PALM DESERT REDEVELOPMENT AGENCY
STAFF REPORT
REQUEST: APPROVE CONTRACT AMENDMENT NO. 3 IN THE AMOUNT
OF $8,700 TO STANTEC CONSULTING INC. (CONTRACT NO.
R24770) FOR THE PROFESSIONAL DRAFTING/SURVEY
SERVICES OF A ROADWAY AND PARKING EXTENSION AND
ADDITIONAL REIMBURSABLE EXPENSES AT ENTRADA DEL
PASEO
SUBMITTED BY: MISSY WIGHTMAN, PROJECT COORDINATOR
CONTRACTOR: STANTEC CONSULTING INC.
73733 FRED WARING DR. SUITE 100
PALM DESERT, CA 92260-2590
DATE: SEPTEMBER 27, 2007
CONTENTS: STANTEC CONSULTING INC. PROPOSAL
CONTRACT AMENDMENT NO. 3
SITE PLAN
Recommendation:
By Minute Motion, that the Agency Board:
1. Approve Contract Amendment No. 3 in the amount of $8,700 to Stantec
Consulting Inc. (Contract No. R24770) of Palm Desert, California for the
professional drafting/survey services of a roadway and parking extension, and
additional reimbursable expenses at Entrada del Paseo.
Funds are available in Account 850-4358-433-4001.
Executive Summary:
Approval of the staff recommendation will approve a contract amendment to allow
Stantec Consulting Inc. to draft and provide survey/staking services for an extension of
the fire access roadway and additional parking at Entrada del Paseo.
Discussion:
The Phase 2 Civil drawings illustrated a turf block lane extension that provides
emergency access to the rear of the Henderson Building. Once staff received the
pricing for the turf block, staff realized that it would be more cost effective and beneficial
Staff Report
Stantec Consulting Inc. Contract Amendment No. 3 to Contract R24770
Page 2 of 2
September 27, 2007
to extend the paving and parking at this time in this area rather than remove the turf
block at a later date. This would extend the paving from beyond La Spiga's front door to
the end of the fire access lane required for the Henderson Building. In addition, this will
provide an additional 18-20 spaces on either side of the roadway and additional parking
for the remaining pad at Entrada del Paseo.
Based on the new scope of work and proposed breakdown, staff recommends approval
of Contract Amendment No. 3 to allow drawings to be completed for a paving/precise
grade plan of the roadway and parking extension at Entrada del Paseo.
Submitted by:
iisy'
Wi t n
Project C dinator
Department Head:
ve YrigoKedevelopment/Housing
Director o
Approval:
J in McCarthy
CM edevelopment
1114
lop
Carlos L. Ortedg
Executive Director
lartin Alvarez
Redevelopment Manager
(j,014,e�
Paul S. Gibson
Director of Finance
BY RD)% 1
ON _
VERIFIED BY
Original on file with City Clerk's Office
P,&C/01)
G:\rda\Melissa Wightman\Entrada del Paseo Civil Improvements\Stanteccontractamndmtt.doc
Q W
F- L0
Z
O N p
� Otis O i
2 m o0
C "s li')
O 0 "
c
CV
`:
z
Q
i
Ocl
C)
W V
O
p
Z
W O
..,
OOU
LLJ Z
C7
CL z
W U J
�CCn
a
Z
�0U
L)
wp~
z
a
Q c~n
n0
v
a
z
U
U
H Z
U w
Q O
Z
_l
000
U U F-
Q Q Q
Z Z Z
o a C7
cc FE Er
000
!A O
O
O
O
O
O
C U O
0) Lo
O
O
Lo
C O
cj C
�
O
0 c U
z
Um
z
U)_
LL
c -r I-
m
C0 Q(r
o .-
IL F-
0
aCo0
Q
Q oU
O
O
O
� c - cq
cq
LQ
—
W o F
00
U
0
0
— CU 0
o " v
rn
0 0 C7
N
O
r
U
0
0
0
o
O
O
}
rn 0
0
r
Ca O aD
0)
o
U
U a�
0
U
cn
C
O
O
U
Q
Oto
c
N
O C
a
3
-
3
�CD
O 0)
c
a a)
N
ca cn
m _0
_0
-
n
U 0
0
0
a
a
a m
1
ZW
0— N CO C Uo
U
0
r
Lo
0
0
0
0
r-
L6
co
Uy
U)
J
Q
H
0
m
C
z
W
O
z
W
N
H
Z
0
c
O
N
d
V
0
LL
J
0
U
0
r
r
v
N
cr
U
c
Fq
rn
O
a
(1)
ir
c
as
om
c
0
J
t
c
m:
PALM DESERT REDEVELOPMENT AGENCY
PROI ESSION SER WE 11N NT
Contract Purpose Civil and infrastructure for Entrada del Paseo
Consultant's Name Stantec Consulting, Inc.
Address: 73-733 Fred Waring Drive
Palm Desert, CA 92260
Contract # / P.O. # R24770 13111
Amendment/ 3
Change Order No.
Contingency: YES NO X
Account No. 850-4358-433-4001
Project No.
Vendor No. 1 8991
You are hereby requested to comply with the following changes from the contract plans and specifications:
DESCRIPTION OF CHANGES In Contract Price In Contract Price
Additional drafting/survey services 8,300.00
Additional reimbursable expenses 400.00
TOTALS: -
8,700.00
NET CHANGE IN
CONTRACT PRICE:
8,700.00
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT:
+ 79,800.00
CONTINGENCY:
Less: Expend. & Encumb. To Date:
- 79,800.00
Amount Approved by Board: +
5,080.00
Less: This Change Order Amount:
- 8,700.00
Less: Prior Amendment(s): -
BALANCE OF BUDGET
Less: This Amendment: -
REMAINING FOR PROJECT:
(8,700.00)
Balance Remaining of Contingency:
5,080.00
The amount of the Contract will be ("ear -eased) Increased by the Sum of: Eiaht Thousand Seven Hundred &
NO/100 Dollars ($8,700.00).
G \rda\Beth Longman\Staff ReportsMightman\Stantec R24770 Amend 3 Form doc See reverse ...
Contract R24770 Amendment No. 3 Continued from front
This Professional Service Amendment covers changes to the subject contract as described herein. The consultant
shall perform all work as necessary or required to complete the Professional Service Amendment items for a lump
sum price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as
Owner.
Contract Time Extension -0- Days.
Revised Contract Total $88,500.00
The undersigned Consultant approves the foregoing Professional Service Amendment # 3 as to the changes, if any,
in the contract price specified for each item including any and all supervision costs and other miscellaneous costs
relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on
account of said Professional Service Amendment # 3 . The Consultant agrees to furnish all labor and materials and
perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required
to complete the Professional Service Amendment items. This document will become a supplement of the contract and
all provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the
Owner.
Execution of this Professional Service Amendment by the Consultant constitutes a binding accord and satisfaction that
fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or
equity, arising out of or related to the subject of the Professional Service Amendment, whether known or unknown,
including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of
productivity, as well as any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
REQUESTED BY:
3. CERTIFIED
FUNDS AVAILABLE:
EXECUTIVE DIRECTOR
FINANCE DIRECTOR
NOTE: No payments will be made
prior to Executive Director and
Agency Board approval
2. ACCEPTED BY:
CONSULTANT Date Accepted
4. APPROVED BY: 9/27/07
RICHARD S. KELLY, CHAIRMAN Date Approved
9/27/07
SECRETARY Date Approved
G \rda\Beth Longman\Staff ReportsMightman\Stantec R24770 Amend 3 Form.doc See reverse
O°O O Q FC>
00.
r.
aCl
ID
tx
1 C J
tiC,DY� 4SLtl� ` ha teal`'[:
�� 1t.5104R`EyLVtµl1�Q2'b0
T
r' gtte 1'Y.+n
September 12, 2(N)7
CITY OF PALM DESERT REDEVELOPMENT AGENCY
ENTRADA DEL PASEO IMPROVEMENTS
ROADWAY AND PARKING EXTENSION
ADDITIONAL SCOPE OF WORK
ROADWAY AND PARKING EXTENSION AT ENTRADA DEL PASEO
TASK 1: Precise Grade Plan Set Inclusion
Upon a written notice to proceed by the City of Palm Desert, Stantec will proceed with providing a
roadway extension and parking improvement plan for the roadway adjacent to the La Spiga
Restaurant site and to the rear of the Henderson Building. Based on comments from the City of Palm
Desert Public Works Department, revised plan set will be accepted as an additional sheet to the
currently approved Entrada Del Paseo Precise Grading Plans- Delta 2 Revision- City Set number
G1102-1-5.
Street Improvement Plan: An additional sheet (1) plan sheets at 1 "=20' scale, horizontal
control sheet modification and title sheet modification and 1 additional sheet of
modifications. The plan will be prepared in accordance with grading standards and
ordinances of the City of Palm Desert. Stantec will deliver the first submittal within five (5)
business days after receipt of written Notice to Proceed.
Included
o Extension of asphalt roadway to include all of the original fire access "Turf Block" lane.
o Include concrete curb and gutter as needed.
o Drainage analysis to provide positive drainage and retention, as needed.
o ADA compliant sidewalk extensions from new parking areas to La Spiga and to the
Henderson Building
o Optimize number of parking spaces with a goal of 20 spaces and will be provided on both
east and west sides of the new asphalt roadway (no handicap access).
o Locate light poles as needed.
..................................................................... . . Fixed Fee: 5,800 00
Parking spaces and plan will be designed for the area being revised by this plan set.
An additional handicapped parking space will not be provided for this area on the
above mentioned revision. It is recommended that an analysis of the entire site be
made to determine if additional handicapped parking spaces and access requirements
are necessary to meet Ca1Dag requirements as part of an overall parking lot plan.
Task 2: Additional Survey
o Construction layout and staking services for the area designed by this revised plan
set.
..............................Time and Materials, Not to Exceed $2,500.00
k)'I 41738\40744n8\da ti\addendum\0:'-1xt-121>ntrndad DO I'auNI Phase 11 RoadN ac & Parking Patvnvon da
September 12, 2(X)7
FEE SCHEDULE FOR ADDITIONAL WORK AUTHORIZATION
September 12, 2007
Stantec will provide the Additional Scope of Services according to the following Fee Schedule.
TASK I: Additional Plan Sheet to Delta 2 Revision G1102-1-5 Fixed Fee (NTE): $5,800.00
TASK 2: Additional Survey ............... ............................ T&M: $2,500.00 (NTE)
Time and Materials Budget(reimburseables).............................. T&M: $400.00
Approved By:
Print Name and Title
Total.............................................................................. $8,700.00
STANTEC CONSULTING INC.
B.D. Franklin, P.E.
Managing Principal
11 , 10-'18\ I(T-, 18 d.x2 Fnirvded 1101 I'—,, I'11a+i` 11 R, Jad.a, & I'nrkmg F,tvnsu+n 1U