Loading...
HomeMy WebLinkAboutPM10 Packet Less Than 10 AcresCITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 *If you have a group of at least 15 persons desiring to become certified, the AQMD will conduct t he class at your site free of charge. NOTICE TO GRADING PERMIT APPLICANTS New Dust Control Ordinance Requirements On November 13, 2003, the City Council of the City of Palm Desert unanimously passed Ordinance 1056 which revised Title 24, Chapter 12 of the Palm Desert Municipal Code, more commonly known as the Dust Control Ordinance. This ordinance was enacted December 13, 2003, to comply with requirements from the South Coast Air Quality Management District (AQMD), and has created new requirements for all applicants for grading permits. 1. All projects disturbing more than 5,000 sq. ft. of earth must complete a PM10 plan. Providing PM10 notes on the grading plan will no longer be adequate. Consult the AQMD Dust Control Handbook for additional requirements on larger projects. 2. The PM10 plan wil l need to be prepared per the instructions in the AQMD Dust Control Handbook. Form templates for preparing the plan are available from the City or the AQMD. 3. Any individual responsible for preparing a PM10 plan must possess a certificate of attendance for the Coachella Valley Fugitive Dust Control Class. 4. Any person performing any site grading, whether contractor or owner, must possess a certificate of attendance for the Coachella Valley Fugitive Dust Control Class or designate an individual who has a cert ificate of attendance to represent them by completing a Owner Designee form. If you have not yet attended the class you will need to contact the AQMD Tuesday through Friday between the hours of 7:00 AM and 5:30 PM. To register, contact: Sharon Fujimoto South Coast Air Quality Management District (866) 861-3878 dustcontrol@aqmd.gov Classes are held monthly in the CVAG building in the Palm Desert Civic Center.* Contact the AQMD for the exact dates and times of the classes. There is no fee to take the class. PM10 PLAN (FORM I) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #1 PM10 (FORM I) PAGE 1 Instructions For Preparing a PM10 Plan Projects Less Than 10 Acres In Size 1. If you have not yet attended the Coachella Valley Fugitive Dust Control Class and received a certificate of completion, and you are not designating a certified individual to act in your behalf, contact the AQMD to register for the class. Contact Sharon Fujimoto at (866) 861-3878. The class if offered monthly free of charge. 2. Fill out the 4 pages of the Palm Desert Fugitive Dust Control Plan Application Form - (FORM A). When completing Form “A” follow instructions to complete a vicinity map and site exhibit. 3. If you are designating a certified individual to act on your behalf, complete the Ownership Designee Form - (FORM OD). 4. Fill out the 5 pages of the Palm Desert Fugitive Dust Control Plan for Projects less than 10 Acres – (FORM DCP). In each source category place an ‘X’ next to the best available control measure(s) you intend to use. If a source category is not applicable to your project, write “N/A” over the bo x. 5. Submit the PM10 Plan Packet to the department of Public Works with your grading plan submittal. 6. At the time of grading permit issuance, obtain a PM10 sign per the attached drawing, and post at the site entrance prior to starting any grading operations. The sign may be removed only after all grading activities have ceased, any exposed areas have been stabilized, and the grading has received a final inspection signoff. PM10 PLAN (FORM A) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #1 PM10 (FORM A) PAGE 1 OF 4 Fugitive Dust Control Plan Application Form (Form A - Page 1 of 4) Please print in ink or type. Blank spaces must be completed for the application to be processed. If an item is not applicable, please enter N/A. 1. Form Preparer: Property Owner q Developer q Prime Contractor q Other q* *(If Other, attach Owner Designee Form OD) * CONTACT PERSON NAME COMPANY NAME COMPANY ADDRESS CITY, STATE, ZIP CODE TELEPHONE NUMBER FACSIMILE NUMBER 24-HOUR, M ANNED AFTER HOURS PHONE NUMBER AQMD DUS T CLASS CERTIFICATE # 2. Project Address or Location PROJECT NAME PROJECT ADDRESS CITY, STATE, ZIP CODE NEAREST M AJOR CROSS STREETS PARCEL NUMBERS PM10 PLAN (FORM A) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #2 PM10 (FORM A) PAGE 2 OF 4 Fugitive Dust Control Plan Application Form (Form A - Page 2 of 4) 3. Project Acreage (total land to be disturbed) (include project site and associated unpaved access roads, stockpiles, and staging areas) PROJECT SIZE (ACRES ) WATER SOURCE (GPM) 4. Project Owner (if Fugitive Dust Control Plan preparer is not the property owner) NAME COMPANY NAME (IF APPLICABLE) ADDRESS (INCLUDE CITY, STATE, & ZIP CODE) TELEPHONE NUMBER FACSIMILE NUMBER 5. The Person(s) responsible for dust control measures and to whom official notices should be sent if necessary RESPONSIBLE P ERSON COMPANY NAME ADDRESS (INCLUDE CITY, STATE, & ZIP CODE) TELEPHONE NUMBER 24-HOUR, M ANNED AFTER-HOURS TELEPHONE NUMBER FACSIMILE NUMBER AQMD DUST CLASS CERTIFICATE # PM10 PLAN (FORM A) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #3 PM10 (FORM A) PAGE 3 OF 4 Fugitive Dust Control Plan Application Form (Form A - Page 3 of 4) 6. On -Site Superintendent/Supervisor/Foreman contact NAME COMPANY NAME ADDRESS (INCLUDE CITY, STATE, & ZIP CODE) TELEPHONE NUMBER 24-HOUR, M ANNED AFTER-HOURS TELEPHONE NUMBER AQMD DUST CLASS CERTIFICATE # 7. Site Mapping Provide a map showing the vicinit y of the project clearly identifying the closest major cross streets or other landmarks and the project location. Label this map “Vicinity Map”. Required map size is 8 ½” by 11”. Provide an 8 ½” by 11” or larger Site Exhibit for the property(s) on which the project will be occurring. Identify the affected parcels. Identify location of site entrances, internal unpaved haul routes, wind fencing, areas to be chemically stabilized and other proposed and required dust control mitigations. Projects that are only installing or constructing linear features such as roads, pipelines or other utilities that border or cross more than one Assessor’s parcel do not require a Site Exhibit, but must provide a detailed vicinity map adequately depicting the entire project area. If the project is divided into construction phases (separate physical project areas), provide an exhibit clearly identifying the phases. 8. Attach a Fugitive Dust Control Plan ü Projects with less than 10 acres of disturbed surfaces must complete a nd attach a Fugitive Dust Control Plan (Form DCP) or equivalent. ü Projects with 10 acres or more of disturbed surfaces must complete and attach a Site-Specific Fugitive Dust Control Plan. Guidance for preparation of a Site-Specific Fugitive Dust Control P lan is available upon request. PM10 PLAN (FORM A) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #4 PM10 (FORM A) PAGE 4 OF 4 Fugitive Dust Control Plan Application Form (Form A - Page 4 of 4) 9. Project notifications For projects with 10 acres or more of disturbed surfaces, the dust control ordinance requires notification to the local permitting authority and to the AQMD prior to project initiation and at project completion. (Refer to Chapter 4 of the Coachella Valley Fugitive Dust Control Handbook for specific requirements and forms). 10. Project Signage Construction signage must be installed on-site prior to construction. Guidelines for construction signage are found attached to this packet. 11. Owner Agreement A signature on this application constitutes an agreement by the owner to be the person with authority to enforce compliance by all contractors and subcontractors of the Dust Control Ordinance, Fugitive Dust Control Plan conditions, and any supplements identified by the permitting authority. Once approved, this application is incorporated by reference and becomes a part of the approved site grading plan. Owner or Owner Designee Signature Date Printed Name Title and Company AQMD Coachella Valley Fugitive Dust Control Class Certificate # PM10 PLAN (FORM OD) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #1 PM10 (FORM OD) PAGE 1 OF 1 Ownership Designee Form (Form OD) An owner’s designee form is required if a Fugitive Dust Control Plan is not prepared/implemented by the property owner, developer or prime contractor. PROJECT INFORMATION PLEASE ENTER INFORMATION BELOW DESIGNEE’S NAME COMPANY NAME ADDRESS /LOCATION PHONE NUMBER AFTER-HOURS PHONE NUMBER AQMD DUST CLASS CERTIFICATE # PROPERTY OWNER INFORMATION PLEASE ENTER INFORMATION BELOW PROPERTY OWNER’S NAME ADDRESS /LOCATION PHONE NUMBER 24-HOUR, M ANNED AFTER- HOURS PHONE NUMBER OWNER STATEMENT I hereby authorize the person listed as my designee to act on my behalf in all matters regarding the issuance and requirements of the Fugitive Dust Control Plan for construction activities. The designee is responsible for project duration. The designee has successfully completed the AQMD Coachella Valley Fugitive Dust Control Class. Furthermore, the designee is responsible for ensuring the contractor(s), subcontractor(s), and all other persons associated with the project are in compliance with the approved Fugitive Dust Control Plan, dust control ordinance requirements, and AQMD regulations. Owner’s Signature Date Printed Name PM10 PLAN (FORM DCP) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 INSTRUCTIONS PM10 (FORM DCP) INSTRUCTIONS N/A P P P FUGITIVE DUST CONTRO L PLAN PREPARATION G UIDANCE FOR SMALLER CONSTRUCTION PROJECTS (LESS THAN 10 ACRES) The following instructions have been prepared to assist project operators in preparing a Fugitive Dust Control Plan for construction activities with les s than 10 acres of disturbed surfaces. Submitting a complete Fugitive Dust Control Plan is essential in expediting the process, so please read and follow the instructions carefully. Fugitive Dust Control Plan Guidance Use the attached pages (Form DCP) to designate the dust control actions to be implemented on-site. Separate the actions to be implemented during the various project phases (e.g., clearing/grubbing and mass grading, finish grading, and site construction, etc.). If applicable, describe the additional control actions to be implemented on-site. Please remember the following when preparing a Fugitive Dust Control Plan: ü A complete copy of the Fugitive Dust Control Plan and all maps must be on-site prior to beginning construction activity and must be retained on-site at all times during project construction. ü Construction signage must be installed on-site prior to construction. Guidelines for construction signage are found in this packet. ü Dust control is required 24 hours a day, 7 days a week for the duration of the project regardless of wind conditions or construction project status. ü Daily recordkeeping of dust control actions is required to be compiled and retained during project duration and for three years after project completion. ü Grading plans must include a statement that incorporates the approved fugitive dust control plan into the approved grading plan. Example Backfilling Stabilize backfill material: q 01 -1 when not actively handling; q 01 -2 during handling; q 01 -3 at completion of activity. Stabilize backfill material: q 01 -1 when not actively handling; & q 01 -2 during handling; & q 01 -3 at completion of activity. Stabilize backfill material: q 01 -1 when not actively handling; & q 01 -2 during handling; & q 01 -3 at completion of activity. PM10 PLAN (FORM DCP) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #1 PM10 (FORM DCP) PAGE 1 OF 5 Fugitive Dust Control Plan For Projects < 10 Acres (Form DCP, Page 1 of 5) Project Name: _____________________________________ Water Source ___ ________________ Permit Number (if applicable): _______________________ No. Water Trucks ______________________ Owner Name: _____________________________________ No. Water Towers _________________________ Anticipated Start Date: __________________ Anticipated Completion Date: _______________ Total Earth-Movement (Cubic Yards): _____________________________________ Note: Complete entire form by checking applicable boxes. Write “N/A” over box if not applicable. Project Phases Source Category Clearing, Grubbing, & Mass Grading (Describe Control Actions) Finish Grading (Describe Control Actions) Site Constructio n (Describe Control Actions) Backfilling Stabilize backfill material: q 01 -1 when not actively handling; q 01 -2 during handling; q 01 -3 at completion of activity. Stabilize backfill material: q 01 -1 when not actively handling; & q 01 -2 during handling; & q 01 -3 at completion of activity. Stabilize backfill material: q 01 -1 when not actively handling; & q 01 -2 during handling; & q 01 -3 at completion of activity. Clearing and Grubbing q 02 -1 Maintain soil stability by pre -watering of site prior to activities; q 02 -2 Stabilize soil during activities; q 02 -3 Stabilize soil immediately after activities. q 02 -1 Maintain soil stability by pre -watering of site prior to activities; q 02 -2 Stabilize soil during activities; q 02 -3 Stabilize soil immediately after activities. q 02 -1 Maintain soil stability by pre -watering of site prior to activities; q 02 -2 Stabilize soil during activities; q 02 -3 Stabilize soil immediately after activities. Clearing Forms q 03 -1 water spray to clear forms; or q 03 -2 sweeping and water spray to clear forms; or q 03 -3 vacuum system to clear forms. q 03 -1 water spray to clear forms; or q 03 -2 sweeping and water spray to clear forms; or q 03 -3 vacuum system to clear forms. q 03 -1 water spray to clear forms; or q 03 -2 sweeping and water spray to clear forms; or q 03 -3 vacuum system to clear forms. Crushing q 04 -1 Stabilize surface soils prior to operation of support equip. q 04 -2 Stabilize mater. after crushing. q 04 -1 Stabilize surface soils prior to operation of support equip. q 04 -2 Stabilize mater. after crushing. q 04 -1 Stabilize surface soils prior to operation of support equip. q 04 -2 Stabilize mater. after crushing. PM10 PLAN (FORM DCP) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #2 PM10 (FORM DCP) PAGE 2 OF 5 Fugitive Dust Control Plan For Projects < 10 Acres (Form DCP, Page 2 of 5) Project Phases Source Category Clearing, Grubbing, and Mass Grading (Describe Control Actions) Finish Grading (Describe Control Actions) Site Construction (Describe Control Actions) Cut and Fill q 05 -1 Pre -water soils prior to cut and fill activities; and. q 05 -2 Stabilize soil during and after cut and fill activities. q 05 -1 Pre -water soils prior to cut and fill activities; and. q 05 -2 Stabilize soil during and after cut and fill activities. q 05 -1 Pre -water soils prior to cut and fill activities; and. q 05 -2 Stabilize soil during and after cut and fill activities. Demolition mechanical /manual q 06 -1 Stabilize wind erodible surfaces to prevent dust; and q 06 -2 Stabilize surface soil where support equipment and vehicles will operate; and q 06 -3 Stabilize loose soil and demolition debris; and q 06 -4 Comply with AQMD Rule 1403. q 06 -1 Stabilize wind erodible surfaces to prevent dust; and q 06 -2 Stabilize surface soil where support equipment and vehicles will operate; and q 06 -3 Stabilize loose soil and demolition debris; and q 06 -4 Comply with AQMD Rule 1403. q 06 -1 Stabilize wind erodible surfaces to prevent dust; and q 06 -2 Stabilize surface soil where support equipment and vehicles will operate; and q 06 -3 Stabilize loose soil and demolition debris; and q 06 -4 Comply with AQMD Rule 1403. Disturbed soil q 07 -1 Stabilize disturbed soil throughout the construction site; and q 07 -2 Stabilize disturbed soil between structures q 07 -1 Stabilize disturbed soil throughout the construction site; and q 07 -2 Stabilize disturbed soil between structures q 07 -1 Stabilize disturbed soil throughout the construction site; and q 07 -2 Stabilize disturbed soil between structures Ea rth- moving activities q 08 -1 Pre -apply water to depth of proposed cuts; and q 08 -2 Re -apply water as necessary to maintain soils in a damp condition; and q 08 -3 Stabilize soils once earth- moving activities are complete. q 08 -1 Pre -apply water to depth of proposed cuts; and q 08 -2 Re -apply water as necessary to maintain soils in a damp condition; and q 08 -3 Stabilize soils once earth- moving activities are complete. q 08 -1 Pre -apply water to depth of proposed cuts; and q 08 -2 Re -apply water as necessary to maintain soils in a damp condition; and q 08 -3 Stabilize soils once earth- moving activities are complete. Importing/ exporting of bulk materials q 09 -1 Stabilize material while loading to prevent fugitive dust emissions; and q 09 -2 Maintain at least six inches of freeboard on haul vehicles; and q 09 -3 Limit vehicular speeds to 15 miles per hour while traveling on-site; and q 09 -1 Stabilize material while loading to prevent fugitive dust emissions ; and q 09 -2 Maintain at least six inches of freeboard on haul vehicles; and q 09 -3 Limit vehicular speeds to 15 miles per hour while traveling on-site; and q 09 -1 Stabilize material while loading to prevent fugitive dust emissions; and q 09 -2 Maintain at least six inches of freeboard on haul vehicles; and q 09 -3 Limit vehicular speeds to 15 miles per hour while traveling on-site; and PM10 PLAN (FORM DCP) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #3 PM10 (FORM DCP) PAGE 3 OF 5 Fugitive Dust Control Plan For Projects < 10 Acres (Form DCP, Page 3 of 5) Project Phases Source Category Clearing, Grubbing, and Mass Grading (Describe Control Actions) Finish Grading (Describe Control Actions) Site Construction (Describe Control Actions) Importing/ exporting of bulk materials (cont.) q 09 -4 Stabilize material while tra nsporting to prevent fugitive dust emissions; and q 09 -5 Stabilize material while unloading to prevent fugitive dust emissions; and q 09 -6 Comply with Vehicle Code Section 23114. q 09 -4 Stabilize material while transporting to prevent fugitive dust emissions; and q 09 -5 Stabilize material while unloading to prevent fugitive dust emissions; and q 09 -6 Comply with Vehicle Code Section 23114. q 09 -4 Stabilize material while transporting to prevent fugitive dust emissions; and q 09 -5 Stabilize material while unloading to prevent fugitive dust emissions; and q 09 -6 Comply with Vehicle Code Section 23114. Landscap- ing q 10 -1 Stabilize soils, materials, slopes q 10 -1 Stabilize soils, materials , slopes q 10 -1 Stabilize soils, materials, slopes Road shoulder maint. q 11 -1 Apply water to unpaved shoulders prior to clearing; and q 11 -2 Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. q 11 -1 Apply water to unpaved shoulders prior to clearing; and q 11 -2 Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. q 11 -1 Apply water to unpaved shoulders prior to clearing; and q 11 -2 Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. Screening q 12 -1 Pre -water ma terial prior to screening; and q 12 -2 Limit fugitive dust emissions to opacity and plume length standards; and q 12 -3 Stabilize material immediately after screening. q 12 -1 Pre -water material prior to screening; and q 12 -2 Limit fugitive dust emissions to opacity and plume length standards; and q 12 -3 Stabilize material immediately after screening. q 12 -1 Pre -water material prior to screening; and q 12 -2 Limit fugitive dust emissions to opacity and plume length standards; and q 12 -3 Stabilize material immediately after screening. Staging Areas q 13 -1 Stabilize staging areas during use; and q 13 -2 Stabilize staging area soils at project completion. q 13 -1 Stabilize staging areas during use; and q 13 -2 Stabilize staging area soils at project completion. q 13 -1 Stabilize staging areas during use; and q 13 -2 Stabilize staging area soils at project completion. PM10 PLAN (FORM DCP) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #4 PM10 (FORM DCP) PAGE 4 OF 5 Fugitive Dust Control Plan For Projects < 10 Acres (Form DCP, Page 4 of 5) Project Phases Source Category Clearing, Grubbing, and Mass Grading (Describe Control Actions) Finish Grading (Describe Control Actions) Site Construction (Describe Control Actions) Stockpiles/ bulk materials handling q 14 -1 Stabilize stockpiled materials; or q 14 -2 Install and maintain wind barriers with no less than 50 percent porosity on three sides of the pile, such that the barrier is equal to or greater than the pile height. q 14 -3 Stockpiles within 100 yards of occupied buildings must not be greater than eight feet in height; or q 14 -4 Stockpiles greater than eight feet in height and not covered must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. q 14 -1 Stabilize stockpiled materials; or q 14 -2 Install and maintain wind barriers with no less than 50 percent porosity on three sides of the pile, such that the barrier is equal to or greater than the pile height. q 14 -3 Stockpiles within 100 yards of occupied buildings must not be greater than eight feet in height; or q 14 -4 Stockpiles greater than eight feet in height and not covered must have a road bladed to the top to allow water truck acces s or must have an operational water irrigation system that is capable of complete stockpile coverage. q 14 -1 Stabilize stockpiled materials; or q 14 -2 Install and maintain wind barriers with no less than 50 percent porosity on three sides of the pile, such that the barrier is equal to or greater than the pile height. q 14 -3 Stockpiles within 100 yards of occupied buildings must not be greater than eight feet in height; or q 14 -4 Stockpiles greater than eight feet in height and not covered must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. Traffic areas for const. activities q 15 -1 St abilize all off -road traffic and parking areas; and q 15 -2 Ensure that on-site vehicular traffic does not exceed 15 miles per hour; and q 15 -3 Stabilize all haul routes; and q 15 -4 Direct construction traffic over established haul routes. q 15 -1 St abilize all off -road traffic and parking areas; and q 15 -2 Ensure that on-site vehicular traffic does not exceed 15 miles per hour; and q 15 -3 Stabilize all haul routes; and q 15 -4 Direct construction traffic over established haul routes. q 15 -1 St abilize all off -road traffic and parking areas; and q 15 -2 Ensure that on-site vehicular traffic does not exceed 15 miles per hour; and q 15 -3 Stabilize all haul routes; and q 15 -4 Direct construction traffic over established haul routes. Trenchin g q 16 -1 Stabilize surface soils where trencher or excavator and support equipment will operate; and q 16 -2 Stabilize soils at the completion of trenching activities . q 16 -1 Stabilize surface soils where trencher or excavator and support equipment will operate; and q 16 -2 Stabilize soils at the completion of trenching activities . q 16 -1 Stabilize surface soils where trencher or excavator and support equipment will operate; and q 16 -2 Stabilize soils at the completion of trenching activities . Truck loading q 17 -1 Pre -water material prior to loading; and q 17 -2 Ensure that freeboard does not exceed six inches q 17 -1 Pre -water material prior to loading; and q 17 -2 Ensure that freeboard does not exceed six inches q 17 -1 Pre -water material prior to loading; and q 17 -2 Ensure that freeboard does not exceed six inches PM10 PLAN (FORM DCP) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #5 PM10 (FORM DCP) PAGE 5 OF 5 Fugitive Dust Control Plan For Projects < 10 Acres (Form DCP, Page 5 of 5) Project Phases Source Category Clearing, Grubbing, and Mass Grading (Describe Control Actions) Finish Grading (Describe Control Actions) Site Construction (Describe Control Actions) Turf overseed - ing q 18 -1 Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plu me length standards; and q 18 -2 Cover haul vehicles prior to exiting the site. q 18 -1 Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plume length standards; and q 18 -2 Cover haul vehicles prior to exiting the site. q 18 -1 Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plume length standards; and q 18 -2 Cover haul vehicles prior to exiting the site. Unpaved roads/ parking lots q 19 -1 Stabilize soils to meet the applicable performance standards; and q 19 -2 Limit vehicular travel to established unpaved roads (haul routes) and unpaved parking lots q 19 -1 Stabilize soils to meet the applicable performance standards; and q 19 -2 Limit vehicular travel to established unpaved roads (haul routes) and unpaved parking lots q 19 -1 Stabilize soils to meet the applicable performance standards; and q 19 -2 Limit vehicular travel to established unpaved ro ads (haul routes) and unpaved parking lots Vehicular track-out, clean-up q 19 -3 Use wheel washes at construction entrances q19-4 Use street sweeping as required. q 19 -3 Use wheel washes at construction entrances q19-4 Use street sweeping as required. q 19 -3 Use wheel washes at construction entrances q19-4 Use street sweeping as required. Weather monitoring/ work practices q 20 -1 Monitor current weather conditions predictions from the AQMD’s wind forecast system (800) CUT -SMOG [Press 1, then Press 5] or the National Weather Service; & q 20 -2 Cease all construction activities if fugitive dust emissions exceed 20 percent opacity or if 100 foot visible plume restriction cannot be met. Control measures must continue to operate unless operation of such equipment cannot reduce emissions or if visibility is limited to such an extent that it is hazardous to operate such equipment. q 20 -1 Monitor current weather conditions predictions from the AQMD’s wind forecast system (800) CUT -SMOG [Press 1, then Press 5] or the National Weather Service; & q 20 -2 Cease all construction activities if fugitive dust emissions exceed 20 percent opacity or if 100 foot visible plume restriction cannot be met. Control measures must continue to operate unless operation of such equipment cannot reduce emissions or if visibility is limited to such an extent that it is hazardous to operate such equipment. q 20 -1 Monitor current weather conditions predictions from the AQMD’s wind forecast system (800) CUT -SMOG [Press 1, then Press 5] or the National Weather Service; & q 20 -2 Cease all construction activities if fugitive dust emissions exceed 20 percent opacity or if 100 foot visible plume restriction cannot be met. Control measures must continue to operate unless operation of such equipment cannot reduce emissions or if visibility is limited to such an extent that it is hazardous to operate such equipment. Other (describe) PM10 PLAN (FORM BACM) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #1 PM10 (FORM BACM) PAGE 1 of 5 PM10 - BEST AVAILABLE CONTROL MEASURES (BACM) Source Category Control Measure Guidance Backfilling 01-1 01-2 01-3 Stabilize backfill material when not actively handling; and Stabilize backfill material during handling; and Stabilize soil at completion of activity. ü Mix backfill soil with water prior to moving ü Dedicate water truck or high capacity hose to backfilling equipment ü Empty loader bucket slowly so that no dust plumes are generated ü Minimize drop height from loader bucket Clearing and grubbing 02-1 02-2 02-3 Maintain stability of soil through pre- watering of site prior to clearing and grubbing; and Stabilize soil during clearing and grubbing activities; and Stabilize soil immediately after clearing and grubbing activities. ü Maintain live perennial vegetation and desert pavement where possible ü Apply water in sufficient quantity to prevent generation of dust plumes Clearing forms 03-1 03-2 03-3 Use water spray to clear forms; or Use sweeping and water spray to clear forms; or Use vacuum s ystem to clear forms. ü Use of high pressure air to clear forms may cause exceedance of opacity/plume length restrictions Crushing 04-1 04-2 Stabilize surface soils prior to operation of support equipment; and Stabilize material after crushing. ü Follow permit conditions for crushing equipment ü Pre-water material prior to loading into crusher ü Monitor crusher emissions opacity ü Apply water to crushed material to prevent dust plumes Cut and fill 05-1 05-2 Pre-water soils prior to cut and fill activities; and Stabilize soil during and after cut and fill activities. ü For large sites, pre-water with sprinklers or water trucks and allow time for penetration ü Use water trucks/pulls to water soils to depth of cut prior to subsequent cuts PM10 PLAN (FORM BACM) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #2 PM10 (FORM BACM) PAGE 2 of 5 Source Category Control M easure Guidance Demolition – mechanical/ manual 06-1 06-2 06-3 06-4 Stabilize wind erodible surfaces to prevent dust; and Stabilize surface soil where support equipment and vehicles will operate; and Stabilize loose soil and demolition debris; and Comply with AQMD Rule 1403. ü Apply water in sufficient quantities to prevent the generation of visible dust plumes Disturbed soil 07-1 07-2 Stabilize disturbed soil throughout the construction site; and Stabilize disturbed soil between structures ü Limit vehicular traffic and disturbances on soils where possible ü If interior block walls are planned, install as early as possible ü Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Earth-moving activities 08-1 08-2 08-3 Pre-apply water to depth of proposed cuts; and Re -apply water as necessary to maintain soils in a damp condition; and Stabilize soils once earth-moving activities are complete. ü Grade each project phase separately, timed to coincide with construction phase ü Upwind fencing can prevent material movement on site ü Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Importing/ exporting of bulk materials 09-1 09-2 09-3 09-4 09-5 09-6 Stabilize material while loading to prevent fugitive dust emissions; and Maintain at least six inches of freeboard on haul vehicles; and Limit vehicular speeds to 15 miles per hour while traveling on-site; and Stabilize material while transporting to prevent fugitive dust emissions; and Stabilize material while unloading to prevent fugitive dust emissions; and Comply with Vehicle Code Section 23114. ü Use tarps or other suitable enclosures on haul trucks ü Check belly-dump truck seals regularly and remo ve any trapped rocks to prevent spillage ü Comply with track-out prevention/mitigation requirements ü Provide water while loading and unloading to prevent visible dust plumes PM10 PLAN (FORM BACM) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #3 PM10 (FORM BACM) PAGE 3 of 5 Source Category Control Measure Guidance Landscaping 10-1 Stabilize soils, materials, slopes ü Apply water to materials to stabilize ü Maintain materials in a crusted condition ü Maintain effective cover over materials ü Stabilize sloping surfaces using soil binders until vegetation or ground cover can effectively stabilize the slopes ü Hyd roseed prior to rain season Road shoulder maintenance 11-1 11-2 Apply water to unpaved shoulders prior to clearing; and Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. ü Installation of curbing and/or paving of road shoulders can reduce recurring maintenance costs ü Use of chemical dust suppressants can inhibit vegetation growth and reduce future road shoulder maintenance costs Screening 12-1 12-2 12-3 Pre-water material prior to screening; and Limit fugitive dust emissions to opacity and plume length standards; and Stabilize material immediately after screening. ü Dedicate water truck or high capacity hose to screening operation ü Drop material through the screen slowly and mini mize drop height ü Install wind barrier with a porosity of no less than 50% upwind of screen to the height of the drop point Staging areas 13-1 13-2 Stabilize staging areas during use; and Stabilize staging area soils at project completion. ü Limit size of staging area ü Limit vehicle speeds to 15 miles per hour ü Limit number and size of staging area entrances/exists PM10 PLAN (FORM BACM) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #4 PM10 (FORM BACM) PAGE 4 of 5 Source Category Control Measure Guidance Stockpiles/ Bulk Material Handling 14-1 14-2 14-3 14-4 Stabilize stockpiled materials; or Install and maintain wind barriers with no less than 50 percent porosity on three sides of the pile, such that the barrier is equal to or greater than the pile height. Stockpiles within 100 yards of occupied buildings must not be greater than eight feet in height; or Stockpiles greater than eight feet in height and not covered must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. ü Add or remove materia l from the downwind portion of the storage pile ü Maintain storage piles to avoid steep sides or faces Traffic areas for construction activities 15-1 15-2 15-3 15-4 Stabilize all off-road traffic and parking areas; and Ensure that on-site vehicular traff ic does not exceed 15 miles per hour; and Stabilize all haul routes; and Direct construction traffic over established haul routes. ü Apply gravel/paving to all haul routes as soon as possible to all future roadway areas ü Barriers can be used to ensure vehicle s are only used on established parking areas/haul routes Trenching 16-1 16-2 Stabilize surface soils where trencher or excavator and support equipment will operate; and Stabilize soils at the completion of trenching activities. ü Pre-watering of soils prior to trenching is an effective preventive measure. For deep trenching activities, pre-trench to 18 inches soak soils via the pre-trench and resuming trenching ü Washing mud and soils from equipment at the conclusion of trenching activities can prevent crusting and drying of soil on equipment Truck loading 17-1 17-2 Pre-water material prior to loading; and Ensure that freeboard does not exceed six inches ü Empty loader bucket such that no visible dust plumes are created ü Ensure that the loader bucket is close to the truck to minimize drop height while loading PM10 PLAN (FORM BACM) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #5 PM10 (FORM BACM) PAGE 5 of 5 Source Category Control Measure Guidance Turf overseeding 18-1 18-2 Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plume length standards; and Cover haul vehicles prior to exiting the site. ü Haul waste material immediately off-site Unpaved roads/parking lots 19-1 19-2 Stabilize soils to meet the applicable performance standards; and Limit vehicular travel to established unpaved roads (haul routes) and unpaved parking lots. ü Restricting vehicular access to established unpaved travel paths and parking lots can reduce stabilization requirements Weather monitoring/work practices 20-1 20-2 Monitor current weather conditions and weather predictions from the AQMD’s toll free wind forecast system (800) CUT- SMOG [Press 1, then Press 5] and / or the National Weather Service; and Cease all construction activities if fugitive dust emissions exceed 20 percent opacity or if 100 foot visible plume restriction cannot be met. Control measures (e.g., water trucks/pulls) must continue to operate unless operation of such equipment cannot reduce fugitive dust emissions or if visibility is limited to such an extent that it is hazardous to continue operating such equipment. ü Documentation of weather (e.g., wind) conditions can facilitate compliance determinations when using an affirmable defense to dust control ordinance and Fugitive Dust Control Plan requirements SUMMARY OF DUST CONT ROL ORDINANCE REQUIREMENTS The Coachella Valley dust control ordinances require: ü at least one of the Coachella Valley Best Available Control Measures (CV BACM) is required to be implemented for each fugitive dust source category. ü CV BACM must be implemented such that the applicable performance standards (e.g., visible emissions not to exceed 100 feet or 20 percent opacity, or cross any property line, etc.) are met. A description of the performance standards and applicable test methods is included in Chapter 8 of the Coachella Valle y Fugitive Dust Control Handbook. I hereby certify that I have read and understand the foregoing requirements. Signature ____________________________________________ Date ___________________________ Print Name ____________________________________________ Dust Certificate # ________________ PM10 PLAN (FORM BOND) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 PAGE #1 PM10 (FORM BOND) PAGE 1 OF 1 Surety Bond or Certificate of Deposit (Form BOND) The City Council of the City of Palm Desert shall require a bond, a cash Certificate of Deposit, or an equivalent form approved by the City, in an amount equal to at least two thousand dollars ($2,000.00) per acre or portion thereof. Such funds shall be in an amount sufficient to completely stabilize all disturbed areas in the event that the Operator fails to adequately control dust, or abandons the site in lieu of mitigating fugitive dust problems; and shall be easily accessible to the City in order to initiate stabilization measures without a significant delay. FORM OF PAYMENT PARCEL SIZE IN ACRES $2,000.00/ACRE AMOUNT OF BOND Cash Deposit $2,000.00 Certificate of Deposit $2,000.00 Letter of Credit $2,000.00 Other (specify) $2,000.00 Parcel Size x $2,000.00 Per Acre = Amount of Bond PM10 PLAN DAILY LOG CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 DATE: ______________ PM10 DAILY LOG AM HOURS Daily Self-Inspection Recordkeeping Form – AM HOURS Elements Monitored 12am 1am 2am 3am 4am 5am 6am 7am 8am 9am 10am 11am Comments Forecasted high winds Wind speed Wind direction # Water trucks operating # Water trucks available Roads moist/watered Unstabilized areas moist/watered Dry areas observed Irrigation working Water tanks filled Water pumps working Chemical stabilization used Track-out observed Blow sand observed on-site Blowing dust observed on-site Blowing dust observed off -site Wind/snow fencing maintained # Complaints received Corrective action taken N= No or none Y = Yes N/A = Not applicable Name: ___________________ Date: ______________________ Additional Comments: PM10 PLAN DAILY LOG CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 DATE: ______________ PM10 DAILY LOG PM HOURS Daily Self-Inspection Recordkeeping Form – PM HOURS Elements Monitored 12pm 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm 10pm 11pm Comments Forecasted high winds Wind speed Wind direction # Water trucks operating # Water trucks available Roads moist/watered Unstabilized areas moist/watered Dry areas observed Irrigation working Water tanks filled Water pumps working Chemical stabilization used Track-out observed Blow sand observed on-site Blowing dust observed on-site Blowing dust observed off -site Wind/snow fencing maintained # Complaints received Corrective action taken N= No or none Y = Yes N/A = Not applicable Name: ___________________ Date: ______________________ Additional Comments: PM10 PLAN (FORM CDS) CITY OF PALM DESERT 73-510 FRED WARING DRIVE PALM DESERT, CALIFORNIA 92260-2578 TEL: (760) 776-6450 FAX: (760) 341-7098 DATE: ______________ PM10 CHEMICAL DUST SUPPRES SANT RECORD (FORM CDS) Chemical Dust Suppressant Recordkeeping Form (Form CDS) The dust control ordinance requires activities that utilize chemical dust suppressants must retain records indicating the type of product applied, vendor name, and the method, frequency, concentratio n, quantity and date of application. A copy of invoices for chemical dust suppressant products or application services is also required. These records must be retained for at least three years after project completion. PROJECT INFORMATION PLEASE ENTER INFORMATION BELOW PLAN /PERMIT NUMBER (IF APPLICABLE) PROPERTY OWNER N AME/PHONE CONSTRUCTION PROJECT NAME PROJECT ADDRESS/L OCATION DUST SUPPRESSANT PRODUCT INFORMATION PLEASE ENTER INFORMATION PLEASE ENTER INFORMAT ION BELOW DATE/T IME OF APPLICATION NAME OF PRODUCT DILUTION RATE APPLICATION RATE ACREAGE/SQUARE FOOTAGE T REATED TRAFFIC OR NON-TRAFFIC AREA DUST SUPPRESSANT APPLICATOR INFORMATION APPLICATOR N AME CONTACT PHONE WARRANTEE T ERMS (IF APPLICABLE) Signature of Form Preparer: ____________________________________________ Date: ____________________ J' (IVIN.) 0 GRADING PERMIT XX=XXX SITE ADDRESS OR PRJ. NM & CASE # 01F YOU SEE DUST COMING FROM THIS PROJECT CALL CONTRACTOR 0 ### m ### m #### IF YOU DO NOT GET A RESPONSE WITHIN ONE HOUR, �5 PLEASE CALL PUBLIC WORKS AT 760-776-6450 (DAY) OR CALL A.Q.M.D. AT 1-800-CUT-SMOG 5000 SF TO 1 ACRE PM 10 SIGN 4' (MIN.) 10GRADING PERMIT (GR. PMT. #) ADDRESS OR PRJ. NM & CASE # CIF YOU SEE DUST COMING oFROM THIS PROJECT CALL eCONTRACTOR e###m###m#### <, IF YOU DO NOT GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL PUBLIC WORKS AT 760-776-6450 (DAY) OR OR CALL A.Q.M.D. AT 1-800-CUT-SMOG 9 ACRE TO 10 ACRE PM 10 SIGN 8' (MIN.) g I ADDRESSGRADING OR PROJ. NAME &CASP# • IF YOU SEE DUST COMING • FROM THIS PROJECT CALL sCONTRACTOR ###M###M#### IF YOU DO NOT GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL PUBLIC WORKS AT 760-776-6450 (DAY) OR OR CALL A.Q.M.D. AT 1-800-CUT-SMOG 10+ ACRE PM 10 SIGN