HomeMy WebLinkAboutR30380 CO1 Perimeter Landscpae Improvement Larkspur Lane and Shadow Mountain DriveALL b PALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVE CHANGE ORDER NO. 1 IN THE AMOUNT OF $2,510.49 TO CONTRACT NO. R30380 FOR PROJECT NO, P87110 FOR PERIMETER LANDSCAPE IMPROVEMENTS AT THE NORTHEAST CORNER OF LARKSPUR LANE AND SHADOW MOUNTAIN DRIVE TO EARTH SCULPTURES, INC. SUBMITTED BY: Bryce L. White, Project Administrator CONTRACTOR: Earth Sculptures, Inc. 38207 N. Primrose Lane Indio, CA 92203 DATE: February 24, 2011 CONTENTS: Aerial Location Map Change Order No. 1 Change Order Requests No. 1 and No. 2 Recommendation By Minute Motion: 1. Approve Change Order No. 1 in the amount of $2,510.49 to Contract No. R30380 for Project No. P87110 for Perimeter Landscape Improvements at the Northeast Corner of Larkspur Lane and Shadow Mountain Drive to Earth Sculptures, Inc.; 2. Authorize the Chairman to execute said Change Order No. 1 to Contract No. R30380 for Project No. P87110; and 3. Authorize the Finance Director to transfer $2,510.49 from the 10% contingency set -aside to the base contract. Funds are available for the project in Account No. 850-4388-433-4001. Executive Summary Approval of staff's recommendation will provide for removal of additional asphalt and installation of additional irrigation lines at the northeast corner of Larkspur Lane and Shadow Mountain Drive (see attached map). The subject properties are currently used for activities during Fashion Week and other temporary uses throughout the year. Staff Report Approve Change Order No. 1 for Contract R30380 February 24, 2011 Page 2 of 3 Background The subject properties are located at the northeast corner of Larkspur Lane and Shadow Mountain Drive (APN 627-262-008 and APN 627-262-011) and are zoned C-1 and R-3 respectively. The properties are located east of The Gardens on El Paseo and total 91,684 square feet in area (2.10 acres). They are the only unimproved properties visible from El Paseo. On January 13, 2011, the Agency Board authorized the award of Contract No. R30380 for Project No. P87110 to Earth Sculptures, Inc. in the amount of $42,044.00. The project will provide 15-foot wide landscaping along both street frontages and a visual buffer between the vacant properties and the street. The improvements include removal of three (3) palm trees in the center of the property for the location of a temporary tent used during Fashion Week. A row of fast-growing Tecoma Stans shrubs will provide a visual buffer of the adjoining residential complex to the east. Improvements also include elimination of two (2) lengthy curb approaches totaling 250 lineal feet and replacement with curb and gutter. Installation of bollards connected by wire rope at the three (3) remaining curb approaches will limit unauthorized vehicular access to the property. The City's Landscape Services Division prepared the irrigation and landscape plans and is assisting the Agency with the project oversight, inspection, and technical review of the installation. The Agency will reimburse the City for staff time. The subject properties are currently used for activities during Fashion Week and other temporary uses throughout the year. The proposed improvements will enhance the aesthetics of the area and will provide a more positive image to the El Paseo shopping district. The proposed improvements are scheduled for completion prior to March 21, 2011, which is the beginning of Fashion Week. Change Order No. 1: During site preparation an asphalt driveway was discovered running the length of the easterly portion of the properties that had been covered by soil. The attached Change Order Request No. 1 from Earth Sculptures, Inc. for $1,814.63 is to remove and dispose of a 3-foot wide strip of asphalt running the length of the easterly portion of the properties (approximately 1,800 square feet) for installation of Tecoma Stans shrubs and irrigation lines. An additional grouping of palm trees requiring irrigation was not noted on the plans. The attached Change Order Request No. 2 from Earth Sculptures, Inc. for $695.86 is for installation of an additional 100 lineal feet of irrigation lines and bubblers to the palm tree grouping. This request is also for installation of an in -ground valve box containing a hose coupler and an additional 140 lineal feet of supply line. Therefore, staff recommends approval of Change Order No. 1 in the amount of $2,510.49 to Contract No. R30380 for Project No. P87110 to Earth Sculptures, Inc. There are no additional days for contract time extension for this Change Order. G.VdakSryce WhitelPenmiter Landscape Larkspur -Shadow MtMChange Order 1 SR 2-24-11.doc Staff Report Approve Change Order No. 1 for Contract R30380 February 24, 2011 Page 3 of 3 Fiscal Analysis Funds for this Change Order are available in Account Number 850-4388-433-4001. The Agency will pay the cost to maintain the improvements of approximately $6,500 per year until an ultimate disposition of the property is determined. There is no current fiscal impact on the General Fund. Submitted By: Br it , Project Administrator r Spen er nig andscape Ma''hager Department Head: Justin McCarthy, ACM Redevelopment Approval: P,aakS. Gibson, Director of Finance Wohlmuth, Executive Director ent Manager 4(7,'V J BY RDA ( J ON C:�-q- �C,// VERIFIED BY J Original on file with City Clerk's Office G IrdalBryce WhitelPenmiter Landscape Larkspur -Shadow WMChange Order 1 SR 2-24-11 doc PALM DESERT REDEVELOPMENT AGENCY CONSTRUCTION CHANGE ORDER Contract Purpose Perimeter Landscape at Northeast Corner of Larkspur Lane & Shadow Mountain Drive Consultant's Name Earth Sculptures, Inc. Address: 38207 N. Primrose Lane Indio, CA 92203 Contract " P.O. # R30380 AmendmenU 1 Change Order No. Contingency: YES X NO Account No. 850-4388-433-4001 Project No. P87110 Vendor No. I 7818 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE DESCRIPTION OF CHANGES In Contract Price In Contract Price Remove and dispose of additional asphalt covered by soil. 1,814,63 Install add'I irrigation lines & emitters for palm tree not shown in plans & additional hose coupler 695.86 TOTALS: - 2,510.49 NET CHANGE IN CONTRACT PRICE: 2,510.49 JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 50,000.00 CONTINGENCY: Less: Expend. & Encumb. To Date: - 42,044.00 Amount Approved by Board: + 4,204.40 Less: This Change Order Amount: - 2,510.49 Less: PriorAmendment(s): - - BALANCE OF BUDGET Less: This Amendment: - 2,510.49 REMAINING FOR PROJECT: 5,445.51 I Balance Remaining of Contingency: 1,693.91 The amount of the Contract will be Increased by the Sum of: Two thousand, five hundred ten and 49/100 Dollars ($ 2,510.49). Wrda\Ngenda Items\2011\2-24-11\R30380 C-0-1.doc See reverse Contract R30380 Change Order No. 1 Continued from front This Contract Amendment covers changes to the subject contract as described herein. The consultant shall perform all work as necessary or required to complete the Contract Amendment items for a lump sum price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as Owner. Contract Time Extension 0 Days. Revised Contract Total 44.554.49 The undersigned Consultant approves the foregoing Change Order # 1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Change Order # 1 . The Consultant agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Contract Amendment items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the Owner. Execution of this Contract Amendment by the Consultant constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Contract Amendment, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of productivity, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. REQUESTED BY: EXECUTIVE DIRECTOR CERTIFIED FUNDS AVAILABLE: FINANCE DIRECTOR NOTE: No payments will be made prior to Executive Director and Agency Board approval 2. ACCEPTED BY: CONTRACTOR 4. APPROVED BY: JEAN M. BENSON, CHAIRMAN SECRETARY 2/24/11 Date Approved 2/24/11 Date Approved GArda\Agenda Items\201 1 \2-24-1 1\R30380 C-0-1.doc See reverse LU H Z O 2 W Z J � �w NO Y W C J Z co Z O M Z U v vQ z NOFCU uj 0 2 V H 0 O 0 U N� �a w = W U) O w a 2 0 v 06 Iq N CO � N CD tt 0 U z U w c� z z M 00 00 00 M Z Z Z i� ao 000 U L M C L O U � N Cfl C O C � C� O O M Z U m Z U- U)_ c2� O C O Q O•-+- ry 0 O Z Q Q 0 c0 rn 7 U LO LO a) o H Iq w U 0 L o 4.1 L6 o c O U rn v o L " _ c LO N U cC6 U 0 E Q z O 0 a U N N � c L 0 (D � CU rn 0= 0 cn =_ C t6 U ccu Q > M of of c 0 N CO d' U-) 0 0 rn LO rn 0 R J H 0 0 DATE: 2-10-2011 TO: Mr. Bryce White Palm Desert Redevelopment Agency PROJECT: PERIMETER LANDSCAPE IMPROVEMENTS LARKSPUR LANE AND SHADOW MTN DRIVE. CHANGE ORDER REQUEST: NO. 1 Description of work: Extra asphalt demolition. Removal and haul off of approximately 1,800 square feet of asphalt. EQUIPMENT COST UNITS SUBTOTAL 15% MARKUP TOTAL JD 160 Excavator $ 45.00 8 $360.00 $54.00 $414.00 End Dump $ 85.00 3 $255.00 $38.25 $293.25 LABOR COST UNITS SUBTOTAL 15% MARKUP TOTAL Operator $ 56.00 8 $448.00 $67.20 $515.20 Laborer $ 48.00 8 $384.00 $57.60 $441.60 Dump Fee $ 100.00 1 $100.00 $15.00 $115.00 Total Change Order: Bond Increase: 2% $1,779.05 $35.58 TOTAL CHANGE ORDER REQUEST: $1,814.63 DATE: 2-10-2011 TO: Mr. Bryce White Palm Desert Redevelopment Agency PROJECT: PERIMETER LANDSCAPE IMPROVEMENTS LARKSPUR LANE AND SHADOW MTN DRIVE. CHANGE ORDER REQUEST: NO. 2 Description of work: Extra Irrigation Purchase and Installation 1. Install (1) Rainbird Q.C. in valve box, and 140 LF of mainline for quick coupler 2. Irrigate (1) Palm Tree with (2) emitters, ancipurchase and install 100 LF of lateral line for bubbler for palm trees. LABOR COST UNITS SUBTOTAL 15% MARKUP TOTAL $48.00 8 $384.00 $57.60 $441.60 MATERIALS COST UNITS SUBTOTAL 15% MARKUP TOTAL 209.23 1 $209.23 $31.38 $240.61 Total Change Order $682.21 Bond 2% $13.64 TOTAL CHANGE ORDER REQUEST $695.86 ;`Y" AP�qoN' 627-262-0 4.�I R15SaF ROW OF I� m