HomeMy WebLinkAboutR29450B CA1 DWGR Lakeview Terrace and Kitchen Building Expansion Construction ManagementV t Contract No. R29450B PALM DESERT REDEVELOPMENT AGENCY STAFF REPORT REQUEST: APPROVE AMENDMENT NO. 1 TO CONTRACT NO. R29450B WITH BARNHART BALFOUR BEATTY FOR CONSTRUCTION MANAGEMENT SERVICES IN AN AMOUNT NOT TO EXCEED $20,340 FOR THE DESERT WILLOW LAKEVIEW TERRACE AND KITCHEN/BUILDING EXPANSION PROJECTS SUBMITTED BY: Heather Buck, Project Coordinator Martin Alvarez, Redevelopment Manager FIRM: Barnhart Balfour Beatty 41-945 Boardwalk, Suite D Palm Desert, CA 92211 DATE: January 13, 2011 CONTENTS: Amendment No. 1 Fee Proposal Change Order Recommendation By Minute Motion: 1. Authorize the Executive Director to execute Contract Amendment No. 1 with the Barnhart Balfour Beatty for construction management services for the Desert Willow Lakeview Terrace and Kitchen/Building Expansion projects in an amount not to exceed $17,840 and an additional amount not to exceed $2,500 for reimbursable expenses; 2. Move $17,040 from the budgeted contingency to contract base; 3. Appropriate $3,300 from the Unobligated Project Area No. 2 Fund to Redevelopment Agency (RDA) Post Construction Costs, Account No. 851-4663-454-4001; and 4. Authorize the Executive Director to execute the contract amendment. Executive Summary Approval of staff's recommendation will authorize the Executive Director to execute Contract Amendment No. 1 in the amount not to exceed $17,840 with Barnhart Balfour Beatty for construction management services, plus $2,500 for reimbursable expenses for the Lakeview Terrace and Expansion project at the Desert Willow Golf Resort. Staff Report Contract No. R29450B Approve Amendment No 1. Barnhart DW Construction Management Services January 13, 2011 Page 2 of 3 Background Design of the Desert Willow Lakeview Terrace and Kitchen Expansion were authorized in early 2010. Design of the Lakeview Terrace was completed by SMS Architects, which increases the outdoor terrace seating capacity by 100 seats and banquet capacity by 250. In addition, the expansion adds flexibility to host multiple events simultaneously while preserving the ability to service residents and guests. The design of the kitchen/building expansion was completed by MDR Architects and expansion includes the following components: • Remodel of the existing lobby/bar area to accommodate an expanded bar area with the relocation of two offices. • Expansion of the lobby/ballroom hallway to eliminate the pinch point. • Enclosure of the existing ballroom to reduce noise. • A 5,264 square foot expansion to the kitchen/building at the east end of clubhouse. • Modification to the ballroom audio visual, window shading, and lighting. On March 25, 2010, the Agency Board authorized a contract with Barnhart Balfour Beatty for construction management services for the Desert Willow Lakeview Terrace and Kitchen/Building Expansion projects in an amount not to exceed $170,400 and an additional amount not to exceed $3,500 for reimbursable expenses. The contract included construction management services for the two projects (Lakeview Terrace and Kitchen/Building Expansion) and included the following tasks: • Performance of constructability review. • Review of schedule/phasing/budget. • Bidding and negotiation assistance. • Preparation and issuance of addenda. • Conduct the progress meetings, and special meetings as required during the construction phase of project. • Identification of potential change orders. • Review and recommendation of pay applications. • Periodic review of the as -built documents. • Field visits and site observations during construction. • Coordination with the testing and inspection lab(s), contractor(s), architects and the City inspectors. • Conducting the final inspection to determine that the contractor's work is complete. • Reviewing and responding to correspondence prepared by the construction contractor(s). • Monitoring and logging the request for information (RFIs), submittals, and field orders. G \rdaWartin Alvarez\2011\BarnhartAmend1 DWCMServc1-13-1 tdoc Staff Report Contract No. R29450B Approve Amendment No 1. Barnhart DW Construction Management Services January 13, 2011 Page 3 of 3 Contract Amendment No. 1: The proposed contract amendment allows for additional construction management services for the Lakeview Terrace only. The terrace expansion was scheduled to commence in July 2010, with a 75-day construction period and completion by September 2010. In July 2010, the Agency Board awarded a contract to GHA Holdings to commence construction of the terrace expansion. In August 2010, the Agency Board rescinded a contract with GHA Holdings as they failed to produce the necessary bonding per the project specifications causing a minor delay. The Agency Board awarded a contract to the next response bidder DavisReed. The proposed contract amendment includes additional construction management services for the months of October and November in the amount of $17,840, which coincides with the delay experience at the beginning of the project and project delays experienced due to unforeseen site conditions such as relocation of a 12" golf course irrigation line, discovery of mold in existing column, and additional scope added by Change Order No. 1. Staff recommends that the Agency Board authorize the Executive Director to execute Contract Amendment No. 1 in the amount not to exceed $17,840, plus an additional $2,500 for reimbursable expenses with Barnhart Balfour Beatty for additional construction management services for the Lakeview Terrace expansion at the Desert Willow Golf Resort. Fiscal Analvsis Funds are available in the Unobligated Project Area 2 Fund; therefore, there is no immediate fiscal impact to the General Fund. Submitted By: Heather Buck, Project Coordinator Department Head: ment Finance Director App al: 7 J M. Wohlmuth, Executive Director 1rd Martin Alvarez\2011\BarnhartAmendIDWCMServcl-13-11 doc Martin Alvarez, Redevelopment Manager BY RDA ON VERIMED BY �l Original on file with City Clerk's Office O O O O O O O O (P O O O O O O it ID W b9 r� V) b9 CO w N to W. w b% Or IR t9 to to a t0 t7 °� m m O t9 N N 001 ti l+l a^ a 401� M V N r R E E W N W I bm r O O b 4 � Ul co 44 0 0 0 0 O O O i O' O N -aa N C tl p; V m O O c0 � O � 7 Lb C Z o to o l- u 4' Ul N V .00 ¢ s u a ta f.1 V Q N Ip, a a` bm xQ tp o ..a.- b T.$ Q S Q J C1 N ...... N .... 0 b O O N Ln 7' N W 4 01 O W W +�+ O W N O O O l0 to bg Vf wk a yg t9 tR tR 1A O >1 O C GI a a ° N= a r m F t d d Q d z c C c E a o a` m o c o m a II. U ro C ? U m C m e ~ p H L 3 W ui cn m o n u 1.. u`1 U LL d N W N LL U Y.1 �I! CT 4. a. fA Ll! to lL U rr c c ro m C m C d t N m c E �:a�i x m' z a v z a c u J N 2 J W ra PALM DESERT REDEVELOPMENT AGENCY Contract # / P.O. # ( R29450B 16671 Change Order No. I 1 PROFESSIONAL SERVICE AMENDMENT Contingency: YES x No Contract Purpose Proj Mgmt — DW Lkvu Terrace & Kitchen/Bldg Expan Account No. I 851-4663-454-4001 Consultant's Name Barnhart Balfour Beatty Project No. Address: 41945 Boardwalk, Suite D Vendor No. I 4594 Palm Desert, CA 92211 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE DESCRIPTION OF CHANGES In Contract Price In Contract Price Additional construction management services for Desert Willow Lakeview Terrace portion of contract due to project delays Not to Exceed Additional reimbursable allowance for Desert Willow Lakeview Terrace portion of contract Not to Exceed TOTALS: NET CHANGE IN CONTRACT PRICE: JUSTIFICATION: TOTAL BUDGET FOR PROJECT: + 190,940.00 Less: Expend. & Encumb. To Date: - 173,900.00 Less: This Change Order Amount: - 20,340.00 BALANCE OF BUDGET REMAINING FOR PROJECT: (3,300.00) CONTINGENCY: Amount Approved by Board: Less: Prior Amendment(s): Less: This Amendment: Balance Remaining of Contingency: 17,840.00 2,500.00 20,340.00 20,340.00 + 17,040.00 20,340.00 (3,300.00) The amount of the Contract will be (De&reased) Increased by the Sum of: Twentv Thousand. Three Hundred Fortv and NO/100 Dollars ($20,340.00). G:\rda\Agenda Items\2011\1-13-11\Barnhart R29450BAmndmt 1.doc See reverse ... Contract R29450B Amendment No. 1 Continued from front This Contract Amendment covers changes to the subject contract as described herein. The consultant shall perform all work as necessary or required to complete the Contract Amendment items for a lump sum price agreed upon between the Consultant and the Palm Desert Redevelopment Agency, otherwise referred to as Owner. Contract Time Extension -0- Days. Revised Contract Total $194.240.00 The undersigned Consultant approves the foregoing Contract Amendment # 1 as to the changes, if any, in the contract price specified for each item including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work on account of said Contract Amendment # 1 . The Consultant agrees to furnish all labor and materials and perform all other necessary work, inclusive of that directly or indirectly related to the approved time extension, required to complete the Contract Amendment items. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that the Contract Amendment shall be effective when approved by the Owner. Execution of this Contract Amendment by the Consultant constitutes a binding accord and satisfaction that fully satisfies, waives, and releases the Owner from all claims, demands, costs, and liabilities, in contract, law or equity, arising out of or related to the subject of the Contract Amendment, whether known or unknown, including but not limited to direct and indirect costs and/or damages for delay, disruption, acceleration, and loss of productivity, as well as any and all consequential damages. This document will become a supplement to the Contract and all provisions will apply hereto, all items included above must have required signatures as per the purchase resolution. 3 REQUESTED BY: CERTIFIED FUNDS AVAILABLE: EXECUTIVE DIRECTOR FINANCE DIRECTOR NOTE: No payments will be made prior to Executive Director and Agency Board approval 2. ACCEPTED BY: CONSULTANT 4. APPROVED BY: 1/13/2011 JEAN M. BENSON, CHAIRMAN Date Approved 1 /13/2011 SECRETARY Date Approved G:\rda\Agenda Items\2011\1-13-11\Barnhart R29450B Amndmt 1.doc See reverse Z 0 U) z a a X w 0 Z N 0 0 m 0 w w m 0 0 Z Y U C.4 otf � Q Z " Z U a wo� �u-z w0o >- (U Y a a � J � oU) J J_ H w N w cl mc) 0 U � rn f rn Z Z O U 2 � / �i o ca v% 20 �% o' 2 a c j C 0 a o/ a o� Q o/ _ rn c ~/ O U z U W C� o c z � Z Z Fa- O O OO co Q 4 Q � z Z z IT C- C- 0- co O O O P. U � O L U � O � C N 0 0 O ca V Z U 75 M Ei z cn o � o °0< C) O M oZ Z aS o O Q 0-0 cc 0 0 o _ U N > � c o ~ rn ( U 0 o cu r- O c O U 0 0 0 N L M 0 o U04 Q I— z O c U o E o c O N C4 N � L 0Ea) F- ai 0c>� o Y c3. U m c L �c O o .2 4 0 o QQ O N co � `n U 0 0 r: 0 0 0 IT M 0 N 0