HomeMy WebLinkAboutConstruction Waste Management Plan 2020 Form FillConstruction Waste Management Plan
City of Palm Desert - Department of Building and Safety
73-510 Fred Waring Drive / Palm Desert, CA 92260-2578 / (760) 776-6420
The City of Palm Desert adopted the State of California 2019 Green Building Standards Code as part of Ordinance 1351.
This Code and Ordinance requires that builders/contractors recycle and/or salvage a minimum of 65% of the non-
hazardous construction and demolition debris, or meet a local construction and demolition waste management
ordinance, whichever is more stringent. This applies to all additions or alterations of existing residential buildings where
the addition or alteration increases the building’s conditioned area, volume, or size. It also applies to newly constructed
non-residential buildings, building additions of 1,000 square feet or greater, and/or building alterations with a permit
valuation of $200,000 or above. Failure to comply with Ordinance 1351 may result in fines, penalties, and imprisonment.
Failure to provide documentation from salvage, recycling and waste facilities may result in final inspection not being
issued.
Waste stream reduction alternative. Projects that generate a total combined weight of construction and demolition
waste disposed of in landfills, which do not exceed two (2) pounds/square feet of the building area shall meet the
minimum 65 percent construction waste reduction requirement.
PLEASE INITIAL to represent that you understand these requirements.
1. I understand that I am required by Palm Desert Ordinance No.1351 to recycle and/or salvage for reuse a minimum
of 65% of the non-hazardous construction and demolition debris, or meet a local construction and demolition waste
management ordinance, whichever is more stringent. __________ (Initial)
2. I understand that failure to meet the requirements of Ordinance No.1351 shall constitute a misdemeanor, and shall
be punishable by imprisonment in the county jail for up to 6 months, or by fine of up to $1000, or both. In addition,
a stop order on the job or a delay of final approval may occur. __________ (Initial)
3.At the completion of this project, or more frequently if required, all receipts or other equivalent documentation
from salvage, recycling and waste facilities will be provided to the City of Palm Desert and I understand that I may
not be issued my final inspection unless all receipts and documentation are submitted to the City of Palm Desert
Building and Safety Department. __________ (Initial)
Permit # _______________________________
Plan Reviewer ___________________________
Date of Application ______________________
STEP 1: PROJECT INFORMATION – FILL OUT THE FOLLOWING INFORMATION
This Construction Waste Management Plan (CWP) must be completed, submitted for review, and approved to obtain
a building permit. Separate CWPs must be completed for demolition and construction at the same site unless the
building department requires only one permit.
Applicant’s Name: _______________________________________________________________________________
Contact Phone Number: _____________________________ Fax Number___________________________________
Check One: □Owner □Architect □Build □Owner/Builder □Other__________________________________
Project Description:______________________________________________________________________________
_______________________________________________________________________________________________
Estimated Completion Date:__________________________
Project Address:____________________________
__________________________________________
__________________________________________
STEP TWO: DETERMINE MATERIALS TO BE PRODUCED AND WHERE THEY WILL BE REUSED,
RECYCLED OR DISPOSED
Check the materials you anticipate generating and fill in the facilities that you plan to use.
MATERIAL CHECK IF
APPLICABLE
REUSE, RECYCLING OR DISPOSAL FACILITY
Appliances
Asphalt
Cardboard/Paper
Concrete
Drywall
Metals
Roofing (non-asphalt)
Wood/Green Waste
Other:
Other:
Materials can only be hauled by the contractor (No Subcontracting) or by the City’s franchise waste hauler,
Burrtec Waste & Recycling Services.
(check answer)
I will be self-hauling materials to a Reuse, Recycling, or Disposal Facility? Yes /No
I will be contracting with Burrtec Waste & Recycling Services to haul materials? Yes /No
The undersigned hereby agrees to comply with the Construction Waste Management Plan as submitted and is
the owner or authorized agent of this project.
Applicant Signature: _____________________________________________ Date: ______________________
City Approval: □ Approved □Approved with comments □ Denied
_______________________________________________________________________________________
_______________________________________________________________________________________
All original receipts, weight tags and documentation for salvage, recycling, and disposal must be submitted:
□On completion of project □Other
Building Dept. Approval: ___________________________________________ Date: _________________
REMEMBER, HAULING OF MATERIALS CAN ONLY BE DONE BY:
Contractor – can only haul debris if using their own employees and equipment.
Demolition Contractor – can haul debris only if doing the demolition work and using own employees and equipment.
City’s Franchise Waste Hauler – must be used if the above does not apply. Contact Burrtec Waste & Recycling Services
at (760) 340-2113
WEIGHT TICKETS will be given every time a load is hauled to a facility. Tickets
must list date, type of material, and tonnage of material. Tickets must be
saved
and turned in with the final report as documentation. Burrtec can also provide
a cumulative report upon completion of the project (see sample on the right).
Please complete this section, have it approved by the Building and Safety Department no later than 30
days after completion of the construction project.
This section must be completed and signed, and all original receipts or other supporting documentation
must be attached in order to receive final project approval.
LIST WEIGHT TICKETS FROM SALVAGE AND RECYCLING FACILITIES
DATE MATERIAL FACILITY TONNAGE CITY USE ONLY
(A) TOTAL TONNAGE SALVAGED/RECYCLED
CONTINUE ON NEXT PAGE
STEP THREE: ARRANGE FOR HAULING OF MATERIALS AND ACCUMULATE WEIGHT
TICKETS/DOCUMENTATION
FINAL REPORT PERMIT #______________________________
LIST WEIGHT TICKETS FROM REFUSE FACILITIES
DATE MATERIAL FACILITY TONNAGE CITY USE ONLY
REFUSE
(B) TOTAL TONNAGE REFUSE
DETERMINE TONNAGE DIVERTED
TOTAL TONNAGE SALVAGED/RECYCLED (FROM PREVIOUS PAGE) (A)
TOTAL TONNAGE REFUSE (B)
TOTAL DEBRIS HAULED (A+B)
PERCENTAGE OF DEBRIS DIVERTED (A) / (A+B)
□ All original receipts or equivalent documentation for salvage, recycling, and disposal are hereby attached.
□ This project has recycled at least 65% of non-hazardous construction and demolition debris.
Applicant Signature: _____________________________________________ Date: ______________________
City Approval: □ Approved □Approved with comments □ Denied
_______________________________________________________________________________________
_______________________________________________________________________________________
All original receipts, weight tags and documentation for salvage, recycling, and disposal must be submitted:
□ On completion of project □ Other
Building Dept. Approval: __________________________________________ Date: ___________________