HomeMy WebLinkAboutR29450A - CA2 - DW Ktchn & Bldg XpnsnContract No. R29450A PALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVAL OF PROFESSIONAL SERVICES CONTRACT AMENDMENT NO. 2 WITH MELZER DECKERT & RUDER ARCHITECTS, INC. IN AN AMOUNT NOT -TO -EXCEED $11,200 FOR THE DESERT WILLOW KITCHEN AND BUILDING EXPANSION ARCHITECTURAL DESIGN SERVICES SUBMITTED BY: Martin Alvarez, Redevelopment Manager Heather Buck, Project Coordinator ARCHITECT: Melzer Deckert & Ruder Architects, Inc. 9511 Irvine Center Drive Irvine, CA 92618 DATE: June 24, 2010 CONTENTS: MDR Request for Additional Services Professional Services Contract Amendment No. 2 Picture of Existing Ceiling Proposed Ceiling Plan Recommendation By Minute Motion: 1. Approve Professional Services Contract Amendment No. 2 to Contract R29450A with Melzer Deckert & Ruder Architects, Inc. in the amount not -to - exceed $11,200 for architectural design services for the Desert Willow Kitchen and Building expansion; 2. Authorize the Director of Finance to move $3,550 from contingency (Account No. 851-4663-454-4001) to base; 3. Appropriate an additional $7,650 from Unobligated Project Area 2 Funds to Post Construction Costs, Account No. 851-4663-454-4001; and 4. Authorize the Chairperson to execute said amendment. Executive Summary Approval of staff's recommendation will approve Professional Services Contract Amendment No. 2 with Melzer Deckert & Ruder Architects, Inc. (MDR) for the Desert Willow Kitchen and Building Expansion. The contract amendment is in the amount not -to -exceed $11,200 for additional architectural services required to complete the construction documents. Staff recommends approval. Staff Report Contract No. R29450A Ratify Amendment No. 2 with MDR for Desert Willow Kitchen/Building Expansion June 24, 2010 Page 2 of 3 Backaround On January 28, 2010, the Agency Board awarded a contract in the amount of $164,000 (plus a reimbursable allowance of $15,000) with a 10 percent contingency ($16,400) to MDR for architectural design services for the Desert Willow Kitchen and Building expansion. The design scope includes, but is not limited to the following components: • Remodel of the existing lobby/bar area to accommodate an expanded bar area with the relocation of two offices. • Expansion of the lobby/ballroom hallway to eliminate the pinch point. • Enclosure of the existing ballroom to reduce noise. • A 5,264 square foot expansion to the kitchen/building at east end of clubhouse. • Modification to the ballroom audio visual, window shading, and lighting. On April 22, 2010, the Agency Board approved Contract Amendment No. 1 in the amount of $12,850. Amendment No. 2 includes four items required to make the design functional, and the transition between the Lakeview Terrace and Kitchen project seamless. Design of the kitchen and building expansion is complete. The project will commence bidding on June 28 with award of construction anticipated at the July 8, 2010, Agency Board meeting. This amendment allows staff to proceed without delay. Contract Amendment No. 2: The amendment allows staff to proceed without delay with the aggressive design and construction schedule. The contract amendment includes costs associated the following items: Item No. Description Cost 1 Food Service, structural, and architectural drawing revisions due to location of existing grease interceptor. $4,800 Provide additional mechanical, electrical, and architectural scope of services 2 to modify ceiling to address mechanical cooling loads and lighting improvements in Banquet Room and Palm Desert Room. $6,400 Total $11,200 Item No. 1 provides an enhanced ceiling design that seamlessly blends the Lakeview Terrace and the Kitchen/Building expansion projects together. The existing ceiling follows the jogs of the glass wall. This corner is being expanded as part of the Lakeview Terrace contract; however the ceiling revisions are needed to modify the ceiling to follow the new glass wall so that this corner of the banquet room does not appear as an addition. See attached photo showing the existing condition and the attached drawings showing the proposed ceiling plan. This item also addresses the cumulative effects of the Terrace and Kitchen/Building expansion cooling loads. The occupancy increase, window area modifications, and new lighting resulting from both projects all contribute to the cooling load, but none of these items on their own necessitate modifications to the HVAC system. In order to address the added cooling loads, new ductwork and a small A/C unit are required. This option provides significant cost savings over earlier design iterations, which proposed replacing an existing functioning unit with a larger GArda\Heather Buck\Desert Willow\Kitchen Renovation\Staff Report\Apprv_Prof _Servc_Agrmt_DWK tchen AmendZdoc Staff Report Contract No. R29450A Ratify Amendment No. 2 with MDR for Desert Willow Kitchen/Building Expansion June 24, 2010 Page 3 of 3 and more expensive A/C unit. These design services will provide a low cost solution to the cooling loads associated with the Terrace and Kitchen projects. Item No. 2 is the result of revisions to the design required to accommodate an existing grease interceptor access point not shown on the concept design. The structural elements, refrigeration and coolers need to be relocated to maintain structural separation between the grease interceptor and the building exterior. Modifications to the architectural, food service, and structural plans are required. Additionally, the engineer's inspections and recommendations regarding the above items will assist the Agency in locating potential construction cost savings that may be realized by minimizing the relocation of and modifications to the existing grease interceptor. The total cumulative cost for these additional services is $11,200 (see attached Amendment No. 2 Proposal). Construction of the project is on track to be completed in December 2010 with bidding in June and July, and construction commencing in August 2010. Fiscal Analysis The estimated construction cost for the project is $2.95 million. Amendment No. 2 in the amount of $11,200 requires an additional appropriation of $7,650. Funds are available in Unobligated Project Area 2 Fund; therefore, there is no immediate fiscal impact to the General Fund. Submitted By: Heather Buck, Project Coordinator Martin Alvarez, Redevelopment Manager Department Head: BY RDA • ON... �C/ C stin McCarthy, ACM fo velopment VERIFIED BY Cj)k l l+n / / �, Original on file with City Clerk's Office Paul Approva John M ibson, Director of Finance Imuth, Executive Director \\srv-fi12k3\groups\rda\Heather Buck\Desert Willow\Kitchen Renovahon\Staff Report\Apprv_Prof_Servc_Agrmt_DWKitchen Amend2 doc Melzer Deckert & Ruder Architects, Inc. Architects & Planners 9511 Irvine Center Drive Irvine, CA 92618 (949)474-8188 Voice (949)474-8189 Fax June 15, 2010 Mr. Martin Alvarez Redevelopment Manager City of Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, CA 92260 Subject: Request for Additional Services — Existing Building Conditions Kitchen and Building Expansion, Desert Willow Golf Club 38-995 Desert Willow Drive Palm Desert, CA Desert Willow Kitchen/Building Expansion Agreement Mr. Alvarez, As requested by Palm Desert Redevelopment Agency (RDA), Melzer Deckert Ruder Architects, Inc. (MDR) submits this request for Additional Services. Scooe of Work 1 . Due to the verified depth and location of existing grease interceptor, shift exterior walls of proposed expansion to the north, thereby reducing the floor area. Food service, structural, and architectural drawings shall be revised. Existing grease interceptor to remain. 2. Dining and Palm Desert Rooms: Provide additional mechanical, electrical, and architectural scope of services to modify ceiling to address mechanical cooling loads and lighting improvements in northwest corner and Palm desert Room, following Lakeview Terrace improvements to window walls. Professional Fee Based on the Scope of Work items, not -to -exceed, fees based on hourly rates are as follows: 1. Modify kitchen due to grease interceptor $4,800 2. Dining and Palm Desert Rooms $6,400 TOTAL $1 1,200 Melzer Decked Ruder Architects, Inc. Mark Melzer, AIA, LEED AP Chairman END PALM DESERT REDEVELOPMENT AGENCY PROFESSIONAL SERVICE AMENDMENT Contract Purpose Desert Willow Kitchen & Building Expansion Architectural Services Consultant's Name Melzer Deckert & Ruder Architects, Inc. Address: 9511 Irvine Center Drive Irvine, CA 92618 Contract # / P.O. # R29450A 16674 Amendment/ 2 Change Order No. Contingency: I YES X I NO Account No. I 851-4663-454-4001 Project No. Vendor No. 9403 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE DESCRIPTION OF CHANGES In Contract Price In Contract Price Additional Architectural Services: Provide lighting design & engineering 11,200.00 for Banquet Room & PDR Ceiling; Provide Title 24 reports & new duct design in Banquest Room; structural revisions to shear wall & internal columns; and kitchen revisions to refrigeration & cooler space. TOTALS: NET CHANGE IN CONTRACT PRICE: JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 191,850.00 Less: Expend. & Encumb. To Date: - 191,850.00 Less: This Change Order Amount: - 11,200.00 BALANCE OF BUDGET REMAINING FOR PROJECT: (11,200.00) CONTINGENCY: Amount Approved by Board: Less: Prior Amendment(s): Less: This Amendment: Balance Remaining of Contingency: 11,200.00 11,200.00 + 16,400.00 12,850.00 11,200.00 (7,650.00) The amount of the Contract will be (OeGFeased) Increased by the Sum of: Eleven Thousand Two Hundred and NO/100 Dollars ($11,200.00). G:\rda\Agenda Items\6-24-10\MDR Amndmt 2.docx See reverse ... Contract R29450A Amendment No. 2 Continued from front This Contract Amendment covers changes to the subject contract as described herein. The consultant shall perform all work as necessary or required to complete the Contract Amendment items for a lump sum price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as Owner. Contract Time Extension -0- Days. Revised Contract Total 203050.00 The undersigned Consultant approves the foregoing Contract Amendment # 2 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Contract Amendment # 2 . The Consultant agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Contract Amendment items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the Owner. Execution of this Contract Amendment by the Consultant constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Contract Amendment, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of productivity, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: CERTIFIED FUNDS AVAILABLE: EXECUTIVE DIRECTOR FINANCE DIRECTOR NOTE: No payments will be made prior to Executive Director and Agency Board approval 2. ACCEPTED BY: CONSULTANT 4. APPROVED BY: CINDY FINERTY, CHAIRMAN 6/24/10 SECRETARY 6/24/10 G:1rda\Agenda Itemsl6-24-10\MDR Amndmt 2.docx See reverse ... ////•l O� U U) o a% ` w .o 0 L ZCo o o 0 0 Z- Q o N w Q o Z W c w a .� W cl O O W Z Z Lo 04 W Q Z H Z Y 0 LL Z 000 WD (j) Cl) W 0 J O C) O O L O r- r U I— Z U W z Z Z Fa- Q LO 0 O � Z_ Z Z W O6C5 E2 R LO 00000O O O U LO c L 0 O M C6 O U O 0 O O Z Um 0 Z LL � c 2 h- O F- U o o o Z Q Q o 0 ca I 0 0 0 LO co r. o O O O _0 LO `n O o U)" - 1 (h O cr) � OF- O N 0 .F 00 O r: LO 0 0 U O 0 o a)+"' 0) a) LO O =3 0 O N �- co co< E �- Q z 0 U O N CO U 0 0 0 co z N O M 0 0 0 LO 0 14 N cn J 0 cn 0 J 0 U N E a E Lo CN 4 o O 0 N E cm -@o cD Vp.lu -A. ,S- '�'W— j*"-jvA--F000 D[Ttlrl(:3 Mir (4vIg I ►e vvv . (��" t"OL.0 M(W,,- ( , h I (o