CITY OF PALM DESERT
Building and Safety Division
73510 Fred Waring Dr, Palm Desert, CA 92260
Phone (760)776-6435 ▪ Email permitcenter@palmdesert.gov
Website: https://www.palmdesert.gov
SOLAR REVISION NOTICE
The “Solar Revision Notice” form (provided on page 2) must be completed and uploaded to the permit
in eTRAKiT prior to scheduling your Final Inspection.
If the revisions include:
EQUIPMENT AND/OR LAYOUT CHANGES (NOT AFFECTING THE KW):
1.Fill out the form indicating the equipment and/or layout change.
2. Upload the completed form to the permit in your eTRAKiT account.
3.When scheduling your final inspection, add a note to the final inspection indicating
that there are equipment and/or layout changes. There will NOT be a revised set of
plans provided.
4.At your final inspection, you must provide the inspector with the original approved plan set
and the completed “Solar Revision Notice” form prior to the inspection.
If the revisions include:
NUMBER OF KILOWATT CHANGES (UNDER 30 KW) AND/OR A PANEL UPGRADE, BATTERY
BACKUP, OR EV CHARGER:
1.Fill out the form indicating the number of kilowatt change, and/or panel upgrade, battery
backup, or EV charger changes.
2. Upload the completed form to the permit in your eTRAKiT account.
o The revisions will be reviewed within 1-3 business days. You must log into your
eTRAKiT account on the 3rd business day to retrieve the updated job card. The job
card will be updated with the number of kilowatts, panel upgrade, battery backup, or
EV charger changes.
3.When scheduling your final inspection, add a note to the final inspection indicating
that there are changes in the number of kilowatts, panel upgrade, battery backup,
or EV charger. There will ONLY be an update to the description on your job card. There
will NOT be a revised set of plans provided.
4.At your final inspection, you must provide the inspector with the original approved plan set
and the completed “Solar Revision Notice” form prior to the inspection.
NOTE: Changes from the “Streamlined 30kW Under” subtype to any other subtype that includes
Ground Mount, Commercial, Ballast, or Solar system over 30 kW, will be subject to a new PV
submittal application. THIS IS NO LONGER CONSIDERED A “STREAMLINED” SOLAR PERMIT.
2
SOLAR REVISION NOTICE FORM
Contractor Name: _____________________________________ State License: ____________________
Permit Number: _______________________________ Contact Number: _________________________
STEP 1: Log into eTRAKiT and upload this completed form.
STEP 2: If the revisions include kilowatt changes and/or equipment add-ons, log into your eTRAKiT account
after the 3rd business day to retrieve your updated job card. If not, proceed to step 3.
STEP 3: Print out this form and provide it to the inspector prior to your inspection.
PLAN REVISIONS:
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
Signature: ______________________________________________ Date: ___________________________