Loading...
HomeMy WebLinkAboutR29420 CA-1A & CA-1B - DW Lkvw Terrace Xpnsn DesignContract No. R29420 PALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVAL OF PROFESSIONAL ARCHITECTURAL SERVICES CONTRACT AMENDMENT NO. 1A ($2,100) AND RATIFICATION OF AMENDMENT 1 B ($5,750) WITH SMART MICHAEL SIMINOFF ARCHITECTS, INC. IN AN AMOUNT NOT -TO - EXCEED $7,850 FOR THE DESERT WILLOW LAKEVIEW TERRACE EXPANSION DESIGN SUBMITTED BY: Martin Alvarez, Redevelopment Manager Heather Buck, Project Coordinator ARCHITECT: Smart Michael Siminoff Architects, Inc. 18662 MacArthur Blvd., Suite 101 Irvine, CA 92612 DATE: May 13, 2010 CONTENTS: SMS Work Authorization No. 1 and No. 2 Requests Professional Services Contract Amendment No. 1 Recommendation By Minute Motion: 1. Approve Professional Services Contract Amendment No. 1A ($2,100) and ratify Amendment 1 B ($5,750) for Contract R29420 with Smart Michael Siminoff Architects, Inc. (SMS) in the amount not -to -exceed $7,850 for architectural design services for the Lakeview Terrace Expansion at Desert Willow; 2. Authorize the Director of Finance to move $7,850 from contingency (Account No. 851-4663-454-4001) to base; and 3. Authorize the Chairperson to execute said amendment. Funds are available in RDA Post Construction Costs, Account No. 851- 4663-454-4001. Staff Report Contract No. R29420 Ratify Amendment No. 1 with SMS for Lakeview Terrace Expansion at Desert Willow May 13, 2010 Page 2 of 3 Executive Summary Approval of staff's recommendation will approve Professional Services Contract Amendment No. 1A ($2,100) and ratify Amendment No. 1B ($5,750) with SMS for the Lakeview Terrace Expansion at Desert Willow. The contract amendment is in the amount not -to -exceed $7,850 for additional architectural services required to complete the construction documents. Staff recommends approval. Backaround On December 10, 2009, the Agency Board awarded a contract in the amount of $82,300 (plus a reimbursable allowance of $4,100) with a ten percent (10%) contingency ($8,230) to SMS for architectural design services for the Lakeview Terrace expansion at Desert Willow. The design scope includes, but is not limited to the following components: • Expansion of the existing outdoor terrace seating capacity by 100 guests. • Expansion of the Ballroom and Palm Desert Room (PDR) by 315 square feet. • Design of a new exterior bar and shade canopy. • Entitlement review process. The design of the Lakeview Terrace expansion is complete. The project received approval by the Architectural Review Commission (ARC) on March 9, 2010, and Planning Commission approval on April 6, 2010. The project is in plan check, and is expected to be out to bid at the end of May 2010. Initial review and coordination of the Lakeview Terrace, kitchen, and parking lot electrical designs anticipated that the existing Southern California Edison transformer located in the building's service yard would need upgrading. The cost and construction of this work was to be included in the kitchen project. Having completed the final electrical designs for the terrace and parking lot and preliminary design for the kitchen, the electrical engineers have verified that the existing transformer has sufficient capacity to handle the proposed electrical loads. This will save time and approximately $200,000. Although the transformer is adequately sized, additional service panels will need to be added to serve each of the added project loads. SMS Contract Amendment No. 1 A: The proposed contract amendment includes design costs associated with an additional service counter at the upper terrace and an adjacent screen wall. These elements will provide improved functionality and aesthetics for the existing outdoor patio. SMS's proposed cost for this work is $4,980 (see attached Work Authorization No. 1 Proposal). However, after review, staff recommends $2,100 as adequate compensation for these design services. G1rda\Heather Buck\Desert Willow\Lakeview Terrace\Staff Report\SMSDWLVTAmendt-051310.doc Staff Report contract No. R29420 Ratify Amendment No. 1 with SMS for Lakeview Terrace Expansion at Desert Willow May 13, 2010 Page 3 of 3 SMS Contract Amendment No. 1 B: The current electrical design for new Lakeview Terrace includes routing all electrical conduits back to the service yard area and adding a new panel. With the recent review and coordination of electrical loads, it was discovered that an existing large service panel located in the basement (cart barn) can accommodate the Lakeview Terrace electrical load with minor modification. The proposed contract amendment includes design costs associated with rerouting the electrical service to the cart barn and redesigning the loads to be compatible with the existing service panel. The location of the cart barn service panel is more accessible and will be less expensive to construct. Cost savings will be achieved by utilizing the basement panel and avoiding having to run all conduits through or around the building to reach the service yard located on the south end of the building. The total cost for these additional design services is $5,750 (see attached Work Authorization No. 2 Proposal). The amendment allows staff to finalize the plans and proceed without delay. Construction of the project is scheduled to commence in June 2010, and be completed in September 2010. Fiscal Analvsis The estimated construction cost for the project is $1 million. Amendment No. 1 in the amount of $7,850 can be accommodated in the project's design contingency ($8,230). Funds have been budgeted in Unobligated Project Area 2 Fund; therefore, there is no immediate fiscal impact to the General Fund. Submitted By: &-t� Heather Buck, Project Coordinator artment Head: " ,v ,t 1 j, in MgCaghy, ACM fqr-Reldevelopment Paul S.'Gibson, Director of Finance Approval: '> John M. Wei Imuth, Executive Director GArda\Heather Buck\Desert Willow\Lakeview Terrace\Staff Report\SMSDWLVTAmendl-051310.doc Martin Alvarez, Redevelopment Manager Y RDA ON_25 VERIFIED BY Original on file- wiffic.N Work Authorization: 02 Dated: April 22, 2010 Re: Electrical & Cost Estimate Revisions Client: Mr. Martin Alvarez, Project Manager Project: Desert Willow City of Palm Desert Terrace Expansion Redevelopment Agency Palm Desert, CA 73-510 Fred Waring Drive Palm Desert, CA 92260-2578 Via: Email/Mali SMS Project No: 10-002.1C Authorizatian is confirmed for SMS Architects to perform the following services: Additional Services: Scope of Services: .1 Provide a new electrical panel and transformer for the Terrace area that will be served from the existing DSBN-4 panel at the Basement cart bam. .2 Revise the electrical drawings based on the new location of the electrical panel and added transformer at the basement cart bam. .3 Revise the cost estimate to incorporate the electrical revisions. .4 Architectural coordination and revision to the architectural basement plan accordingly. Compensation: TOTAL $5,750.00 Conditions: 1. This fee is in addition to the Basic Services Agreement 2. This Work Authorization is for only those services itemized on this Work Authorization #02. Original Agreement: Client/ Architect Agreement Services not included: All Services not specifically indicated. Fee: As indicated Services to Begin: Upon receiving written authorization to proceed SMS Archfte by: Emad Michael, Principal Reimbursable Expenses: Cost +10% Consultant Expenses: Cost +10% Services to be completed 3 weeks. Date: Apd122, 2010 Date: P,USEM-WUOMEWT MUOW_OOL�_iESOFUOWOFWA-O22O1O0415.00C Work Authorization: 01 Dated: April 15, 2010 Client: Mr. Martin Alvarez, Project Manager City of Palm Desert Redevelopment Agency 73-510 Fred Waring Drive Palm Desert, CA 92260-2578 Re: Added Service Counter Project: Desert Willow Terrace Expansion Palm Desert, CA Via: Email / Mail SMS Project No: 10-002.1 C Authorization is confirmed for SMS Architects to perform the following services: Additional Services: Scope of Services: .1 Provide one additional service counter at the high Terrace Level .2 Provide a conceptual sketch of the stepped planter wall screen .3 Provide Construction Documents for the new service counter and screen wall .4 Coordination with our consultants to provide the necessary documents and instructions for pricing of the screen wall as an add alternate Compensation: Architectural: $4,680.00 Landscaoe $300.00 TOTAL $4,980.00 Conditions: 1. This fee is in addition to the Basic Services Agreement. 2. This Work Authorization is for only those services itemized on this Work Authorization #01. Any additional Services, which may be required by consultants due to this revision, will be issued under a separate Work Authorization. Original Agreement: Client/ Architect Agreement Services not included: All Services not specifically indicated. Fee: As indicated Services to Begin: Completed. SMS Architects, by: Emad Michael, Principal Approved for Client, by: Reimbursable Expenses: Cost +10% Consultant Expenses: Cost +10% Date: Date: April 15, 2010 PADESERT WILLOWESERT WILLOW GOLF RESORTIWA-01.2010.04.15.000 O D r a w cn 0 0 0 n -p w N W D O ccn a 00000� (D Q cn m m ;a (D C) rn D cD n n v D D D w 0 r r r D (D -� n C) cn (D (D �' O O O ZZ m (D a D —Zj o cn n cn (D r 0 (D0 � Z D (D =3 m n o�(D o o D 0 v � o n O Z D n iv cn 0 -� (D 0 cn m 0 0 0 0 O O C� O o :3 0, ro N O N 0 w -P o j-69 CO CO / CC)- O - / A N .+ / O N — N (D / -N U1 Cn h Q / O D O O / O � O O /O / O O / O -O6 / / _. N Oo E D ��/o a / D -z-1 ID CD a-0 a jCC) % o c) y O �Fn C �oj�o o -69� L C) z C) o c) O / ° Z3 10 N �, (Q A v / w � n ° rn / D '. : / 00 0o w / C) 0 o cn' o / 0 0 0/ 0 Z, -I C c D 0- --I 7 Z I OC PALM DESERT REDEVELOPMENT AGENCY Contract # / P.O. # PROFESSIONAL SERVICE AMENDMENT Amendment/ Change Order No. Contingency: Contract Purpose Lakeview Terrace Expansion Architectural Services Account No. Consultant's Name SMS Architects Project No. Address: 18662 MacArthur Boulevard, Suite 101 Vendor No. Irvine, CA 92612 R29420 16566 1 YES X NO 851-4663-454-4001 11872 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE DESCRIPTION OF CHANGES In Contract Price In Contract Price Additional electrical design work and architectural coordination outlined in SMS Project No 10-002.1 C, Work Authorization 02 5,750.00 Additional architectural services for addition of service counter and screen wall outlined on SMS Project No 10-002.1 C, Work Authorization 01 TOTALS: NET CHANGE IN CONTRACT PRICE: JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 86,400.00 CONTINGENCY: Less: Expend. & Encumb. To Date: - 86,400.00 Amount Approved by Board: + Less: This Change Order Amount: - 7,850.00 Less: Prior Amendment(s): - BALANCE OF BUDGET Less: This Amendment: - REMAINING FOR PROJECT: (7,850.00) Balance Remaining of Contingency: 2,100.00 7,850.00 7,850.00 8,230.00 7,850.00 380.00 The amount of the Contract will be (Oe�eased) Increased by the Sum of: Seven Thousand. Eiaht Hundred Fiftv and NO/100 Dollars ($7,850.00). G:\rda\Agenda Items\5-13-10\SMS-Amndmt-1.docx See reverse ... Contract R29420 Amendment No. 1 Continued from front This Contract Amendment covers changes to the subject contract as described herein. The consultant shall perform all work as necessary or required to complete the Contract Amendment items for a lump sum price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as Owner. Contract Time Extension -0- Days. Revised Contract Total 94.250.00 The undersigned Consultant approves the foregoing Contract Amendment # 1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Contract Amendment # 1 . The Consultant agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Contract Amendment items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the Owner. Execution of this Contract Amendment by the Consultant constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Contract Amendment, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of productivity, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: EXECUTIVE DIRECTOR 2. ACCEPTED BY: CONSULTANT 3. CERTIFIED FUNDS AVAILABLE: 4. APPROVED BY: FINANCE DIRECTOR CINDY FINERTY, CHAIRMAN 5/13/10 NOTE: No payments will be made prior to Executive Director and Agency Board approval SECRETARY 5/13/10 G:\rda\Agenda Items\5-13-10\SMS-Amndmt-1.docx See reverse