Loading...
HomeMy WebLinkAbout0508 - Valve Operator Well InstallationTOP OF PAVEMENT 48" MAX. DEPTH 36" 1 MIN. 3" 6" TYPICAL INSTALLATION (STREET OR ALLEY) 12" J P.C. CONCRETE 8' 6" MIN.--Q_ T r--�-- TYPICAL INSTALLATION (UNTRAVELED AREAS) NOTES: 1. ALL CONCRETE SHALL BE 560-C-3250 2. CONCRETE SURFACE SHALL RECEIVE HEAVY BROOM FINISH. 6-5/8" OR 10-3/4" O.D.x18", 10 GAGE STEEL 6" OR 10" X REQUIRED LENGTH, 10 GAGE STEEL 1-SACK SAND SLURRY OR PEA GRAVEL BACKFILL VALVE OPERATOR NUT RKER POST N.T.S. CITY OF PALM DESERT APPROVED BY: DEPARTMENT OF PUBLIC WORKS STD NO. Feb 19, 2025 VALVE OPERATORWELL O MARTIN ALVAREZ DATE INSTALLATION PUBLIC WORKS DIRECTOR