Loading...
HomeMy WebLinkAbout0803 - Utility Trench Pavement ReplacementLOCAL STREETS: THE GREATER OF EXISTING +1" A.C., OR 4" A.C. OVER 4" A.B. JOIN EXISTING A.C. PAVEMENrTRENC ALL OTHER STREETS: THE GREATER OF EXISTING +1" A.C., OR 5" A.C. OVER 10" A.B. WITH SMOOTH BUTT JOINT (NO FEATHERING) H WIDTH+2' MIN. SAW CUT 1' MIN. V TRENCH WIDTH 1' MIN. / , EXISTING A.C. PAVT. N A.B! COMPACTED EARTH FILL MIN. RELATIVE COMPACTION 95%, 6" MAX. LIFTS OR USE 1-CLASS "CONCRETE SLURRY TRENCH COMPACTED EARTH FILL MIN. RELATIVE COMPACTION 90%, 8" MAX. LIFTS SIDE SLOPES OR USE 1-CLASS 'CONCRETE SLURRY MAY VARY N U' Z o BEDDING PER PLANS AND SPECIFICATIONS (MIN. 90% RELATIVE COMPACTION) w m i "T—TRENCH" DETAIL NOT TO SCALE NOTE: AN ALTERNATIVE SECTION MAY BE CONSIDERED. PROPOSED DESIGN SHALL BE SIGNED BY A LICENSED ENGINEER AND IS SUBJECT TO APPROVAL OF THE CITY ENGINEER. TRANSVERSE TRENCH CUTS 0" TO 12" WIDE - REPAIR TRENCH WIDTH ONLY (NO "T-TRENCH") 12" TO 24" WIDE - REPAIR TRENCH WIDTH PLUS ADDITIONAL 1' "T" ON BOTH SIDES >24" WIDE - REPAIR TRENCH WIDTH PLUS ADDITIONAL 1' "T" ON BOTH SIDES PLUS GRIND/OVERLAY 0.1' MIN. DEPTH FOR AN ADDITIONAL 3' ON BOTH SIDES LONGITUDINAL TRENCH CUTS IN DRIVING LANES 0" TO 12" WIDE - REPAIR TRENCH WIDTH ONLY (NO "T-TRENCH") PLUS 0.1' GRIND AND OVERLAY FROM LANE LINE TO LANE LINE 12" TO 24" WIDE - REPAIR TRENCH WIDTH PLUS ADDITIONAL 1' "T" ON BOTH SIDES PLUS 0.1' GRIND/OVERLAY FROM LANE LINE TO LANE LINE >24" WIDE - REPAIR TRENCH WIDTH PLUS ADDITIONAL 1' "T" ON BOTH SIDES PLUS GRIND/OVERLAY 0.1' MIN. FROM LANE LINE TO LANE LINE FOR CAP, MILL CL TO LIP OF GUTTER, OR LANE LINE TO LIP OF GUTTER 0.1' SHOULDER TRENCH CUTS AT EDGE OF GUTTER - REPAIR TRENCH WIDTH ONLY (NO "T-TRENCH") OFF EDGE OF GUTTER - NO LESS THAN 5' "FLOATER" BETWEEN TRENCH AND GUTTER SLURRY OR FOG SEAL MAY BE REQUIRED UNLESS THE ROADWAY IS A DESIGNATED BIKE ROUTE, WHICH WOULD REQUIRE A 0.1' THICK GRIND/OVERLAY FROM EDGE OF GUTTER TO LANE LINE. N.T.S. CITY OF PALM DESERT APPROVED BY: DEPARTMENT OF PUBLIC WORKS STD NO. Feb 19, 2025 UTILITY CH PAVEMENT80 MARTIN ALVAREZ DATE REPLACEMENT PUBLIC WORKS DIRECTOR