HomeMy WebLinkAboutOB Approved ROPS3 thru June 30 2013RESOLUTION NO. SA-RDA_010 RESOLUTION NO. OB 007
SUMMARY OF RECOGNIZED OBLIGATION PAYMENT SCHEDULE
Filed for the January 1, 2013 to June 30, 2013 Period
Name of Successor Agency:Successor Agency to the Palm Desert Redevelopment Agency
Total Outstanding
Debt or Obligation
Outstanding Debt or Obligation 1,027,199,254$
Current Period Outstanding Debt or Obligation Six-Month Total
A 6,911,190
B 20,287,210
C 617,691
D 20,904,901
Total Current Period Outstanding Debt or Obligation (A + B + C = E) Should be same amount as ROPS form six-month total 27,816,091$
E 20,911,970
F 7,069$
Prior Period (January 1, 2012 through June 30, 2012) Estimated vs. Actual Payments (as required in HSC section 34186 (a))
G 37,751,247
H 35,077,626
I Enter Actual Administrative Expenses Paid with RPTTF 2,673,621
J Adjustment to Redevelopment Obligation Retirement Fund (G - (H + I) = J)-
K Adjusted RPTTF (The total RPTTF requested shall be adjusted if actual obligations paid with RPTTF are less than the estimated obligation amount.)20,904,901$
Certification of Oversight Board Chairman:
Pursuant to Section 34177(m) of the Health and Safety code,Name Title
I hereby certify that the above is a true and accurate Recognized
Obligation Payment Schedule for the above named agency.
Signature Date
Available Revenues Other Than Anticipated RPTTF Funding
Enforceable Obligations Funded with RPTTF
Administrative Allowance Funded with RPTTF
Enter Estimated Obligations Funded by RPTTF (Should be the lesser of Finance's approved RPTTF amount including admin allowance or the actual amount distributed)
Enter Actual Obligations Paid with RPTTF
Enter Total Six-Month Anticipated RPTTF Funding
Variance (D - E = F) Maximum RPTTF Allowable should not exceed Total Anticipated RPTTF Funding
Total RPTTF Funded (B + C = D)
Name of Successor Agency:Successor Agency to the Palm Desert Redevelopment Agency
County:Riverside Oversight Board Approval Date:
Item #Project Name / Debt Obligation
Contract/Agreement
Execution Date
Contract/Agreement
Termination Date Payee Description/Project Scope LMIHF
Bond
Proceeds
Reserve
Balance
Admin
Allowance RPTTF Other Six-Month Total
1,027,199,254$ 68,833,087$ -$ 4,235,390$ 2,675,800$ 617,691$ 20,287,210$ -$ 27,816,091$
1
2002 Tax Allocation Refunding Bond
Issue - $22,070,000 2/28/2002 4/1/2030 Wells Fargo Bank Semi-Annual Debt Service Payment 1 37,529,167.50 1,114,665.00 557,333 557,333
2
2003 Tax Allocation Bond Issue -
$19,000,000 7/15/2003 4/1/2030 Wells Fargo Bank Semi-Annual Debt Service Payment 1 33,817,500.00 950,000.00 475,000 475,000
3
2004 Tax Allocation Bond Issue -
$24,945,000 6/9/2004 4/1/2025 Wells Fargo Bank Semi-Annual Debt Service Payment 1 23,377,081.25 1,983,962.50 388,494 388,494
4
2006 Tax Allocation Bond Issue -
$62,320,000 6/22/2006 4/1/2030 Wells Fargo Bank Semi-Annual Debt Service Payment 1 68,191,930.50 5,168,269.00 1,211,120 1,211,120
5
2007 Tax Allocation Bond Issue -
$32,600,000 12/13/2006 4/1/2018 Wells Fargo Bank Semi-Annual Debt Service Payment 1 22,954,000.00 3,895,000.00 397,250 397,250
6
1998 Housing Tax Allocation Bond
Issue - $48,760,000 1/23/1998 10/1/2011 Wells Fargo Bank Semi-Annual Debt Service Payment 1 - - -$ -
7
2002 Housing Tax Allocation Bond
Issue - $12,000,000 8/21/2002 10/1/2031 Wells Fargo Bank Semi-Annual Debt Service Payment 1 14,761,716.25 763,348.75 546,124 546,124
8
2007 Housing Tax Allocation Bond
Issue - $87,056,348 1/25/2007 10/1/2027 Wells Fargo Bank Semi-Annual Debt Service Payment 1 88,153,250.00 8,318,038.00 6,841,469 6,841,469
9 Indian Springs Stipulated Agreement 2/27/2009 2/27/2039
Indian Springs Mobilehome
Park Judgement related to ISMHP 1 6,000,000.00 139,668.00 69,834 69,834
10 L/M Housing Fund Loan 6/30/2010 6/30/2015 Palm Desert Housing Authority 2009/10 SERAF Loan Repayment 1 7,828,598.38 2,609,532.79 1,304,766 1,304,766
11 Fire Station Renovation 2/24/2011 1/19/2012 Penta Building Group
Payments per existing contract for renovations at Fire Stn
#33.1 - - - -
12 Alessandro Alleyway 3/29/2011 9/1/2011 Wood Rodgers Inc.
Payments per existing contract for public parking
improvements along commercial corridor. 1 - - - -
13 Alessandro Alleyway 12/29/2010 10/13/2011 The Altum Group
Payments per existing contract for public parking
improvements along commercial corridor. 1 - - - -
14 Alessandro Alleyway 2/28/2011 Upon project completion.Prest Vuksic Architects
Payments per existing contract for public parking
improvements along commercial corridor. 1 3,513.53 3,513.53 3,514 3,514
15 Trustee Services 5/13/2011
Varies, per bond
issuance.Wells Fargo Bank Payments per existing contract for professional services.1 67,701.86 16,426.00 8,213 8,213
16 Disclosure Services Varies, per bond issuance
Varies, per bond
issuance.Willdan Payments per existing contract for professional services.1 56,054.00 13,600.00 6,800 6,800
17 Legal Services 9/1/2009 8/31/2014 Richards, Watson & Gershon Payments per existing contract for professional services.1 375,853.00 91,190.88 45,595 45,595
18 Legal Services 9/1/2009 8/31/2014 Best-Best & Krieger Payments per existing contract for professional services.1 31,542.92 7,653.06 3,827 3,827
19 Professional Association n/a n/a
California Redevelopment
Association Payments per existing contract for professional services.1 61,547.15 14,932.80 14,933 14,933
20 Auditing Services 6/30/2008 6/30/2014 Diehl, Evans & Co.Payments per existing contract for professional services.1 51,699.60 12,543.55 6,272 6,272
21 Reporting Services Annual Contract Annual Contract
Redevelopment Reporting
Solutions Payments per existing contract for professional services.1 20,515.71 4,978.00 2,489 2,489
22 Banking Services 3/11/2010 3/11/2015 Union Bank of California Payments per existing contract for professional services.1 4,821.19 1,169.74 585 585
23 Liability Insurance 8/24/1995 n/a California JPIA Payments per existing contract for professional services.1 56,418.23 13,688.40 6,844 6,844
24 Facilities Lease 9/10/2010 9/10/2020 El Paseo LLC
Payments on existing contract providing a central location
for information distribution and marketing.1 227,056.60 67,992.00 31,998 31,998
25 Pass-thru Trust Account Obligations Various 11/25/2032 Palm Desert Taxing Entities Balances in trust per negotiated pass-thru agreements 1 8,667,301.11 8,667,301.00 2,675,800 2,675,800
26 Energy Independence Program 4/22/2010 4/25/2012 Lawyer's Title Ins Corp
Payments for existing contract related to title insurance
services for EIP loan program.1 - 7,200.00 - -
27 Carrying Costs - Agency Property On-Going
Upon disposition of
property.Guzman Gardening
Payments for existing contract services related to Agency
owned property.1 3,888.00 3,888.00 1,944 1,944
28 Carrying Costs - Agency Property 2/10/2011
Upon disposition of
property.Overland Pacific & Cutler
Payments for existing contract services related to Agency
owned property.1 11,223.75 30,000.00 11,224 11,224
29 El Paseo Revitlization 7/10/2008 Upon project completion.Forma Design, Inc
Payments for existing contract for public improvements in
the central business district and commercial corridor.1 168,558.28 171,123.65 168,558 168,558
30 Project Area Administration n/a 11/25/2032 Various
Allowable Costs per Admin Plan-staff, utililities,
professional services, etc.1 5,286,527.13 722,953.00 166,802 166,802
31 Vested Employee Benefit Obligation n/a 11/25/2032 RDA Assigned Employees Obligation based on accrued leaves and current MOU.1 2,158,049.51 107,902.47 53,951 53,951
32 Stipulated Judgement Case No. 51124 11/20/1991 11/25/2032 Various
Duties required under said court order. Desert Rose, Etc.
PDHA subsidy for 1,100 Afford Units 1 161,138,230.00 4,429,529.72 -
33 Replacement Reserve Fund 2/10/2011 n/a Palm Desert Housing Authority 1,100 Affordable Housing Apt Comp's 1 7,452,028.00 1,916,402.00 -
34 FW Drive Widening Improvements 5/27/2010 Upon project completion.Kimley Horne & Associates
Payments on existing contracts for street improvements
along Fred Waring Drive.1 32,791.50 32,791.50 18,515 18,515
35 FW Drive Widening Improvements 9/10/2009 Upon project completion.VA Consulting
Payments on existing contracts for street improvements
along Fred Waring Drive.1 6,895.00 6,895.00 4,573 4,573
36 FW Drive Widening Improvements 11/3/2009 Upon project completion.Ecorp Consulting
Payments on existing contracts for street improvements
along Fred Waring Drive.1 4,568.00 4,568.00 4,568 4,568
37 FW Drive Widening Improvements 4/28/2011 Upon project completion.NAI Consulting
Payments on existing contracts for street improvements
along Fred Waring Drive.1 15,235.00 15,235.00 12,915 12,915
August 20, 2012
RECOGNIZED OBLIGATION PAYMENT SCHEDULE (ROPS III)
January 1, 2013 through June 30, 2013
Grand Total
Project Area
Total
Outstanding
Debt or
Obligation
Funding Source
Total Due During
Fiscal Year
2012-13
Item #Project Name / Debt Obligation
Contract/Agreement
Execution Date
Contract/Agreement
Termination Date Payee Description/Project Scope LMIHF
Bond
Proceeds
Reserve
Balance
Admin
Allowance RPTTF Other Six-Month Total
Grand Total
Project Area
Total
Outstanding
Debt or
Obligation
Funding Source
Total Due During
Fiscal Year
2012-13
38 Portola Wall & Sidewalk Imps 5/22/2008 Upon project completion.David Evans & Associates
Payments on existing contract for public improvements
relative to the Portola Avenue Wall and Sidewalk
Relocation project.1 25,495.00 25,495.00 18,360 18,360
39 PDHA Property Management 9/23/2010 12/31/2012 RPM Company
Payment on existing contract for Housing Authority
property management.1 1,033,410.00 295,260.00 147,630 147,630
40 PDHA Properties 2/24/2011 6/30/2012 Andy's Landscape and Tree
Payment on existing contract for Housing Authority
property maintenance.1 - - - -
41 PDHA Properties 3/10/2011 6/30/2012 West Coast Arborist
Payment on existing contract for Housing Authority
property maintenance.1 - - - -
42 PDHA Property Maintenance n/a n/a
Utilities, Maint Services, HOA
Dues, Etc.
Payment on existing contract for Housing Authority
property maintenance -SR 1 356,288.00 89,072.00 44,536 44,536
43 Agency Owned Properties n/a n/a
Utilities, Maint Services, HOA
Dues, Etc.
Agency owned properties monthly carrying costs prior to
disposition.1 200,000.00 50,000.00 25,000 25,000
44 Additional Disclosures on TAB's Varies, per bond issuance
Varies, per bond
issuance.Willdan
Additional disclosures that will be required to report
changes in the allocation of tax increment and the
payment on tax allocation bonds due to AB 26. These
disclosures would not have been necessary without this
legislative change.1 5,600.00 1,400.00 700 700
45 Bond Project Overhead Costs n/a n/a Various
Costs associated with administration of bond
funded projects.1 1,014,424.90 253,606.23 126,803 126,803
46 Alessandro Alley Frontage Rd Imps n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-1 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 1 5,000,000.00 - -
47
Core Commercial Parking
Improvements n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-1 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 1 1,000,000.00 - -
48 President's Plaza Parking Lot Imps n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-1 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 1 1,200,000.00 - -
49 Undergrounding Utilities n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-1 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 1 10,000,000.00 - -
50 Portola Avenue Widening n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-1 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 1 3,000,000.00 - -
51 NSP Rehabilitation 1/27/2011 Upon project completion.Mostar Heavy Equipment Corp
Payments on existing contract for Rehab/Resale of Single
Family Dwelling 1 16,115.00 16,115.00 8,015 8,015
52 Santa Rosa Apartments 12/9/1999 1/1/2015 Utilities, Maint Services, Etc.Per contract dated 1/1/00 1 150,000.00 60,000.00 30,000 30,000
53
Civic Center Park Community
Recreation Center Lease 5/23/1990 1/1/2015
Coachella Valley
Recreation & Park District
(Lessee)
Annual payment per existing contract of $23,670 for each
year through 2015 if lease use is terminated 1 94,680.00 - - -
54 Alessandro Alleyway 5/7/2012 7/18/2012 The Land Stewards
Agency owned properties carrying costs prior to
disposition.1 1,941.11 1,941.11 1,941 1,941
55
2002 Tax Allocation Refunding Bond
Issue - $17,310,000 6/19/2002 8/1/2022 Wells Fargo Bank Semi-Annual Debt Service Payment 2 13,353,392.50 1,304,762.50 1,079,944 1,079,944
56
2003 Tax Allocation Bond Issue -
$15,745,000 3/12/2003 8/1/2033 Wells Fargo Bank Semi-Annual Debt Service Payment 2 28,667,856.25 769,006.25 384,503 384,503
57
2006 Tax Allocation Bond Issue -
$67,618,273 6/27/2006 8/1/2036 Wells Fargo Bank Semi-Annual Debt Service Payment 2 105,244,102.50 3,907,987.50 3,087,494 3,087,494
58
County CIP Reimbursement for 88/89
and 90/91 6/30/2002 6/30/2012 County of Riverside Reimbursement of Original Pass-Thru's 2 - - - -
59 North Sphere Hotel land 3/23/1995 7/15/2038 City of Palm Desert Balance due Property Acquisition 2 5,500,000.00 137,500.00 68,750 68,750
60 North Sphere Property Acquisition 3/13/1997 7/15/2038 City of Palm Desert Loan for Property Acquisition 2 2,055,000.00 51,376.00 25,688 25,688
61
City Loan for formation of Project Area
No. 2- 1986 12/5/1986 7/15/2038 City of Palm Desert Formation of PA/Prop Acquisition 2 6,000,000.00 150,000.00 90,000 90,000
62 L/M Housing Loan 6/30/2010 6/30/2015 Palm Desert Housing Authority 2009/10 SERAF Loan Repayment 2 2,816,704.00 938,901.33 469,451 469,451
63 Fire Station Renovation 2/24/2011 1/19/2012 Penta Building Group
Payment on existing contract related to renovation at Fire
Station #71.2 - - -
64 North Sphere Fire Station 1/29/2008 Upon project completion.Rudy Acosta
Payments on existing contracts related to a newly
constructed fire station to serve the North area.2 8,750.00 8,750.00 8,750 8,750
65 North Sphere Fire Station 9/9/2008 Upon project completion.MSA Consulting
Payments on existing contracts related to a newly
constructed fire station to serve the North area.2 - - - -
66 Cal State University Infrastructure 2/24/2011 1/20/2012 Cooley Construction
Payments on existing contracts related to the street
improvements at the Palm Desert Cal State Campus.2 - - - -
67 Cal State University Infrastructure 4/14/2011 11/4/2011 Leighton Consulting
Payments on existing contracts related to the street
improvements at the Palm Desert Cal State Campus.2 - - - -
68 Aquatic Facility 12/10/2009 Upon project completion.Gould Evans Associates, LLC
Payments on existing contracts related to the
Aquatic/Community Facility.2 168,254.00 168,254.00 110,234 110,234
69 Aquatic Facility 10/7/2010 Upon project completion.Planit Reprographics
Payments on existing contracts related to the
Aquatic/Community Facility.2 312.79 312.79 313 313
70 Aquatic Facility 9/9/2010 Upon project completion.ASR Contructors
Payments on existing contracts related to the
Aquatic/Community Facility.2 1,846,816.99 1,846,816.99 1,512,274 1,512,274
71 Aquatic Facility 10/28/2010 Upon project completion.Converese Consultants
Payments on existing contracts related to the
Aquatic/Community Facility.2 5,381.00 5,381.00 1 1
72 Aquatic Facility 9/9/2010 Upon project completion.ASR Contructors
Payments on existing contracts related to the
Aquatic/Community Facility.2 - - - -
73 Aquatic Facility 5/13/2011 6/20/2012 David Moore & Co.
Payments on existing contracts related to the
Aquatic/Community Facility.2 - - - -
74 Aquatic Facility 6/8/2011 7/15/2011 Desert Alarm, Inc.
Payments on existing contracts related to the
Aquatic/Community Facility.2 - - - -
75 Trustee Services 5/13/2011
Varies, per bond
issuance.Wells Fargo Bank Payments per existing contract for professional services.2 21,089.47 5,116.32 2,558 2,558
76 Disclosure Services Varies, per bond issuance
Varies, per bond
issuance.Willdan Payments per existing contract for professional services.2 17,459.46 4,236.08 2,118 2,118
77 Legal Services 9/1/2009 8/31/2014 Richards, Watson & Gershon Payments per existing contract for professional services.2 117,068.98 28,403.72 14,202 14,202
Item #Project Name / Debt Obligation
Contract/Agreement
Execution Date
Contract/Agreement
Termination Date Payee Description/Project Scope LMIHF
Bond
Proceeds
Reserve
Balance
Admin
Allowance RPTTF Other Six-Month Total
Grand Total
Project Area
Total
Outstanding
Debt or
Obligation
Funding Source
Total Due During
Fiscal Year
2012-13
78 Legal Services 9/1/2009 8/31/2014 Best-Best & Krieger Payments per existing contract for professional services.2 9,824.84 2,383.74 1,192 1,192
79 Professional Association n/a n/a
California Redevelopment
Association Payments per existing contract for professional services.2 19,170.00 4,651.20 4,651 4,651
80 Auditing Services 6/30/2008 6/30/2014 Diehl, Evans & Co.Payments per existing contract for professional services.2 16,103.15 3,907.01 1,954 1,954
81 Aquatic Facility 7/8/2011 Upon project completion.MG Lighting & Electric
Payments on existing contracts related to the
Aquatic/Community Facility.2 - - - -
82 Well Sites 11/14/1996 Upon project completion.CVWD
Payments on existing contracts related to the North area
required future well sites.2 667,246.00 667,246.00 667,246 667,246
83 Public Safety Academy Reimb 3/27/2008 Upon project completion.College of the Desert
Payments on existing contract related to the
reimbursement of College of the Desert for the
construction of the Public Safety Academy.2 - - - -
84 Project Area Administration n/a 7/15/2038 Various
Allowable Costs per Admin Plan-staff, utililities,
professional services, etc.2 1,646,623.20 314,257.76 110,561 110,561
85 Vested Employee Benefit Obligation n/a 7/15/2038 RDA Assigned Employees Obligation based on accrued leaves and current MOU.2 672,179.36 33,608.97 16,805 16,805
86 Stipulated Judgement Case No. 51124 11/20/1991 7/15/2038 Various
Duties required under said court order. Vineyards,
Emerald Brook (Palm Desert 103) PDHA subsidy for
1,100 Afford Units 2 51,747,973.00 1,379,689.59 -
87 PDHA Property Management 9/23/2010 12/31/2012 RPM Company
Payments on existing contract for the Housing Authority
property management.2 220,500.00 63,000.00 31,500 31,500
88 PDHA Properties 2/24/2011 6/30/2012 Andy's Landscape and Tree
Payments on existing contract for Housing Authority
property maintenance.2 - - - -
89 PDHA Properties 3/10/2011 6/30/2012 West Coast Arborist
Payments on existing contract for Housing Authority
property maintenance.2 - - - -
90 Replacement Reserve Fund 2/10/2011 n/a Palm Desert Housing Authority 1,100 Affordable Housing Apt Comp's 2 1,562,967.00 357,281.00 -
91 Monterey @ I-10 Imps 3/20/2012 Upon project completion.NAI Consulting
Payments on existing contracts for the street
improvements related to arterial access inbound and
outbound from Interstate 10 on Monterey.2 500.00 500.00 500 500
92 Monterey @ I-10 Imps 3/4/2004 Upon project completion.Robert Bein Frost & Assoc
Payments on existing contracts for the street
improvements related to arterial access inbound and
outbound from Interstate 10 on Monterey.2 - - - -
93 Monterey @ I-10 Imps 4/17/2012 Upon project completion.Overland Pacific & Cutler
Payments on existing contracts for the street
improvements related to arterial access inbound and
outbound from Interstate 10 on Monterey.2 2,484.00 2,484.00 2,484 2,484
94 Monterey @ I-10 Imps 2/13/2009 Upon project completion.LSA Associates
Payments on existing contracts for the street
improvements related to arterial access inbound and
outbound from Interstate 10 on Monterey.2 8,930.00 8,930.00 8,930 8,930
95 Monterey @ I-10 Imps 10/14/2004 Upon project completion.Robert Bein Frost & Assoc
Payments on existing contracts for the street
improvements related to arterial access inbound and
outbound from Interstate 10 on Monterey.2 137,123.00 137,123.00 61,386 61,386
96 Portola @ I-10 Imps 12/8/2005 Upon project completion.Dokken Engineering
Payments on existing contract related to the alignment of
Portola Avenue to connect with the proposed new
interchange on I-10.2 18,636.93 18,636.93 13,747 13,747
97 Reporting Services Annual Contract Annual Contract
Redevelopment Reporting
Solutions Payments per existing contract for professional services.2 6,390.14 1,550.40 775 775
98 Liability Insurance 8/24/1995 n/a California JPIA Payments per existing contract for professional services.2 17,572.81 4,263.60 2,132 2,132
99 Pass-thru Trust Account Obligations Various 7/15/2038 Palm Desert Taxing Entities Balances in trust per negotiated pass-thru agreements 2 250,168.83 250,168.83 - -
100 Additional Disclosures on TAB's Varies, per bond issuance
Varies, per bond
issuance.Willdan
Additional disclosures that will be required to report
changes in the allocation of tax increment and the
payment on tax allocation bonds due to AB 26. These
disclosures would not have been necessary without this
legislative change.2 2,400.00 600.00 300 300
101 Banking Services 3/11/2010 3/11/2015 Union Bank of California Payments per existing contract for professional services.2 1,501.65 364.34 182 182
102 Bond Project Overhead Costs n/a n/a Various
Costs associated with administration of bond
funded projects.2 2,383,221.74 595,805.44 297,903 297,903
103 North Sphere Fire Station n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-2 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 2 10,000,000.00 - - -
104 Monterey Ave On/Off Ramp Imps n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-2 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 2 6,000,000.00 - - -
105 Portola @ I-10 Imps n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-2 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 2 16,800,000.00 - - -
106 Undergrounding Utilities n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-2 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 2 12,000,000.00 - - -
107
2003 Tax Allocation Bond Issue -
$4,745,000 7/21/2003 4/1/2033 Wells Fargo Bank Semi-Annual Debt Service Payment 3 6,115,433.75 297,265.00 88,976 88,976
108
2006 Tax Allocation Bond Issue -
$15,029,526 6/27/2006 4/1/2041 Wells Fargo Bank Semi-Annual Debt Service Payment 3 31,512,625.00 793,875.00 270,738 270,738
109 L/M Housing Loan 6/30/2010 6/30/2015 Palm Desert Housing Authority 2009/10 SERAF Loan Repayment 3 727,724.75 242,578.25 121,289 121,289
110 Cook Street Widening 2/24/2011 Upon project completion.Cooley Construction
Payments on existing contracts related to the
infrastructure improvements on Cook Street. 3 1,164,293.49 1,164,293.49 322,641 322,641
111 Cook Street Widening 2/12/2004 Upon project completion.Harris & Associates
Payments on existing contracts related to the
infrastructure improvements on Cook Street. 3 16,011.15 16,011.15 16,011 16,011
112 Cook Street Widening 2/24/2011 7/12/2012 Cooley Construction
Payments on existing contracts related to the
infrastructure improvements on Cook Street. 3 - - - -
113 Cook Street Widening 4/1/2011 9/30/2011 Gaugush, Joseph
Payments on existing contracts related to the
infrastructure improvements on Cook Street. 3 - - - -
114 Cook Street Widening 5/13/2011 6/6/2012 Robert Bein, Frost & Assoc
Payments on existing contracts related to the
infrastructure improvements on Cook Street. 3 10,351.00 10,351.00 - -
Item #Project Name / Debt Obligation
Contract/Agreement
Execution Date
Contract/Agreement
Termination Date Payee Description/Project Scope LMIHF
Bond
Proceeds
Reserve
Balance
Admin
Allowance RPTTF Other Six-Month Total
Grand Total
Project Area
Total
Outstanding
Debt or
Obligation
Funding Source
Total Due During
Fiscal Year
2012-13
115 Cook Street Widening 6/7/2011 3/29/2012 Sladden Engineering
Payments on existing contracts related to the
infrastructure improvements on Cook Street. 3 1,233.80 1,233.80 - -
116 Public Safety Academy Reimb 3/27/2008 Upon project completion.College of the Desert
Payments on existing contract related to the
reimbursement of College of the Desert for the
construction of the Public Safety Academy.
3
- 300,000.00 - -
117 Project Area Administration n/a 7/17/2042 Various
Allowable Costs per Admin Plan-staff, utililities,
professional services, etc.3 433,321.90 29,212.38 2,351 2,351
118 Vested Employee Benefit Obligation n/a 7/17/2042 RDA Assigned Employees Obligation based on accrued leaves and current MOU.3 176,889.30 8,844.47 4,422 4,422
119 Stipulated Judgement Case No. 51124 11/20/1991 7/17/2042 Various
Duties required under said court order. Falcon Crest
Afford Housing Dev - Homeowners at lots 1 through 93,
et al. PDHA Subsidy for 1,100 Affordable Units
3
13,617,888.00 363,076.21 -
120 Replacement Reserve Fund 2/10/2011 n/a Palm Desert Housing Authority 1,100 Affordable Housing Apt Comp's 3 299,003.00 71,470.00 -
121 PDHA Property Management 9/23/2010 12/31/2012 RPM Company
Payments on existing contract for Housing Authority
Property Management.3 39,690.00 11,340.00 5,670 5,670
122 PDHA Properties 2/24/2011 6/30/2012 Andy's Landscape and Tree
Payments on existing contract for Housing Authority
Property Maintenance.3 - - - -
123 PDHA Properties 3/10/2011 6/30/2012 West Coast Arborist
Payments on existing contract for Housing Authority
Property Maintenance.3 - - - -
124 Trustee Services 5/13/2011
Varies, per bond
issuance.Wells Fargo Bank Payments per existing contract for professional services.3 5,549.33 1,346.40 673 673
125 Disclosure Services Varies, per bond issuance
Varies, per bond
issuance.Willdan Payments per existing contract for professional services.3 4,594.60 1,114.76 557 557
126 Legal Services 9/1/2009 8/31/2014 Richards, Watson & Gershon Payments per existing contract for professional services.3 30,807.63 7,474.66 3,737 3,737
127 Legal Services 9/1/2009 8/31/2014 Best-Best & Krieger Payments per existing contract for professional services.3 2,585.49 627.30 314 314
128 Professional Association n/a n/a
California Redevelopment
Association Payments per existing contract for professional services.3 5,044.85 1,224.00 1,224 1,224
129 Auditing Services 6/30/2008 6/30/2014 Diehl, Evans & Co.Payments per existing contract for professional services.3 4,237.67 1,028.16 514 514
130 Reporting Services Annual Contract Annual Contract
Redevelopment Reporting
Solutions Payments per existing contract for professional services.3 1,681.62 408.00 204 204
131 Pass-thru Trust Account Obligations Various 7/17/2042 Palm Desert Taxing Entities Balances in trust per negotiated pass-thru agreements 3 532,294.71 532,294.71 - -
132 Additional Disclosures on TAB's Varies, per bond issuance
Varies, per bond
issuance.Willdan
Additional disclosures that will be required to report
changes in the allocation of tax increment and the
payment on tax allocation bonds due to AB 26. These
disclosures would not have been necessary without this
legislative change.
3
1,600.00 400.00 200 200
133 Liability Insurance 8/24/1995 n/a California JPIA Payments per exisitng contract for professional services.3 4,624.44 1,122.00 561 561
134 Banking Services 3/11/2010 3/11/2015 Union Bank of California Payments per exisitng contract for professional services.3 395.18 95.88 48 48
135 Bond Project Overhead Costs n/a n/a Various
Costs associated with administration of bond
funded projects.3 834,594.47 208,648.62 104,324 104,324
136
Portola Avenue On/Off Ramp
Construction n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-3 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 3 8,200,000.00 - - -
137 Undergrounding Utilities n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-3 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 3 2,000,000.00 - - -
138 Portola Avenue Widening n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2006-3 Tax
Certificate dd 7/6/06 - IRS Form 8038-G 3 5,000,000.00 - - -
139 Falcon Crest Lot K n/a n/a TDB
One-time payment per existing contract for the cost of
constructing a perimeter wall & all surrounding
improvements including exterior landscaping, plans for
drainage & discharge, power for well operation
3
TBD - - -
140
1998 $11,020,000 Tax Allocation Bond
Issue 2/24/1998 10/1/2028 Wells Fargo Bank Semi-Annual Debt Service Payment 4 11,984,812.50 554,240.00 350,475 350,475
141
2001 $15,695,000 Tax Allocation Bond
Issue 11/15/2001 10/1/2031 Wells Fargo Bank Semi-Annual Debt Service Payment 4 20,646,947.50 959,805.00 668,821 668,821
142
2006 $19,273,089 Tax Allocation Bond
Issue 7/13/2006 10/1/2034 Wells Fargo Bank Semi-Annual Debt Service Payment 4 36,557,870.00 1,307,876.25 1,127,466 1,127,466
143 L/M Housing Fund Loan 6/30/2010 6/30/2015 Palm Desert Housing Authority 2009/10 SERAF Loan Repayment 4 1,992,928.99 664,309.66 332,155 332,155
144 PA 4 Public Improvements 5/22/2008 Upon project completion.Interactive Design Corp
Payments per existing contract related to the public
improvements to develop and construct public facilities
for emergency services, affordable housing, façade
improvements to existing structures, and infrastructure
imps.
4
9,854.00 9,854.00 9,854 9,854
145 PA 4 Public Improvements 1/29/2008 Upon project completion.Heitec
Payments per existing contract related to the public
improvements to develop and construct public facilities
for emergency services, affordable housing, façade
improvements to existing structures, and infrastructure
imps.
4
7,420.00 7,420.00 7,420 7,420
146 PD Country Club Undergrounding 2/14/2008 Upon project completion.Willdan Financial Services
Payments per existing contract related to undergrounding
of utilities in Project Area No. 4. 4 15,058.15 15,058.15 15,058 15,058
147 Trustee Services 5/13/2011
Varies, per bond
issuance.Wells Fargo Bank Payments per existing contract for professional services.4 16,648.00 4,039.20 2,020 2,020
148 Disclosure Services Varies, per bond issuance
Varies, per bond
issuance.Willdan Payments per existing contract for professional services.4 13,783.79 3,344.27 1,672 1,672
149 Legal Services 9/1/2009 8/31/2014 Richards, Watson & Gershon Payments per existing contract for professional services.4 92,422.88 22,423.99 11,212 11,212
150 Legal Services 9/1/2009 8/31/2014 Best-Best & Krieger Payments per existing contract for professional services.4 7,756.46 1,881.90 941 941
Item #Project Name / Debt Obligation
Contract/Agreement
Execution Date
Contract/Agreement
Termination Date Payee Description/Project Scope LMIHF
Bond
Proceeds
Reserve
Balance
Admin
Allowance RPTTF Other Six-Month Total
Grand Total
Project Area
Total
Outstanding
Debt or
Obligation
Funding Source
Total Due During
Fiscal Year
2012-13
151 Professional Association n/a n/a
California Redevelopment
Association Payments per existing contract for professional services.4 15,134.54 3,672.00 3,672 3,672
152 Auditing Services 6/30/2008 6/30/2014 Diehl, Evans & Co.Payments per existing contract for professional services.4 12,713.02 3,084.48 1,542 1,542
153 Reporting Services Annual Contract Annual Contract
Redevelopment Reporting
Solutions Payments per existing contract for professional services.4 5,044.85 1,224.00 612 612
154 Liability Insurance 8/24/1995 n/a California JPIA Payments per existing contract for professional services.4 13,873.33 3,366.00 1,683 1,683
155 Banking Services 3/11/2010 3/11/2015 Union Bank of California Payments per existing contract for professional services.4 1,185.54 287.64 144 144
156 Hovley Retention Basin 2/24/2011 7/22/2011 Leon's Landscaping
Payments per existing contract for public improvements
related to a xeriscaped open space and retention basin.4
- - - -
157
Affordable Housing-Carlos Ortega
Villas 4/8/2010 Upon project completion.Interactive Design Corp
Payments per existing contract for a 72 unit affordable
senior complex. 4 644,649.13 644,649.13 441,958 441,958
158 Project Area Administration n/a 7/19/2044 Various
Allowable Costs per Admin Plan-staff, utililities,
professional services, etc.4 1,299,965.69 168,957.66 47,714 47,714
159 Vested Employee Benefit Obligation n/a 7/19/2044 RDA Assigned Employees Obligation based on accrued leaves and current MOU.4 530,667.91 26,533.40 13,267 13,267
160 Stipulated Judgement Case No. 51124 11/20/1991 7/19/2044 Various
Duties required under said court order. PDHA subsidy for
1,100 Affordable Units 4 40,853,663.00 1,089,228.62 -
161 Replacement Reserve Fund 2/10/2011 n/a Palm Desert Housing Authority 1,100 Affordable Housing Apt Comp's 4 1,178,772.00 273,489.00 -
162 PDHA Property Management 9/23/2010 12/31/2012 RPM Company
Payments per existing contract for Housing Authority
Property Management.4 207,270.00 59,220.00 29,610 29,610
163 PDHA Properties 2/24/2011 6/30/2012 Andy's Landscape and Tree
Payments per existing contract for Housing Authority
Property Maintenance.4 - - - -
164 PDHA Properties 3/10/2011 6/30/2012 West Coast Arborist
Payments per existing contract for Housing Authority
Property Maintenance.4 - - - -
165 Additional Disclosures on TAB's Varies, per bond issuance
Varies, per bond
issuance.Willdan/RWG
Additional disclosures that will be required to report
changes in the allocation of tax increment and the
payment on tax allocation bonds due to AB 26. These
disclosures would not have been necessary without this
legislative change.
4
2,400.00 600.00 300 300
166 Pass-thru Trust Account Obligations Various 7/19/2044 Palm Desert Taxing Entities Balances in trust per negotiated pass-thru agreements 4 2,990,664.20 2,990,664.20 - -
167 Public Safety Academy Reimb 3/27/2008 Upon project completion.College of the Desert
Payments on existing contract related to the
reimbursement of College of the Desert for the
construction of the Public Safety Academy.
4
400,000.00 100,000.00 - -
168 Carlos Ortega Villas n/a n/a To Be Determined Agreement to build wall as part of COV construction 4 17,000.00 -
169 NSP Rehabilitation 1/27/2011 Upon project completion.AA Max
Payments per existing contract related to Rehab/Resale
of Single Family Dwelling 4 27,103.50 27,103.50 4,668 4,668
170 Bond Project Overhead Costs n/a n/a Various
Costs associated with administration of bond
funded projects.4 2,213,249.06 553,312.27 276,550 276,550
171 Carlos Ortega Villas n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2007-SA Tax
Certificates - IRS Form 8038-G HA 18,500,000.00 - - -
172 Desert Pointe Rehabilitation n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2007-SA Tax
Certificates - IRS Form 8038-G HA 5,000,000.00 - - -
173 Undergrounding Utilities n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 01-4 & 06-4 Tax
Certificates - IRS Form 8038-G 4 18,571,000.00 - - -
174
Buydown Subsidies for Low-Mod
Housing n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2007-SA Tax
Certificates - IRS Form 8038-G HA 5,000,000.00 -
175 Sagecrest Rehabilitation n/a n/a
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 2007-SA Tax
Certificates - IRS Form 8038-G HA 6,000,000.00 -
Name of Successor Agency:Successor Agency to the Palm Desert Redevelopment Agency
County:Riverside
Item #
25 Original Source of Funds - Tax Increment (Cash on Hand).
Notes/Comments
RECOGNIZED OBLIGATION PAYMENT SCHEDULE (ROPS III) -- Notes (Optional)
January 1, 2013 through June 30, 2013
Name of Successor Agency:Successor Agency to the Palm Desert Redevelopment Agency
County:Riverside
Line Project Name / Debt Obligation Payee Description/Project Scope Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate Actual
-$ -$ 5,509,303$ 1,459,107$ -$ 43,329,105$ 2,786,282$ 2,673,621$ 102,063,830$ 35,077,626$ 20,862$ -$
1 1)
2002 Tax Allocation Refunding Bond
Issue - $22,070,000 Wells Fargo Bank Semi-Annual Debt Service Payment 1 557,332 1,114,664 557,332.00$
1 2)
2003 Tax Allocation Bond Issue -
$19,000,000 Wells Fargo Bank Semi-Annual Debt Service Payment 1 475,000 950,000 475,000.00$
1 3)
2004 Tax Allocation Bond Issue -
$24,945,000 Wells Fargo Bank Semi-Annual Debt Service Payment 1 1,488,107 1,902,588 414,481.25$
1 4)
2006 Tax Allocation Bond Issue -
$62,320,000 Wells Fargo Bank Semi-Annual Debt Service Payment 1 3,807,317 5,093,952 1,286,635
1 5)
2007 Tax Allocation Bond Issue -
$32,600,000 Wells Fargo Bank Semi-Annual Debt Service Payment 1 3,411,750 3,881,750 470,000
1 6)
1998 Housing Tax Allocation Bond
Issue - $48,760,000 Wells Fargo Bank Semi-Annual Debt Service Payment 1 -
1 7)
2002 Housing Tax Allocation Bond
Issue - $12,000,000 Wells Fargo Bank Semi-Annual Debt Service Payment 1 232,224 769,449 537,224
1 8)
2007 Housing Tax Allocation Bond
Issue - $87,056,348 Wells Fargo Bank Semi-Annual Debt Service Payment 1 1,706,569 8,418,137 6,711,569
1 9)Indian Springs Stipulated Agreement
Indian Springs
Mobilehome Park Judgement related to ISMHP 1 11,639 69,834 58,197
1 10)L/M Housing Fund Loan
Palm Desert Housing
Authority 2009/10 SERAF Loan Repayment 1 1,304,766
1 11)Fire Station Renovation Penta Building Group
Payments per existing contract for
renovations at Fire Station #33.1 68,595 38,412
1 12)Alessandro Alleyway Wood Rodgers Inc.
Payments per existing contract for public
parking improvements along commercial
corridor. 1 925
1 13)Alessandro Alleyway The Altum Group
Payments per existing contract for public
parking improvements along commercial
corridor. 1 -
1 14)Alessandro Alleyway Prest Vuksic Architects
Payments per existing contract for public
parking improvements along commercial
corridor. 1 9,631
1 15)Trustee Services Wells Fargo Bank
Payments per existing contract for
professional services.1 1,392
1 16)Disclosure Services Willdan
Payments per existing contract for
professional services.1 1,152 1,152
1 17)Legal Services
Richards, Watson &
Gershon
Payments per existing contract for
professional services.1 1,371 8,224 6,853
1 18)Legal Services Best-Best & Krieger
Payments per existing contract for
professional services.1 108 648 540
1 19)Professional Association
California Redevelopment
Association
Payments per existing contract for
professional services.1 2,530
1 20)Auditing Services Diehl, Evans & Co.
Payments per existing contract for
professional services.1 1,063 503
1 21)Reporting Services
Redevelopment Reporting
Solutions
Payments per existing contract for
professional services.1 422
1 22)Banking Services Union Bank of California
Payments per existing contract for
professional services.1 17 99 83
1 23)Liability Insurance California JPIA
Payments per existing contract for
professional services.1 1,160
1 24)Facilities Lease El Paseo LLC
Payments on existing contract providing a
central location for information distribution
and marketing.1 5,335 32,000 26,675
1 25)Pass-thru Trust Account Obligations
Palm Desert Taxing
Entities
Balances in trust per negotiated pass-thru
agreements 1 26,495,748 39,862,122 11,343,101
1 26)Energy Independence Program Lawyer's Title Ins Corp
Payments for existing contract related to
title insurance services for EIP loan
program.1 200
1 27)Carrying Costs - Agency Property Guzman Gardening
Payments for existing contract services
related to Agency owned property.1 1,944
1 28)Carrying Costs - Agency Property Overland Pacific & Cutler
Payments for existing contract services
related to Agency owned property.1 15,000
1 29)El Paseo Revitlization Forma Design, Inc
Payments for existing contract for public
improvements in the central business
district and commercial corridor.1 168,558
2 30)Project Area Administration Various
Allowable Costs per Admin Plan-staff,
utililities, professional services, etc.1 1,247,855 1,247,855
2 31)Vested Employee Benefit Obligation RDA Assigned Employees
Obligation based on accrued leaves and
current MOU.1 332,195 332,195
Page/Form
Grand Total
LMIHF Bond Proceeds Reserve Balance Admin Allowance RPTTF Other
Pursuant to Health and Safety Code section 34186 (a)
PRIOR PERIOD ESTIMATED OBLIGATIONS vs. ACTUAL PAYMENTS
RECOGNIZED OBLIGATION PAYMENT SCHEDULE (ROPS I)
January 1, 2012 through June 30, 2012
Project Area
Line Project Name / Debt Obligation Payee Description/Project Scope Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate ActualPage/Form
Grand Total
LMIHF Bond Proceeds Reserve Balance Admin Allowance RPTTF Other
Project Area
2 32)
Stipulated Judgement Case No.
51124
Desert Rose Affordable
Housing Development -
Homeowners at lots 1
through 161, et al.
PDHA subsidy for 1,100
Affordable Units
Duties required under said court order.
1 2,833,633 102,409
2 33)Replacement Reserve Fund
Palm Desert Housing
Authority 1,100 Affordable Housing Apt Comp's 1 1,618,199 1,618,199
2 34)FW Drive Widening Improvements
Kimley Horne &
Associates
Payments on existing contracts for street
improvements along Fred Waring Drive.1 83,574
2 35)FW Drive Widening Improvements VA Consulting
Payments on existing contracts for street
improvements along Fred Waring Drive.1 6,895
2 36)FW Drive Widening Improvements Ecorp Consulting
Payments on existing contracts for street
improvements along Fred Waring Drive.1 4,568
2 37)FW Drive Widening Improvements NAI Consulting
Payments on existing contracts for street
improvements along Fred Waring Drive.1 17,048
2 38)Portola Wall & Sidewalk Imps David Evans & Associates
Payments on existing contract for public
improvements relative to the Portola
Avenue Wall and Sidewalk Relocation
project.1 25,495
2 39)PDHA Property Management RPM Company
Payment on existing contract for Housing
Authority property management.1 164,946 137,279
2 40)PDHA Properties
Andy's Landscape and
Tree
Payment on existing contract for Housing
Authority property maintenance.1 -
2 41)PDHA Properties West Coast Arborist
Payment on existing contract for Housing
Authority property maintenance.1 -
2 42)PDHA Property Maintenance
Utilities, Maint Services,
HOA Dues, Etc.
Payment on existing contract for Housing
Authority property maintenance -SR 1 44,536
2 43)Agency Owned Properties
Utilities, Maint Services,
HOA Dues, Etc.
Agency owned properties monthly carrying
costs prior to disposition.1 25,000
2 44)Additional Disclosures on TAB's Willdan
Additional disclosures that will be required
to report changes in the allocation of tax
increment and the payment on tax
allocation bonds due to AB 26. These
disclosures would not have been
necessary without this legislative change.1 1,400 300
2 45)Bond Project Overhead Costs Various
Costs associated with administration of
bond
funded projects.1 104,247
2 46)Alessandro Alley Frontage Rd Imps
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-1 Tax Certificate dd 7/6/06 - IRS
Form 8038-G 1
2 47)
Core Commercial Parking
Improvements
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-1 Tax Certificate dd 7/6/06 - IRS
Form 8038-G 1
2 48)President's Plaza Parking Lot Imps
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-1 Tax Certificate dd 7/6/06 - IRS
Form 8038-G 1
2 49)Undergrounding Utilities
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-1 Tax Certificate dd 7/6/06 - IRS
Form 8038-G 1
2 50)Portola Avenue Widening
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-1 Tax Certificate dd 7/6/06 - IRS
Form 8038-G 1
2 51)NSP Rehabilitation
Mostar Heavy Equipment
Corp
Payments on existing contract for
Rehab/Resale of Single Family Dwelling 1 41,900 37,650
2 52)Santa Rosa Apartments
Utilities, Maint Services,
Etc.Per contract dated 1/1/00 1 30,000 10,789
2 53)
Civic Center Park Community
Recreation Center Lease
Coachella Valley
Recreation & Park District
(Lessee)
Annual payment per existing contract of
$23,670 for each year through 2015 if
lease use is terminated 1
1 1)
2002 Tax Allocation Refunding Bond
Issue - $17,310,000 Wells Fargo Bank Semi-Annual Debt Service Payment 2 264,819 1,324,637 1,057,819
1 2)
2003 Tax Allocation Bond Issue -
$15,745,000 Wells Fargo Bank Semi-Annual Debt Service Payment 2 384,503 769,006 384,503
1 3)
2006 Tax Allocation Bond Issue -
$67,618,273 Wells Fargo Bank Semi-Annual Debt Service Payment 2 975,494 3,920,987 2,945,794
1 4)
County CIP Reimbursement for 88/89
and 90/91 County of Riverside Reimbursement of Original Pass-Thru's 2 122,707 122,707
1 5)North Sphere Hotel land City of Palm Desert Balance due Property Acquisition 2 90,000
1 6)North Sphere Property Acquisition City of Palm Desert Loan for Property Acquisition 2 68,750
1 7)
City Loan for formation of Project
Area No. 2- 1986 City of Palm Desert Formation of PA/Prop Acquisition 2 25,688
1 8)L/M Housing Loan
Palm Desert Housing
Authority 2009/10 SERAF Loan Repayment 2 375,561
1 9)Fire Station Renovation Penta Building Group
Payment on existing contract related to
renovation at Fire Station #71.2 47,775
Line Project Name / Debt Obligation Payee Description/Project Scope Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate ActualPage/Form
Grand Total
LMIHF Bond Proceeds Reserve Balance Admin Allowance RPTTF Other
Project Area
1 10)North Sphere Fire Station Rudy Acosta
Payments on existing contracts related to a
newly constructed fire station to serve the
North area.
2
8,750
1 11)North Sphere Fire Station MSA Consulting
Payments on existing contracts related to a
newly constructed fire station to serve the
North area.
2
6,861
1 12)Cal State University Infrastructure Cooley Construction
Payments on existing contracts related to
the street improvements at the Palm
Desert Cal State Campus.
2
229,732 102,575
1 13)Cal State University Infrastructure Leighton Consulting
Payments on existing contracts related to
the street improvements at the Palm
Desert Cal State Campus.
2
3,089
1 14)Aquatic Facility
Gould Evans Associates,
LLC
Payments on existing contracts related to
the Aquatic/Community Facility.2 123,144 58,020
1 15)Aquatic Facility Planit Reprographics
Payments on existing contracts related to
the Aquatic/Community Facility.2 313
1 16)Aquatic Facility ASR Contructors
Payments on existing contracts related to
the Aquatic/Community Facility.2 887,176
1 17)Aquatic Facility Converese Consultants
Payments on existing contracts related to
the Aquatic/Community Facility.2 5,270 11,698
1 18)Aquatic Facility ASR Contructors
Payments on existing contracts related to
the Aquatic/Community Facility.2 65,400
1 19)Aquatic Facility David Moore & Co.
Payments on existing contracts related to
the Aquatic/Community Facility.2 11,963
1 20)Aquatic Facility Desert Alarm, Inc.
Payments on existing contracts related to
the Aquatic/Community Facility.2 11,500
1 21)Trustee Services Wells Fargo Bank
Payments per existing contract for
professional services.2 7,974
1 22)Disclosure Services Willdan
Payments per existing contract for
professional services.2 6,602 6,602
1 23)Legal Services
Richards, Watson &
Gershon
Payments per existing contract for
professional services.2 7,378 44,268 37,140
1 24)Legal Services Best-Best & Krieger
Payments per existing contract for
professional services.2 619 3,715 3,096
1 25)Professional Association
California Redevelopment
Association
Payments per existing contract for
professional services.2 14,498
1 26)Auditing Services Diehl, Evans & Co.
Payments per existing contract for
professional services.2 2,880 6,089
1 27)Aquatic Facility MG Lighting & Electric
Payments on existing contracts related to
the Aquatic/Community Facility.2 6,000
1 28)Well Sites CVWD
Payments on existing contracts related to
the North area required future well sites.2
667,246
1 29)Public Safety Academy Reimb College of the Desert
Payments on existing contract related to
the reimbursement of College of the Desert
for the construction of the Public Safety
Academy.
2
2 30)Project Area Administration
Allowable Costs per Admin Plan-staff,
utililities, professional services, etc.2 388,676 388,676
2 31)Vested Employee Benefit Obligation RDA Assigned Employees
Obligation based on accrued leaves and
current MOU.2 103,470 103,470
2 32)
Stipulated Judgement Case No.
51124
Vineyards, Emerald Brook
(AKA Palm Desert 103)
PDHA subside for 1,100
Affordable Units
Duties required under said court order.2
882,607
2 33)PDHA Property Management RPM Company
Payments on existing contract for the
Housing Authority property management.2 16,488 14,263
2 34)PDHA Properties
Andy's Landscape and
Tree
Payments on existing contract for Housing
Authority property maintenance.2 -
2 35)PDHA Properties West Coast Arborist
Payments on existing contract for Housing
Authority property maintenance.2 -
2 36)Replacement Reserve Fund
Palm Desert Housing
Authority 1,100 Affordable Housing Apt Comp's 2 179,800 179,800
2 37)Monterey @ I-10 Imps NAI Consulting
Payments on existing contracts for the
street improvements related to arterial
access inbound and outbound from
Interstate 10 on Monterey.
2
500
2 38)Monterey @ I-10 Imps Robert Bein Frost & Assoc
Payments on existing contracts for the
street improvements related to arterial
access inbound and outbound from
Interstate 10 on Monterey.
2
61,386
2 39)Monterey @ I-10 Imps Overland Pacific & Cutler
Payments on existing contracts for the
street improvements related to arterial
access inbound and outbound from
Interstate 10 on Monterey.
2
2,484
2 40)Monterey @ I-10 Imps LSA Associates
Payments on existing contracts for the
street improvements related to arterial
access inbound and outbound from
Interstate 10 on Monterey.
2
8,930
Line Project Name / Debt Obligation Payee Description/Project Scope Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate ActualPage/Form
Grand Total
LMIHF Bond Proceeds Reserve Balance Admin Allowance RPTTF Other
Project Area
2 41)Monterey @ I-10 Imps Robert Bein Frost & Assoc
Payments on existing contracts for the
street improvements related to arterial
access inbound and outbound from
Interstate 10 on Monterey.
2
137,123
2 42)Portola @ I-10 Imps Dokken Engineering
Payments on existing contract related to
the alignment of Portola Avenue to connect
with the proposed new interchange on I-10.
2
69,235
2 43)Reporting Services
Redevelopment Reporting
Solutions
Payments per existing contract for
professional services.2 2,416
2 44)Liability Insurance California JPIA
Payments per existing contract for
professional services.2 6,645
2 45)Pass-thru Trust Account Obligations
Palm Desert Taxing
Entities
Balances in trust per negotiated pass-thru
agreements 2 1,962,335 3,665,266 312,812
2 46)Additional Disclosures on TAB's Willdan
Additional disclosures that will be required
to report changes in the allocation of tax
increment and the payment on tax
allocation bonds due to AB 26. These
disclosures would not have been
necessary without this legislative change.
2
600 100
2 47)Banking Services Union Bank of California
Payments per existing contract for
professional services.2 91 546 455
2 48)Bond Project Overhead Costs Various
Costs associated with administration of
bond funded projects.2 248,194
2 49)North Sphere Fire Station
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-2 Tax Certificate dd 7/6/06 - IRS
Form 8038-G
2
-
2 50)Monterey Ave On/Off Ramp Imps
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-2 Tax Certificate dd 7/6/06 - IRS
Form 8038-G
2
-
2 51)Portola @ I-10 Imps
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-2 Tax Certificate dd 7/6/06 - IRS
Form 8038-G
2
-
2 52)Undergrounding Utilities
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-2 Tax Certificate dd 7/6/06 - IRS
Form 8038-G
2
-
1 1)
2003 Tax Allocation Bond Issue -
$4,745,000 Wells Fargo Bank Semi-Annual Debt Service Payment 3 203,112 294,245 91,133
1 2)
2006 Tax Allocation Bond Issue -
$15,029,526 Wells Fargo Bank Semi-Annual Debt Service Payment 3 483,037 757,475 274,438
1 3)L/M Housing Loan
Palm Desert Housing
Authority 2009/10 SERAF Loan Repayment 3 121,289
1 4)Cook Street Widening Cooley Construction
Payments on existing contracts related to
the infrastructure improvements on Cook
Street.
3
1,335,417 1,119,852
1 5)Cook Street Widening Harris & Associates
Payments on existing contracts related to
the infrastructure improvements on Cook
Street.
3
19,293
1 6)Cook Street Widening Cooley Construction
Payments on existing contracts related to
the infrastructure improvements on Cook
Street.
3
200,144
1 7)Cook Street Widening Gaugush, Joseph
Payments on existing contracts related to
the infrastructure improvements on Cook
Street.
3
12,173
1 8)Cook Street Widening
Robert Bein, Frost &
Assoc
Payments on existing contracts related to
the infrastructure improvements on Cook
Street.
3
15,318
1 9)Cook Street Widening Sladden Engineering
Payments on existing contracts related to
the infrastructure improvements on Cook
Street.
3
9,700
1 10)Public Safety Academy Reimb College of the Desert
Payments on existing contract related to
the reimbursement of College of the Desert
for the construction of the Public Safety
Academy.
3
-
1 11)Project Area Administration
Allowable Costs per Admin Plan-staff,
utililities, professional services, etc.3 102,283 102,283
1 12)Vested Employee Benefit Obligation RDA Assigned Employees
Obligation based on accrued leaves and
current MOU.3 27,229 27,229
1 13)
Stipulated Judgement Case No.
51124
Falcon Crest Affordable
Housing Development -
Homeowners at lots 1
through 93, et al.
PDHA Subsidy for 1,100
Affordable Units
Duties required under said court order.3
232,265
1 14)Replacement Reserve Fund
Palm Desert Housing
Authority 1,100 Affordable Housing Apt Comp's 3 179,800 179,800
1 15)PDHA Property Management RPM Company
Payments on existing contract for Housing
Authority Property Management.3
16,488
1 16)PDHA Properties
Andy's Landscape and
Tree
Payments on existing contract for Housing
Authority Property Maintenance.3
-
Line Project Name / Debt Obligation Payee Description/Project Scope Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate ActualPage/Form
Grand Total
LMIHF Bond Proceeds Reserve Balance Admin Allowance RPTTF Other
Project Area
1 17)PDHA Properties West Coast Arborist
Payments on existing contract for Housing
Authority Property Maintenance.3
-
1 18)Trustee Services Wells Fargo Bank
Payments per existing contract for
professional services.3 4,216
1 19)Disclosure Services Willdan
Payments per existing contract for
professional services.3 3,491 3,491
1 20)Legal Services
Richards, Watson &
Gershon
Payments per existing contract for
professional services.3 3,901 23,408 19,506
1 21)Legal Services Best-Best & Krieger
Payments per existing contract for
professional services.3 327 1,965 1,637
1 22)Professional Association
California Redevelopment
Association
Payments per existing contract for
professional services.3 7,666
1 23)Auditing Services Diehl, Evans & Co.
Payments per existing contract for
professional services.3 1,463 3,094
1 24)Reporting Services
Redevelopment Reporting
Solutions
Payments per existing contract for
professional services.3 2,455
1 25)Pass-thru Trust Account Obligations
Palm Desert Taxing
Entities
Balances in trust per negotiated pass-thru
agreements 3 6,549,775 532,295
2 26)Additional Disclosures on TAB's Willdan
Additional disclosures that will be required
to report changes in the allocation of tax
increment and the payment on tax
allocation bonds due to AB 26. These
disclosures would not have been
necessary without this legislative change.
3
400 100
2 27)Liability Insurance California JPIA
Payments per exisitng contract for
professional services.3 3,514
2 28)Banking Services Union Bank of California
Payments per exisitng contract for
professional services.3 300
2 29)Bond Project Overhead Costs Various
Costs associated with administration of
bond
funded projects.
3
78,500
2 30)
Portola Avenue On/Off Ramp
Construction
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-3 Tax Certificate dd 7/6/06 - IRS
Form 8038-G
3
-
2 31)Undergrounding Utilities
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-3 Tax Certificate dd 7/6/06 - IRS
Form 8038-G
3
-
2 32)Portola Avenue Widening
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2006-3 Tax Certificate dd 7/6/06 - IRS
Form 8038-G
3
-
2 33)Falcon Crest Lot K TDB
One-time payment per existing contract for
the cost of constructing a perimeter wall &
all surrounding improvements including
exterior landscaping, plans for drainage &
discharge, power for well operation
3
-
1 1)
1998 $11,020,000 Tax Allocation
Bond Issue Wells Fargo Bank Semi-Annual Debt Service Payment 4 208,765 557,530 348,765
1 2)
2001 $15,695,000 Tax Allocation
Bond Issue Wells Fargo Bank Semi-Annual Debt Service Payment 4 310,983 966,967 655,984
1 3)
2006 $19,273,089 Tax Allocation
Bond Issue Wells Fargo Bank Semi-Annual Debt Service Payment 4 315,410 1,320,820 1,005,410
1 4)L/M Housing Fund Loan
Palm Desert Housing
Authority 2009/10 SERAF Loan Repayment 4 332,155
1 5)PA 4 Public Improvements Interactive Design Corp
Payments per existing contract related to
the public improvements to develop and
construct public facilities for emergency
services, affordable housing, façade
improvements to existing structures, and
infrastructure imps.
4
9,854
1 6)PA 4 Public Improvements Heitec
Payments per existing contract related to
the public improvements to develop and
construct public facilities for emergency
services, affordable housing, façade
improvements to existing structures, and
infrastructure imps.
4
7,420
1 7)PD Country Club Undergrounding Willdan Financial Services
Payments per existing contract related to
undergrounding of utilities in Project Area
No. 4.
4
18,903 3,845
1 8)Trustee Services Wells Fargo Bank
Payments per existing contract for
professional services.4 100
1 9)Disclosure Services Willdan
Payments per existing contract for
professional services.4 83 83
1 10)Legal Services
Richards, Watson &
Gershon
Payments per existing contract for
professional services.4 93 557 464
1 11)Legal Services Best-Best & Krieger
Payments per existing contract for
professional services.4 8 47 39
1 12)Professional Association
California Redevelopment
Association
Payments per existing contract for
professional services.4 175
1 13)Auditing Services Diehl, Evans & Co.
Payments per existing contract for
professional services.4 35 74
Line Project Name / Debt Obligation Payee Description/Project Scope Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate Actual Estimate ActualPage/Form
Grand Total
LMIHF Bond Proceeds Reserve Balance Admin Allowance RPTTF Other
Project Area
1 14)Reporting Services
Redevelopment Reporting
Solutions
Payments per existing contract for
professional services.4 - 29
1 15)Liability Insurance California JPIA
Payments per existing contract for
professional services.4 84
1 16)Banking Services Union Bank of California
Payments per existing contract for
professional services.4 7 7
1 17)Hovley Retention Basin Leon's Landscaping
Payments per existing contract for public
improvements related to a xeriscaped open
space and retention basin.
4
1 18)
Affordable Housing-Carlos Ortega
Villas Interactive Design Corp
Payments per existing contract for a 72 unit
affordable senior complex. 4 537,329 76,930
1 19)Project Area Administration
Allowable Costs per Admin Plan-staff,
utililities, professional services, etc.4 306,849 306,849
1 20)Vested Employee Benefit Obligation RDA Assigned Employees
Obligation based on accrued leaves and
current MOU.4 68,073 68,073
1 21)
Stipulated Judgement Case No.
51124
PDHA subsidy for 1,100
Affordable Units Duties required under said court order.4 696,795
1 22)Replacement Reserve Fund
Palm Desert Housing
Authority 1,100 Affordable Housing Apt Comp's 4 179,800 179,800
1 23)PDHA Property Management RPM Company
Payments per existing contract for Housing
Authority Property Management.4
16,488
2 24)PDHA Properties
Andy's Landscape and
Tree
Payments per existing contract for Housing
Authority Property Maintenance.4
-
2 25)PDHA Properties West Coast Arborist
Payments per existing contract for Housing
Authority Property Maintenance.4
-
2 26)Additional Disclosures on TAB's Willdan/RWG
Additional disclosures that will be required
to report changes in the allocation of tax
increment and the payment on tax
allocation bonds due to AB 26. These
disclosures would not have been
necessary without this legislative change.
4
600 100
2 27)Pass-thru Trust Account Obligations
Palm Desert Taxing
Entities
Balances in trust per negotiated pass-thru
agreements 4 10,435,341 2,990,664
2 28)Public Safety Academy Reimb College of the Desert
Payments on existing contract related to
the reimbursement of College of the Desert
for the construction of the Public Safety
Academy.
4
-
2 29)Carlos Ortega Villas To Be Determined
Agreement to build wall as part of COV
construction 4 -
2 30)NSP Rehabilitation AA Max
Payments per existing contract related to
Rehab/Resale of Single Family Dwelling 4
20,862 41,174 20,862
2 31)Bond Project Overhead Costs Various
Costs associated with administration of
bond
funded projects.
4
221,420
2 32)Carlos Ortega Villas
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2007-SA Tax Certificates - IRS Form 8038-
G
4
-
2 33)Desert Pointe Rehabilitation
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A,
2007-SA Tax Certificates - IRS Form 8038-
G
4
-
2 34)Undergrounding Utilities
TBD from Unspent Bond
Proceeds
Approved project as listed in Exhibit A, 01-
4 & 06-4 Tax Certificates - IRS Form 8038-
G
4
-
Amount Disallowed by DOF Per 4/26/12 Letter from DOF 1-4 (184,438)