Loading...
HomeMy WebLinkAboutSOLAR REVISION FORM NOTICE 11220231 CITY OF PALM DESERT Building and Safety Division 73510 Fred Waring Dr, Palm Desert, CA 92260 Phone (760)776-6435 ▪ Email permitcenter@palmdesert.gov Website: https://www.palmdesert.gov SOLAR REVISION NOTICE The “Solar Revision Notice” form (provided on page 2) must be completed and uploaded to the permit in eTRAKiT prior to scheduling your Final Inspection. If the revisions include: EQUIPMENT AND/OR LAYOUT CHANGES (NOT AFFECTING THE KW): 1.Fill out the form indicating the equipment and/or layout change. 2. Upload the completed form to the permit in your eTRAKiT account. 3.When scheduling your final inspection, add a note to the final inspection indicating that there are equipment and/or layout changes. There will NOT be a revised set of plans provided. 4.At your final inspection, you must provide the inspector with the original approved plan set and the completed “Solar Revision Notice” form prior to the inspection. If the revisions include: NUMBER OF KILOWATT CHANGES (UNDER 30 KW) AND/OR A PANEL UPGRADE, BATTERY BACKUP, OR EV CHARGER: 1.Fill out the form indicating the number of kilowatt change, and/or panel upgrade, battery backup, or EV charger changes. 2. Upload the completed form to the permit in your eTRAKiT account. o The revisions will be reviewed within 1-3 business days. You must log into your eTRAKiT account on the 3rd business day to retrieve the updated job card. The job card will be updated with the number of kilowatts, panel upgrade, battery backup, or EV charger changes. 3.When scheduling your final inspection, add a note to the final inspection indicating that there are changes in the number of kilowatts, panel upgrade, battery backup, or EV charger. There will ONLY be an update to the description on your job card. There will NOT be a revised set of plans provided. 4.At your final inspection, you must provide the inspector with the original approved plan set and the completed “Solar Revision Notice” form prior to the inspection. NOTE: Changes from the “Streamlined 30kW Under” subtype to any other subtype that includes Ground Mount, Commercial, Ballast, or Solar system over 30 kW, will be subject to a new PV submittal application. THIS IS NO LONGER CONSIDERED A “STREAMLINED” SOLAR PERMIT. 2 SOLAR REVISION NOTICE FORM Contractor Name: _____________________________________ State License: ____________________ Permit Number: _______________________________ Contact Number: _________________________ STEP 1: Log into eTRAKiT and upload this completed form. STEP 2: If the revisions include kilowatt changes and/or equipment add-ons, log into your eTRAKiT account after the 3rd business day to retrieve your updated job card. If not, proceed to step 3. STEP 3: Print out this form and provide it to the inspector prior to your inspection. PLAN REVISIONS: _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ Signature: ______________________________________________ Date: ___________________________