. If you have any questions, feel free to
call me at (951)928-8294.
Sincerely,
BERTRAM E WILLIAMS
Customer Service Planner
Enclosures
?b 1 uu Mcnilcc Road
Ronwland. CA 92585
Contract No. R2.6540
Y)l MR\(AMORNIA
EDISON'
December 12, 2006
SALES INVOICE
NAME:
PROJECT LOCATION:
PALM DES REDEV AGNCY
HOVLEY/COOK ST
PALM DESERT, CA 92260
PLEASE MAIL PAYMENT TO:
SOUTHERN CALIFORNIA EDISON CO.
ATTN: BERTRAM E WILLIAMS
26100 MENIFEE RD
ROMOLAND, CA 92585
PROJECT DESCRIPTION: 61807, R15 LINE EXT REL TO TR 30795
LOT SALES, LOTS 95-108
All prices are applicable for a period of 90 days
from this date and are subject to change thereafter.
------------------------------------------------------------------------
CUSTOMER INVOICE
INFORMATION
SCE
ACCOUNTING
------------------------------------------------------------------------
Amount To Be Paid By
$ 27,157.00
Cust Adv
for Const-ITCC/Ref
Applicant To SCE
252.130
= $ 18,407.00
TOTAL =
$ 27,157.00
ITCC Cust
Adv/Non-Ref
253.930
= $ 1,648.50
LESS ADVANCE
$ 12,128.12
ITCC Cust
Adv/Ref
--------------
253.931
= $ 7,101.50
PLEASE PAY THIS AMOUNT
$ 15,028.88
LESS ADVANCE $ 12,128.12
--------------
TOTAL $ 15,028.88
SCE PROJECT NUMBER:
6479-1857, 61807
C.W.O.# C.J.O.#
Name: PALM DES REDEV AGNCY
Prj Loc HOVLEY/COOK ST
PALM DESERT, CA 92260
2(-)100 N1cnifcc Road
Romulmid. CA 92585
Contract No. R26540
MWIMRN CAHIORNIA
EDISON'
12mjWj 6 APPENDIX A - REFUNDABLE OPTION
`VT9IDENTIAL ELECTRIC LINE EXTENSION AGREEMENT
LOC. 6479 W.O. 1857 A.I. 61807 JOB ## 000445392
1. SCE RULE 16 COST TO SERVE
(A) SCE RULE 16 COST TO SERVE $.00
(B) LESS APPLICANT ALLOWANCES $.00
(C) EXCESS RULE 16 COST TO (LINE 5. (A)) $.00
(D) EXCESS ALLOWANCES TO (LINE 2.) $.00
SCE COST TO SERVE RULE 15
(E) OVERHEAD 0 FEET X $.00 UNIT COST
(F) UNDERGROUND 0 FEET X $.00 UNIT COST
(G) PROJECT SPECIFIC(IF 2X UNIT COST OR COMPETITIVE BID)
(H) TOTAL SCE RULE 15 COST TO SERVE
2. APPLICANT ALLOWANCES (FROM LINE 1. (D))
3. REFUNDABLE:
(A) SCE RULE 15 COST TO SERVE (LINE 1.(H))
(B) PLUS ESTIMATED VALUE OF STRUCTURES
(C) SUBTOTAL (LINE 3 . (A) + 3 . (B) )
(D) LESS ALLOWANCE (LINE 2)
(E) REFUNDABLE AMOUNT (LINE 3.(C) - 3.(D))
(F) PLUS REFUNDABLE ITCC* ON LINE 3.(E)
(G) TOTAL AMOUNT (LINE 3 . (E) + 3. (F) )
4. PAYMENT OPTION SELECTED: REFUNDABLE HAS CHOSEN: SIGN
(A) REFUNDABLE OPTION:
1)
2)
3)
$.00
$.00
$18,407.00
$18,407.00
$18,407.00
$1,883.00
$20,290.00
$.00
$20,290.00
$7,101.50
$27,391.50
LINE 3.(G) $27,391.50
VALUE OF STRUCTURES: $1,883.00
REFUNDABLE PAYMENT: $25,508.50
AMOUNT SUBJECT TO REFUND/CREDIT $27,391.50
5. OTHER NON-REFUNDABLE ADVANCES & CREDITS
(A) OTHER NON-REFUNDABLE CHARGES
(RULE 16, FLAT RATE, INSPECTION, R/W, ETC.)
(B) ITCC* ON OTHER NON-REFUNDABLE
(C) ITCC* ON APPLICANT FURNISHED FACILITIES.
(D) INSTALLED COST OF SUBSTRUCTURE BY SCE
(E) LESS APPLICANT DESIGN OR REIMBURSABLE CREDITS
(F) TOTAL NON-REFUNDABLE (LINE 5. (A) THRU 5. (D) -
(G) TOTAL CREDITS (LINE 5. (E) - 5. (A) THRU 5. (D) )
$.00
$.00
$1,648.50
$.00
$.00
5. (E) $1,648.50
$.00
6. AMOUNT TO BE PAID BY APPLICANT TO SCE
7. AMOUNT TO BE REFUNDED TO APPLICANT UPON FULFILLMENT OF ALL
CONTRACTUAL OBLIGATIONS
HAS NOT CHOSEN: SIGN
* INCOME TAX COMPONENT OF CONTRIBUTION
$27,157.00
$.00
20100 ,\Ienifee Road
Ronmland. CA 1)2585
Contract No. R26540
Y)LAIII RN ( ALI[ORNIA
EDISON'
December 12, 2006
SALES INVOICE
NAME:
PROJECT LOCATION
PALM DES REDEV AGNCY
HOVLEY/COOK ST
PALM DESERT, CA 92260
PLEASE MAIL PAYMENT TO:
SOUTHERN CALIFORNIA EDISON CO.
ATTN: BERTRAM E WILLIAMS
26100 MENIFEE RD
ROMOLAND, CA 92585
PROJECT DESCRIPTION: 61807, R15 LINE EXT REL TO TR 30795
LOT SALES, LOTS 95-108
All prices are applicable for a period of 90 days
from this date and are subject to change thereafter.
------------------------------------------------------------------------
CUSTOMER INVOICE
INFORMATION
SCE
ACCOUNTING
------------------------------------------------------------------------
Amount To Be Paid By
$
13,461.25
Cust Adv
Non-Ref-ITCC/Non-Ref
Applicant To SCE
142.130
= $ 8,262.00
TOTAL =
$
13,461.25
ITCC Cust
Adv/Non-Ref
253.930
= $ 5,199.25
LESS ADVANCE
$
12,128.12
PLEASE PAY THIS AMOUNT
--------------
$
1,333.13
LESS ADVANCE $ 12,128.12
--------------
TOTAL $ 1,333.13
SCE PROJECT NUMBER:
6479-1857, 61807
C.W.O.# C.J.O.#
Name: PALM DES REDEV AGNCY
Prj Loc HOVLEY/COOK ST
PALM DESERT, CA 92260
26100 \lcniIcc Road
Rumoland. CA 92585
Sc)UIIII RN ( XI11ORNIA
EDISON'
1 6 APPENDIX A - DISCOUNT OPTION
nr.rA 'ktg7DENTIAL ELECTRIC LINE EXTENSION AGREEMENT
LOC. 6479 W.O. 1857 A.I. 61807 JOB # 000445392
1. SCE RULE 16 COST TO SERVE
(A) SCE RULE 16 COST TO SERVE
(B) LESS APPLICANT ALLOWANCES
(C) EXCESS RULE 16 COST TO (LINE 5. (A))
(D) EXCESS ALLOWANCES TO (LINE 2.)
SCE COST TO SERVE RULE 15
(E) OVERHEAD 0 FEET X $.00 UNIT COST
(F) UNDERGROUND 0 FEET X $.00 UNIT COST
(G) PROJECT SPECIFIC(IF 2X UNIT COST OR COMPETITIVE BID)
(H) TOTAL SCE RULE 15 COST TO SERVE
2. APPLICANT ALLOWANCES (FROM LINE 1. (D))
3. REFUNDABLE:
(A) SCE RULE 15 COST TO SERVE (LINE 1.(H))
(B) PLUS ESTIMATED VALUE OF STRUCTURES
(C) SUBTOTAL (LINE 3 . (A) + 3 . (B) )
(D) LESS ALLOWANCE (LINE 2)
(E) REFUNDABLE AMOUNT (LINE 3.(C) - 3.(D))
(F) PLUS REFUNDABLE ITCC* ON LINE 3.(E)
(G) TOTAL AMOUNT (LINE 3 . (E) + 3 . (F) )
4. PAYMENT OPTION SELECTED: DISCOUNT
(A) NON-REFUNDABLE DISCOUNT OPTION:
1)
2)
3)
4)
HAS CHOSEN: SIGN
50%
$.00
$.00
$.00
$.00
$.00
$.00
$18,407.00
$18,407.00
$.00
$18,407.00
$1,883.00
$20,290.00
$.00
$20,290.00
$7,101.50
$27,391.50
50% OF LINE 3G. $13,695.75
VALUE OF STRUCTURES: $1,883.00
NON-REFUNDABLE PAYMENT: $11,812.75
AMOUNT DUE APPLICANT: $.00
S. OTHER NON-REFUNDABLE ADVANCES & CREDITS
(A) OTHER NON-REFUNDABLE CHARGES
(RULE 16, FLAT RATE, INSPECTION, R/W, ETC.)
(B) ITCC* ON OTHER NON-REFUNDABLE
(C) ITCC* ON APPLICANT FURNISHED FACILITIES.
(D) INSTALLED COST OF SUBSTRUCTURE BY SCE
(E) LESS APPLICANT DESIGN OR REIMBURSABLE CREDITS
(F) TOTAL NON-REFUNDABLE (LINE 5. (A) THRU 5. (D) -
(G) TOTAL CREDITS (LINE 5. (E) - 5. (A) THRU 5. (D) )
$.00
$.00
$1,648.50
$.00
$.00
5.(E)) $1,648.50
$.00
6. AMOUNT TO BE PAID BY APPLICANT TO SCE
7. AMOUNT TO BE REFUNDED TO APPLICANT UPON FULFILLMENT OF ALL
CONTRACTUAL OBLIGATIONS
HAS NOT CHOSEN: SIGN
* INCOME TAX COMPONENT OF CONTRIBUTION
$13,461.25
$.00
26 100 .Nlcnil'cc Road
Rotliol.rnd. CA k12585
CONTRACT FOR EXTENSION OF ELECTRIC DISTRIBUTION LINE
RULE NO. 15
1. PARTIES
This contract for Extension of Electric Distribution Line ("Contract") is issued this 12"' day of December, 2006.
The Parties to this Contract are:
PALM DES REDEV AGNCY
("Applicant")
and Southern California Edison Company ("Edison"). Applicant and Edison are referred to individually as
"Party" and collectively as "Parties".
2. RECITALS
Applicant has requested Edison, pursuant to Edison's Rule No. 15, Distribution Line Extensions, to install an
electric distribution line extension ("Line Extension") to the location or locations described as follows:
HOVLEY/COOK ST
PALM DESERT, CA
TRACT# 30795 PH-5
(Hereinafter referred to as "Project")
3. AGREEMENT
3.1 Responsibilities of Applicant
Construction
Applicant shall, in accordance with Edison's specifications and timing requirements for the Project
• Perform route cleaning, tree trimming, trenching, excavating and backfilling and compacting;
• Furnish imported backfill material and dispose of trench spoil as required;
• Furnish, install and transfer ownership to Edison any substructures, conduit, and protective
structures required other than the conduit portion of cable -in -conduit;
• Obtain any necessary construction permits for all work performed by Applicant under this
Contract.
If Applicant elects to have Edison perform any part of this work, Applicant shall pay to Edison, as
specified herein and before the start of construction, Edison's estimated -installed costs thereof.
Rights of Way
Applicant hereby grants to Edison the rights of way and easements for the Line Extension over the
shortest, most practical, available, and acceptable route within Applicant's property for the purpose of
making delivery of electric service hereunder. Such easement shall include the right of access and
right to trim trees as necessary. Where formal rights of way, easements, land leases, or permits are
required by Edison for installation of facilities on or over Applicant's properly, or the property of others,
Applicant understands and agrees that Edison shall not be obligated to install the Line Extension for
the Project unless and until any necessary permanent rights of way, easements, land leases, and
permits, satisfactory to Edison, are granted to or obtained for Edison without cost to or condemnation
by Edison.
SCE 16-330
ADVANCES
Applicant shall contribute or advance, before the start of construction, the refundable and non-
refundable amounts as set forth in Appendix A to this Contract. This includes the costs for
substructures and conduits which Edison had previously installed at its expense in anticipation of the
current Line Extension. Any necessary riser conduit, conduit covering, and miscellaneous riser
material required for the Line Extension shall be furnished or paid for by Applicant and shall be
installed by Edison.
All contributions and advances by Applicant are taxable and shall include an Income Tax Component
of Contribution (ITCC) at the rate provided in Edison's Preliminary Statement. ITCC will be either
refundable or non-refundable depending on whether the corresponding contribution or advance is
refundable or non-refundable.
Joint Applicants. The total contribution or advance from joint Applicants will be apportioned by Edison
among the members of the group in such manner as Applicants mutually agree.
3.2 Responsibilities of Edison
Construction
Edison shall install, own, operate, and maintain the Line Extension to serve the Project. Edison will
install only those facilities that, in Edison's judgment, will be used within a reasonable time to serve
permanent loads.
Refunds
Edison shall make refunds to Applicant in accordance with the provisions of Rule No. 15.
3.3 Ownership of Facilities
Title to and ownership of the Line Extension shall vest in Edison. Applicant does hereby agree that
upon completion and acceptance by Edison of Any Applicant -installed facilities, title to each and every
component part thereof shall immediately pass to Edison free and clear of all liens and encumbrances.
3.4 Service Facilities
Service extensions shall be installed pursuant to Edison's Rule No. 16, Service Extensions.
3.5 Street Lighting Facilities
Street lighting and Line Extensions within the Project solely for service to street lighting equipment shall
be installed in accordance with the appropriate street light tariff schedule. Street light revenues are not
applicable toward allowances or refunds for Line Extensions. Electroliers shall be located at points
determined by the governmental agency having jurisdiction over streets to be dedicated to that agency
or by Applicant for privately owned and maintained streets open to and used by the general public.
3.6 Non -Refundable Discount Option
In lieu of contributing the total refundable amount, Applicant has the option of contributing, on a non-
refundable basis, a percentage of such refundable amount as set forth in Appendix A to this Contract.
Applicant has or has not chosen this option as indicated by signature on Appendix A.
3.7 Refunds
The total refundable amount shall be subject to refund, without interest, in accordance with the
provisions of Rule No. 15, which include the following:
Residential. Refunds will be made on the basis of any new customer permanent load connected to
the Line Extension which produces additional revenues to Edison. The refund will be deducted from
the total refundable amount, and the remaining amount subject to refund will represent that portion of
the Line Extension cost no supported by revenues.
Non -Residential. Refunds will be made on the basis of Applicant or any new customer permanent
load connected to the Line Extension which produces additional revenues to Edison. Edison shall be
responsible to review Applicant's actual net revenue for the first three years from the date Edison is
first ready to serve. Applicant shall be responsible for notifying Edison if new, permanent load is added
the fourth through tenth year from the date Edison is first ready to serve. Such review shall determine
if additional net revenue justifies refunds to Applicant.
Unsupported Extension Cost. When any portion of a refundable amount has not qualified for a
refund at the end of twelve (12) months from the date Edison is first ready to serve, Applicant will pay
to Edison an ownership charge on the remaining refundable balance. The difference between the total
refundable advance and any refunds made or eligible to be made to Applicant shall serve as the basis
of a monthly ownership charge ("base"). Monthly ownership charges are calculated by multiplying the
base times the Customer -financed added facilities percentage in Rule No. 2. Monthly ownership
charges are distinct from the refundable amount and will normally be accumulated and deducted from
refunds due to Applicant. This provision does not apply to individual residential Applicants.
The monthly ownership charges herein shall automatically increase or decrease if the California Public
Utilities Commission should subsequently authorize a higher or lower percentage rate for the monthly
ownership charges, effective on the date of such authorization.
Refund Period. The total refundable amount is subject to refund for a period of ten (10) years after
the Line Extension is first ready to serve. Any unrefunded amount remaining at the end of the ten-year
period shall become property of Edison.
3.8 Payment Adjustments
Contract Compliance. If, after six (6) months following the date Utility is first ready to serve
residential loads for which allowances were granted, one (1) year for non-residential loads, Applicant
fails to take service, or fails to use the service contracted for, Applicant shall pay to Edison an
additional contribution, based on the allowances for the loads actually installed.
Excess Facilities. If the load information provided by Applicant results in Edison having installed
facilities which are in excess of those needed to serve the actual loads, and Edison elects to reduce
such excess facilities, Applicant shall pay to Edison its estimated total costs to remove, abandon, or
replace the excess facilities, less the estimated salvage of any removed facilities.
3.9 Reimbursement to Applicant
Where mutually agreed upon by Edison and Applicant, Applicant may perform Edison's work or install
facilities normally installed by Edison. Such work shall be in accordance with Edison's specifications
and timing requirements. Edison shall reimburse Applicant Edison's estimated installed cost of such
facilities and work by applying a credit toward Applicant's advance. Any amount not so credited shall
be reimbursed to Applicant upon acceptance of the work and facilities by Edison.
3.10 Delays in Construction
Force Majeure. Edison shall not be responsible for any delay in the installation or completion of the
facilities by Edison resulting from the late performance of Applicant's responsibilities under this
Contract, shortage of labor or material, strike, labor disturbance, war, riot, weather conditions,
governmental rule, regulation or order, including orders or judgments of any court or commission,
delay in obtaining necessary land rights, act of God, or any other cause or condition beyond the control
of Edison.
Resources. Edison shall have the right, in the event it is unable to obtain sufficient supplies, materials,
or labor for all of its construction requirements, to allocate materials and labor to construction projects
which it deems, in its sole discretion, most important to serve the needs of its customers. Any delay in
construction hereunder resulting from such allocation shall be deemed to be cause beyond Edison's
control.
Contract Revision. If Applicant does not commence installation of any facilities which are Applicant's
responsibility or Edison is prevented from commencing the installation of the facilities for causes
beyond its reasonable control within one year from the effective date of this Contract, Edison may, in its
discretion, revise its cost estimate and recalculate the refundable and/or non-refundable amounts et
forth herein. Edison will notify Applicant of such increased costs and give the option to either terminate
this Contract or pay Edison the additional charges.
3.11 Contract Termination
If at any time during the term of this Contract, Edison is not the sole supplier of electrical requirements
for the Project, this Contact may be terminated. Upon termination of the Contract, Applicant agrees to
forfeit that portion of the advance paid to Edison for its expenses covering any engineering, surveying,
right of way acquisition and other associated work incurred by Edison. If such expenses are greater or
less than the refundable and/or non-refundable advance, Applicant shall pay to Edison, or Edison shall
refund the balance to Applicant, without interest, as the case may be.
3.12 Indemnification
Applicant shall, at its own cost, defend, indemnify, and hold harmless Edison, its officers, agents,
employees, assigns, and successors in interest from and against any and all liability, damages, losses,
claims, demands, actions, causes of action, costs including attorney's fees and expenses, or any of
them, resulting from the death or injury to any person or damages to any property caused by Applicant
or its contractor and employees, officers or agents of either Applicant or its contractor, or any of them,
and arising out of the performance or nonperformance of their obligations under this contract.
3.13 Assignment of Contract
Applicant may assign this Contract, in whole or in part, only if Edison consents in writing and the party
to who the Contract is assigned agrees in writing, to perform the obligations of Applicant hereunder.
Assignment of the Contract shall not release Applicant from any of the obligations under this Contract
unless otherwise provided herein.
3.14 Joint and Several Liability
Where two or more individuals or entities are joint Applicants under this Contract, all Applicants shall
be jointly and severally liable to comply with all terms and conditions herein.
3.15 Warranty
Applicant warrants that all work and/or equipment furnished or installed by Applicant or its contractor
shall be free of defects in workmanship and material. The warranty period shall begin from the date of
final acceptance by Edison and extend for one (1) year. Should the work develop defects during that
period, Edison, at its election, shall either (a) repair or replace the defective work and/or equipment, or
(b) demand that Applicant repair or replace the defective work and/or equipment and, in either event,
Applicant shall be liable for all costs associated with such repair and/or replacement. Applicant upon
demand by Edison, shall promptly correct, to Edison's satisfaction and that of any governmental
agency having jurisdiction, any breach of any warranty.
3.16 Contract Effective Date
This Contract shall not be effective unless it is (1) executed and delivered by Applicant to Edison
together with payment required hereunder within ninety (90) days of the date in Paragraph 1 of this
Contract and (2) accepted by Edison. This Contract shall then be effective on the date executed by
Edison and shall take effect without further notice to Applicant.
3.17 Commission Jurisdiction
This Contract is subject to the applicable provision of Edison's tariffs, including Rule No. 15, filed and
authorized by the California Public Utilities Commission.
This Contract shall, at all times, be subject to such changes or modifications by the Public Utilities
Commission of the State of California, as said Commission may, from time to time, direct in the
exercise of its jurisdiction.
3.18 Completion Date
The completion date requested by Applicant is X
4. SIGNATURE CLAUSE
The signatures hereto represent that they have been appropriately authorized to enter into this Contract on
behalf of the party for whom they sign.
APPLICANT(S)
CORPORATION, PARTNERSHIP, OR DBA: PALM DES REDEV AGNCY
NAME OF AUTHORIZED INDIVIDUAL: X
SIGNATURE: X
TITLE: X
MAILING ADDRESS: 73-510 FRED WARING DR. PALM DESERT. CA 92260
TELEPHONE: 760-320-8773
ADDITIONAL SIGNATURES FOR JOINT APPLICANTS
NAME OF AUTHORIZED INDIVIDUAL:
SIGNATURE:
TITLE:
ADDITIONAL SIGNATURES FOR JOINT APPLICANTS
NAME OF AUTHORIZED INDIVIDUAL:
SIGNATURE:
TITLE:
MAILING ADDRESS:
TELEPHONE:
APPORTIONMENT OF ADVANCE AMONG JOINT APPLICANTS:
SOUTHERN CALIFORNIA EDISON COMPANY
NAME OF AUTHORIZED INDIVIDUAL: RONALD G ANDERSON
SIGNATURE:
TITLE:
DATE EXECUTED:
DATE EDISON FIRST READY TO SERVE:
New Development Desian: Suaervisor
WORK ORDER NO: 6479-1857/ 61807
ASSOCIATED WORK ORDER NOS: 6479-1000/ 61173
6
SOUTHERN CALIFORNIA EDISON ("SCE")
DISTRIBUTION LINE AND/OR SERVICE EXTENSION
APPLICANT'S INSTALLATION OPTION AND
STATEMENT OF APPLICANT'S CONTRACT ANTICIPATED COSTS
Applicant: PALM DES REDEV AGNCY
Work Order Number: 6479-1857/61807 (TRACT# 30795 PH-5)
Project Specific Location: HOVLEY/COOK ST, PALM DESERT
1. INSTALLATION OPTIONS
Applicant understands that in accordance with SCE's Rule 15 and/or Rule 16, Applicant can elect to
have either SCE install the Distribution Line and/or Service Extension or a Qualified
Contractor/Subcontractor install the Distribution Line and/or Service Extension.
2. SCE'S ESTIMATED REFUNDABLE COST INFORMATION
SCE's estimated refundable costs are based on the work that SCE would normally perform that can
be performed by a Qualified Contractor/Subcontractor under the provisions of the Applicant
Installation Option, Rule 15, Section G, and in accordance with SCE's Terms and Conditions
Agreement for Installation of Distribution Line Extension by Applicant (Form 14-188).
SCE's estimated refundable costs:* $ 18,407.00
If applicable, other estimated cost information may be provided below. This could include the credit
amount for Rule 16, street light, or other associated installation work.
SCE Rule 16 credit amount:*
SCE street light credit amount:* $
SCE associated work credit amount:* $
3. APPLICANT SELECTION
Applicant understands the installation options under Section 1 above, and hereby elects the
following Installation Option by initialing the appropriate selection below:
Installation by SCE
Installation by Qualified Contractor/Subcontractor
Under installation by Qualified Contractor/Subcontractor, Applicant shall secure project specific bid
information from Qualified Contractors/Subcontractors for the installation of the Distribution Line
and/or Service extension. Applicant shall contribute or advance before the start of construction any
refundable or non-refundable amounts as specified in Rules 15 and 16.
*Please refer to the specific contract. Appendix A, for detailed financial information.
Form 14-754, New 7/04
4. APPLICANT'S CONTRACT ANTICIPATED COST INFORMATION (to be completed only
if installation is performed by a Qualified Contractor/Subcontractor as selected in Section 3 above)
Applicant and/or Applicant's Qualified Contractor/Subcontractor understands that for the portion of
the Electrical Distribution and/or Service Extension that SCE would normally install, in accordance
with SCE's Rule's 15 and/or 16 and the Terms and Conditions Agreement for Installation of
Distribution Line Extension by Applicant, the Applicant, prior to performing any work associated
with the installation of these electrical facilities, and for the purpose of utility billing and accounting,
shall elect one of the following options, and return this form to SCE prior to SCE proceeding with
any further work on the Applicant's project.
Option 1 Applicant elects to provide SCE with the Applicant's Contract Anticipated Costs, which
are subject to refund, that are associated with that portion of the new Distribution Line
and/or Service Extension normally installed by SCE, and understands that the lower of
SCE's estimated refundable cost or the Applicant's Contract Anticipated Costs, which
are subject to refund, as submitted below, shall apply to any applicable SCE refunds and
allowances provided in accordance with Rules 15 and 16,' or
Option 2 Applicant elects not to provide SCE with the Applicant's Contract Anticipated Costs,
which are subject to refund. The Applicant understands that by selecting this option, the
Applicant is directing SCE to use SCE's estimated refundable cost for all billing and
accounting.
Applicant understands the Applicant Cost Information, as described above, and hereby elects the
following by initialing the appropriate selection below:
Option 1 - Applicant's Contract Anticipated Costs $
Option 2 - SCE's Estimated Refundable Costs
5. ITCC
SCE shall value all trenching, conduit, backfill, street repair, substructures, and encasement, based
on SCE's estimate of such items, for the purposes of collecting the applicable governmental taxes
(ITCC) on contributions to SCE.
6. UTILITY RESPONSIBILITIES
Upon receipt of this completed and signed form, SCE shall begin the process of producing the
applicable contracts and forms based on the selections made by the Applicant.
7. SIGNATURE
I declare under penalty of perjury that the foregoing is true and correct.
Applicant's signature:
Applicant's printed name:
Date:
' Excludes the estimated costs of work the Applicant cannot perform, such as, work on or in proximity to, energized
equipment.
Form 14-754, New 7/04