Loading...
HomeMy WebLinkAbout04a+Ex+to+Reso+-+Priorities+and+Spending+PlanPRIORITY - FIRE PREVENTION/EMERGENCY RESPONSE Project #1: Fire Station 102 Construction and Staffing The City has reallocated bond proceeds intended for lower priority projects to build Fire Station 102.Upon its opening,the Fire Services costs are estimated to increase $7.5M in the first year to operate the new staion and ladder truck.Additionally,Cal-Fire who provides the staffing for fire services in Palm Desert through the contract with the County of Riverside,has implemented new requirements that require additional staffing to accommodate the various changes including limiting the max number of hours each fire person is permitted to work.The associated costs immediately increase costs by an additional $3M annually beginning in 2025-26.Revenues associated with the growth in the North Sphere grow at a much slower pace and will not be able to support the increased staffing needs to maintain current emergency service levels.Funding from the could be used for these Project #2: Fire Station 33 Rehabilitation Over a period of years,the City has transferred funds from the General Fund to reserve funds necessary to rehabilitate the 30+year old Fire Station 33.Current estimates are at $6M.Costs to house the staff during rehabilitation have not been included in the budget.Funding from the Tax could be used to pay these costs,while not limiting service to the community or risking the safety of the staff during that time. Project #3: Fire Station 71 Reconstruction Over a period of years,the City has transferred funds from the General Fund to reserve funds necessary to rehabilitate the 30+year old Fire Station 71.Current estimates are at $7M.Costs to house the staff during rehabilitation have not been included in the budget.Funding from the Tax could be used to pay these costs,while PRIORITY - PUBLIC SAFETY Project #1: Increase Public Safety Patrol Staffing (3) rising crime rates.The cost for 3 additional police officers is $1.3M in FY 2024-25.Overall public safety costs typically increase at approximately 3-5%annually.As the City continues to grow,we anticipate the need for an PRIORITY - INFRASTRUCTURE REPAIR AND EQUIPMENT REPLACEMENT Project #1: North Sphere Flood Control Infrastructure and Emergency Plan As a result of Tropical Storm Hilary,City staff has analyzed ways to address those areas of the City that were adversely impacted.The North Sphere was impacted by flooding,silt,and debris that moved eastward from the Morongo basin.The $6M in cleanup costs were covered by City emergency reserve funds.Staff hopes to recover approximately $3-4M of those costs through insurance and FEMA claims.However,maintaining and improving infrastructure,expanding retention basin areas,and ensuring the cities storm water infrastructure network is Project #2: North Sphere Public Works Staffing (3) As the City continues to grow,additional public works crews are required to maintain the city's infrastructure network .Staff estimates the cost for 3 additional crew members to be roughly $360,000 in 2024-25 dollars.The growth in north PD including new roadways,sidewalk,drainage and park infrastructure and additional staffing or PALM DESERT TRANSACTION AND USE TAX - 5 YEAR SPENDING PLAN AND PRIORITIES PRIORITY - PARKS, RECREATION, AND LIBRARY EXPANSION Project #1: Palm Desert Library Construction and Staffing The City has reallocated bond proceeds intended for lower priority projects to help build the Palm Desert Municipal Library.Costs are currently estimated at $30M for construction.There currently is approximately $20M in proceeds available,with the remaining $10M requiring the use of reserves and/or funding from another source Project #2: North Sphere Regional Park and Staffing bond proceeds.However,the majority of the $20M estimated costs would be paid through the use of reserve funds,or funding from another source,such as the sales tax to complete construction.Depending on the ultimate design and use of the park facilities,additional staffing will be required,which could be paid from the sales tax PRIORITY - FINANCIAL RESERVES Project #1: Replenishment of Emergency and Operation Reserves The City may be required to use reserve funds to pay for numerous facility maintenance and capital improvement costs over the next 5 years.Additionally,planning and preparing for natural disasters,by reserving for emergencies is important,as evidenced by the swift response to Tropical Storm Hilary.Palm Desert's ability to recover from such events is necessary to support community resilliency.Sales tax revenue would be allocated to replenish the reductions to reserve in accordance with the reserve policy.This standard supports the City's conintued effort to maintain fiscal responsibility and not having to rely on debt financing. Category FY 2024-25 FY 2025-26 FY 2026-27 FY 2027-28 FY 2028-29 Total 5-Yr Plan 1 cent sales tax 25,164,510 25,869,116 26,515,844 27,311,320 104,860,790 Current Planned Costs New Fire Services Staffing Public Safety 900,000 10,657,440 10,971,472 11,232,818 11,496,338 45,258,067 Fire Station 33 Renovation/Temp Site Public Safety 1,200,000 1,200,000 Fire Station 71 Renovation/Temp Site Public Safety 1,200,000 1,200,000 New Police Services Staffing Public Safety 1,300,000 1,352,000 1,406,080 2,812,160 2,924,646 9,794,886 Storm Channel and Retention Basin Imps Infrastructure/H&S 5,508,000 8,000,000 5,000,000 18,508,000 City-Wide Facility and Equipment Replacement Infrastructure/H&S 8,397,001 9,944,665 7,798,734 12,865,305 9,264,802 48,270,506 New Public Works Staffing Public Works 360,000 370,800 381,924 786,763 810,366 2,709,854 Library Construction ($20M Pd from Bonds)Community Amenity 10,000,000 10,000,000 North Sphere Regional Park Community Amenity 15,000,000 15,000,000 30,000,000 Spending Contingency/Reserve Replenishment Fiscal Discipline/Responsibility 2,815,167 2,815,167 Total Planned Costs 16,465,001 32,724,905 40,558,210 52,697,046 27,311,319 169,756,480 Additional Amount needed from Reserve or Other Source (16,465,001) (7,560,395) (14,689,094) (26,181,202) 0 (64,895,690) PALM DESERT TRANSACTION AND USE TAX - 5 YEAR SPENDING PLAN AND PRIORITIES ***Annual allocations subject to City Council approval of Annual Budget