Loading...
HomeMy WebLinkAboutSR - R22600A CO4 - Henderson Cmty BldgPALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVE CONSTRUCTION CHANGE ORDER NO. 4 TO STETON CONSTRUCTION GROUP (CONTRACT NO. R22600A) IN THE AMOUNT OF $80,354 FOR THE HENDERSON COMMUNITY BUILDING SUBMITTED BY: MISSY GRISA, PROJECT COORDINATOR CONTRACTOR: STETON CONSTRUCTION GROUP 145 S. STATE COLLEGE BLVD., SUITE 450 BREA, CA 92821-5818 DATE: FEBRUARY 28, 2008 CONTENTS: CHANGE ORDER NO. 4 (C.O.R. NOS. 59, 77.1, 80R1, 84R1, 88, 89, 91, 92,98) Recommendation: By Minute Motion, that the Agency Board: (1) Approve Change Order No. 4 to Contract No. R22600A for the change order requests listed above in a cumulative amount of $80,354 for the Henderson Community Building; and (2) Authorize the Finance Director to move $80,354 from contingency to base. Executive Summary: Approval of this recommendation will allow the General Contractor to move ahead as scheduled with the attached, referenced change order requests. The above -referenced change order requests total a cumulative amount of $80,354. The proposed Change Order No. 4 addresses modifications to the architectural plans required to complete the project per the Building Code. The construction manager, architect and staff have reviewed the proposed changes and recommend approval. Discussion: On 13 July 2006, the Agency Board authorized the award of Contract No. R22600A in the amount of $4,540,000 to Steton Construction Group for the construction of the new 5,800 square foot Henderson Community Building at the Entrada del Paseo site. Construction is coming to a close and additional modifications to the architectural plans above the original contract are required to successfully complete the project. Change Order Requests 59, 77.1, 80R1, 84R1, 88, 89, 91, and 92 are a result of modifications to various sections of the architectural plans. Specifically, the modifications address incorrect Staff Report Approve Construction Change Order No. 4 to Steton Construction Group (Contract No. R22600A) Henderson Community Building Page 2 of 2 February 28, 2008 dimensions found in the field, engineered miscalculations, and requirements per the Building Code that were not shown on the plans. These proposed changes represent labor and materials required to complete the project. As part of Change Order No. 3, six security cameras were incorporated into the contract in the amount of $12,806. The security subcontractor awarded this work by the general contractor was not aware of the prevailing wage job requirements. Change Order Request 98 in the amount of $2,268.76 addresses the additional funds necessary to provide prevailing wages. The new total cost for the installation of security cameras is $15,074.76, which is still below the other bids submitted to the general contractor. The difference in contract prices is recommended for approval. A completion date is now anticipated for April 2008. Based on review by the Construction Manager, Architect and staff, Change Order No. 4 is recommended for approval to allow the construction of the Henderson Community Building to move forward towards completion. If Change Order No. 4 is approved, the project will have $298,355.54 remaining as contingency. Submitted by: Missy Grisa """t" Project Coordinator Department Head: Dave YrigoyeK Director of Redevelopment/Housing Carlos l_. Orte a Executive Director i [in Alvarez evelopment Manager Approval: a • dt'stMcCarthy AN Redevelop ent Paul S. Gibson, Director of Finance )ix�Z�FC� BY FtOA °�-L ON � C VERIFIED BY J Original on file with City Clerk's Office GArdaWelissa Wightman\Henderson Community Building\Staff Reports\Staff Report- Change OrdeM.doc E % / 7 t 2 a \ a $ a \ a % b / u @ §2 � ° 04 � � 0 �k 2 � @6 c I«) 0� rƒ e = - a) c)o 0 C) �f2e'a CD/\0ƒ 06�#�a=R /k//� <CL CL 2 22f�� <0 Via@ <70 m d R E m / G k IT >C� \ \ ( 0 0- 0) to P�� \ # 2F-� $ # k # � c + o� 0 2 ix U ƒ \ 0 2 a @ \ q / z «:3 x 0 \\ 0 6 Q / z E 3 ? C:) \ \ \ Z q� R o LO M i r 7 / 0 Q E\ /- n k w0z w 0 � U ? � 2�Q U ?20 � ®m z 0 O U & f 0 0 = _ ƒ \ } $ \ \ » E y 'n _ a)[ ] = a E @ E % z k \jE///7aCL E S \$ 2 q k§&/ t ƒ / A m @ 8 % 0 ; 8 V I e e 2 2 c 7ƒ$ g u» w - / / f0t /}�)ƒ « E 6 $ < < % k: \ ) ®± % �%£ 2z_j \// \\$ t . m a $ / R = o E e o�CL= C° m 5 o 0 0/ j} A E§/ co t 0- N Cl) It r = w 0 ,I- -0 a \ LO m / O R MA PALM DESERT REDEVELOPMENT AGENCY CONSTRUCTION CHANGE ORDER Contract Purpose Construction of Henderson Community Building Consultant's Name Steton Construction Group Address: 145 South State College, Suite 450 Brea, CA 92821 Contract # / P.O. # R22600A 13386 Change Order No. I 4 Contingency: YES X I NO Account No. 850-4358-433-4001 Project No. Vendor No. 1 9494 You are hereby requested to comply with the following changes from the contract plans and specifications: DESCRIPTION OF CHANGES DECREASE INCREASE (Supplemental Plans, Specifications, and Directives dated Attached) In Contract Price In Contract Price COR Numbers 77.1, 80R1, 84R1, 92, 98, 59, 89, 88, 91 (Tokistar bench 80,354.00 lighting, Glazcon stack wall system, conf rm heat pump, fixture change, D/A Pacific contract modification, light kit deletion, sprinkler soffit modification, Pacific West Interiors add'I framing, supervised knox box) TOTALS: NET CHANGE IN CONTRACT PRICE: JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 4,615,290.46 Less: Expend. & Encumb. To Date: - 4,615,290.46 Less: This Change Order Amount - 80,354.00 BALANCE OF BUDGET REMAINING FOR PROJECT: (80,354.00) CONTINGENCY: Amount Approved by Board: Less: Prior Change Order(s): Less: This Change Order: Balance Remaining of Contingency. 80,354.00 80,354.00 + 454,000.00 - 75,290.46 - 80,354.00 298,355.54 The amount of the Contract will be (DeeFeased) Increased by the Sum of: Eighty Thousand Three Hundred Fiftv-four and 00/100 Dollars ($80,354.00). G \rda\Beth Longman\Staff Reports\Gnsa\Steton CO 4 Form doc See reverse ... Contract R22600A Change Order No. 4 Continued from front This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order items for a lump sum price agreed upon between the Contractor and the Palm Desert Redevelopment Agency, otherwise referred to as Owner. Contract Time Extension -0- Days. Revised Contract Total $4,695,644.46 The undersigned Contractor approves the foregoing Change Order # 4 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order # 4 . The Contractor agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Change Order items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Change Order shall be effective when approved by the Owner. Execution of this Change Order by the Contractor constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Change Order, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, loss of productivity, and stacking of trades, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: 3. CERTIFIED FUNDS AVAILABLE: EXECUTIVE DIRECTOR FINANCE DIRECTOR NOTE: No payments will be made prior to Executive Director and Agency Board approval 2. ACCEPTED BY: CONTRACTOR Date Accepted 4. APPROVED BY: JEAN M. BENSON, CHAIRMAN 2/28/08 SECRETARY 2/28/08 G.\rda\Beth Longman\Staff Reports\Gnsa\Steton CO 4 Form.doc See reverse ... douglas e. barnhart, inc. February 13, 2008 Melissa Grisa Project Coordinator City of Palm Desert, Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, CA 92260-2578 Subject: deb Project #6016 Henderson Community Building Entrada del Paseo 72-559 Highway I 11, Palm Desert Re: Recommendation for awards of Change Orders — Steton Construction Group Ms. Grisa, We have reviewed the attached documentation received for Change Order Requests listed below from Steton Construction Group for the above named project. Based on our review, we recommend award as follows: 1. COR#77. l: Tokistar Bench Liehtina. Approved $20,142.86 The deletion of (11) LI fixtures and replacement with Tokistar Lighting. Original fixture did not meet local lighting ordinance. ( RFI 72 R1). 2. COR#80R1: Glazcon Stack Wall System. Approved $11,319.21 Glazing modifications to meet constructability of design. 3. COR#84R 1: Additional Heat Pump at Conference room Approved $37,910.56 To meet required CFM/AC loads at full occupancy. (ACD 50.3). 4. COR#92: Fixture change Approved $963.20 Step light called out changed to TL6070MH-S-N-DB 5. COR#98: D/A Pacific Contract Modification Approved $2,268.76 Contract revised to incorporate prevailing wage. 6. COR#59: Light Kit Deletion _ _ Approved ($520.00) ACD 21 Deletion of Light kits from Solartube. 7. COR#89: Sprinkler Soffit Modification Annroved $4.655.82 Additional Soffit and sprinkler modifications. (ACD 21/ACD 41). 8. COR#88: Pacific West Interiors Additional Framiniz Amwoved $1,991.54 Extra soffit framing need to support both sides of lid at register. (ACD 13). 9. COR#91: Sunervised Knox Box Atwoved $1.621.63 Code requires a supervised Knox Box (Fire Department Key Access) Sincerely, TMicha I Lugo -Thompson Project Manager douglas a b"iart, inc. Post Office Box 270399, San Diego, California 92198-2399, (858) 385-8200, FAX (858) 385-8201 www.debconstruct.com