HomeMy WebLinkAboutEXPLORE COMMUNITY ENGAGMENT 20250204r04Del Webb Explore
Palm Desert
Project Details:
•332 SFU over 93 acres
•Homes will range from 1,900 to 3,100
square feet.
•Architectural Styles: Spanish Progressive,
Mid-Century, and Desert Contemporary
•6,000 to 7,000 sf Clubhouse with Fitness
Room, Meeting Rooms, Lounge and Event
Room
•Pool, Spa, Pickleball, Bocce, Event Lawn,
Walking Trails and Open Space (over 13
acres)
Project Status:
•Site Fully Graded
•Phase 1 Sewer, Water and Storm Drain installed
•Phase 1 Paving scheduled for 2/7/25 thru 3/7/25
•Models starting 2/17/25 -Opening Summer 2025
•Phase 1 Landscaping Summer 2025
•First Move-ins 3rd Quarter 2025
•Phase 2 Paving 3rd Quarter 2025
•Phase 2 Landscaping 4th Quarter 2025
Communication:
•For Non-Emergency Concerns:
DWEXPLORELAND@pultegroup.com
•For Urgent Matters: 1-877-724-6593 (24 Hour Call Center)
•The call center will accept calls 24 hours a day allowing resident
to share their concern as well as establish record of an issue or
incident. The call center will make immediate contact with Pulte
personnel who will then respond to each call as quickly as
possible. Emergency calls will be prioritized and addressed
immediately. Non-Emergency calls should expect a return call by
next business day depending on urgency of concern.
Request: Maintain the height of neighbor’s
wall from buffer.
•Response: The existing Kaufman/Broad walls will remain as is. The
ultimate wall height on Pulte side of property will be determined
by the required soil coverage needed for the foundation per
structural requirements.
•Additional: Pulte will be installing plant material that will deter
people from approaching the existing Kaufman/Broad
development walls. Examples: Bougainvillea and Agave.
•Additional: Pulte will work with the City to provide restricted
access to the open space buffer. Example: provide signage or
fencing and/or gates requiring fob key access.
Proposed lots rear property line (abutting east
and south open space) wall condition?
•Request: Residents requested that view fence be replaced with
block wall for privacy.
•Response: Pulte replaced view fence with 6ft high block wall.
Proposed Wall Plan:
East and South Open Space -Landscape &
Slope Conditions:
•Request: Residents expressed landscaping to be inline with Del
Webb Rancho Mirage.
•Response: Pulte will be installing landscape inline with Del Webb
Rancho Mirage.
•Additional: Pulte will be adding jute mesh and landscape material
to add extra erosion control based on resident and Council
comments.
•Additional: Pulte will be working with Civil Engineer, Landscape
Architect and City on open space slope softening and trail buffer
as we move into our precise grading plans.
Phase 2: Overall Conceptual Landscaping Plan –
Subject Areas “A” & “B”
A
B
SLOPE PLANTING
SYM
BOTANICALICOMMON NAME
SIZEISPACING WUCOL OR
TREESIPALMS
PARKINSONIA'DESERT MUSEUM'
24'BOX
L
DESERT MUSEUM PALO VERDE MULTI TRUNK, SYMM.
O
WASHINGTONIA RILFERA BTH
SIZE NOTED ON PLAN
M
CALIFORNIA PALM
DEEP ROOTED SHRUBS
ACACIA REDOLENS
IGAL
L
O
DESERT CARPET
4'O.C.
O
EDUGAINVILLEA-BARBARAKARST
5GAL
M
BOUGAINVILLEA
4'0.0
GAESALPINIAPULCHERRIMA
15GAL
L
e
RED BIRD OF PARADISE
i60C.
HESPERALOE PARVIFOLIA
1GAL
L
®
REDYUCCA
8'OC.
LANTANA'NEWGOLD
iGAL
M
M
NEW GOLD LANTANA
8'O.C.
®
TECOMASTANS'ORANGEJU&LEE'
SGAi
M
ORANGE TRUMPET BUSH
SOC.
DEFENSWE BARRIER PLANTS ALONG PROPERTY
WALL
AGAVE DESMETTMNA
15GAL
L
L�
WEBERS AGAVE
6D.C.
DASYLIRNTN WHEELERI
5GAL
L
SPOON YUCCA
ECHINOCACTUSGRUSONII
15GAL
L
GOLDENBARRELCACTUS
4O.C,
®
YUCCAFILAMENTOSA
15GAL
L
ADAM'S NEEDLE
6OC.
VINES ALONG PROPERTY WALL
BOUGAINWLLEA'BARBARA MR87
15GAL
M
BOUGAINVILLEA
XI'O.C.
VINE
/
D �
5023 5(2 <
-------------� L------------- i L--
3 A
�LL " v L ®®�
M3�Mv�x+3�x.9�xra�xA�M'a�:u3�xn. xs�.vr3�w3�m��me�m9� �ru3�xx3�rv3�mq�w3�
FUTURE 6' BLOCK WALL
MEGIUM CRUSHED ROCK
ME UM RUSH DROCKDROCK PL
LARGE CRUSHED ROCK AT ENTRY AREAS I
AGGREGATE '2'-0' CRUSHED ROCK OR ROUNDED PEBBLE
L -L'L L L L L L JUTE MESH EROSION CONTROL BASE
PROPOSED LCTS
SECTIONA =IiI r
SCALE: 3/16"=1'-0"
AGGREGATE ROCK BASE
W/ DEEP ROOTING PLANTS ON SLOPE
1" CRUSHED ROCK
GROUND COVER
GROUND COVER V V
6' WIDE PEDESTRIAN WALK —
DEFENSIVE BARRIER PLANTS & VINE
ALONG EXISTING 6' PROPERTY WALL
AREA OF EROSION CONTROL &
SLOPE ENHANCEMENT
JUTE MESH EROSION CONTROL SYSTEM W/
LARGE AGGREGATE ROCK GROUND COVER — d
EXPLORE IN PALM DESERT Slope Erosion Control - Jute Mesh + Large Rock Ground Cover + Deep Rooting Plants
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
j,')avUe4W I Palm Desert, CA I Feb. 04, 2025
SCALE: 1" = 10' - 0"
JUTE MESH BASE THROUGHOUT
u�
EXISTING RESIDENTIAL
KEYMAP
SM+
D �
5023 5(2 <
-------------� L------------- i L--
3 A
�LL " v L ®®�
M3�Mv�x+3�x.9�xra�xA�M'a�:u3�xn. xs�.vr3�w3�m��me�m9� �ru3�xx3�rv3�mq�w3�
FUTURE 6' BLOCK WALL
MEGIUM CRUSHED ROCK
ME UM RUSH DROCKDROCK PL
LARGE CRUSHED ROCK AT ENTRY AREAS I
AGGREGATE '2'-0' CRUSHED ROCK OR ROUNDED PEBBLE
L -L'L L L L L L JUTE MESH EROSION CONTROL BASE
PROPOSED LCTS
SECTIONA =IiI r
SCALE: 3/16"=1'-0"
AGGREGATE ROCK BASE
W/ DEEP ROOTING PLANTS ON SLOPE
1" CRUSHED ROCK
GROUND COVER
GROUND COVER V V
6' WIDE PEDESTRIAN WALK —
DEFENSIVE BARRIER PLANTS & VINE
ALONG EXISTING 6' PROPERTY WALL
AREA OF EROSION CONTROL &
SLOPE ENHANCEMENT
JUTE MESH EROSION CONTROL SYSTEM W/
LARGE AGGREGATE ROCK GROUND COVER — d
EXPLORE IN PALM DESERT Slope Erosion Control - Jute Mesh + Large Rock Ground Cover + Deep Rooting Plants
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
j,')avUe4W I Palm Desert, CA I Feb. 04, 2025
SCALE: 1" = 10' - 0"
JUTE MESH BASE THROUGHOUT
u�
EXISTING RESIDENTIAL
KEYMAP
SM+
BOUGAINVILLEA'BARBARA KARS7 - VINE
VINES ALONG PROPERTY WALL
WASHINGTONIA FILIFERA-
CALIFORNIA FAN PALM
PARKINSONIA'DESERT MUSEUM'-
PALO VERDE
TREES/PALMS
YUCCA FILAMENTOSA AGAVE DESMETTIANA ECHINOCACTUS GRUSONII
ADAMS NEEDLE INEBER'S AGAVE GOLDEN BARREL CACTUS
DEFENSIVE BARRIER PLANTS ALONG PROPERTY WALL
TECOMA STANS'ORANGE JUBILEE' ACACIA REDOLENS
ORANGE TRUMPET JUBILEE DESERT CARPET
CAESALPINIA PULCHERRIMA HESPERALOE PARVIFLORA
RED BIRD OF PARADISE RED YUCCA
DEEP ROOTED SHRUBS ON 2:1 SLOPE
EXPLORE IN PALM DESERTS Slope Erosion Control - Plant Palette
� Wes, I Palm Desert, CA I Feb. 04, 2025
BOUGAINVILLEA'BARBARA KARST'
LANTANA NEW GOLD
DASYLIRION WHEELERI
SPOON YUCCA
1'M P
Questions
Site Drainage:
•Concern: Site Drainage entering east and south open space buffer
from proposed streets and residential lots.
•Response: Site Drainage is staying within streets and storm drain
infrastructure and will not be entering the east and south open
space lots.
•The east and south open space lots will only retain what rain falls
on that area.
Previous Existing Drainage Condition
Current Drainage Condition