PALM DESERT REDEVELOPMENT AGENCY
STAFF REPORT
REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 2 TO
JACOBSSON ENGINEERING CONSTRUCTION, INC.
(CONTRACT NO. R25590) IN THE AMOUNT OF $22,088 FOR
THE PHASE 2 CIVIL IMPROVEMENTS AT ENTRADA DEL
PASEO
SUBMITTED BY: MISSY WIGHTMAN, PROJECT COORDINATOR
CONTRACTOR: JACOBSSON ENGINEERING CONSTRUCTION, INC.
P.O. BOX 14430
PALM DESERT, CA 92255-4430
DATE: OCTOBER 25, 2007
CONTENTS: CHANGE ORDER NO. 2 (C.O.R. NOS. 9, 12, and 14)
Recommendation:
By Minute Motion, that the Agency Board:
(1) Approve Change Order No. 2 to Contract No. R25590 for the
change order requests 9, 12, and 14 in the amount of $22,088 for
the Phase 2 Civil Improvements at Entrada del Paseo; and
(2) Authorize the Finance Director to move this amount from
contingency to base.
Executive Summarv:
Approval of the recommendation will allow the General Contractor to move ahead as
scheduled with modifications to the light pole specifications, additional construction
staking services and the phasing of the final pavement installation as referenced in the
attached change order requests. The above -referenced requests create Change Order
No. 2 in the amount of $22,088.
Discussion:
On 13 July 2006, the Agency Board authorized the award of Contract No. R25590 in the
amount of $695,584.80 to Jacobsson Engineering Construction, Inc. (JEC) for the
construction of the Phase 2 Civil Improvements at the Entrada del Paseo site.
Staff Report
Approve Construction Change Order No. 2 to Jacobsson Engineering Construction, Inc.
(Contract No. R25590) for Phase 2 Civil Improvements
Page 2 of 2
October 25, 2007
During the construction of the Phase 2 Civil Improvements at Entrada Del Paseo, JEC
discovered that the light pole specifications provided in the bid package did not match
the existing ones on site. After review of the specifications, it was agreed that all site
lighting should match the existing both in size and finish. Change Order Request No. 9
allows for the contractor to match the new light poles with the ones currently on site.
The total cost for this modification is $4,130.
Change Order Request No. 12 allows the Agency to reimburse JEC for additional
construction staking services paid to Stantec Engineering in the amount of $4,025.
These services were not included in the original bid package and included additional
staking for street lights, curb and gutter required after revisions were made to the design
to better accommodate access points to the site.
In an effort to avoid damage to the finished pavement by construction
vehicles/equipment while construction continues at La Spiga Restaurant and the
Henderson Community Building, our construction manager and contractor
recommended installing the final pavement lift at a later date. The base layer would be
placed in the meantime, while the final placement would be done at a later date. This
phasing will allow large equipment to get in and out of the site and minimize damage
during construction. The total cost to phase the work is $13,933.
Based on the Architect's, Construction Manager's, and staff's review, Change Order
No. 2 is the amount of $22,088 is recommended for approval to allow the construction
of the Phase 2 Civil Improvements at Entrada Del Paseo to move forward towards
completion.
Submitted by:
Missy W' hiRfan
Project Coordinator
Department Head:
Dave Yri oy
Director o edevelopment/Housing
Carlos L. Ortega, Executive Director
0
actin Alvarez
edevelopment Manager a)
p
°c U v
Approval: �D
CO
McCarthy
AMC Redevelop ent ILL`=
o >
�, o
Paul S. Gibson, Director of Finance
G \rda\Melissa Wightman\Entrada del Paseo Civil Improvements\Staff Report- Change Order2 doc
U ,
z f 00
Z ►l-
U /
O .
w )
(D�
O p C a j
Ln
� G CO j
M c j
O o O
Z Q °oCL
Ix U cc LO
W c
Z /
OO 0
Z
V 2 Z
W U R
Z U W
a�z
Z
Z
Q Z W
O
U Z
ON
� m
QO
U
fnai
O
U
U
ZO U w
Q
U Z Z F-
0 0 Q
J J J
_Z _Z Z_
O O O
0
0
cn O
O
>+L LO
O
ti
O
c L
ItO
C� fli 4- �
c
M
('
0
O m U
Z
U
0
m
Z
U)
LL
c T F-
ol-U
c-0 O M
Oc
a F-
o Z
Q0.0
0OU
00
00
-0 U v7
c)
N O
L
C O O
N
O F- ti
�
U
rn�
�.
cv O
"
E � N
UOa
Z
O
U
O N M ICt (r0
U
0
O
L6
0
0
ri
LO
LO
(o
C)
U)
J
Q
F-
0
i
x
a�
0
J
0
U
c
0
U)
U)
O
U
(0
N
O
O.
N
Q
m
U)
c
f0
CY)
C
O
J
L
N
m
m
CONS UJCT i CRANGS . R
Contract Purpose Construction of La Spiga Phase 2 Civil Imprvmts
Consultant's Name Jacobsson Engineering
Address: P.O. Box 14430
Palm Desert, CA 92260
Contract # / P.O. # R25590 13697
Change Order No. 2
Contingency: YES X I NO
Account No. 850-4358-433-4001
Project No.
Vendor No, 1 2883
You are hereby requested to comply with the following changes from the contract plans and specifications:
DESCRIPTION OF CHANGES DECREASE INCREASE
(Supplemental Plans, Specifications, and Directives dated Attached) In Contract Price In Contract Price
C.O.R. Nos. 9 (site lighting), 12 (reimb of staking svcs provided by Stantec),
and 14 (place asphalt in two lifts) 22,088.00
TOTALS: - 22,088.00
NET CHANGE IN CONTRACT PRICE: 22,088.00
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT: + CONTINGENCY:
Less: Expend. & Encumb. To Date: - Amount Approved by Board: + 69,560.00
Less: This Change Order Amount: - Less: Prior Change Order(s): - 14,465.00
BALANCE OF BUDGET Less: This Change Order: - 22,088.00
REMAINING FOR PROJECT: - Balance Remaining of Contingency: 33,007.00
The amount of the Contract will be (rleer-esGed) Increased by the Sum of: Twentv-two Thousand Eiahtv-eiaht
and 00/100 Dollars ($22,088.00).
G Voa\Beth Longman\Staff Reports\Wightman\Jacobsson CO 2 Fcrm.doc See reverse
Contract R25590 Change Order No. 2 Continued from front
This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish
equipment and materials, and perform all work as necessary or required to complete the Change Order items for a
lump sum price agreed upon between the Contractor and the Palm Desert Redevelopment Agency, otherwise referred
to as Owner.
Contract Time Extension -0- Days.
Revised Contract Total $732,237.80
The undersigned Contractor approves the foregoing Change Order # 2 as to the changes, if any, in the contract
price specified for each item including any and all supervision costs and other miscellaneous costs relating to the
change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said
Change Order # 2 . The Contractor agrees to furnish all labor and materials and perform all other necessary work,
inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order
items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood
that the Change Order shall be effective when approved by the Owner.
Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies,
waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of
or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and
indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as
any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
REQUESTED BY:
CERTIFIED
FUNDS AVAILABLE:
EXECUTIVE DIRECTOR
FINANCE DIRECTOR
NOTE: No payments will be made
prior to Executive Director and
Agency Board approval
2. ACCEPTED BY:
CONTRACTOR Date Accepted
4. APPROVED BY:
RICHARD S. KELLY, CHAIRMAN 10/25/07
SECRETARY 10/25/07
G \rda\Beth Longman\Staff Reports\WightmanWacobsson CO 2 Form doc See reverse
RECEIVED
,101 . l 41;l'
douglas e. barnhart, inc. PalmDesertRDA
August 30, 2007
Melissa Wightman
Project Coordinator
City of Palm Desert, Redevelopment Agency
73-510 Fred Waring Drive
Palm Desert, CA 92260-2578
Subject: deb Project #6016
PDRDA # 967-06
Entrada del Paseo
Phase II Civil Improvements
Highway 111, Palm Desert
Re: Recommendation for award of Change Orders #9, #12, #13 and #14 — Jacobsson
Engineering Construction Inc.
Change Order Request # 9: Increase (7) lightpole bases to 36" diameter from 24" to match existing
lightpole bases.
Amount $ 4,130.00
Change Order Request # 12: Staking for SCE transformer and electrical pedestal pads on 6/28/07. Staking
for street lights and revised curb and gutter on 7/25/07.
Amount $ 4,025.00
Change Order Request # 14: Place asphalt paving in two lifts. This will minimize damage due to continued
construction at the La Spiga restaurant and Henderson Community Center.
Amount $ 13,933.00
Sincerely,
Michael ugo-Thompson
Project Manager
douglas e barnhart, inc.
CHANGE ORDER REQUEST
Page 1
From:
Jacobsson Engineering
Construction, Inc.
P.O. Box 14430
Palm Desert, CA 92255-4430
(760) 340-0194 Fax (760) 340-1574
License: 650389
To:
Palm Desert Red. Agency
73510 Fred Waring Drive
Palm Desert, CA 92260-2578
Request No.: P009
Request Date: 07/05/07
Project:
Entrada Del Paseo
Hwy 111 & E1 Paseo
Palm Desert, CA 92260
We hereby request that the Original Construction Agreement be modified and amended
by the following deviations from original plans and specifications:
Increase concrete and rebar in lightpole base. Plan showns 24" diameter, increase
to 36" diameter.
1. INCREASE LIGHT BASE 7 EA $ 590.00 $ 4.130.00
It is mutually agreed that for such change the contract price is increased by
$4,130.00 (Four Thousand One Hundred Thirty and 00/100) payable with the payments
due under the original construction agreement.
Time for completion of the above cited work is hereby extended 0 days beyond any
completion date set forth in the original contract for such work.
All other provisions of the original contract and agreement shall remain in full
force and effect without change because of the above deviations.
JACOBSSO NGINEEERING CONSTRUCTION, INC.
Signed
Dated:
Title:
2"
Attachment B
L MNAiM ASSEMBLY. REF.
LUNINAIRE SCHEDULE FOR
PART NUNRER.
ROUND NON -TAPERED
STEEL POLE. WHrrCO CAT
NO. WISP-25-50-93-AIL
CONFIRU FINISH OF POLE
AND LUNINAIRE AM
OYMER PRIOR TO
CRDERINC.
CONTRACTOR TO PROVIDE
POLL FOOTING. ANCHOR
BOLTS, LULIWAIRF.S AND
IAOUNRNO HARDWARE
BOLT CIRCLE
BASE PLATE
BASE COVER
BASE PLATE
PROMOF REMO NUT INSIDE
•�•� POLE FOR GROUNDING PER VIED
ARTICLE 00-15(2)
HANDHOLE NLTH
RTNOVABLE COVER
PROVIDE W/OASE COVER
4 AT T n 2 SE PLATE FOR LEVELING
AT TOP a�
BASE PLATE
L
CROUT AFTER LEVELING
ANCHOR BOLT 7YP N6[F,I ANCHOR
t' BOLTS ARE TO DE BOTH LENGTH
LESSER LENGTH SUBMITTAL WILL
BE REJECTED - OIA/ETER IS TO
�•�,..• - '':v • BE PER MANUFACTURER'S
SPECIRCATOH SHEET.
r:i,,-.i\-(J TIES 012' O.C.
I • �:•; S : i' �::: �413 VERTICAL nEOAR
(EOUAILY SPACED)
PION METALLIC CONDUIT+ --NON METALLIC CONOIRT
f. N'•
TO NEXT POLE � ^I•'- FROM PREVIOUS POLE
FOUNDATION (20DO P.S.I.)
CONCRETE.
2r
NO SCALE
CHANGE ORDER REQUEST
Page 1
From:
Jacobsson Engineering
Construction, Inc.
P.O. Box 14430
Palm Desert, CA 92255-4430
(760) 340-0194 Fax (760) 340-1574
License: 650389
To:
Palm Desert Red. Agency
73510 Fred Waring Drive
Palm Desert, CA 92260-2578
Request No.: P012
Request Date: 08/24/07
Project:
Entrada Del Paseo
Hwy 111 & El Paseo
Palm Desert, CA 92260
We hereby request that the Original Construction Agreement be modified and amended
by the following deviations from original plans and specifications:
Staking for dry utilities:
Invoice 159590 (Stantec) $ 1,750.00
Invoice 154906 (Stantec) $ 1,750.00
15% Mark-up $ 525.00
TOTAL $ 4,025.00
This request replaces PO10
It is mutually agreed that for such change the contract price is increased by
$4,025.00 (Four Thousand Twenty -Five and 00/100) payable with the payments due
under the original construction agreement.
Time for completion of the above cited work is hereby extended 0 days beyond any
completion date set forth in the original contract for such work.
All other provisions of the original contract and agreement shall remain in full
force and effect without change because of the above deviations.
JACOBSSON N)GINEERING CONSTRUCTION, INC.
Signed •
Dated:
Title:
Stantec
Bill To Jacobson Engineering
Accounts Payable
41625 Eclectic, Suite 1-1,
Palm Desert CA 92260
United States
INVOICE
-o=r= cn
Page 1
Invoice Number 159590
Invoice Date July 25, 2007
Customer Number 9247
JACOBSON ENG, CONTR., INC. Project Number 2016073812
Project Entrada
Project Manager
Current Invoice Total (USD)
Please Remit To Stantec Consulting Inc. (SCI)
13980 Collections Center Drive
Chicago IL 60693
United States
Mullins, Russell John Contract Upset 3,500.00
(Russ)
Contract Billed to Date 3,500.00
1,750.00
For Period Ending July 13, 2007
Task 200 Stkg Dry Utilities
Professional Services
Task Subtotal
Current Hours
Usage - 2-Person Survey Crew 8.00
Mullins, Russell John (Russ) 0.93
Subtotal Professional Services 8.93
Total Fees
INVOICE TOTAL (USD)
Due on Receipt
Rate Current Amount
200.00 1.600.00
161.00 150.00
1,750.00
1.750.00
1,750.00
1,750.00
stantec.com
LX
U
INVOICE
Page 1
Invoice Number
154906
--}^n
Invoice Date
June 28, 2007
1.Q
Customer Number
9247
Project Number
2016073812
Bill To Jacobson Engineering
RECEIVE® Please Remit To Stantec Consulting Inc. (SCI)
Accounts Payable
13980 Collections Center Drive
41625 Eclectic, Suite L1
,.
Palm Desert CA 92260
Chicago IL 60693
United States
JpCOBSON ENG. CONTR., INC.
United States
Project Entrada
Project Manager
Mullins, Russell John
Contract Upset
3.500.00
(Russ)
Contract Billed to Date
1.750.00
Current Invoice Total (USD)
1,750.00
For Period Ending
June 15, 2007
Task 200 Stkg Dry Utilities
Professional Services
Task Subtotal
Usage - 2-Person Survey Crew
Spurkosky, Michael A
Mullins, Russell John (Russ)
Subtotal Professional Services
Current Hours
6.00
2.00
2.00
Total Fees
INVOICE TOTAL (USD)
Due on Receipt
10.00
Rate
Current Amount
200.00
1,200.00
114.00
228.00
161.00
322.00
1,750.00
1,750.00
1,750.00
1,750.00
stantec.com
CHANGE ORDER REQUEST
Page 1
From:
Jacobsson Engineering
Construction, Inc.
P.O. Box 14430
Palm Desert, CA 92255-4430
(760) 340-0194 Fax (760) 340-1574
License: 650389
To:
Palm Desert Red. Agency
73510 Fred Waring Drive
Palm Desert, CA 92260-2578
Request No.: P014
Request Date: 08/24/07
Project:
Entrada Del Paseo
Hwy 111 & El Paseo
Palm Desert, CA 92260
We hereby request that the Original Construction Agreement be modified and amended
by the following deviations from original plans and specifications:
Per Owner's request, place asphalt paving in two (2) separate move -ins. Price
includes paving mobilization, one day cleaning, tack and overlay.
1. ASPHALT SECOND LIFT 17091 SF $ 0.70/SF
2. CLEANING (1 DAY) 1 LS $ 1970.00/LS
$ 11,963.70
$ 1,970.00
$ 13,933.00
It is mutually agreed that for such change the contract price is increased by
$13,933.00 (Thirteen Thousand Nine Hundred Thirty -Three and 00/100) payable with
the payments due under the original construction agreement.
Time for completion of the above cited work is hereby extended 0 days beyond any
completion date set forth in the original contract for such work.
All other provisions of the original contract and agreement shall remain in full
force and effect without change because of the above deviations.
JACOBSSON INEERING CONSTRUCTION, INC.
Signed:
Dated.
Title:
r-
J O
N
< N
T
m p
61>6061)
6c.�
co
Q
Z
CD 0 I a
m
C9
O
J C3�
N
T
Q T
�
a
Q�»(13,(fl(swOf
Q
Z
Z
J J
w w
w
0
Q
z 0
m
Q Q
Z
Z Z
W .II
Q
M
W
z'
z
01
�I
LLJ
Z
>-z
ac)
w
J0
Qa
a
Q
}
J
Z
0
U)
Z
w
0
�wCV N
m T O O
Z m '7
Q
a
i- LO o T
Z op000p
0 (D 00 Lf
T
w
a
6���
Z1l-aNO
0OMM(D
F- (D 1-- fr)
� T
w
a613� 69� 6co. &3�
0 0
O O
ER EH
N N
Z O o T 0
0 T T CO O
cD CD •— CD
-- CD
m w
a- to
Z M O N
F— O ems- M
0 ~
ULU
w
a
T �
I- M
NOG c O
T OQ
cV U')
619, 6s64
LUo 0
N (MD
J
to (A
a'
QQO O
F--
O
F-
O N N
W J M O O
0 0
= o
aNLO
OOTM Q'� o
Q LU
m O a
Q (A 69
Q m U J a m
Z Z } z
Z Z
00000 a>a oQ N°�
F- a F-
cwi�cwncwnIwauUQ.Qn-a.2 pw Qz mZo�
�� O
>aU�2Y=ONQmU 0�"w Oc~n�cn apJ
pw�-�Q�wW�zzz} a�ocnt)oQ� Wo<C�
UMDR<iaw�Ooog oQ <z w� z
�wUw�OaozF=F-f=Of Zzoo?�ww �Uwo
a(WJ)LL -mmraa000w jz0 >wF-a C90E-�
U Q LL Q> » w w w> a O w c a w Q� O Z Q
Qm02(f) zClwwwo aF-a aa.o2co ax2(D
ASPHALT PAVING WORKSHEET
PROJECT NAME:
SECTION A
SECTION B
SECTION C
OVERLAY ONLY
AC PRICE (PER TON)
BASE PRICE (PER TON)
DIFFICULTY FACTOR
MATERIAL MARK-UP
SUB MARK-UP
LABOR/EQUIP MARK-UP
NUMBER OF MOVE -INS
QUANTITY SUMMARY
SECTION A
SECTION B
SECTION C
OVERLAY
PAVING PRODUCTION
TONNAGE PER DAY
PROD. DAYS
BID DAYS
PAVING COST
CREW COST
MATERIAL COST
SUPERVISION
AGGREGATE BASE
KNOCKDOWN PROD
MATERIAL COST
GRADING COST
IN) I BASE
$ 2.33 $
NA $ 0.10
INCLUDING TAX AND DELIVERY
INCLUDING TAX AND DELIVERY
PAVING MOVE -INS ONLY
BID
kSE TOTAL
0.96 $ 3.29
NA $ 0.10
ASPHALT
BASE
309
412
0
0
0
0
0
309
412
350
1
1
PER TON
PER TON
$ 11, 500.00
1
$11, 500.00
$
37.23
$
42.82
$
73.00
$
83.95
$ 500.00
1
$ 500.00
$
1.62
$
2.02
$
111.85
$
128.79
COST
BID
PER HR
TOTAL HRS
HRLY RATE
PER TON
PER TON
50
8
$ 265.00
$
2,182.71
$
5.30
$
6.10
$
14.00
$
16.10
1850
9
$ 635.00
$
5,866.37
$
14.24
$
17.81
$
0.34
$
33.54
$
40.00