HomeMy WebLinkAboutSR - R23390 CA16 - Falcon CrestVL*b
PALM DESERT REDEVELOPMENT AGENCY
STAFF REPORT
REQUEST: APPROVE AMENDMENT NO. 16 FOR WORK AT FALCON
CREST (CONTRACT NO. R23390) WITH COMDYN PD,
LLC IN THE CUMULATIVE AMOUNT OF $1,624.32
SUBMITTED BY: CATHERINE WALKER, SENIOR MANAGEMENT ANALYST
DEVELOPER: COMDYN PD, LLC
2800 28T" STREET, SUITE 206
SANTA MONICA, CA 90405
DATE: FEBRUARY 14, 2008
CONTENTS: AMENDMENT NO. 16 TO CONTRACT NO. R23390
Recommendation:
By Minute Motion, that the Agency Board:
1. Approve Amendment No. 16 in the cumulative amount of
$1,624.32. Representing a deductive contract amendment in the
amount of ($16,261.75), and an additive contract amendment in
the amount of $17,886.07 for changes to the scope for the
Falcon Crest development (Contract No. R23390).
Executive Summarv:
Approval of staffs recommendation will allow for a cumulative amendment in the
amount of $1,624.32. This request is comprised of two amendments. The first
represents a deduction to the scope of work at the Falcon Crest development.
This will result in a ($16,261.75) credit to the Agency for the removal of a block
wall from ComDyn's contractual scope of work. The second represents an
additive amendment in the amount of $17,886.07 for drainage reconfiguration at
the Emergency Access Lot "I".
Discussion:
On July 14, 2005, the Palm Desert Redevelopment Agency Board authorized an
agreement with ComDyn PD, LLC for the development of affordable housing on
the 20-acre site, currently known as Falcon Crest and the La Rocca Villas.
Staff Report
Approve Amendment No. 16 to Contract No. R23390 (ComDyn PD, LLC)
February 14, 2008
Page 2 of 3
During the time of execution of the contract, all rough grading plans represented
a block wall condition along the western boundary of the well site. In subsequent
approved rough grading plans, the wall condition has been changed to that of a
permanent fence along the western boundary to the well site, and is called out as
such on the amended rough grading plans. As per Ordinance No. 1091A, a chain
link fence cannot be a permanent wall condition in the City of Palm Desert, and
will not be installed. The fence was implemented to accommodate CVWD's
irrigation line/conditions of approval; however, this is not an acceptable
permanent condition. The change in scope detailed below represents a deductive
change order to the Agency for the original block wall condition. It will also allow
for a comprehensive plan to be considered for the adjacent lot to accommodate
use by the La Rocca Villas for the purpose of storage.
CVWD Well Site Deductive Amendment
Material
Units Quantity
Cost/Unit Total
6' Slump Block
LF 194.54
$ 62.00 ($ 12,061.48)
Wall
Iron Gate
EA 1
$ 3,500.00 ($ 3,500.00)
Developer's
4.5%
($ 700.27)
Fee I I
Total ($16,261.75)
At the October 25, 2007 meeting of the Agency Board, Lot "I" (the Emergency
Access lot at Falcon Crest), was added to ComDyn's scope of services in a not -
to -exceed amount of $33,821.62. Upon further review by the Public Works
Department, the drainage solution, as originally conceived at the time of the
approval, was not practical or efficient in the field. Public Works requested
resolution of the potential flooding and storm drainage from the adjacent Hovley
Gardens property. The solution, as approved by Public Works, represents
additional work not conceived in the initial project costs in the amount of
$17,886.07. This solution will accommodate the drainage from Hovley Gardens
and preserve the Emergency Access topical materials implemented for Fire
Department use.
Emergency Access Lot "I"
Storm Drain Improvements $ 13,715.00
Landscaping/Irrigation 3,400.86
Developer fee 770.21
Total $ 17,886.07
G.bda\Cathy WalkerlWord Dala1STAFF REPORTSNComDyn deductwewaJI doc
Staff Report
Approve Amendment No. 16 to Contract No. R23390 (ComDyn PD, LLC)
February 14, 2008
Page 3 of 3
Approval of this amendment will remedy the storm drainage at Lot "I", the fence
condition, and allow for the consideration of a storage facility for the La Rocca
Villas, which could incorporate this western boundary into its design. Therefore,
staff requests approval of Amendment No. 16 in the amount of $1,624.32.
Submitted By:
Department Head:
r
��
i2T/[ti
Catherine Walker 4ave Yngoy
Senior Management Analyst Director o edevelopment/Housing
mh
Approval:
Justi cCarthy
A R development
Carlos L. Ortega, ecutive Director
Paul S'. in
Directdr bf Finance
Cl BY RDA
ON ` l- C9 5 ��
VERIFIED BY f(''X //> )c
Original on file with City Clerk's Office
G \rda\Cathy Walker\Word Data\STAFF REPORTS\ComDyn deductivewall.doc
68*Z96'b9Z'£
Z9' LZ8`££
6E6 LO` L5
8806�`9�Z` L
00117E`SZt7` L
00't78Z`609
joej}uoo 1OV2JiNOO
slid jo; aouelee SIHl 01 paWoolle
Aoua6ulluoO suol;eudoiddy
leuoi}lppy
ONIONnzi
9 L £ Lt�`085`6Z
ti888L`8L5'6Z
ZZ*L96`17175`6Z
9L't78E`ZO9'6Z
9L*t7EE`Z99`6Z
6E'LV5`EL9`6Z
V L * LZ6`9t,9'6Z
L9*6ZL`LLL`6Z
L L * L69`9K `6Z
LL16`6ZL`6Z
LZ'986'SZ L'6Z
LZ'986`5Z L `6Z
88*996`17L0`6Z
88*9961799'9Z
00'9LV609`LZ
00'6ZL`nL`9Z
00'9t78`17L9`9Z
le}ol
toejtuoO
paslAa�j
%£NAVE
%L0*0
%LL'O
%K'0
%t7S'0-
%t70'0-
%£t7*0
%LZ* L
%WO
%90'0
%LO'0
%00 * 0
%8L*0
%9L * 0
%LS*17
%tlt7*9
%86' L
%00'0
4oej4uoO
10 %
9 V 99S' 906' £
ZE*bZ9` L
Z9* LZ8`£E
9t7*ZE9'Zti
l00.000 `09 L )
tE9'Z L Z' L 0
SZ'9Z9`9Z L
Ltv' L6L`69E
09'8£i7`OE
Ot7'ELL`9 L
05LE6`E
6E'6 L0` L9
00'000`OZZ
88'0617`517Z` L
00*Lt7E`5ZV L
OO*b8Z`609
}unowy
japj0
abuego
IIeM tonpap/uooaj abeulejp ppy
ssaooy Aoua6jaw3 Od
�Jed aAlssed Od
tuawtiwwoO pjenruo3 V-�ReO
s6uijan00 mopuim tonpap A81
sapejbdn u6isap `saaJ/stiwaad-ndl
�joM}o adooS a6uego
sauilapin6 jets A6j9u3 M@u IGGA
sell!A e000d el `ajnsoloue gsejl
isajO uoole3 -ppow adeospuel
uolsuaixa Aep 9Z
sellln e0002iel 4PoW
tuawtiwwoO pjenruo3 d3Hle0
sellln e000Hel
�R 1SWO uoole_� le 01etlon010yd
tuawisn(pe wns patelnditS
uolsuatxa Aep jepualeo 89
uoliduosaa japj0 abuego
13VNiNO3
ld101 IVN I O N O
AON3ONllN00 IVNIO1210
00.5ti8 `l7L9 `9Z IDVRUN OO TdN I D NO
(; aio1d aillue 01IOU 100V-9917-86917-OL8
i0V8iNO3 SIHl 01 pa;eoolly uoaleljdaddy leul6lj0
06E£Z2i 'ON 13Vd IlNOO 011 `ad uAawoO
selllA e000bel -2 IsaJO uoolezl - SN30NO 30NVHO 10d2I1N00 40 Al ivwWf1S
1NMdOl3AM 3NOb-0Z JNINIVW3N NOOO jo;sem 31?J3W I? pZis Aqaq - Od 0jr/OZ
9L
SL
t7 L
EL
ZL
LL
OL
6
8
L
9
9
ti
0
PALM DESERT REDEVELOPMENT AGENCY Contract # / P.O. # I R23390 13549
Amendment/ 16
PROFESSIONAL SERVICE AMENDMENT Change Order No.
Contingency: I YES I NO X
Contract Purpose Develop affordable housing on 20AC site Account No. 1870-4698-466-4001
Consultant's Name ComDyn PD,LLC Project No.
Address: 2800 28th Street, Suite 206 Vendor No. 18948
Santa Monica, CA 90405
You are hereby requested to comply with the following changes from the contract plans and specifications:
DECREASE INCREASE
DESCRIPTION OF CHANGES In Contract Price In Contract Price
Removal of block wall on west side of Lot K from scope of work 16,261.75
Addition for drainage reconfiguration at Emergency Access Lot 1 17,886.07
TOTALS: 16, 261.75 17, 886.07
NET CHANGE IN CONTRACT PRICE: 1,624.32
JUSTIFICATION:
TOTAL BUDGET FOR PROJECT: + 29,578,788.84 CONTINGENCY:
Less: Expend. & Encumb. To Date: - 29,578,788.84 Amount Approved by Board: +
Less: This Change Order Amount: - 1,624.32 Less: Prior Amendment(s): -
BALANCE OF BUDGET Less: This Amendment: -
REMAINING FOR PROJECT: (1,624.32) Balance Remaining of Contingency: -
The amount of the Contract will be Increased by the Sum of: One Thousand Six Hundred Twenty-
four and 32/100 Dollars ($1,624.32).
G.\rda\Beth Longman\Staff Reports\Walker\ComDyn Amend No 16 Form doc See reverse
Contract R23390 Amendment No. 16 Continued from front
This Professional Service Amendment covers changes to the subject contract as described herein. The consultant
shall perform all work as necessary or required to complete the Professional Service Amendment items for a lump
sum price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as
Owner.
Contract Time Extension -0- Days.
Revised Contract Total $29,580,413.16
The undersigned Consultant approves the foregoing Professional Service Amendment # 16 as to the changes, if
any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs
relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on
account of said Professional Service Amendment # 16 . The Consultant agrees to furnish all labor and materials and
perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required
to complete the Professional Service Amendment items. This document will become a supplement of the contract and
all provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the
Owner.
Execution of this Professional Service Amendment by the Consultant constitutes a binding accord and satisfaction that
fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or
equity, arising out of or related to the subject of the Professional Service Amendment, whether known or unknown,
including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of
productivity, as well as any and all consequential damages.
This document will become a supplement to the Contract and all provisions will apply hereto, all items included above
must have required signatures as per the purchase resolution.
REQUESTED BY:
3. CERTIFIED
FUNDS AVAILABLE:
EXECUTIVE DIRECTOR
FINANCE DIRECTOR
NOTE: No payments will be made
prior to Executive Director and
Agency Board approval
2. ACCEPTED BY:
CONSULTANT Date Accepted
4. APPROVED BY: 2/14/08
JEAN M. BENSON, CHAIRMAN Date Approved
2/14/08
SECRETARY Date Approved
G \rda\Beth Longman\Staff Reports\Walker\ComDyn Amend No 16 Form doc See reverse ...
PINK INC
Jan 1ii US 04' 35P
QUOTATION
PM11(o INC.
Landscape - Maintename - Golf Coxwse Construction
760-340-09945
FAX
Lic, # 69349:2
P.Q. Box 1012 /// -7/per
Palm Dcscrt, CA 92261-101:0
�,vW/l lint dA.,e
q1 3.
7- 2 3.
f5p
C
e6
TOTAL
CHANGE ORDER REQUEST
From:
Jacobsson Engineering
Construction, Inc.
P.O. Box 14430
Palm Deseret, CA 92255-4430
(760) 340-0194 Fax (760) 340-1574
License: 650389
To:
Community Dynamics
2800 28th Street
Suite 206
Santa Monica. CA 90405
Page 1
Request No.: P040
Request Date: 01/16/08
Project;
Hoviey Gardens
42095 Hovley Gardens
Palm Desert. CA 92260
We hereby request that the Original Construction Agreement be modified and amended
by the following deviations from original plans and specifications:
STORM DRAIN
Mobilization
Remove & Replace Geo-Block
Remove & Replace Dee Gee
18" HDPE
18" x 22.25 Bend
36" x 36" Brooks Box
Modify Existing Catch Basin
Potholing
1
EA
0
$
1,000.00
$
1.000.00
100
SF
@
$
10.00
$
1,000.00
500
SF
@
$
3.00
$
1.500.00
100
LF
@
$
50.00
$
5,000.00
1
EA
@
$
265.00
$
265.00
1
EA
@
$
3,200.00
$
3.200.00
1
LS
&
$
1.500.00
S
1.500.00
1
LS
@
$
250.00
$
250.00
TOTAL: ;,'S'13,715.00'
It is mutually agreed that for such change the contract price is increased by
$13.715.00 (Thirteen Thousand Seven Hundred Fifteen and 00/100) payable with the
payments due under the original construction agreement.
Time for completion of the above cited work is hereby extended 0 days beyond any
completion date set forth in the original contract for such work.
All other provisions of the original contract and agreement shall remain in full
force and effect without change because of the above deviations.
JACOBSSON ENGINEERING CONSTRUCTION. INC.
Signed: ✓J% ��
Dated: /- ?-.P- -P.9
Title: A00419W'- ,*1A&eAA A,0
30796,411Pi oat7y�
7 COST -TO -COMPLETE ��tJ
FTHE MOOTE GROUP CheBOMMUNITY DYNAMICS
28 F. Warner Avenue, Suito 57 2800 Twenty -Eighth Street, Suite 206
Santa Ana, CA 92705 Santa Monlca, CA 90406
Tel: (714) 751-5557, Fax: 751-4552 Tel: (310) 399-9555, Fx: 399-9777
PRELIMINARY OFFSITE COST ESTIMtofsAC: 17.96 SFD: 108
Project: Tract 30796 SENIOR HOUSING: 26
133 DWELLING UNITS Total AC: 17.96 TOTAL DU: 133
City of Palm Desert Avg. SF/DU: 1'660
ITEM
O. ROUGH GRADING (1)
1. Mobilization
2 Cloar & Grub
3. Remove & Dispose Dense Trees & Root System @
4 Remove & Dispose Existing AC Along Rose Court,
Verbena, Saguaro & Lot "A"
5. Remove Existing Sand Fence, Wood Picket
6. Water Development, Meter
7. Pro -Watering - Entire Site
8. Excavation (Quantity Check by Digitized Plans)
9. Over Excavation of Lots "Under" Stockpile, 3.0'
Deep
10. Export (Quantity Check by Digitized Plans)
11. Pad Finish (+/- 0.1'), Entire Site
12. Erosion Control, Sand Bags, 1 Season
13. SWPPP Compliance/Malntenanco, 1 Season
14. Remove Existing Chainlink Fence w/ Fabric
Density: 7.4
UNIT
MEAS
QUAN
PRICE
IOUNT
AMOUNT
LS
1
25,000.00
25,000
AC
17.95
600.00
10,770
LS
1
65,000.00
65,000
SF
26,080
2.00
52,160
LF
2,860
1.00
2,860
LS
1
750.00
750
AC
17.95
1,000.00
17,950
CY
63,387
2.50
158,468
CY
13,764
2.50
34,410
CY
45,920
8.00
367,360
AC
17.95
4,356.00
78,190
AC
17.95
1.000.00
17,950
AC
17.95
500.00
8,975
LF
1,260
3.00
3,780
Sub -Total, ROUGH GRADING...................................................................................................
$ID.0..............................................................................................................................................
843,623
6,343
"1 The site was substantially rough graded at some point In time to a different land plan than the one shown. Any prior a
of the project by the Civil or Soils Engineers will be void. However, we did assume any over excavations were comple
accepted, accept under the stockpile. Costs shown above are to re -grade the entire site to tho new land plan.
EROSION CONTROL - PM 10
1.
Silt Fences for Erosion Control
LF
0
3.50
Existing
2,
Security 6' Chain Link Fence with Wind Screen
LF
0
3.00
Existing
3.
Chain Link Gate
EA
0
175.00
Existing
4.
Dust Control Monitor during Grading, Infrastructure
& Export
MO
4
18,000.D0
72,000
5.
Street Cleaning, During Construction (4 Hr/Day, 3
Days[Week)
MO
4
10,500.00
42,000
6.
Soil Sealant for Dust Control Site
AC
17.95
800.00
14,360
Sub -Total, EROSION CONTROL - PM 10.......................................................................................
128.360
$ID. U.............................................................................................................................................
965
PERIMETER WALLS & FENCING
6' Perimeter Slump Block Wall with a Decorative
1.
Cap
LF
2,990
62.001
185,380
2.
Fence - Tubular Steel for Detention Basin
LF
600
t50)
15,000
3.
Pilasters Slump Block with a Cap, Hm6.5'
EA
53
550.00
29,150
4.
Gates for Detention Basin, Tubular Steel
EA
2
1,000.00
2,000
( 5.
Gate for Well -Site. Solid Iron (Lot "D"1
EA
1
3,5uU,W
-'' NW �
Sub -Total, PERIMETER WALLS & FENCING..................................................................................
:�ae�,ear
235,030
$/D. U..............................................................................................................................
.
Jan P1 2011£1 1:37PM 14P I_(IS FRJ£.i FAX F. 1
i�
COMPANY, INC.
December 7, 2007
Mr. Frank Chen
Community Dynamics
42095 Hovley Gardens Drive
Palm Desert, CA 92260
Pll: 310-399-9555 X205
Fax, 310-399-97777
Frank,
Per our discussion regarding chain link fencing at. above noted project, please review the
following information:
A & A Fence Company proposes to supply and install 202' of 6' tall, 9 gauge chain link
fence with 1 5/8" top rail and 7 gauge tension wire. Corner posts will be 2 7/8" 80H40
and line posts will be 2 3/8" SCH40. The price for 202' would be fYM;
Please call me if you would like to proceed.
RLeggards,
;P4-44 /
Pete Vas ue
S79 E. Lincoln St.,13anning,CA 92220 • (M) 849-85I5 Fax (951) 849-8518