REQUEST: APPROVE PROFESSIONAL SERVICES AMENDMENT NO. 1 IN AN AMOUNT
NOT -TO -EXCEED $25,500 FOR CONTRACT NO. R24980A WITH
INTERACTIVE DESIGN CORPORATION TO PREPARE DECONSTRUCTION
AND RECYCLING PLANS FOR DEMOLITION OF COUNTRY VILLAGE
APARTMENTS
SUBMITTED BY: BRYCE L. WHITE, PROJECT ADMINISTRATOR
CONTRACTOR: INTERACTIVE DESIGN CORPORATION
199 S. CIVIC DRIVE
PALM SPRINGS, CA 92262
DATE: APRIL 24, 2008
CONTENTS: NOTICE OF EXEMPTION
PROFESSIONAL SERVICES AMENDMENT NO. 1 TO CONTRACT NO.
R24980A
INTERACTIVE DESIGN CORPORATION AMENDMENT PROPOSAL
Recommendation:
By Minute Motion, that the Agency Board approve Professional Services Amendment
No. 1 in an amount not -to -exceed $25,500 for Contract No. R24980A with Interactive
Design Corporation to prepare deconstruction and recycling plans for demolition of
Country Village Apartments.
Funds are available in Account Nos. 870-4195-466-3092 and 854-4195-466-3092.
Executive Summarv:
Approval of staff's recommendation will allow preparation of environmentally friendly deconstruction
and recycling plans for demolition of the Country Village Apartments. Rejection of staff's
recommendation will require demolition and disposal without plans for reuse and recycling.
Discussion:
In August 2006, the Agency contracted with Interactive Design Corporation (IDC) to provide site
utilization and configuration at the existing Country Village Apartments' site at 42-555 Washington
Street on the southwest corner of Washington Street and Avenue of the States and adjacent property to
the south at 42-615 Washington Street. On October 11, 2007, the Agency Board approved a contract
with IDC to develop a schematic site plan for these properties to include Casey's Restaurant, a future
fire station, and an affordable senior apartment project, including a conceptual architectural design.
This item was on the January 24, 2008, agenda and was continued to a date uncertain to allow staff to
address concerns raised by the public regarding compliance with the California Environmental Quality
Act (CEQA).
Staff Report
Amendment No. 1 Contract R24980A (Interactive Design Corp.) — Country Village Apartments
Page 2 of 2
April 24, 2008
CEQA Review
For the purposes of CEQA, the Director of Community Development has determined that the proposed
preparation of engineering plans by which the Country Village Apartments could be demolished is part of a
study leading to a potential project that has not been approved, adopted or funded, and therefore
constitutes a Class 6 Categorical Exemption. It will not result in a serious disturbance to any
environmental resources and, therefore, requires no further CEQA analysis.
Before the proposed improvements can be built, the existing Country Club Apartments will need to be
removed. A relocation plan has been prepared for the existing tenants, and removal of the existing
buildings is intended to begin shortly after all of the units are vacated. The subject professional services
amendment will provide plans for environmentally friendly removal of the buildings and clearing of the
site. IDC will provide plans and specifications for the following:
Phase One
• Remediation of hazardous materials
• Deconstruction and demolition of the buildings above the concrete slabs
• Reuse and recycling of removed materials
• Disposal of non -recyclable materials
Phase Two
• Deconstruction and demolition of the balance of the site, including concrete slabs,
asphalt, and below grade items, which will remain in place until site grading begins to
limit fugitive dust and erosion
• Reuse and recycling of removed materials
• Disposal of non -recyclable materials
• Crushing and reconditioning of concrete and asphalt on site (optional)
IDC's scope of services also include: (1) preparation of bid documents for Phase One; (2) contract
administration for Phase One; and (3) coordination and estimated cost for professional services
provided by Civil Engineer.
Staff recommends approval of the subject amendment to prepare deconstruction and recycling plans
for demolition of the Country Village Apartments.
�itted by-
"e
ite N�fin Alvarez
ect dmirator Redevelopment Manager
Departt Head'
Dave Yrigoyen
Director of R evelopment/Housing
Approval:
Carlos e�er,xecutive Director
G \rda\Beth Longman\Staff ReportsUhite\Interactive Amend 1 Cty Vill 042408.doc
roval:
i McCarthy
A edevelopment
Aa6l S. Gibson, Finance Director
PROJECT NAME COUNTRY VILLAGE APARTMENTS
SUMMARY OF CONTRACT CHANGE ORDERS
CONTRACTOR: INTERACTIVE DESIGN CORP CONTRACT NO. R24980A
ORIGINAL CONTRACT
ORIGINAL CONTINGENCY
ORIGINAL TOTAL
CO # Change Order Description
1 Additional design services
2
3
4
5
TOTALS
CONTRACT
Change
Order
Amount
25, 500.00
$ 25,500.00
% of
Contract
45.13%
0.00%
45.13%
Original Appropriation Allocated to THIS CONTRACT
(not to entire project)
f.1111P.FBII10
Additional
Revised
Appropriations
Contract
allocated to THIS
Total
CONTRACT
82, 000.00
For Internal Use Only - DO NOT SEND TO VENDOR
g/rda/Beth Longman/Staff Reports/Interactive CO Log
Contingency
Balance for this
contract
NOTICE OF EXEMPTION
TO: ❑ Clerk of the Board of Supervisors FROM: Palm Desert Redevelopment Agency
or 73-510 Fred Waring Drive
t] County Clerk Palm Desert, CA 92260
I . Project Title:
2. Project Location — Identify street address and
cross streets or attach a map showing project site
(preferably a USGS 15' or 7 1/2' topographical
map identified by quadrangle name):
3. (a) Project Location — City:
(b) Project Location — County:
4. Description of nature, purpose, and beneficiaries
of Project:
5.
Name of Public Agency approving project:
6.
Name of Person or Agency carrying out project:
7.
Exempt status:
(check one)
(a) ❑
Ministerial project.
(b) ❑
Not a project.
(c) ❑
Emergency Project.
(d) O
Categorical Exemption.
State type and class number:
(e) ❑ Declared Emergency.
(f) ❑ Statutory Exemption.
State Code section number:
(g) ❑ Other. Explanation:
j 8. Reason why project was exempt:
JTB\21589. 1 \CITY\2006
Country Village Apartments: Relocation Plan and
Preparation of Demolition Specifications
SW Corner of Avenue of the States and Washington Street
Palm Desert, California
Palm Desert
Riverside County
Adoption of a relocation plan will allow the Redevelopment
Agency to assist approximately twelve residents of the
Country Village Apartments to move to decent, safe, and
sanitary housing that is affordable to them. Preparation of
demolition plans and specifications will allow further study
and analysis of a new project to provide affordable housing.
The scope of such new project is not yet clearly defined.
City of Palm Desert and its Redevelopment Agency
I Palm Desert Redevelopment Agency
Class 6 categorical exemption for the preparation of plans
and specifications for demolition. 15061.3.b Exemption
for approval of a relocation plan
It can be clearly seen that the relocation of a limited number
! of residents poses no possibility of a significant effect on the
environment, so preparation of a relocation plan is exempt
from further review under Section 15061 (b) (3) of the
California Code of Regulations, Title 14, Division 6, Chapter
3. Additionally, the preparation of engineering plans by
Which the Country Village Apartments could be demolished is
part of a study leading to a potential project that has not been
approved adopted, or funded. It will not result in a serious
FORM "B"
disturbance to any environmental resources and, therefore,
constitutes a Class 6 categorical exemption and requires no
further CEQA analysis.
9. Contact Person: Martin Alvarez, Redevelopment Manager
Telephone: 760.346.0611
10. Attach Preliminary Exemption Assessment (Form "A") before filing.
Date Received for Filing:
Signature (Lead Agency Representative)
(Clerk Stamp Here) 16ifd—&W �� C-�"'^""�.J�'►� e�° �'�jt
Title
JTB\21589. 1\CITY\2006 FORM `B"
)ALM DESERT REDEVELOPMENT AGENCY
'ROFESSIONAL SERVICE AMENDMENT
;ontract Purpose Professional design services to develop a senior
housing project at the Country Village site
;onsultant's Name Interactive Design Corporation
,ddress: 199 S. Civic Drive
Palm Springs, CA 92262
Contract # / P.O. # R24980A 14696
Amendment/ 1
Change Order No.
Contingency: YES NO X
Account No. 870-4195-466-3092 (86%)
854-4195-466-3092 (14%)
Project No.
Vendor No. 326
'ou are hereby requested to comply with the following changes from the contract_ plans and specifications:
DECREASE INCREASE
DESCRIPTION OF CHANGES In Contract Price In Contract Price
Additional design services 25,500.00
TOTALS:
NET CHANGE IN CONTRACT PRICE:
IUSTIFICATION:
TOTAL BUDGET FOR PROJECT: +
56,500.00
Less: Expend. & Encumb. To Date: -
56,500.00
Less: This Change Order Amount -
25,500.00
BALANCE OF BUDGET
REMAINING FOR PROJECT:
(25,500.00)
CONTINGENCY:
Amount Approved by Board: +
Less: Prior Amendment(s): -
Less: This Amendment: -
Balance Remaininq of Contingency.
25,500.00
25,500.00
the amount of the Contract will be (DOGFeased) Increased by the Sum of: Twentv-five Thousand Five
tundred & no/100 Dollars ($25,500.00).
:Vdakaeth Longman\staR Reports\WNte\Interacbve 0"gn Amend 1.doc See reverse
;ontract R24980A Amendment No. 1 Continued from front
Fhis Professional Service Amendment covers changes to the subject contract as described herein. The consultant
;hall perform all work as necessary or required to complete the Professional Service Amendment items for a lump
;um price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as
)wner.
:ontract Time Extension -0- Days.
Revised Contract Total $82.000
Fhe undersigned Consultant approves the foregoing Professional Service Amendment # 1 as to the changes, if any,
n the contract price specified for each item including any and all supervision costs and other miscellaneous costs
elating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on
account of said Professional Service Amendment # 1 . The Consultant agrees to furnish all labor and materials and
)erform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required
o complete the Professional Service Amendment items. This document will become a supplement of the contract and
ill provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the
)wner.
xecution of this Professional Service Amendment by the Consultant constitutes a binding accord and satisfaction that
ully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or
equity, arising out of or related to the subject of the Professional Service Amendment, whether known or unknown,
ncluding but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of
)roductivity, as well as any and all consequential damages.
this document will become a supplement to the Contract and all provisions will apply hereto, all items included above
nust have required signatures as per the purchase resolution.
REQUESTED BY:
CERTIFIED
FUNDS AVAILABLE:
EXECUTIVE DIRECTOR
FINANCE DIRECTOR
NOTE: No payments will be made
prior to Executive Director and
Agency Board approval
2. ACCEPTED BY:
CONSULTANT Date Accepted
4. APPROVED BY:
JEAN M. BENSON, CHAIRMAN 4/24/08
SECRETARY 4/24/08
;Ardal leth lorgmaMStaft RepaRslWhitekinteractive Design Amend t.doc See reverse
ENE CONTRACT AMENDMENT 0709.1
mom
■N❑ INTERACTIVE DESIGN CORPORATION
ARCHITECTS +
DATE November 30, 2007 199 S. Civic Drive, Suite 10
Palm Springs, California 92262
TO Bryce White @ City of PD RDA T: (760) 323-4990 F: (760) 322-5308
VIA Email mail@interactivedesigncorp.com
FROM Maria Song
PROJECT IDC No. 0709.1 Country Village Green Deconstruction
SUBJECT Contract Amendment Page I of 2
We are proceeding with development of the above referenced project In accordance with our understanding of the materialrssues noted below. Unless we rece,re written clarification or
DISTRIBUTION amendment by the third business day from the date of this project record, the following will be considered as confirmed Instruction and understanding m
City of PD RDA
Martin Alvarez ❑
CONTRACT AMENDMENT 0709.1
Amendment to
Contract Services Agreement for
Architectural Design Consulting Services
Dated October 01, 2007
Based upon the provisions for Contract Amendment in above mentioned contract, the
following amendment shall be incorporated in the Agreement:
SECTION I I -SERVICES
ARCHITECT'S SERVICES:
E. Demolition Plan and Specifications: Prepare a demolition plan for two phases of
work. Phase One includes the demolition and/or de -construction and recycling
of the buildings above the concrete slab; Phase Two includes the on -site re-
conditioning of concrete, concrete with re -bar, and asphalt.
a. Phase One includes the remediation of hazardous material, demolition
and deconstruction of the project materials (buildings) above finish grade
and finish building slab. The demolition plan will include the
deconstruction recycle and reuse programs for items listed in the Palm
Desert Construction/Demolition Debris Recyclers and Reuse sites
determined during this phase. Items such as asphalt, concrete, concrete
w/ rebar will be included as part of Phase Two work. Destination of
recycled material to be provided by Lisa Ream, Recycling Technician
from the City of Palm Desert. Destination of reuse sites will be finalized
based on research provided by Architect.
P:\0709 PD RDA Hsg\CONTRACTS\0709 I Cont Amnd rev 30NOV07.doc ■
MEN
■■■
■■❑
INTERACTIVE DESIGN CORPORATION
b. Phase Two includes the deconstruction of the project materials below
finish grade and finish building slab. The demolition plan will include the
deconstruction recycle program for concrete, asphalt, rebar, piping, etc.
The concrete and asphalt will be crushed and reconditioned on -site for
use as sub -base material for new driveways and parking areas of the
proposed project. Utility Data will also be provided in this plan for
reuse or permanent capping. The information of Phase Two will be
provided to the Agency for inclusion in the scope of work for the
construction of the proposed housing project.
Note: the concrete and other paving material will remain in place both
to limit fugitive dust and erosion, and for recycling as part of the as part
of the construction of the new housing project.
F. Preparation of Bid Documents and Bid Administration
G. Contract Administration of the Demolition Phase One
H. Civil Engineering Consultant:
a. Site Demolition Plan: Using information from the ALTA Surveys (by
DUDEK and STANTEC) supplemented by field review, Civil Engineer to
provide location, size, and invert elevations of on -site utility meters,
underground lines and points of connection.
b. Site Demolition Plan: Civil Engineer to provide direction for on -site
"potholing" to locate below grade utilities and record same on
demolition plan.
c. Utility Plan: Civil engineer to research and provide the sizes of existing
utility line feeds to the site (laterals), off -site main line sizes, and points
of connections for water, sewer, storm drain, electrical, phone, cable,
and gas.
2. COMPENSATION:
A. Demolition Plan and Specification for Phase One $10,000 NTX
B. Demolition Plan and Specification for Phase Two $ 5,000 NTX
C. Bidding and Negotiation for Phase One $ 2,000 NTX
D. Contract Administration for Phase One $ 2,000 NTX
E. Consultants $6,500 estimated
P:10709 PD RDA Hsg\CONTRACTS\0709 I Cont Amnd rev 30NOV07.doc ■
Page 2 of 3
■o■
man
■N❑ INTERACTIVE DESIGN CORPORATION
3. SCHEDULE: after utility information is reviewed by the design team.
A. Demolition Plan and Specification for Phase One
3 Weeks
B. Demolition Plan and Specification for Phase Two
2 Weeks
C. Bidding and Negotiation for Phase One
3 Weeks
D. Contract Administration for Phase One
3 Weeks
All other provision shall remain in effect.
AGREED,AND C E�
Reuel Young, AIA, Pr sident C 1 g#74
Interactive Des' Corporation
199 S. Civic Drive, Suite # 10
Palm Springs, CA 92262
(760) 323-4990
Redevelopment Agency
City of Palm Desert
73-510 Fred Waring Drive
Palm Desert, CA 92260
(760) 346-061 1
1�olzvz� r-�--
Date /
Date
CADocuments and Settings\Maria\Local Settings\Temporary Internet FilesIOLKIW709 I Cont Amnd 15NOV07.doc ■
Page 3 of 3
s