Loading...
HomeMy WebLinkAbout1001 - Shrub InstallationDEPRESSED WATERING BASIN SET TO TOP OF ROOT CROWN AT FINAL GRADE FINISH GRADE ROOT ZONE NATIVE UNDISTURBED SOIL N OTES PLANT SHRUBS MINIMUM OF 3' FROM CURB IN MEDIANS, 3' FROM CURB/SIDEWALKS IN PARKWAYS OR AS NOTED ON PLANS APPLY 1 " THICK LAYER OF DECOMPOSED GRANITE ON TOP OF ROOT BALL FORM 3" BERM TO CREATE TEMPORARY WATERING BASIN (USE WITH ONE BUBBLER EMITTER MINIMUM IRRIGATION ONLY) N.T.S. CITY OF PALM DESERT APPROVED BY: DEPARTMENT OF PUBLIC WORKS STD NO. Feb 19, 2025 SHRUB INSTALLATION 1001 MARTIN ALVAREZ DATE PUBLIC WORKS DIRECTOR