HomeMy WebLinkAbout0402 - Asphalt Concrete Berm3" 5" ROADBED WIDTH TO THIS POINT
r)Of
6" A.C. BERM
Wml lr.W. Uvra
4" 5" ROADBED WIDTH TO THIS POINT
_I. _I- 1
8" A.C. BERM
NOTES:
1. A.C. BERM REQUIRED WHERE FILL SLOPES ARE STEEPER THAN 4:1, MATERIAL
IS SUSCEPTIBLE TO EROSION, OR WHERE ROADWAY GRADIENT EXCEEDS 3%.
N.T.S.
CITY OF PALM DESERT APPROVED BY:
DEPARTMENT OF PUBLIC WORKS STD NO.
Feb 19, 2025 ASPHALT CONCRETE 40 2
MARTIN ALVAREZ DATE BERM
PUBLIC WORKS DIRECTOR